ROADWORKS SUMMARY
Hawesside Street, SOUTHPORT, PR9 0UA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hawesside Street, PR9 0UA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hawesside Street, SOUTHPORT, PR9 0UA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hawesside Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Sefton Metropolitan Borough Council logo
LONG TERM
Between
28 Aug 2024 and 4 Jun 2025
Details
View Map
Share
Eastbank Street

Sefton Metropolitan Borough Council were proposing to carry out Highway improvement works on Eastbank Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2024 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Sep 2024 at 09:59.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
28 Aug 2024 and 4 Jun 2025
Details
View Map
Share
King Street

Sefton Metropolitan Borough Council were proposing to carry out Highway improvement works on King Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2024 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Sep 2024 at 09:58.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
28 Aug 2024 and 4 Jun 2025
Details
View Map
Share
Market Street

Sefton Metropolitan Borough Council were proposing to carry out Highway improvement works on Market Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2024 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Sep 2024 at 09:58.

Lancashire County Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Heathy Lane

Lancashire County Council are carrying out Highway repair and maintenance works on Heathy Lane, Downholland.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 09:00 and could run through until 29 August 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Lancashire County Council on 15 Oct 2024 at 15:26.

ManWeb logo
LONG TERM
Between
30 Oct 2024 and 8 Jan 2025
Details
View Map
Share
Town Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Town Lane, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 1 Aug 2024 at 12:28.

ManWeb logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Heathfield Road

ManWeb are carrying out Utility repair and maintenance works on Heathfield Road, Birkdale.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 16:45 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 12 Nov 2024 at 14:11.

Cadent Gas logo
LONG TERM
Between
11 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Norwood Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 14:48.

ManWeb logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Town Lane Kew

ManWeb are carrying out Utility repair and maintenance works on Town Lane Kew, Southport.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:28 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 5 Dec 2024 at 13:50.

ManWeb logo
LONG TERM
Between
18 Nov 2024 and 4 Feb 2025
Details
View Map
Share
Town Lane Kew

ManWeb were proposing to carry out Utility repair and maintenance works on Town Lane Kew, Southport.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 4 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 16 Oct 2024 at 12:53.

ManWeb logo
Finishing
Today
Details
View Map
Share
Town Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Town Lane, Southport.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 4 Sep 2024 at 11:35.

Sefton Metropolitan Borough Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
North Road

Sefton Metropolitan Borough Council are proposing to carry out Utility asset works on North Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 25 Nov 2024 at 11:48.

Sefton Metropolitan Borough Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
North Road

Sefton Metropolitan Borough Council are carrying out Utility asset works on North Road, Southport.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Nov 2024 at 11:30.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:58.

ManWeb logo
LONG TERM
Between
6 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Heathfield Road

ManWeb were proposing to carry out Utility repair and maintenance works on Heathfield Road, Birkdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 7 Nov 2024 at 16:22.

ManWeb logo
LONG TERM
Between
6 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Heathfield Road

ManWeb are proposing to carry out Utility repair and maintenance works on Heathfield Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Oct 2024 at 15:12.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Hart Street

Cadent Gas are proposing to carry out Utility asset works on Hart Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:24.

United Utilities Water (formerly North West Water) logo
Finishing
Today
Details
View Map
Share
Follow
Cavendish Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Cavendish Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Oct 2024 at 09:12.

United Utilities Water (formerly North West Water) logo
Finishing
Today
Details
View Map
Share
Cavendish Road

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Cavendish Road, Birkdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Dec 2024 at 08:13.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Poplar Street

Cadent Gas were proposing to carry out Utility asset works on Poplar Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:29.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Hart Street

Cadent Gas were proposing to carry out Utility asset works on Hart Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:21.

Sefton Metropolitan Borough Council logo
Between
16 and 24 Dec 2024
Details
View Map
Share
Follow
Gloucester Road

Sefton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Gloucester Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 13 May 2024 at 08:34.

ManWeb logo
LONG TERM
Between
17 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Mill Road

ManWeb are proposing to carry out Utility repair and maintenance works on Mill Road, Ainsdale.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 9 Oct 2024 at 15:17.

ManWeb logo
LONG TERM
Between
18 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Mill Road

ManWeb were proposing to carry out Utility repair and maintenance works on Mill Road, Ainsdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 20 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 31 Oct 2024 at 10:21.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Eastbank Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Eastbank Street, Southport.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 24 Oct 2024 at 15:26.

Sefton Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Chester Avenue

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Chester Avenue, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 14 Aug 2024 at 11:21.

Sefton Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Chester Avenue

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Chester Avenue, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:22.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Market Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 24 Oct 2024 at 15:29.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Market Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 22 Nov 2024 at 14:52.

ManWeb logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Benthams Way

ManWeb are proposing to carry out Utility repair and maintenance works on Benthams Way, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Nov 2024 at 15:44.

Cadent Gas logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Shelley Grove

Cadent Gas are proposing to carry out Utility asset works on Shelley Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 15:00.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
King Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on King Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 22 Nov 2024 at 14:52.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
King Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on King Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 24 Oct 2024 at 15:27.

