ROADWORKS SUMMARY
Gubbins Lane, ROMFORD, RM3 0BH
Introduction
View current and future planned roadworks and road closures for Gubbins Lane, RM3 0BH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Gubbins Lane, ROMFORD, RM3 0BH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Gubbins Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
3 Sep 2023 and 4 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Access Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2023 and could run through until 4 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Essex County Council on 24 Jul 2023 at 11:32.
4 Feb 2025
Essex County Council are carrying out Highway improvement works on Access Road, Brentwood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2023 at 00:00 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 16:26.
1 Jun 2025
National Highways are carrying out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 22:00 and could run through until 1 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 11 Oct 2024 at 08:30.
19 Jan 2025
London Borough Of Barking And Dagenham are carrying out roadworks on Freshwater Road, Dagenham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 10:00 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 10 Dec 2024 at 15:48.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Warley Road, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 15:06.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Warley Road, Great Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 16:02.
2 Oct 2024 and 1 Jun 2025
National Highways were proposing to carry out Highway improvement works on Colchester Road, Romford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2024 and run through until 1 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by National Highways on 9 Oct 2024 at 13:48.
Friday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Tweed Glen, Romford.
The works should not impact the carriageway.
The works started on 27 November 2024 at 13:43 and could run through until 13 December 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 15:57.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on A1023 Spur From M25 J28 Roundabout, Havering.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 08:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 16:30.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Brook Street, Brentwood.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 15:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 10:43.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Brook Street, Brentwood.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 11:20 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:25.
20 Dec 2024
Essex County Council are carrying out Highway improvement works on Stapleford Road, Stapleford Abbotts, Epping.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Dec 2024 at 13:19.
3 and 31 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:09.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:06.
Cadent Gas carried out Utility repair and maintenance works on Holgate Road, Dagenham.
The road was closed for some or all of the period.
The works were originally planned between 6 Dec 2024 and 16 Dec 2024 and were actually completed between 6 Dec 2024 (08:15) and 11 Dec 2024 (14:56). The works impacted the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 15:51.
Monday
BT are carrying out Utility asset works on Fen Lane, North Ockendon, Upminster.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 09:30 and could run through until 16 December 2024. The works will impact the verge only.
This roadwork event was last updated by BT on 9 Dec 2024 at 09:44.
Tomorrow
London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:31.
Tomorrow
London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 20 Sep 2024 at 14:03.
Friday
Essex County Council were proposing to carry out Highway improvement works on Clive Road, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.
Saturday
Essex County Council were proposing to carry out Highway improvement works on Eagle Way, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 14 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.
Saturday
Essex County Council were proposing to carry out Highway improvement works on Mascalls Lane, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 14 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.
Saturday
Essex County Council were proposing to carry out Highway improvement works on Warley Road, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 14 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.
Saturday
Essex County Council were proposing to carry out Highway improvement works on Warley Hill, Great Warley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 14 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex County Council on 1 Nov 2024 at 10:08.
Friday
Essex County Council are proposing to carry out Highway improvement works on Tysea Hill, Stapleford Abbotts, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 08:29.
Friday
Essex County Council are carrying out Highway improvement works on Tysea Hill, Stapleford Abbotts, Epping.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 15:09 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Dec 2024 at 15:17.
Monday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Durrants Close, Rainham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 09:29 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 10 Dec 2024 at 17:44.
Friday
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Havering Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Nov 2024 at 15:14.
Friday
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Havering Road, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 09:38 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Dec 2024 at 09:39.
Tuesday
London Borough Of Havering are proposing to carry out Highway improvement works on Noak Hill Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:53.
Tuesday
London Borough Of Havering are proposing to carry out Highway improvement works on Noak Hill Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 20 Sep 2024 at 15:25.
17 and 20 Dec 2024
London Borough Of Havering are proposing to carry out Highway improvement works on Main Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:40.
2 and 30 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:17.
6 and 15 Jan 2025
BT are proposing to carry out Utility asset works on Fen Lane, North Ockendon, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 24 Sep 2024 at 13:44.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out New service connection on Fels Farm Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 14:25.
6 and 8 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:35.
6 and 8 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Wingletye Lane, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 10 Dec 2024 at 14:05.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Geoffrey Avenue, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 09:56.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colchester Road, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 09:01.
