ROADWORKS SUMMARY
Low Bradfield, SHEFFIELD, S6 6LB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for S6 6LB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Low Bradfield, SHEFFIELD, S6 6LB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Heavygate Avenue

Sheffield City Council are carrying out Utility asset works on Heavygate Avenue, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:48.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Springvale Road

Sheffield City Council are carrying out Utility asset works on Springvale Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:57.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Mona Avenue

Sheffield City Council are carrying out Utility asset works on Mona Avenue, Sheffield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:49.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Newent Lane

Sheffield City Council are carrying out Utility asset works on Newent Lane, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:50.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Romsdal Road

Sheffield City Council are carrying out Utility asset works on Romsdal Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:56.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Sackville Road

Sheffield City Council are carrying out Utility asset works on Sackville Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:56.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Highton Street

Sheffield City Council are carrying out Utility asset works on Highton Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2022 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:48.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Fir Street

Sheffield City Council are carrying out Utility asset works on Fir Street, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2023 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:48.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Matlock Road

Sheffield City Council are carrying out Utility asset works on Matlock Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2023 at 00:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:49.

Sheffield City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Loxley Road

Sheffield City Council are carrying out Utility asset works on Loxley Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 07:42 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 6 Dec 2024 at 13:35.

Sheffield City Council logo
LONG TERM
Between
3 Oct and 20 Dec 2024
Details
View Map
Share
Crimicar Lane

Sheffield City Council were proposing to carry out Utility asset works on Crimicar Lane, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Oct 2024 at 08:22.

Sheffield City Council logo
LONG TERM
Between
3 Oct and 20 Dec 2024
Details
View Map
Share
Fulwood Road

Sheffield City Council were proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Oct 2024 at 08:22.

Sheffield City Council logo
LONG TERM
Between
3 Oct and 20 Dec 2024
Details
View Map
Share
Redmires Road

Sheffield City Council were proposing to carry out Utility asset works on Redmires Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Oct 2024 at 08:22.

Sheffield City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Sugworth Road

Sheffield City Council are carrying out Utility asset works on Sugworth Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 12:13 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 09:44.

Sheffield City Council logo
LONG TERM
Between
3 Oct and 20 Dec 2024
Details
View Map
Share
Carsick Hill Road

Sheffield City Council were proposing to carry out Utility asset works on Carsick Hill Road, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Oct 2024 at 08:22.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cedar Road

Sheffield City Council are carrying out Utility asset works on Cedar Road, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 6 Dec 2024 at 11:56.

Yorkshire Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Winchester Avenue

Yorkshire Water are carrying out Utility asset works on Winchester Avenue, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:20 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 08:26.

Yorkshire Water logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Winchester Avenue

Yorkshire Water are proposing to carry out Utility asset works on Winchester Avenue, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 12:39.

Yorkshire Water logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Winchester Avenue

Yorkshire Water are proposing to carry out Utility asset works on Winchester Avenue, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 09:57.

Sheffield City Council logo
Today
Details
View Map
Share
Manchester Road

Sheffield City Council carried out Utility asset works on Manchester Road, Crosspool, Sheffield.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 19 Nov 2024 and 11 Dec 2024 and were actually completed between 19 Nov 2024 (17:40) and 11 Dec 2024 (14:14). The works impacted the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 14:40.

Northern Powergrid (Yorkshire) logo
Until
19 Dec 2024
Details
View Map
Share
Follow
Ridal Avenue

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Ridal Avenue, Sheffield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 November 2024 at 12:24 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Dec 2024 at 14:27.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are carrying out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 07:46 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Dec 2024 at 10:46.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are carrying out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 07:46 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 5 Dec 2024 at 10:46.

Cadent Gas logo
LONG TERM
Between
25 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Main Road

Cadent Gas were proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:18.

Northern Powergrid (Yorkshire) logo
Finishing
Sunday
Details
View Map
Share
Follow
Main Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Nov 2024 at 15:04.

Sheffield City Council logo
Today
Details
View Map
Share
Crimicar Lane

Sheffield City Council carried out Utility asset works on Crimicar Lane, Sheffield.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 27 Nov 2024 and 11 Dec 2024 and were actually completed between 27 Nov 2024 (07:56) and 11 Dec 2024 (14:13). The works impacted the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 14:40.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Shay House Lane

Sheffield City Council are carrying out Utility asset works on Shay House Lane, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 08:20 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 6 Dec 2024 at 08:49.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fox Hill Road

Sheffield City Council are proposing to carry out Utility asset works on Fox Hill Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 30 Sep 2024 at 10:19.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fox Hill Road

Sheffield City Council are carrying out Utility asset works on Fox Hill Road, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 07:47 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 29 Nov 2024 at 08:09.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 16:54.

