ROADWORKS SUMMARY
Holton, OXFORD, OX33 1PZ
Introduction
View current and future planned roadworks and road closures for OX33 1PZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Holton, OXFORD, OX33 1PZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Jan 2025
Thames Water are carrying out Utility asset works on Grenoble Road, Sandford-on-thames, Oxford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 08:17 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.
Friday
Oxfordshire County Council are carrying out Highway improvement works on Garsington Road, Oxford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 July 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Oxfordshire County Council on 17 Jul 2024 at 13:59.
Friday
Buckinghamshire Council are carrying out Highway repair and maintenance works on Manor Road, Oakley.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 September 2024 at 11:39 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 25 Nov 2024 at 09:14.
Thursday
Oxfordshire County Council are carrying out Highway improvement works on St Luke's Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 09:30 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 29 Nov 2024 at 10:14.
Thursday
Oxfordshire County Council are carrying out Highway improvement works on Napier Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 12:45 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 29 Nov 2024 at 10:40.
13 Dec 2024
Oxfordshire County Council are carrying out Highway improvement works on Phipps Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 12:45 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 29 Nov 2024 at 10:41.
Thursday
Oxfordshire County Council are carrying out Highway improvement works on Garsington Road, Oxford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 12:45 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 8 Oct 2024 at 08:31.
Friday
Thames Water are carrying out Disconnection or alteration of supply on Underhill Circus, Oxford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 08:15 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:49.
20 Dec 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Unnamed-b480-single Carriageway (36209964), South Oxfordshire.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:10 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 13:55.
20 Dec 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Watlington Road, Garsington, Oxford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 14:09.
8 Aug 2025
Oxfordshire County Council are carrying out Highway repair and maintenance works on Blackbird Leys Road, Oxford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:30 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 14:29.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Crown Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 12:45.
Friday
Thames Water are carrying out Utility repair and maintenance works on Crown Street, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:15.
Friday
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Watlington Road, Cowley, Oxford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 13:00 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Nov 2024 at 14:09.
Friday
Oxfordshire County Council are carrying out Utility repair and maintenance works on Lime Walk, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 27 Nov 2024 at 09:59.
10 Dec 2024
Thames Water are carrying out Utility asset works on Jack Straw's Lane, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 09:51 and could run through until 10 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 09:52.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Road Running Through Elsfield, Elsfield, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:29.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Road Running Through Elsfield, Elsfield, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:04.
16 and 18 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Merton Street, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:35.
6 Jan and 11 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Cowley Road, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 22 Nov 2024 at 09:50.
6 and 17 Jan 2025
Thames Water are proposing to carry out Utility asset works on Stowford Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Sep 2024 at 08:26.
6 and 8 Jan 2025
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Manor Road, Oakley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 1 Oct 2024 at 08:08.
6 and 24 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Section Of B480 From Junction With B4015 North To St Katherine's Church, Chiselhampton, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 14:13.
6 Jan and 16 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lower Road, Garsington, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 14:15.
6 and 8 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Ock Street, Abingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:28.
6 and 10 Jan 2025
Thames Water were proposing to carry out New service connection on Lower End, Great Milton, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 10:44.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Merton Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 10:00.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Merton Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 13:59.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Gardiner Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 08:09.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Gardiner Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 11:24.
13 and 15 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on York Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:30.
13 and 15 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on York Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:53.
14 and 16 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on School Lane, Stadhampton, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 13:27.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Way, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:51.
20 and 22 Jan 2025
Thames Water are proposing to carry out New service connection on Sawpit Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:05.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Charles Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 11:42.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Saxon Way, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 16:22.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Old Road, Shotover Hill, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:35.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Old Road, Shotover Hill, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:29.
30 Jan and 2 Feb 2025
Thames Water are proposing to carry out New service connection on Hollow Way, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:37.
30 Jan and 2 Feb 2025
Thames Water are proposing to carry out New service connection on Church Road, Great Milton, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 09:34.
3 Feb and 11 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Blackbird Leys Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 13:37.
3 Feb and 11 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Blackbird Leys Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 13:35.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Catherine Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:48.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Thame Road, Great Haseley, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 14:07.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Catherine Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 13:22.
Roadworks Map near to Holton, OXFORD, OX33 1PZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Holton, OXFORD, OX33 1PZ (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.