ROADWORKS SUMMARY
Calvert Road, DORKING, RH4 1LT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Calvert Road, RH4 1LT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Calvert Road, DORKING, RH4 1LT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Calvert Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Kingston Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Kingston Road, Leatherhead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 7 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 11:15.

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Follow
By-pass Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on By-pass Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Jul 2024 at 13:40.

Surrey County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Apr 2025
Details
View Map
Share
Follow
Horsham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, North Holmwood, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 3 Jul 2024 at 09:18.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Mill Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Mill Road, South Holmwood, Dorking.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:32.

Surrey County Council logo
Finishing
Today
Details
View Map
Share
Follow
Mill Road

Surrey County Council are carrying out Highway repair and maintenance works on Mill Road, South Holmwood, Dorking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 08:00 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 09:27.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Monday
Details
View Map
Share
Follow
Chart Downs

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Chart Downs, Dorking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 14:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 10 Dec 2024 at 14:18.

Surrey County Council logo
Until
24 Dec 2024
Details
View Map
Share
Follow
Slipshatch Road

Surrey County Council are carrying out Highway repair and maintenance works on Slipshatch Road, Reigate.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 12:56 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 16:09.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brockham Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Brockham Lane, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 24 Sep 2024 at 13:51.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Sole Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sole Farm Road, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 08:25.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Little Bookham Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Bookham Street, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 10:30.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Little Bookham Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Bookham Street, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 08:23.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Sole Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sole Farm Road, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 10:37.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Sole Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sole Farm Road, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:25.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Church Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, Leatherhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 10:55.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Church Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 09:29.

Southern Gas Networks logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Ranmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ranmore Road, Dorking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 13:43.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Betchworth, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 09:16.

Network Rail logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Betchworth, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Aug 2024 at 10:50.

Surrey County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 10:40.

Surrey County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Mill Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Mill Way, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 10:38.

Surrey County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Hurst Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hurst Lane, Headley, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 10:52.

Surrey County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Horsham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, Abinger Hammer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 14:07.

Surrey County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Headley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Headley Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 10:31.

Surrey County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Horsham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horsham Road, Abinger Hammer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 14:08.

Surrey County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Leech Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Leech Lane, Headley, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 10:34.

Surrey County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lodgebottom Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lodgebottom Road, Mickleham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 10:50.

Surrey County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Headley Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Headley Lane, Mickleham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 10:46.

Surrey County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Felday Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Felday Road, Abinger Hammer, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 14:06.

Surrey County Council logo
LONG TERM
Between
13 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Buckland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Dec 2024 at 12:59.

Surrey County Council logo
LONG TERM
Between
13 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Buckland Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Buckland Road, Reigate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 1 Dec 2024 at 13:45.

Surrey County Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Station Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Station Road, Betchworth, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 14:36.

BT logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Cobham Road

BT were proposing to carry out Utility asset works on Cobham Road, Bookham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Nov 2024 at 09:41.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Snowerhill Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Snowerhill Road, Betchworth, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 25 Oct 2024 at 15:43.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Snowerhill Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Snowerhill Road, Betchworth, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 2 Nov 2024 at 09:30.

Southern Gas Networks logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Longfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longfield Road, Dorking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 08:31.

Southern Gas Networks logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Longfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Longfield Road, Dorking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 13:42.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Reigate Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Reigate Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 4 Dec 2024 at 12:27.

Surrey County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Old London Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Old London Road, Mickleham, Dorking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 10:24.

Surrey County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Old London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Old London Road, Mickleham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 10:52.

Surrey County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Old London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Old London Road, Mickleham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 07:30.

BT logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility repair and maintenance works on Church Road, Surrey, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Nov 2024 at 10:30.

BT logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility asset works on Park Lane, Surrey, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 5 Nov 2024 at 15:33.

BT logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility asset works on Park Lane, Surrey, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 3 Nov 2024 at 10:36.

Southern Gas Networks logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Ranmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ranmore Road, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 13:37.

Southern Gas Networks logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Ranmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ranmore Road, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 09:00.

Southern Gas Networks logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Ranmore Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ranmore Road, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 13:44.

BT logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Church Street

BT are proposing to carry out Utility repair and maintenance works on Church Street, Surrey, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Nov 2024 at 13:07.

