ROADWORKS SUMMARY
Campbell Road, MARLOW, SL7 3GZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Campbell Road, SL7 3GZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Campbell Road, MARLOW, SL7 3GZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Campbell Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Buckinghamshire Council logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Bourne End Road

Buckinghamshire Council are carrying out roadworks on Bourne End Road, Hedsor.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 7 July 2024 at 09:00 and could run through until 7 July 2025. The works will impact the verge only.

This roadwork event was last updated by Buckinghamshire Council on 18 Jul 2024 at 08:52.

Buckinghamshire Council logo
LONG TERM
Between
29 Jul and 4 Dec 2024
Details
View Map
Share
Follow
Rutland Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Rutland Avenue, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 24 Jul 2024 at 13:36.

Buckinghamshire Council logo
LONG TERM
Between
29 Jul and 6 Dec 2024
Details
View Map
Share
Follow
Spearing Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Spearing Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 24 Jul 2024 at 13:37.

Buckinghamshire Council logo
LONG TERM
Between
29 Jul and 2 Dec 2024
Details
View Map
Share
Follow
Booker Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Booker Lane, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 24 Jul 2024 at 13:33.

Buckinghamshire Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Middle Way

Buckinghamshire Council are proposing to carry out Highway improvement works on Middle Way, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 3 Jul 2024 at 14:01.

Buckinghamshire Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Cross Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Cross Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 24 Jul 2024 at 13:32.

Buckinghamshire Council logo
LONG TERM
Between
19 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
White Hart Street

Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 23 May 2024 at 10:18.

Buckinghamshire Council logo
LONG TERM
Between
19 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Whitelands Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Whitelands Road, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 24 Jul 2024 at 13:34.

Eunetworks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Heath End Road

Eunetworks are proposing to carry out Utility asset works on Heath End Road, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Eunetworks on 10 Jul 2024 at 13:37.

Eunetworks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Heath End Road

Eunetworks are proposing to carry out Utility asset works on Heath End Road, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Eunetworks on 7 Aug 2024 at 14:43.

Eunetworks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Heath End Road

Eunetworks are carrying out Utility asset works on Heath End Road, Flackwell Heath.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 October 2024 at 08:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 09:39.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hill Farm Road

Cadent Gas are carrying out Utility asset works on Hill Farm Road, Taplow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:39 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:08.

Cadent Gas logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Boundary Road

Cadent Gas are proposing to carry out Utility asset works on Boundary Road, Taplow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2024 at 14:11.

Buckinghamshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dedmere Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Dedmere Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Oct 2024 at 14:10.

Buckinghamshire Council logo
LONG TERM
Between
28 Oct 2024 and 31 May 2025
Details
View Map
Share
Follow
White Hart Street

Buckinghamshire Council are proposing to carry out Highway improvement works on White Hart Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 11 Oct 2024 at 11:13.

Buckinghamshire Council logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Bourne End Road

Buckinghamshire Council are proposing to carry out roadworks on Bourne End Road, Hedsor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 26 Sep 2024 at 12:09.

Thames Water logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Booker Place

Thames Water are carrying out Utility repair and maintenance works on Booker Place, High Wycombe.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 18:30 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:48.

Cadent Gas logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
St Johns Road

Cadent Gas are proposing to carry out Utility asset works on St Johns Road, Tylers Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 09:36.

Cadent Gas logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
St Johns Road

Cadent Gas were proposing to carry out Utility asset works on St Johns Road, Tylers Green.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 14:37.

Eunetworks logo
LONG TERM
Between
12 Nov and 29 Dec 2024
Details
View Map
Share
Desborough Road

Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 29 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Aug 2024 at 12:40.

Eunetworks logo
Finishing
Friday
Details
View Map
Share
Follow
Desborough Road

Eunetworks are proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Aug 2024 at 11:34.

Finishing
Friday
Details
View Map
Share
St Cloud Way

Royal Borough Of Windsor And Maidenhead were proposing to carry out Highway improvement works on St Cloud Way, Maidenhead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 11 Nov 2024 at 14:21.

Finishing
Friday
Details
View Map
Share
Forlease Road

Royal Borough Of Windsor And Maidenhead were proposing to carry out Highway improvement works on Forlease Road, Maidenhead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 11 Nov 2024 at 14:21.

