ROADWORKS SUMMARY
Wheatley, OXFORD, OX33 1JQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for OX33 1JQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wheatley, OXFORD, OX33 1JQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Grenoble Road

Thames Water are carrying out Utility asset works on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:17 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.

Oxfordshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Garsington Road

Oxfordshire County Council are carrying out Highway improvement works on Garsington Road, Oxford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Oxfordshire County Council on 17 Jul 2024 at 13:59.

Oxfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Garsington Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Garsington Road, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Aug 2024 at 12:05.

Oxfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
St Luke's Road

Oxfordshire County Council are carrying out Highway improvement works on St Luke's Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 7 Oct 2024 at 10:01.

Oxfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Napier Road

Oxfordshire County Council are carrying out Highway improvement works on Napier Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 12:45 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 7 Oct 2024 at 14:34.

Oxfordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Phipps Road

Oxfordshire County Council are carrying out Highway improvement works on Phipps Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 12:45 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 7 Oct 2024 at 14:34.

Oxfordshire County Council logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Garsington Road

Oxfordshire County Council are carrying out Highway improvement works on Garsington Road, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 12:45 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 8 Oct 2024 at 08:31.

Thames Water logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Underhill Circus

Thames Water are carrying out Disconnection or alteration of supply on Underhill Circus, Oxford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 08:15 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:49.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Crotch Crescent

Thames Water were proposing to carry out Disconnection or alteration of supply on Crotch Crescent, Oxford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 08:10.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Unnamed-b480-single Carriageway (36209964)

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Unnamed-b480-single Carriageway (36209964), South Oxfordshire.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:10 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 13:55.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Watlington Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Watlington Road, Cowley, Oxford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Nov 2024 at 12:02.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Watlington Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Watlington Road, Garsington, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 14:09.

Oxfordshire County Council logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Blackbird Leys Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Blackbird Leys Road, Oxford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:30 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 14:29.

Oxfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Section Of B480 Passing Chalgrove Airfield

Oxfordshire County Council are carrying out Highway improvement works on Section Of B480 Passing Chalgrove Airfield, Chalgrove, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 November 2024 at 09:30 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Nov 2024 at 08:43.

Oxfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Section Of B480 Passing Chalgrove Airfield

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B480 Passing Chalgrove Airfield, Chalgrove, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 27 Aug 2024 at 14:50.

Thames Water logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Crown Street

Thames Water are carrying out Utility repair and maintenance works on Crown Street, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:15.

Thames Water logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Crown Street

Thames Water are proposing to carry out Utility repair and maintenance works on Crown Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 12:45.

Scottish Hydro Electric Power Dis logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Watlington Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Watlington Road, Cowley, Oxford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 13:00 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Nov 2024 at 14:09.

Thames Water logo
Between
27 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Jack Straw's Lane

Thames Water are proposing to carry out Utility asset works on Jack Straw's Lane, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 10 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:07.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Cowley Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Cowley Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 22 Nov 2024 at 09:50.

Scottish Hydro Electric Power Dis logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Section Of B480 From Junction With B4015 North To St Katherine's Church

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Section Of B480 From Junction With B4015 North To St Katherine's Church, Chiselhampton, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 14:13.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 16 May 2025
Details
View Map
Share
Follow
Lower Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lower Road, Garsington, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 14:15.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Ock Street

Thames Water were proposing to carry out Utility repair and maintenance works on Ock Street, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:28.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Lower End

Thames Water were proposing to carry out New service connection on Lower End, Great Milton, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 10:44.

Thames Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Stowford Road

Thames Water are proposing to carry out Utility asset works on Stowford Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 08:26.

Oxfordshire County Council logo
LONG TERM
Between
13 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Road Running Through Nuneham Courtenay

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Road Running Through Nuneham Courtenay, Nuneham Courtenay, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 16 Oct 2024 at 10:04.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Gardiner Street

Thames Water are proposing to carry out New service connection on Gardiner Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 08:09.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Gardiner Street

Thames Water are proposing to carry out New service connection on Gardiner Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 11:24.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
York Road

Thames Water are proposing to carry out Utility repair and maintenance works on York Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:30.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
York Road

Thames Water are proposing to carry out Utility repair and maintenance works on York Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:53.

Thames Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
School Lane

Thames Water are proposing to carry out Utility repair and maintenance works on School Lane, Stadhampton, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 13:27.

Thames Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Church Way

Thames Water are proposing to carry out Utility repair and maintenance works on Church Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:51.

Thames Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Sawpit Road

Thames Water are proposing to carry out New service connection on Sawpit Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:05.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Saxon Way

Thames Water are proposing to carry out Utility repair and maintenance works on Saxon Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 16:22.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Charles Street

Thames Water are proposing to carry out Utility repair and maintenance works on Charles Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 11:42.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Old Road

Thames Water are proposing to carry out New service connection on Old Road, Shotover Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:29.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Old Road

Thames Water are proposing to carry out New service connection on Old Road, Shotover Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:35.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan and 18 Apr 2025
Details
View Map
Share
Follow
Road Running Through Nuneham Courtenay

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Road Running Through Nuneham Courtenay, Nuneham Courtenay, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 22 Oct 2024 at 14:13.

Thames Water logo
Between
30 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Hollow Way

Thames Water are proposing to carry out New service connection on Hollow Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:37.

Thames Water logo
Between
30 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Great Milton, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 09:34.

Oxfordshire County Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Blackbird Leys Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Blackbird Leys Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 13:35.

Oxfordshire County Council logo
LONG TERM
Between
3 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Blackbird Leys Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Blackbird Leys Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 13:37.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Catherine Street

Thames Water are proposing to carry out New service connection on Catherine Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:48.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Catherine Street

Thames Water are proposing to carry out New service connection on Catherine Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 13:22.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Thame Road

Thames Water are proposing to carry out New service connection on Thame Road, Great Haseley, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 14:07.


Roadworks Map near to Wheatley, OXFORD, OX33 1JQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 13:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wheatley, OXFORD, OX33 1JQ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
URGENT
  
AMBROSE RISE, WHEATLEY 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 23 Nov 2024 11:32
(Scheduled: 23 Nov 2024 - 27 Nov 2024)
0.5
Details
Share
Follow
2
Energy Assets Networks (formerly Utility Distribution Networks) logo
LONDON ROAD, WHEATLEY 
(1.0 miles)
Energy Assets Networks (formerly Utility Distribution Networks)
New service connection - Verge - Multi-way signals
In Progress
Since: 18 Nov 2024 10:00
(Scheduled: 18 Nov 2024 - 24 Nov 2024)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.