6 Jan and 25 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Western Avenue, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 16:44.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Navestock Side, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 16:07.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Navestock Side, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Dec 2024 at 09:25.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crown Road, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:16.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crown Road, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 16:03.
6 and 10 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Crown Road, Kelvedon Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 6 Dec 2024 at 09:24.
7 and 10 Jan 2025
National Highways are proposing to carry out Highway improvement works on Colchester Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 10 Dec 2024 at 08:56.
8 and 11 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Hall Lane, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Oct 2024 at 09:43.
8 and 11 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Hall Lane, Upminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 10 Dec 2024 at 14:04.
8 Jan and 31 May 2025
National Highways are proposing to carry out Highway improvement works on A1023 Spur From M25 J28 Roundabout, Havering.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Nov 2024 at 08:35.
13 and 27 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:42.
13 and 25 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 13:44.
15 and 23 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Monmouth Road, Dagenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:15.
17 and 20 Jan 2025
Essex And Suffolk Water are proposing to carry out Remedial works on Lower Bedfords Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:05.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 15:32.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Road, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 12:11.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Avenue, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 15:32.
18 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Western Avenue, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 12:17.
20 and 23 Jan 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rusholme Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Dec 2024 at 10:28.
20 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:53.
20 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 16:10.
20 and 31 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:18.
20 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Priests Lane, Shenfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 10:32.
20 Jan and 1 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Ongar Road, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 9 Oct 2024 at 15:39.
21 and 23 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 25 Oct 2024 at 12:48.
22 and 25 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Airfield Way, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 6 Dec 2024 at 16:27.
22 and 25 Jan 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Airfield Way, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 10 Dec 2024 at 13:03.
27 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 11:45.
27 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 07:51.
27 Jan and 3 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:17.
27 Jan and 3 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 13:54.
27 Jan and 1 Feb 2025
National Highways were proposing to carry out Works for road purposes on Colchester Road, Romford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Oct 2024 at 09:59.
27 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lodge Lane, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 13:01.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Northend, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 11:01.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Northend, Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 12:41.
27 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 13 Nov 2024 at 06:21.
27 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 25 Nov 2024 at 08:21.
27 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 26 Nov 2024 at 07:14.
27 and 31 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Nags Head Lane, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 28 Nov 2024 at 07:39.
27 Jan and 10 Feb 2025
Virgin Media are proposing to carry out Utility asset works on Kimpton Avenue, Brentwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 13 Nov 2024 at 07:40.
28 and 30 Jan 2025
Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 3 Oct 2024 at 10:21.
2 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 29 Oct 2024 at 05:48.
2 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 08:58.
2 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 15:40.
3 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.
3 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:19.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:51.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Priests Lane, Shenfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 06:46.
3 and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lancaster Close, Pilgrims Hatch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 06:52.
4 and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:48.
5 and 11 Feb 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Lancaster Close, Pilgrims Hatch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 February 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 16:10.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:25.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wykeham Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:31.
10 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Little Warley Hall Lane, Little Warley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 17:06.
24 Feb and 28 Mar 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rainham Road South, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 3 Dec 2024 at 08:33.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Baron Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 12:33.
24 Feb and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:12.
24 Feb and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:08.
24 and 26 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.
This roadwork event was last updated by Essex And Suffolk Water on 27 Nov 2024 at 16:34.
3 and 7 Mar 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Lancaster Close, Pilgrims Hatch.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 11:37.
4 and 10 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hubbards Chase, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 10:51.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 18:50.
4 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 18:55.
5 and 11 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Stanhope Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 14:30.
10 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Neville Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:38.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:27.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:07.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:51.
10 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:06.
10 and 13 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Manor Road, Lambourne, Epping.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 08:29.
Roadworks Map near to Gubbins Lane, ROMFORD, RM3 0BH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Gubbins Lane, ROMFORD, RM3 0BH (15 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 Nov 2024 - 11 Dec 2024)
(Scheduled: 9 Dec 2024 - 12 Dec 2024)
(Scheduled: 11 Dec 2024 - 17 Dec 2024)
(Scheduled: 9 Dec 2024 - 13 Dec 2024)
(Scheduled: 10 Dec 2024 - 16 Dec 2024)
(Scheduled: 11 Dec 2024 - 13 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data