Finishing
Friday
Details
View Map
Share
Follow
St Lukes Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on St Lukes Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 30 Jul 2024 at 12:44.

Finishing
Friday
Details
View Map
Share
Follow
St Lukes Road

Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on St Lukes Road, Maidenhead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 14:34 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 15 Nov 2024 at 14:43.

Finishing
Friday
Details
View Map
Share
Follow
St Lukes Road

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on St Lukes Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 19 Jul 2024 at 11:34.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Bovingdon Green

Cadent Gas are proposing to carry out Utility asset works on Bovingdon Green, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Jul 2024 at 14:09.

Cityfibre Metro Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Coronation Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 24 Sep 2024 at 16:38.

Cityfibre Metro Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Oct 2024 at 14:17.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
19 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:49.

Eunetworks logo
LONG TERM
Between
20 Nov 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 7 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 9 Aug 2024 at 12:08.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Ray Mill Road East

Cadent Gas are carrying out Utility repair and maintenance works on Ray Mill Road East, Maidenhead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 11:57 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 08:03.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Lisle Road

Cadent Gas are carrying out Utility repair and maintenance works on Lisle Road, High Wycombe.

The works started on 21 November 2024 at 13:02 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:36.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Lisle Road

Cadent Gas were proposing to carry out Utility repair and maintenance works on Lisle Road, High Wycombe.

The works were originally planned to start 21 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:00.

Buckinghamshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Spinfield Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on Spinfield Lane, Marlow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 09:30 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Nov 2024 at 10:12.

Buckinghamshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Winchbottom Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on Winchbottom Lane, Little Marlow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 09:30 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Nov 2024 at 10:16.

Eunetworks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are carrying out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 07:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 23 Nov 2024 at 08:44.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sheephouse Road

Cadent Gas are proposing to carry out Utility asset works on Sheephouse Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 09:57.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sheephouse Road

Cadent Gas are proposing to carry out Utility asset works on Sheephouse Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:26.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Long Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Long Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Oct 2024 at 09:27.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Long Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Long Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Nov 2024 at 12:13.

Buckinghamshire Council logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Bourne End Road

Buckinghamshire Council are proposing to carry out roadworks on Bourne End Road, Hedsor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Buckinghamshire Council on 26 Sep 2024 at 14:22.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Desborough Avenue

Buckinghamshire Council are proposing to carry out Highway improvement works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 2 Oct 2024 at 15:04.

Eunetworks logo
Between
26 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Straight Bit

Eunetworks are proposing to carry out Utility asset works on Straight Bit, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 8 Aug 2024 at 10:58.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Henley Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Henley Road, Medmenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Oct 2024 at 14:25.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Marlow Common Road

Buckinghamshire Council are proposing to carry out Core Sampling on Marlow Common Road, Marlow Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 12:01.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Widmoor

Buckinghamshire Council are proposing to carry out Core Sampling on Widmoor, Wooburn Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 11:43.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Kiln Lane

Buckinghamshire Council are proposing to carry out Core Sampling on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 11:41.

Buckinghamshire Council logo
Between
27 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Ferry Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Ferry Lane, Bourne End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 5 Aug 2024 at 16:46.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:42.

Between
2 and 12 Dec 2024
Details
View Map
Share
Follow
Australia Avenue

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Australia Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 23 Jul 2024 at 13:21.

Between
2 and 12 Dec 2024
Details
View Map
Share
Follow
Australia Avenue

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Australia Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 3 Oct 2024 at 12:58.

Thames Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Lock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lock Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:44.

Thames Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Main Road

Thames Water are proposing to carry out Utility repair and maintenance works on Main Road, Rotten Row, Hambleden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 13:20.

Buckinghamshire Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Chapman Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Chapman Lane, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 10 Oct 2024 at 14:29.

Cadent Gas logo
Between
2 and 6 Dec 2024
Details
View Map
Share
West End Road

Cadent Gas were proposing to carry out Disconnection or alteration of supply on West End Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:06.

Scottish Hydro Electric Power Dis logo
Between
3 and 9 Dec 2024
Details
View Map
Share
Follow
Providence Place

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Providence Place, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Aug 2024 at 16:50.