ManWeb logo
LONG TERM
Between
9 Jan and 17 Feb 2025
Details
View Map
Share
Liverpool Road

ManWeb were proposing to carry out Utility repair and maintenance works on Liverpool Road, Ainsdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 12:53.

Sefton Metropolitan Borough Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Griffiths Drive

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Griffiths Drive, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:11.

Sefton Metropolitan Borough Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Griffiths Drive

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Griffiths Drive, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 14 Aug 2024 at 11:24.

ManWeb logo
Between
14 Jan and 3 Feb 2025
Details
View Map
Share
Segars Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Segars Lane, Ainsdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 16 Oct 2024 at 15:26.

ManWeb logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Segars Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Segars Lane, Ainsdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 15:58.

ManWeb logo
Between
16 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Segars Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Segars Lane, Ainsdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 14 Nov 2024 at 19:08.

Sefton Metropolitan Borough Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Stretton Drive

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Stretton Drive, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 30 May 2024 at 07:36.

Sefton Metropolitan Borough Council logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Follow
Grosvenor Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Grosvenor Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 20 May 2024 at 12:45.

Sefton Metropolitan Borough Council logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Follow
Grosvenor Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Grosvenor Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 14 Aug 2024 at 10:45.

United Utilities Water (formerly North West Water) logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Banks Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Banks Road, Banks.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 10:59.

United Utilities Water (formerly North West Water) logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Banks Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Banks Road, Banks.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 12:10.

Sefton Metropolitan Borough Council logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Westcliffe Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Westcliffe Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 20 May 2024 at 12:38.

Sefton Metropolitan Borough Council logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Westcliffe Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Westcliffe Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 11 Dec 2024 at 13:54.

The Environment Agency logo
LONG TERM
Between
27 Jan and 2 May 2025
Details
View Map
Share
Follow
Aveling Drive

The Environment Agency are proposing to carry out Section 50 on Aveling Drive, Banks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by The Environment Agency on 19 Jun 2024 at 10:49.

ManWeb logo
LONG TERM
Between
27 Jan and 12 May 2025
Details
View Map
Share
Follow
Sandbrook Road

ManWeb are proposing to carry out Utility repair and maintenance works on Sandbrook Road, Ainsdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Sep 2024 at 17:02.

ManWeb logo
LONG TERM
Between
27 Jan and 12 May 2025
Details
View Map
Share
Sandbrook Road

ManWeb were proposing to carry out Utility repair and maintenance works on Sandbrook Road, Ainsdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 12 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 16 Oct 2024 at 13:10.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

BT are proposing to carry out Utility asset works on Wellington Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 14:21.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

BT are proposing to carry out Utility asset works on Wellington Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Nov 2024 at 14:22.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

BT are proposing to carry out Utility asset works on Wellington Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Nov 2024 at 16:36.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

BT are proposing to carry out Utility asset works on Wellington Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Nov 2024 at 11:45.

ManWeb logo
LONG TERM
Between
30 Jan and 12 May 2025
Details
View Map
Share
Follow
Sandbrook Road

ManWeb are proposing to carry out Utility repair and maintenance works on Sandbrook Road, Ainsdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 22 Oct 2024 at 14:16.

ManWeb logo
LONG TERM
Between
31 Jan and 11 Mar 2025
Details
View Map
Share
Liverpool Road

ManWeb were proposing to carry out Utility repair and maintenance works on Liverpool Road, Ainsdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 18 Nov 2024 at 12:15.

Sefton Metropolitan Borough Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Parklands

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Parklands, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:15.

Sefton Metropolitan Borough Council logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Hawkshead Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Hawkshead Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:18.

Sefton Metropolitan Borough Council logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Hawkshead Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Hawkshead Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 10 Dec 2024 at 10:50.

Sefton Metropolitan Borough Council logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Hall Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Hall Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:19.

Sefton Metropolitan Borough Council logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Hall Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Hall Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 10 Dec 2024 at 10:52.

ManWeb logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Liverpool Road

ManWeb are proposing to carry out Utility repair and maintenance works on Liverpool Road, Ainsdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 18 Nov 2024 at 12:16.

National Highways logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Heathey Lane

National Highways are proposing to carry out Works for Rail Purposes on Heathey Lane, Halsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Nov 2024 at 11:37.

ManWeb logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Moor Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Moor Lane, Ainsdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 25 Nov 2024 at 12:05.

Cadent Gas logo
LONG TERM
Between
17 Feb and 6 Apr 2025
Details
View Map
Share
Kew Road

Cadent Gas were proposing to carry out Utility asset works on Kew Road, Birkdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:44.

Cadent Gas logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Bedford Road

Cadent Gas were proposing to carry out Utility asset works on Bedford Road, Birkdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:43.

ManWeb logo
Between
21 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Guildford Road

ManWeb are proposing to carry out Utility repair and maintenance works on Guildford Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 2 Dec 2024 at 11:07.

