ROADWORKS SUMMARY
Town Green Road, ROYSTON, SG8 5QL
Introduction
View current and future planned roadworks and road closures for Town Green Road, SG8 5QL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Town Green Road, ROYSTON, SG8 5QL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Town Green Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
7 Oct 2024 and 16 Jan 2025
Cambridgeshire County Council were proposing to carry out Highway improvement works on Station Road, Foxton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 16 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridgeshire County Council on 11 Oct 2024 at 12:10.
7 Oct 2024 and 16 Jan 2025
Cambridgeshire County Council were proposing to carry out Highway improvement works on Shepreth Road, Foxton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 16 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridgeshire County Council on 11 Oct 2024 at 12:09.
7 Oct 2024 and 16 Jan 2025
Cambridgeshire County Council were proposing to carry out Highway improvement works on High Street, Foxton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 16 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridgeshire County Council on 11 Oct 2024 at 12:10.
17 and 20 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Fountain Lane, Haslingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 14:04.
17 and 20 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Fountain Lane, Haslingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 10:39.
24 Dec 2024 and 5 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Royston Road, Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 31 Oct 2024 at 12:29.
24 Dec 2024 and 1 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cambridge Road (A10), Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 30 Oct 2024 at 15:30.
24 Dec 2024 and 1 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cambridge Road (A10), Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Oct 2024 at 16:20.
24 Dec 2024 and 6 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Royston Road, Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Oct 2024 at 15:47.
25 Dec 2024 and 1 Jan 2025
Network Rail were proposing to carry out Works for Rail Purposes on Cambridge Road (A10), Foxton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 December 2024 and run through until 1 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Sep 2024 at 10:01.
2 and 5 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cambridge Road (A10), Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Oct 2024 at 10:55.
2 and 5 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cambridge Road (A10), Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Nov 2024 at 13:32.
2 and 5 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Cambridge Road (A10), Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Nov 2024 at 15:54.
6 and 30 Jan 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Caxton Road, Bourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 12:06.
6 Jan and 7 Jul 2025
UK Power Distribution are proposing to carry out Utility asset works on Melbourn Bypass, Melbourn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by UK Power Distribution on 11 Nov 2024 at 16:18.
6 Jan and 7 Jul 2025
UK Power Distribution are proposing to carry out Utility asset works on Melbourn Bypass, Melbourn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 July 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by UK Power Distribution on 18 Oct 2024 at 14:17.
6 and 30 Jan 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Alms Hill, Bourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 14:36.
6 and 30 Jan 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Caxton End, Bourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 12:16.
6 and 30 Jan 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Bourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 14:45.
6 and 10 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 1 Oct 2024 at 08:26.
13 Jan and 7 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Longstowe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 28 Nov 2024 at 14:44.
13 and 17 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Holben Close, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 21 Oct 2024 at 14:48.
13 and 17 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Holben Close, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 29 Oct 2024 at 15:21.
14 and 20 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Spring Lane, Bassingbourn Cum Kneesworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 08:16.
20 Jan and 6 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fowlmere Road, Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 6 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Oct 2024 at 16:01.
20 Jan and 6 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fowlmere Road, Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 6 February 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Sep 2024 at 11:09.
27 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Medcalfe Way, Melbourn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 09:52.
27 and 29 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 09:30.
27 and 29 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 11:57.
29 Jan and 11 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Swaynes Lane, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 11:56.
3 and 9 Feb 2025
Cambridge Water Company are proposing to carry out Utility asset works on Church Street, Harston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 22 Nov 2024 at 09:22.
3 and 6 Feb 2025
Cambridge Water Company are proposing to carry out New service connection on Harlton Road, Little Eversden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 20 Nov 2024 at 11:43.
3 and 6 Feb 2025
Cambridge Water Company are proposing to carry out New service connection on Harlton Road, Little Eversden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 22 Nov 2024 at 10:20.
10 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Spring Lane, Bassingbourn Cum Kneesworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 08:21.
10 and 14 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Barton Road, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 11:56.
13 and 19 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Hines Lane, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 11:20.
13 and 19 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Hines Lane, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway, verge and footpath.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 11:30.
17 and 21 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 25 Oct 2024 at 13:19.
17 and 21 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Barton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 21 Oct 2024 at 15:46.
17 and 23 Feb 2025
Cambridge Water Company are proposing to carry out Utility asset works on Church Street, Harston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cambridge Water Company on 27 Nov 2024 at 13:43.
17 and 21 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Chapel Hill, Barrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cambridgeshire County Council on 25 Nov 2024 at 10:06.
17 and 21 Feb 2025
Cambridgeshire County Council are proposing to carry out Highway improvement works on Haslingfield Road, Barrington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cambridgeshire County Council on 25 Nov 2024 at 10:05.
18 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Green End, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 13:32.
18 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Green End, Comberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 26 Nov 2024 at 13:41.
18 Feb and 16 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fowlmere Road, Foxton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:20.
Roadworks Map near to Town Green Road, ROYSTON, SG8 5QL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Town Green Road, ROYSTON, SG8 5QL (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.