Scottish Hydro Electric Power Dis logo
Between
3 and 9 Dec 2024
Details
View Map
Share
Follow
Providence Place

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Providence Place, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Aug 2024 at 13:49.

Eunetworks logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 13 Nov 2024 at 09:51.

Thames Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Whitehouse Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Whitehouse Lane, Wooburn Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 15:44.

Thames Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Booker Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Booker Lane, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 12:22.

Thames Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Booker Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Booker Lane, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:22.

Scottish Hydro Electric Power Dis logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Frieth Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Frieth Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Sep 2024 at 10:38.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Whitehouse Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Whitehouse Lane, Wooburn Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 10:38.

Eunetworks logo
LONG TERM
Between
19 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 27 Aug 2024 at 15:35.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 11:01.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Lancaster Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lancaster Road, Cressex, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 07:22.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Wellington Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 12:49.

Scottish Hydro Electric Power Dis logo
Between
19 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Wellington Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wellington Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 08:50.

Buckinghamshire Council logo
Between
23 and 26 Dec 2024
Details
View Map
Share
Follow
Hughenden Boulevard

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hughenden Boulevard, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 3 Oct 2024 at 14:35.

Eunetworks logo
Between
26 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
White Hill

Eunetworks are proposing to carry out Utility asset works on White Hill, Beaconsfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Oct 2024 at 14:13.

Eunetworks logo
Between
26 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
White Hill

Eunetworks are proposing to carry out Utility asset works on White Hill, Wooburn Moor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Oct 2024 at 11:24.

Buckinghamshire Council logo
Between
1 and 6 Jan 2025
Details
View Map
Share
Follow
Wymers Wood Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Wymers Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 30 Sep 2024 at 11:03.

Eunetworks logo
Between
1 and 29 Jan 2025
Details
View Map
Share
Follow
Taplow Common Road

Eunetworks are proposing to carry out Utility asset works on Taplow Common Road, Burnham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:05.

Eunetworks logo
LONG TERM
Between
4 Jan and 11 Feb 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, Loudwater.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 10:06.

Eunetworks logo
LONG TERM
Between
4 Jan and 11 Feb 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, Loudwater.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 14:48.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 14:26.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Ray Park Avenue

Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 10:15.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:04.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Ray Park Avenue

Cadent Gas were proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:01.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:31.

Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
North Dean

Royal Borough Of Windsor And Maidenhead are proposing to carry out Works for road purposes on North Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 4 Oct 2024 at 11:12.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 11:33.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 11:31.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 12:12.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sutton Road

Cadent Gas are proposing to carry out Utility asset works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:02.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Mundaydean Lane

Cadent Gas are proposing to carry out Utility asset works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:18.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Mundaydean Lane

Cadent Gas are proposing to carry out Utility asset works on Mundaydean Lane, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:32.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Marlow Road

Cadent Gas are proposing to carry out Utility asset works on Marlow Road, Little Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 12:03.

Eunetworks logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Broad Lane

Eunetworks are proposing to carry out roadworks on Broad Lane, Beaconsfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Oct 2024 at 11:45.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Loudwater.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:26.

Eunetworks logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:40.

Eunetworks logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 27 Sep 2024 at 09:49.

Network Rail logo
Between
7 and 11 Jan 2025
Details
View Map
Share
Maidenhead Road

Network Rail were proposing to carry out Works for Rail Purposes on Maidenhead Road, Cookham, Maidenhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 11 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 16:01.

Eunetworks logo
LONG TERM
Between
7 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wooburn Common Road

Eunetworks are proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:07.

Eunetworks logo
Between
7 and 27 Jan 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Oct 2024 at 11:46.

Eunetworks logo
Between
7 and 22 Jan 2025
Details
View Map
Share
Follow
Dashwood Avenue

Eunetworks are proposing to carry out Utility asset works on Dashwood Avenue, Sands, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:51.

Thames Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Hedsor Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Hedsor Hill, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 10:18.

Scottish Hydro Electric Power Dis logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Frieth Road

Scottish Hydro Electric Power Dis are proposing to carry out Permanent reinstatement on Frieth Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Nov 2024 at 12:13.

Buckinghamshire Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Marlow Common Road

Buckinghamshire Council are proposing to carry out Core Sampling on Marlow Common Road, Marlow Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:11.