ManWeb logo
Between
21 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Guildford Road

ManWeb are proposing to carry out Utility repair and maintenance works on Guildford Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 22 Nov 2024 at 14:20.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Compton Road

Cadent Gas were proposing to carry out Utility asset works on Compton Road, Birkdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 16 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:45.

Network Rail logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Bescar Lane

Network Rail were proposing to carry out Works for Rail Purposes on Bescar Lane, Scarisbrick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 13:38.

Network Rail logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Pool Hey Lane

Network Rail were proposing to carry out Works for Rail Purposes on Pool Hey Lane, Scarisbrick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 13:33.

ManWeb logo
LONG TERM
Between
26 Feb and 24 Apr 2025
Details
View Map
Share
Benthams Way

ManWeb were proposing to carry out Utility repair and maintenance works on Benthams Way, Southport.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 24 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 16 Oct 2024 at 12:55.

United Utilities Water (formerly North West Water) logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Portland Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Portland Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 17:44.

United Utilities Water (formerly North West Water) logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Portland Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Portland Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 09:47.

Cadent Gas logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Norwood Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:27.

Cadent Gas logo
Between
3 and 24 Mar 2025
Details
View Map
Share
Follow
Peel Street

Cadent Gas are proposing to carry out Utility asset works on Peel Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:29.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Cobden Road

Cadent Gas are proposing to carry out Utility asset works on Cobden Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:44.

Cadent Gas logo
Between
3 and 19 Mar 2025
Details
View Map
Share
Follow
Clifton Road

Cadent Gas are proposing to carry out Utility asset works on Clifton Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:31.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Cypress Road

Cadent Gas are proposing to carry out Utility asset works on Cypress Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:40.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Laburnum Grove

Cadent Gas are proposing to carry out Utility asset works on Laburnum Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:37.

Cadent Gas logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Claremont Road

Cadent Gas were proposing to carry out Utility asset works on Claremont Road, Birkdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:45.

Cadent Gas logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Eastbourne Road

Cadent Gas were proposing to carry out Utility asset works on Eastbourne Road, Birkdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:46.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Shelley Grove

Cadent Gas are proposing to carry out Utility asset works on Shelley Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:22.

ManWeb logo
Between
5 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Meadow Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Meadow Lane, Ainsdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 6 Dec 2024 at 08:53.

ManWeb logo
Between
5 and 25 Mar 2025
Details
View Map
Share
Meadow Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Meadow Lane, Ainsdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 March 2025 and run through until 25 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 29 Nov 2024 at 14:42.

ManWeb logo
Between
5 Mar and 3 Apr 2025
Details
View Map
Share
Meadow Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Meadow Lane, Ainsdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 March 2025 and run through until 3 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 14 Nov 2024 at 09:08.


Roadworks Map near to Hawesside Street, SOUTHPORT, PR9 0UA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 22:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hawesside Street, SOUTHPORT, PR9 0UA (44 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
SCARISBRICK STREET 
(0.1 miles)
BT
New service connection - Footway - Some carriageway incursion
Complete
10 Dec 2024 10:11 - 12:45
0.1
Details
Share
2
Sefton Metropolitan Borough Council logo
LONDON STREET 
(0.1 miles)
Sefton Metropolitan Borough Council
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 10 Dec 2024 07:04
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
0.1
Details
Share
Follow
3
Nexfibre Networks Limited logo
HOPE STREET 
(0.2 miles)
Nexfibre Networks Limited
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 11 Dec 2024 - 24 Dec 2024
0.2
Details
Share
Follow
4
Nexfibre Networks Limited logo
HOPE STREET 
(0.2 miles)
Nexfibre Networks Limited
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 11 Dec 2024 - 24 Dec 2024
0.2
Details
Share
Follow
5
Its Technology Group logo
GLEBE PLACE 
(0.2 miles)
Its Technology Group
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Complete
10 Dec 2024 20:00 - 21:00
0.2
Details
Share
6
Nexfibre Networks Limited logo
ASHLEY ROAD 
(0.2 miles)
Nexfibre Networks Limited
Remedial works - Footway - No carriageway incursion
Cancelled
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
0.2
Details
Share
7
Nexfibre Networks Limited logo
ASHLEY ROAD 
(0.2 miles)
Nexfibre Networks Limited
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 10 Dec 2024 - 12 Dec 2024
0.2
Details
Share
Follow
8
United Utilities Water (formerly North West Water) logo
URGENT
  
MARLBOROUGH ROAD 
(0.3 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
9 Dec 2024 11:10 - 11 Dec 2024 14:05
0.3
Details
Share
9
Sefton Metropolitan Borough Council logo
EATON DRIVE 
(0.3 miles)
Sefton Metropolitan Borough Council
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 10 Dec 2024 07:04
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
0.3
Details
Share
Follow
10
Sefton Metropolitan Borough Council logo
MAJOR
  
EASTBANK STREET 
(0.3 miles)
Sefton Metropolitan Borough Council
Highway improvement works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 28 Aug 2024 - 4 Jun 2025)
0.3
Details
Share
  • ...