BT logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Church Street

BT are proposing to carry out Utility repair and maintenance works on Church Street, Surrey, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 13:17.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Reigate Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Reigate Road, Leatherhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 13:40.

Surrey County Council logo
Between
15 and 21 Feb 2025
Details
View Map
Share
Follow
Leatherhead Road

Surrey County Council are proposing to carry out Highway improvement works on Leatherhead Road, Bookham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 19 Jun 2024 at 12:57.

BT logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Dene Street

BT are proposing to carry out Utility asset works on Dene Street, Surrey, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 11:15.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Sep 2024 at 10:34.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Sep 2024 at 09:02.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ottways Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Ottways Lane, Ashtead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Nov 2024 at 11:56.

BT logo
Between
24 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Dene Street

BT are proposing to carry out Utility asset works on Dene Street, Surrey, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Nov 2024 at 10:56.

BT logo
Between
24 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Dene Street

BT are proposing to carry out Utility asset works on Dene Street, Surrey, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 10:13.

Surrey County Council logo
LONG TERM
Between
1 Mar and 1 Sep 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on High Street, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 15:39.

Surrey County Council logo
LONG TERM
Between
1 Mar and 1 Sep 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 15:48.

BT logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility repair and maintenance works on Church Road, Surrey, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 14:29.

BT logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility repair and maintenance works on Church Road, Surrey, Bookham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 4 Nov 2024 at 09:00.

Surrey County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Middle Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Middle Street, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Oct 2024 at 11:25.

Surrey County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Middle Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on Middle Street, Brockham, Dorking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 13:34.


Roadworks Map near to Calvert Road, DORKING, RH4 1LT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Calvert Road, DORKING, RH4 1LT (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Surrey County Council logo
URGENT
  
ASHCOMBE ROAD 
(0.1 miles)
Surrey County Council
Highway improvement works - Carriageway - Some carriageway incursion
Complete
11 Dec 2024 13:00 - 13:01
0.1
Details
Share
2
Surrey County Council logo
URGENT
  
ASHCOMBE ROAD 
(0.2 miles)
Surrey County Council
Highway improvement works - Carriageway - Some carriageway incursion
Complete
11 Dec 2024 13:22 - 14:04
0.2
Details
Share
3
Surrey County Council logo
URGENT
  
CHALKPIT LANE 
(0.4 miles)
Surrey County Council
Highway improvement works - Carriageway - Some carriageway incursion
Complete
11 Dec 2024 12:08 - 12:09
0.4
Details
Share
4
Surrey County Council logo
URGENT
  
ASHCOMBE ROAD 
(0.4 miles)
Surrey County Council
Highway improvement works - Carriageway - Some carriageway incursion
Complete
11 Dec 2024 13:02 - 13:03
0.4
Details
Share
5
Surrey County Council logo
URGENT
  
CHALKPIT LANE 
(0.4 miles)
Surrey County Council
Highway improvement works - Carriageway - Some carriageway incursion
Complete
11 Dec 2024 12:26 - 12:26
0.4
Details
Share
6
Surrey County Council logo
URGENT
  
FRASER GARDENS 
(0.4 miles)
Surrey County Council
Highway improvement works - Carriageway - Some carriageway incursion
Complete
11 Dec 2024 14:05 - 14:09
0.4
Details
Share
7
BT logo
HART ROAD, SURREY 
(0.4 miles)
BT
Utility asset works - Footway - Priority working
Planned
Scheduled: 12 Dec 2024 - 13 Dec 2024
0.4
Details
Share
Follow
8
Surrey County Council logo
URGENT
  
FRASER GARDENS 
(0.4 miles)
Surrey County Council
Highway improvement works - Carriageway - Some carriageway incursion
Complete
11 Dec 2024 12:49 - 12:50
0.4
Details
Share
9
Surrey County Council logo
URGENT
  
FRASER GARDENS 
(0.4 miles)
Surrey County Council
Highway improvement works - Carriageway - Stop/go boards
Complete
11 Dec 2024 12:52 - 12:53
0.4
Details
Share
10
Surrey County Council logo
URGENT
  
RANMORE ROAD 
(0.4 miles)
Surrey County Council
Highway improvement works - Carriageway - Two-way signals
Complete
11 Dec 2024 10:56 - 10:58
0.4
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.