Buckinghamshire Council logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Marlow Hill

Buckinghamshire Council are proposing to carry out Highway improvement works on Marlow Hill, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Nov 2024 at 08:51.

Cityfibre Metro Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Coronation Road

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 10:40.

Cityfibre Metro Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Coronation Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coronation Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Nov 2024 at 11:20.

Eunetworks logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:36.

Eunetworks logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:26.

Eunetworks logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 13:01.

Thames Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Bellfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bellfield Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:55.

T-Mobile (UK) logo
Between
16 and 24 Jan 2025
Details
View Map
Share
Follow
Daws Hill Lane

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 24 Oct 2024 at 14:02.

T-Mobile (UK) logo
Between
16 and 24 Jan 2025
Details
View Map
Share
Daws Hill Lane

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Daws Hill Lane, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 31 Oct 2024 at 14:50.

Cadent Gas logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Berry Hill

Cadent Gas are proposing to carry out Utility asset works on Berry Hill, Taplow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 16:02.

Nexfibre Networks Limited logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Victoria Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Victoria Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 17 Oct 2024 at 14:27.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:34.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Oak Tree Road

Cadent Gas are proposing to carry out Utility asset works on Oak Tree Road, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:17.

Cadent Gas logo
LONG TERM
Between
20 Jan and 21 Jul 2025
Details
View Map
Share
Follow
Marlow Bottom

Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:44.

Nexfibre Networks Limited logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Totteridge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 3 Oct 2024 at 11:28.

Eunetworks logo
Between
21 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Aug 2024 at 11:36.

Eunetworks logo
Between
21 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:37.

Eunetworks logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Bradenham Road

Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:24.

Eunetworks logo
Between
21 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Bradenham Road

Eunetworks are proposing to carry out Utility asset works on Bradenham Road, West Wycombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Eunetworks on 1 Nov 2024 at 11:30.

Eunetworks logo
Between
23 and 28 Jan 2025
Details
View Map
Share
Follow
Copyground Lane

Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Oct 2024 at 12:00.

Eunetworks logo
Between
23 and 28 Jan 2025
Details
View Map
Share
Follow
Copyground Lane

Eunetworks are proposing to carry out Utility asset works on Copyground Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Oct 2024 at 14:39.

Eunetworks logo
Between
25 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Straight Bit

Eunetworks are proposing to carry out Utility asset works on Straight Bit, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 11:28.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Cliveden Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cliveden Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:11.

South East Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Startins Lane

South East Water are proposing to carry out Utility repair and maintenance works on Startins Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 23 Oct 2024 at 14:54.

South East Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Startins Lane

South East Water are proposing to carry out Utility repair and maintenance works on Startins Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 19 Nov 2024 at 10:31.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Glade Road

Thames Water are proposing to carry out New service connection on Glade Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:05.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Glade Road

Thames Water are proposing to carry out New service connection on Glade Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:06.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Desborough Road

Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:51.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Desborough Road

Cadent Gas are proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 16:15.

Buckinghamshire Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Widmoor

Buckinghamshire Council are proposing to carry out Core Sampling on Widmoor, Wooburn Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:11.

Buckinghamshire Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Kiln Lane

Buckinghamshire Council are proposing to carry out Core Sampling on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 14:09.

Eunetworks logo
Between
28 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Straight Bit

Eunetworks are proposing to carry out Utility asset works on Straight Bit, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 12:17.

Eunetworks logo
Between
28 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Frances Dove Way

Eunetworks are proposing to carry out Utility asset works on Frances Dove Way, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 17 Oct 2024 at 11:17.

Eunetworks logo
Between
28 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Frances Dove Way

Eunetworks are proposing to carry out Utility asset works on Frances Dove Way, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 14:21.

Eunetworks logo
Between
29 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Wooburn Town

Eunetworks are proposing to carry out Utility asset works on Wooburn Town, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Sep 2024 at 14:57.

Eunetworks logo
Between
29 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Plumer Road

Eunetworks are proposing to carry out Utility asset works on Plumer Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 21 Oct 2024 at 13:53.

BT logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Follow
Forty Green Road

BT are proposing to carry out Utility asset works on Forty Green Road, Forty Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Nov 2024 at 14:38.

