ROADWORKS SUMMARY
Dashwood Court, WATLINGTON, OX49 5TA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Dashwood Court, OX49 5TA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Dashwood Court, WATLINGTON, OX49 5TA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Dashwood Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Between
1 Jul 2024 and 14 Mar 2025
Details
View Map
Share
Follow
Cuxham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Cuxham Road, Watlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 14 March 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 28 Jun 2024 at 15:50.

Oxfordshire County Council logo
LONG TERM
Between
4 Jul 2024 and 4 Jul 2025
Details
View Map
Share
Follow
Shirburn Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Shirburn Road, Watlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 4 July 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 2 Jul 2024 at 15:24.

Gigaclear logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Footpath Between Chowns Close And Broadwaters Avenue

Gigaclear are carrying out roadworks on Footpath Between Chowns Close And Broadwaters Avenue, Thame.

The works should not impact the carriageway.

The works started on 8 November 2024 at 13:45 and could run through until 6 December 2024. The works will impact the verge only.

This roadwork event was last updated by Gigaclear on 8 Nov 2024 at 18:43.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bell Lane

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Bell Lane, Thame.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 23:49 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 09:00.

Buckinghamshire Council logo
Between
30 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Thame Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Thame Road, Kingsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Aug 2024 at 10:14.

Oxfordshire County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Chinnor Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Chinnor Road, Towersey, Thame.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 11:35.

Oxfordshire County Council logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Chinnor Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Chinnor Road, Towersey, Thame.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 17 Sep 2024 at 08:59.

Buckinghamshire Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Chequers Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Chequers Lane, Cadmore End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Nov 2024 at 14:05.

Buckinghamshire Council logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Bledlow Road

Buckinghamshire Council are proposing to carry out Core Sampling on Bledlow Road, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 25 Oct 2024 at 15:09.

Buckinghamshire Council logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Oddley Lane

Buckinghamshire Council are proposing to carry out Core Sampling on Oddley Lane, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 24 Oct 2024 at 11:59.

Thames Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bottom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 10:13.

Thames Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Bottom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:28.

Airband Community Internet logo
Between
6 and 12 Jan 2025
Details
View Map
Share
Cuxham Road

Airband Community Internet were proposing to carry out Utility repair and maintenance works on Cuxham Road, Watlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 12 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Airband Community Internet on 29 Oct 2024 at 09:39.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
The Common

Southern Gas Networks are proposing to carry out New service connection on The Common, Stokenchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 08:29.

Scottish Hydro Electric Power Dis logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Spring Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Spring Lane, Watlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 14:37.

Scottish Hydro Electric Power Dis logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Spring Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Spring Lane, Watlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Oct 2024 at 13:47.

Thames Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Watlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 08:26.

Buckinghamshire Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Oddley Lane

Buckinghamshire Council are proposing to carry out Core Sampling on Oddley Lane, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 08:04.

Buckinghamshire Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Bledlow Road

Buckinghamshire Council are proposing to carry out Core Sampling on Bledlow Road, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Oct 2024 at 08:05.

Airband Community Internet logo
Between
26 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Cuxham Road

Airband Community Internet are proposing to carry out Utility repair and maintenance works on Cuxham Road, Watlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 January 2025 and could run through until 1 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Airband Community Internet on 20 Nov 2024 at 10:52.

Airband Community Internet logo
Between
26 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Cuxham Road

Airband Community Internet are proposing to carry out Utility repair and maintenance works on Cuxham Road, Watlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 January 2025 and could run through until 1 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Airband Community Internet on 20 Nov 2024 at 09:39.

UK Power Networks Eastern & London logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Keens Lane

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Keens Lane, Chinnor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 07:39.

UK Power Networks Eastern & London logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Keens Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Keens Lane, Chinnor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 11:16.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
High Street

Thames Water were proposing to carry out Utility repair and maintenance works on High Street, Watlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:05.

Thames Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Buttermarket

Thames Water were proposing to carry out New service connection on Buttermarket, Thame.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:03.

Oxfordshire County Council logo
Between
2 and 28 Feb 2025
Details
View Map
Share
Follow
Unnamed-a418-single Carriageway(36212246)

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed-a418-single Carriageway(36212246), Thame.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Sep 2024 at 15:21.

Oxfordshire County Council logo
Between
2 and 28 Feb 2025
Details
View Map
Share
Follow
Aylesbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Aylesbury Road, Scotsgrove.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 24 Oct 2024 at 16:30.

Thames Water logo
Between
6 and 9 Feb 2025
Details
View Map
Share
Follow
Little Lane

Thames Water are proposing to carry out New service connection on Little Lane, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:49.

Thames Water logo
Between
6 and 9 Feb 2025
Details
View Map
Share
Follow
City Road

Thames Water are proposing to carry out New service connection on City Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 9 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:52.

Thames Water logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Wellington Street

Thames Water are proposing to carry out New service connection on Wellington Street, Thame.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 11:52.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Little Lane

Thames Water are proposing to carry out New service connection on Little Lane, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 18:56.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Little Lane

Thames Water are proposing to carry out New service connection on Little Lane, Saunderton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:08.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
City Road

Thames Water are proposing to carry out New service connection on City Road, Radnage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:51.


Roadworks Map near to Dashwood Court, WATLINGTON, OX49 5TA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 12:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Dashwood Court, WATLINGTON, OX49 5TA (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.