Northern Powergrid (Yorkshire) logo
Finishing
Monday
Details
View Map
Share
Follow
Carsick Hill Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Carsick Hill Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 11:15 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 11:25.

Yorkshire Water logo
Tomorrow
Details
View Map
Share
Cliffe Road

Yorkshire Water carried out Utility repair and maintenance works on Cliffe Road, Sheffield.

The road was closed for some or all of the period.

The works were originally planned between 5 Dec 2024 and 12 Dec 2024 and were actually completed between 5 Dec 2024 (16:40) and 11 Dec 2024 (12:51). The works impacted the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 13:43.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Crofton Avenue

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Crofton Avenue, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 12:09.

Yorkshire Water logo
Tomorrow
Details
View Map
Share
Cliffe Road

Yorkshire Water carried out Utility repair and maintenance works on Cliffe Road, Sheffield.

The road was closed for some or all of the period.

The works were originally planned between 5 Dec 2024 and 12 Dec 2024 and were actually completed between 5 Dec 2024 (22:20) and 11 Dec 2024 (12:25). The works impacted the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 12:38.

Sheffield City Council logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Den Bank Avenue

Sheffield City Council are proposing to carry out Utility asset works on Den Bank Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 30 Oct 2024 at 13:32.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Crofton Avenue

Yorkshire Water are carrying out Utility repair and maintenance works on Crofton Avenue, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 09:00 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 5 Dec 2024 at 09:57.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Crofton Avenue

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Crofton Avenue, Sheffield.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 14:38.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Crofton Avenue

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Crofton Avenue, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 5 Dec 2024 at 09:10.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Crofton Avenue

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Crofton Avenue, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Dec 2024 at 12:31.

Northern Powergrid (Yorkshire) logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Uppergate Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Uppergate Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 19:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Dec 2024 at 14:27.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
New Hall Lane

Sheffield City Council are proposing to carry out Utility asset works on New Hall Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 7 Nov 2024 at 09:33.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
New Hall Lane

Sheffield City Council are carrying out Utility asset works on New Hall Lane, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 07:35 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 07:45.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
School Green Lane

Sheffield City Council are carrying out Utility asset works on School Green Lane, Sheffield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 07:35 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 07:45.

Sheffield City Council logo
Finishing
Friday
Details
View Map
Share
Follow
School Green Lane

Sheffield City Council are proposing to carry out Utility asset works on School Green Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Nov 2024 at 09:12.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Halifax Road

Yorkshire Water are carrying out Utility repair and maintenance works on Halifax Road, Wadsley Bridge, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 16:34 and could run through until 17 December 2024. The works will impact the verge only.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 09:56.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Whitehouse Road

Yorkshire Water are carrying out Utility repair and maintenance works on Whitehouse Road, Sheffield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 15:20 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 16:18.

Sheffield City Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Harrison Lane

Sheffield City Council are proposing to carry out Utility asset works on Harrison Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 8 Nov 2024 at 08:29.

Nexfibre Networks Limited logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
High Matlock Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on High Matlock Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Nov 2024 at 10:02.

Sheffield City Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Harrison Lane

Sheffield City Council are proposing to carry out Utility asset works on Harrison Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 18 Nov 2024 at 16:46.

Yorkshire Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Barlow Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Barlow Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Nov 2024 at 08:39.

Yorkshire Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Barlow Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Barlow Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Nov 2024 at 17:13.

Yorkshire Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Broomfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 16:58.

Yorkshire Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Broomfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 06:30.

Yorkshire Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Broomfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 16:32.

Yorkshire Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Broomfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 28 Nov 2024 at 09:30.

Yorkshire Water logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Broomfield Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 17:13.

Sheffield City Council logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Den Bank Avenue

Sheffield City Council are proposing to carry out Utility asset works on Den Bank Avenue, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway only.

This roadwork event was last updated by Sheffield City Council on 2 Dec 2024 at 16:30.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:49.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 13:09.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 17:48.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 13:08.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:25.