Eunetworks logo
Between
1 and 16 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 7 Nov 2024 at 11:24.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ray Park Road

Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:52.

Cadent Gas logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ray Park Road

Cadent Gas are proposing to carry out Utility asset works on Ray Park Road, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 11:31.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hawks Hill

BT are proposing to carry out Utility asset works on Hawks Hill, Bourne End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 30 Oct 2024 at 15:01.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Kiln Lane

BT are proposing to carry out Utility asset works on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 30 Oct 2024 at 15:00.

Buckinghamshire Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Lane End Road

Buckinghamshire Council are proposing to carry out Core Sampling on Lane End Road, Sands, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 10:13.

Eunetworks logo
Between
3 and 9 Feb 2025
Details
View Map
Share
Follow
Suffield Hill

Eunetworks are proposing to carry out Utility asset works on Suffield Hill, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:45.

Eunetworks logo
LONG TERM
Between
3 Feb and 12 Mar 2025
Details
View Map
Share
Follow
West Wycombe Road

Eunetworks are proposing to carry out Utility asset works on West Wycombe Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:21.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 16 Aug 2024 at 09:08.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 2 Oct 2024 at 11:35.

Eunetworks logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Dorney Wood Road

Eunetworks are proposing to carry out Utility asset works on Dorney Wood Road, Burnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 18 Oct 2024 at 09:35.

Eunetworks logo
Between
4 and 28 Feb 2025
Details
View Map
Share
Follow
Wash Hill

Eunetworks are proposing to carry out Utility asset works on Wash Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Aug 2024 at 11:36.

Eunetworks logo
Between
4 and 28 Feb 2025
Details
View Map
Share
Follow
Wash Hill

Eunetworks are proposing to carry out Utility asset works on Wash Hill, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 09:00.

Eunetworks logo
Between
8 and 23 Feb 2025
Details
View Map
Share
Follow
Suffield Road

Eunetworks are proposing to carry out Utility asset works on Suffield Road, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:48.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Hitcham Lane

Cadent Gas are proposing to carry out Utility asset works on Hitcham Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:09.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
West End Street

Thames Water are proposing to carry out Utility repair and maintenance works on West End Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 09:07.

Eunetworks logo
Between
10 and 23 Feb 2025
Details
View Map
Share
Follow
Abercromby Avenue

Eunetworks are proposing to carry out Utility asset works on Abercromby Avenue, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Nov 2024 at 15:16.

Cadent Gas logo
LONG TERM
Between
10 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Micklefield Road

Cadent Gas are proposing to carry out Utility asset works on Micklefield Road, Micklefield, High Wycombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:30.

Eunetworks logo
LONG TERM
Between
11 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road

Eunetworks are proposing to carry out Utility asset works on London Road, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 11:03.

Eunetworks logo
Between
12 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Heath End Road

Eunetworks are proposing to carry out Utility asset works on Heath End Road, Flackwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 14 Aug 2024 at 11:42.

Buckinghamshire Council logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Follow
Park Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Park Lane, Lane End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:48.

Buckinghamshire Council logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Follow
Lane End Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Lane End Road, Sands, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 14:10.

Buckinghamshire Council logo
Between
14 and 20 Feb 2025
Details
View Map
Share
Follow
Lane End Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Lane End Road, Lane End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 16 Oct 2024 at 11:47.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:17.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Town Lane

Eunetworks are proposing to carry out Utility asset works on Town Lane, Wooburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:09.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:04.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Sep 2024 at 15:36.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
The Green

Eunetworks are proposing to carry out Utility asset works on The Green, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:23.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
The Green

Eunetworks are proposing to carry out Utility asset works on The Green, Wooburn Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Sep 2024 at 13:09.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 29 Oct 2024 at 15:30.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 12 Nov 2024 at 13:06.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Daws Hill Lane

Eunetworks are proposing to carry out Utility asset works on Daws Hill Lane, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 18 Nov 2024 at 08:56.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Desborough Avenue

Eunetworks are proposing to carry out Utility asset works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 17 Sep 2024 at 14:49.

Eunetworks logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Gallows Lane

Eunetworks are proposing to carry out Utility asset works on Gallows Lane, Sands, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 11 Oct 2024 at 10:01.

