ROADWORKS SUMMARY
Wellington Place, Barrack Road, NORTHAMPTON, NN1 3RQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wellington Place, Barrack Road, NN1 3RQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wellington Place, Barrack Road, NORTHAMPTON, NN1 3RQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wellington Place, Barrack Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Northamptonshire Council logo
LONG TERM
Between
8 Jun and 20 Dec 2024
Details
View Map
Share
Follow
Newport Pagnell Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Newport Pagnell Road, Northampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Northamptonshire Council on 2 Apr 2024 at 09:49.

West Northamptonshire Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Rushmere Road

West Northamptonshire Council are carrying out Highway repair and maintenance works on Rushmere Road, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 21 Oct 2024 at 11:33.

West Northamptonshire Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Billing Road

West Northamptonshire Council are carrying out Highway repair and maintenance works on Billing Road, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 21 Oct 2024 at 11:32.

West Northamptonshire Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Billing Road East

West Northamptonshire Council are carrying out Highway repair and maintenance works on Billing Road East, Northampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 21 Oct 2024 at 12:16.

West Northamptonshire Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Park Avenue South

West Northamptonshire Council are carrying out Highway repair and maintenance works on Park Avenue South, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 21 Oct 2024 at 14:38.

Cadent Gas logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Wellingborough Road

Cadent Gas were proposing to carry out Utility asset works on Wellingborough Road, Northampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 14:12.

West Northamptonshire Council logo
LONG TERM
Between
15 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Rushmere Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rushmere Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 11:21.

West Northamptonshire Council logo
LONG TERM
Between
15 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Billing Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Billing Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 11:21.

West Northamptonshire Council logo
LONG TERM
Between
15 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Billing Road East

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Billing Road East, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 11:19.

West Northamptonshire Council logo
LONG TERM
Between
15 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Park Avenue South

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Park Avenue South, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 11:25.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Main Road

Cadent Gas are carrying out Utility asset works on Main Road, Duston, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 14:30 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:31.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
South Oval

Cadent Gas are carrying out Utility asset works on South Oval, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 11:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:38.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Welland Way

Cadent Gas are carrying out Utility asset works on Welland Way, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 14:00 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 15:55.

West Northamptonshire Council logo
LONG TERM
Until
25 Dec 2024
Details
View Map
Share
Follow
Brampton Lane

West Northamptonshire Council are carrying out Highway repair and maintenance works on Brampton Lane, Pitsford.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 17:00 and could run through until 25 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 27 Nov 2024 at 10:38.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beech Avenue

Cadent Gas are carrying out Utility asset works on Beech Avenue, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 10:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:07.

Cadent Gas logo
Between
2 and 26 Dec 2024
Details
View Map
Share
Follow
Pembroke Road

Cadent Gas are proposing to carry out Utility asset works on Pembroke Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 26 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:22.

Cadent Gas logo
Between
2 and 26 Dec 2024
Details
View Map
Share
Follow
Raynsford Road

Cadent Gas are proposing to carry out Utility asset works on Raynsford Road, Northampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 26 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:07.

Cadent Gas logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Birchfield Road East

Cadent Gas are carrying out Utility asset works on Birchfield Road East, Northampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 08:09.

Cadent Gas logo
Between
2 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Gladstone Road

Cadent Gas are proposing to carry out Utility asset works on Gladstone Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:24.

Cadent Gas logo
Between
2 and 24 Dec 2024
Details
View Map
Share
Follow
Welland Way

Cadent Gas are proposing to carry out Utility asset works on Welland Way, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:06.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
East Oval

Cadent Gas are proposing to carry out Utility asset works on East Oval, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:07.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
East Oval

Cadent Gas are proposing to carry out Utility asset works on East Oval, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 07:29.

West Northamptonshire Council logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Sandy Lane

West Northamptonshire Council are carrying out Highway repair and maintenance works on Sandy Lane, Chapel Brampton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 09:30 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 10 Dec 2024 at 11:57.

West Northamptonshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Rushmere Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rushmere Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 3 Sep 2024 at 16:58.

West Northamptonshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Rushmere Road

West Northamptonshire Council are carrying out Highway repair and maintenance works on Rushmere Road, Northampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 20:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Dec 2024 at 09:17.

West Northamptonshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Billing Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Billing Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 3 Sep 2024 at 16:57.

West Northamptonshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Billing Road

West Northamptonshire Council are carrying out Highway repair and maintenance works on Billing Road, Northampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 20:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Dec 2024 at 09:16.

West Northamptonshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Park Avenue South

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Park Avenue South, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 3 Sep 2024 at 16:57.

West Northamptonshire Council logo
Finishing
Today
Details
View Map
Share
Follow
Park Avenue South

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Park Avenue South, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 27 Nov 2024 at 14:46.

Cadent Gas logo
Between
9 and 24 Dec 2024
Details
View Map
Share
Follow
South Oval

Cadent Gas are proposing to carry out Utility asset works on South Oval, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:09.

Cadent Gas logo
Between
9 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
The Green

Cadent Gas are proposing to carry out Utility asset works on The Green, Kingsthorpe, Northampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:30.

Cadent Gas logo
Until
30 Dec 2024
Details
View Map
Share
Follow
The Green

Cadent Gas are carrying out Utility asset works on The Green, Kingsthorpe, Northampton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 11:50 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 11:55.

Cadent Gas logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Pembroke Road

Cadent Gas are proposing to carry out Utility asset works on Pembroke Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:12.

Cadent Gas logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Raynsford Road

Cadent Gas are proposing to carry out Utility asset works on Raynsford Road, Northampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:17.

Cadent Gas logo
Between
16 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Gladstone Road

Cadent Gas are proposing to carry out Utility asset works on Gladstone Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:13.

Anglian Water logo
Between
17 and 23 Dec 2024
Details
View Map
Share
Harlestone Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Harlestone Road, Harlestone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 10:19.

West Northamptonshire Council logo
LONG TERM
Between
6 Jan and 31 Aug 2025
Details
View Map
Share
Follow
Newport Pagnell Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Newport Pagnell Road, Northampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Aug 2024 at 08:50.

West Northamptonshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
The Green

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on The Green, Great Houghton, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 4 Oct 2024 at 13:19.

West Northamptonshire Council logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Weedon Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Weedon Road, Harpole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 18 Nov 2024 at 05:54.

Cadent Gas logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Ross Road

Cadent Gas were proposing to carry out Utility asset works on Ross Road, Northampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 1 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:54.

Cadent Gas logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Ross Road

Cadent Gas are proposing to carry out Utility asset works on Ross Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 11:06.

Cadent Gas logo
Between
6 and 28 Jan 2025
Details
View Map
Share
Follow
Weedon Road

Cadent Gas are proposing to carry out Utility asset works on Weedon Road, Northampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 15:53.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitworth Road

Cadent Gas are proposing to carry out New service connection on Whitworth Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:50.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Harlestone Road

Cadent Gas are proposing to carry out Utility asset works on Harlestone Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 11:36.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Wellingborough Road

Cadent Gas were proposing to carry out Utility asset works on Wellingborough Road, Northampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 10:34.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:31.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:46.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Dallington, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 12:22.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 08:34.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Park Drive

Cadent Gas are proposing to carry out Utility asset works on Park Drive, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 12:24.

Western Power Distribution (East Midlands) logo
Between
6 and 16 Jan 2025
Details
View Map
Share
Follow
Humfrey Lane

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Humfrey Lane, Boughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Sep 2024 at 10:27.

BT logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Cherry Tree Lane

BT are proposing to carry out Utility asset works on Cherry Tree Lane, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Oct 2024 at 12:18.

Anglian Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Marefair

Anglian Water are proposing to carry out Utility repair and maintenance works on Marefair, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 11 Sep 2024 at 10:06.

Anglian Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Marefair

Anglian Water are proposing to carry out Utility repair and maintenance works on Marefair, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 12 Dec 2024 at 15:13.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
12 Jan and 2 Mar 2025
Details
View Map
Share
Follow
St Peters Way

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on St Peters Way, Northampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Nov 2024 at 11:24.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Quinton Road

BT are proposing to carry out Utility asset works on Quinton Road, Courteenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Oct 2024 at 06:29.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Courteenhall Road

BT are proposing to carry out Utility asset works on Courteenhall Road, Quinton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Oct 2024 at 06:28.

West Northamptonshire Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Salthouse Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Salthouse Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 18 Sep 2024 at 11:23.

Cadent Gas logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Duston Road

Cadent Gas are proposing to carry out Utility asset works on Duston Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 12:25.

Cadent Gas logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Glasgow Street

Cadent Gas are proposing to carry out Utility asset works on Glasgow Street, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:16.

West Northamptonshire Council logo
LONG TERM
Between
13 Jan and 22 Mar 2025
Details
View Map
Share
Sandy Lane

West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Sandy Lane, