ROADWORKS SUMMARY
Lime Oval, WELLINGBOROUGH, NN9 6FX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lime Oval, NN9 6FX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lime Oval, WELLINGBOROUGH, NN9 6FX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lime Oval are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North Northamptonshire Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Ditchford Lane

North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Wellingborough.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:47.

North Northamptonshire Council logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Ditchford Lane

North Northamptonshire Council are carrying out Highway repair and maintenance works on Ditchford Lane, Rushden.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2024 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 22 Oct 2024 at 08:48.

Anglian Water logo
Finishing
Monday
Details
View Map
Share
Follow
Midland Road

Anglian Water are carrying out Utility repair and maintenance works on Midland Road, Raunds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 12:28 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 13:29.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Berry Green Road

Cadent Gas are proposing to carry out Utility asset works on Berry Green Road, Finedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 13:40.

BT logo
Finishing
Wednesday
Details
View Map
Share
Ditchford Lane

BT were proposing to carry out Utility asset works on Ditchford Lane, Rushden.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Aug 2024 at 09:32.

North Northamptonshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
The Hedges

North Northamptonshire Council are proposing to carry out Section 50 on The Hedges, Higham Ferrers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 30 Sep 2024 at 10:18.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Aug 2024 at 11:43.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Berry Green Road

Cadent Gas are proposing to carry out Utility asset works on Berry Green Road, Finedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 09:04.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Aug 2024 at 11:42.

BT logo
Finishing
Wednesday
Details
View Map
Share
Ditchford Lane

BT were proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Aug 2024 at 09:32.

Anglian Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Hargrave.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 30 Oct 2024 at 15:34.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Chapel Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Chapel Lane, Denford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Oct 2024 at 14:04.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Lilley Terrace

Anglian Water are proposing to carry out Utility repair and maintenance works on Lilley Terrace, Irthlingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 9 Oct 2024 at 08:17.

Anglian Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Chelveston Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Chelveston Road, Raunds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 10:18.

Cityfibre Metro Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Chapel Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Chapel Lane, Denford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Oct 2024 at 14:07.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Coffee Tavern Lane

Cadent Gas are proposing to carry out Utility asset works on Coffee Tavern Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:40.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Coffee Tavern Lane

Cadent Gas are proposing to carry out Utility asset works on Coffee Tavern Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:38.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:42.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:45.

North Northamptonshire Council logo
Between
10 and 12 Jan 2025
Details
View Map
Share
A605 Eastern Bypass

North Northamptonshire Council were proposing to carry out Highway repair and maintenance works on A605 Eastern Bypass, Thrapston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 January 2025 and run through until 12 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 15 Nov 2024 at 16:35.

North Northamptonshire Council logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Windmill Banks

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Windmill Banks, Higham Ferrers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 17 Oct 2024 at 09:36.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Allen Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Allen Road, Irthlingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 3 Oct 2024 at 09:33.

Cityfibre Metro Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Freemans Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Freemans Lane, Denford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Oct 2024 at 14:05.

Cityfibre Metro Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Freemans Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Freemans Lane, Denford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Oct 2024 at 14:09.

Cityfibre Metro Networks logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Denford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Oct 2024 at 14:05.

North Northamptonshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Meadow Lane

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Meadow Lane, Raunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 14:05.

North Northamptonshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Marshalls Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Marshalls Road, Raunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 14:02.

North Northamptonshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on London Road, Raunds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 4 Sep 2024 at 13:55.

Cadent Gas logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Mountbatten Drive

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Mountbatten Drive, Ringstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:29.

Cityfibre Metro Networks logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
School Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on School Lane, Denford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Oct 2024 at 15:16.

Anglian Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Loop Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Loop Road, Keyston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 24 Oct 2024 at 12:28.

Anglian Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Harborough Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Harborough Road, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 29 Oct 2024 at 09:46.

Cityfibre Metro Networks logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Lane, Denford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Oct 2024 at 15:16.

Cityfibre Metro Networks logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Church Lane, Denford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 15 Oct 2024 at 14:04.

Anglian Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Westfield Place

Anglian Water are proposing to carry out Utility repair and maintenance works on Westfield Place, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 09:27.

Anglian Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

Anglian Water are proposing to carry out Remedial works on High Street, Twywell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 6 Nov 2024 at 09:28.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Wellingborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Nov 2024 at 13:12.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Ditchford Lane

BT are proposing to carry out Utility asset works on Ditchford Lane, Rushden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Nov 2024 at 13:19.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Finedon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 14:49.

Cadent Gas logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
A6 Irthlingborough Bypass

Cadent Gas are proposing to carry out Utility asset works on A6 Irthlingborough Bypass, Irthlingborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:46.

Bedford Borough Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

Bedford Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Yielden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bedford Borough Council on 20 Nov 2024 at 13:38.


Roadworks Map near to Lime Oval, WELLINGBOROUGH, NN9 6FX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 15:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lime Oval, WELLINGBOROUGH, NN9 6FX (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
BURYSTEAD RISE 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 24 Nov 2024 - 26 Nov 2024
0.7
Details
Share
Follow
2
BT logo
BURYSTEAD RISE 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 24 Nov 2024 - 26 Nov 2024
0.8
Details
Share
Follow
3
Anglian Water logo
URGENT
  
MIDLAND ROAD 
(0.9 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 19 Nov 2024 12:28
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
0.9
Details
Share
Follow