Buckinghamshire Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Rectory Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 11 Nov 2024 at 16:16.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

South East Water are proposing to carry out Utility repair and maintenance works on Church Road, Cookham Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by South East Water on 25 Oct 2024 at 15:01.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

South East Water are proposing to carry out Utility repair and maintenance works on Church Road, Cookham Dean, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by South East Water on 19 Nov 2024 at 15:25.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Road

South East Water are proposing to carry out Utility repair and maintenance works on Lower Road, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 25 Oct 2024 at 15:01.

Eunetworks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Wooburn Common Road

Eunetworks were proposing to carry out Utility asset works on Wooburn Common Road, Taplow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 16 Oct 2024 at 09:03.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Oakridge Road

Thames Water were proposing to carry out Utility repair and maintenance works on Oakridge Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:41.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Rowan Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Rowan Avenue, Bowerdean, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Nov 2024 at 11:44.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Totteridge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Oct 2024 at 08:52.

Nexfibre Networks Limited logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Totteridge Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Totteridge Lane, Totteridge, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Oct 2024 at 11:08.

Eunetworks logo
Between
18 and 25 Feb 2025
Details
View Map
Share
Follow
Whitepit Lane

Eunetworks are proposing to carry out Utility asset works on Whitepit Lane, Flackwell Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Oct 2024 at 14:15.

Eunetworks logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Lilys Walk

Eunetworks are proposing to carry out Utility asset works on Lilys Walk, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 24 Oct 2024 at 13:47.

Eunetworks logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Desborough Road

Eunetworks were proposing to carry out Utility asset works on Desborough Road, High Wycombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 8 Nov 2024 at 09:03.

Eunetworks logo
Between
20 and 25 Feb 2025
Details
View Map
Share
Follow
Littleworth Road

Eunetworks are proposing to carry out Utility asset works on Littleworth Road, Burnham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 9 Oct 2024 at 15:25.


Roadworks Map near to Campbell Road, MARLOW, SL7 3GZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 16:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Campbell Road, MARLOW, SL7 3GZ (23 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
HILLSIDE ROAD 
(0.4 miles)
Cadent Gas
Utility asset works - Carriageway - Some carriageway incursion
In Progress
Since: 4 Nov 2024 14:41
(Scheduled: 4 Nov 2024 - 20 Dec 2024)
0.4
Details
Share
Follow
2
Buckinghamshire Council logo
MAJOR
  
MARLOW FOOTPATH 17 
(0.5 miles)
Buckinghamshire Council
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 28 Oct 2024 - 29 Nov 2024
0.5
Details
Share
Follow
3
Buckinghamshire Council logo
MAJOR
  
DEDMERE ROAD 
(0.6 miles)
Buckinghamshire Council
Highway repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 28 Oct 2024 - 29 Nov 2024
0.6
Details
Share
Follow
4
Nexfibre Networks Limited logo
SEYMOUR PARK ROAD 
(0.6 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 21 Nov 2024 - 28 Nov 2024)
0.6
Details
Share
5
Nexfibre Networks Limited logo
SANDYGATE CLOSE 
(0.7 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 28 Nov 2024
0.7
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
SANDYGATE CLOSE 
(0.7 miles)
Cadent Gas
Utility asset works - Carriageway - Some carriageway incursion
Planned
Scheduled: 30 Sep 2024 - 25 Nov 2024
0.7
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
DEANFIELD CLOSE 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 18 Nov 2024 - 20 Dec 2024)
0.7
Details
Share
8
Cadent Gas logo
MAJOR
  
PINECROFT 
(0.7 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - No carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 6 Dec 2024
0.7
Details
Share
Follow
9
Nexfibre Networks Limited logo
CHAPEL STREET 
(0.7 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Two-way signals
Planned
Scheduled: 23 Nov 2024 - 24 Nov 2024
0.7
Details
Share
Follow
10
Buckinghamshire Council logo
DEAN STREET 
(0.7 miles)
Buckinghamshire Council
Highway repair and maintenance works - Footway, Verge - Two-way signals
Planned
Scheduled: 21 Nov 2024 - 24 Nov 2024
0.7
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.