Sheffield City Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Gorse Lane

Sheffield City Council are proposing to carry out Utility asset works on Gorse Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Dec 2024 at 11:44.

Sheffield City Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Gorse Lane

Sheffield City Council are proposing to carry out Utility asset works on Gorse Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 23 Nov 2024 at 16:43.

Nexfibre Networks Limited logo
Between
6 and 12 Jan 2025
Details
View Map
Share
Follow
High Matlock Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on High Matlock Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 26 Nov 2024 at 09:54.

Sheffield City Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dungworth Green

Sheffield City Council are proposing to carry out Utility asset works on Dungworth Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Nov 2024 at 23:48.

Sheffield City Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dungworth Green

Sheffield City Council are proposing to carry out Utility asset works on Dungworth Green, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Dec 2024 at 12:29.

Sheffield City Council logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Lee Lane

Sheffield City Council are proposing to carry out Utility asset works on Lee Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 3 Dec 2024 at 12:26.

Sheffield City Council logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Lee Lane

Sheffield City Council are proposing to carry out Utility asset works on Lee Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Nov 2024 at 23:48.

Sheffield City Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Broomfield Road

Sheffield City Council are proposing to carry out Section 50 on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Dec 2024 at 17:09.

Sheffield City Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Broomfield Road

Sheffield City Council are proposing to carry out Section 50 on Broomfield Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 4 Dec 2024 at 17:04.

Nexfibre Networks Limited logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
High Matlock Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on High Matlock Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Dec 2024 at 16:54.

Northern Powergrid (Yorkshire) logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Main Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Main Road, Wharncliffe Side, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Nov 2024 at 15:43.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 29 Nov 2024 at 12:54.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 15:54.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 29 Nov 2024 at 12:54.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 15:55.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 29 Nov 2024 at 12:54.

Sheffield City Council logo
Between
15 and 30 Jan 2025
Details
View Map
Share
Follow
Fulwood Road

Sheffield City Council are proposing to carry out Utility asset works on Fulwood Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 9 Dec 2024 at 15:53.

Northern Powergrid (Yorkshire) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Sykehouse Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sykehouse Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Nov 2024 at 12:58.

Northern Powergrid (Yorkshire) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Sykehouse Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sykehouse Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Dec 2024 at 15:04.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Brookhouse Hill

Sheffield City Council were proposing to carry out Utility asset works on Brookhouse Hill, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 11 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 10:17.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Crimicar Lane

Sheffield City Council are proposing to carry out Utility asset works on Crimicar Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 08:47.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Crimicar Lane

Sheffield City Council are proposing to carry out Utility asset works on Crimicar Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 08:47.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Crimicar Lane

Sheffield City Council are proposing to carry out Utility asset works on Crimicar Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 08:47.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Mansel Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Mansel Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Dec 2024 at 09:55.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Brookhouse Hill

Sheffield City Council were proposing to carry out Utility asset works on Brookhouse Hill, Sheffield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 11 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 10:17.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Brookhouse Hill

Sheffield City Council are proposing to carry out Utility asset works on Brookhouse Hill, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 10:17.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Mansel Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Mansel Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Dec 2024 at 10:58.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Crimicar Lane

Sheffield City Council are proposing to carry out Utility asset works on Crimicar Lane, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 08:47.

Sheffield City Council logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Brookhouse Hill

Sheffield City Council are proposing to carry out Utility asset works on Brookhouse Hill, Sheffield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 10:17.

Sheffield City Council logo
LONG TERM
Between
28 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Halifax Road

Sheffield City Council are proposing to carry out Utility asset works on Halifax Road, Wadsley Bridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 24 Oct 2024 at 14:56.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Redmires Road

Sheffield City Council are proposing to carry out Utility asset works on Redmires Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 08:47.

Sheffield City Council logo
Between
5 and 20 Feb 2025
Details
View Map
Share
Follow
Redmires Road

Sheffield City Council are proposing to carry out Utility asset works on Redmires Road, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sheffield City Council on 11 Dec 2024 at 08:47.

Cadent Gas logo
LONG TERM
Between
17 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Stocksbridge, Sheffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 13:25.

Northern Powergrid (Yorkshire) logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Station Road

Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on Station Road, Deepcar, Sheffield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 07:26.


Roadworks Map near to Low Bradfield, SHEFFIELD, S6 6LB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 23:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Low Bradfield, SHEFFIELD, S6 6LB (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.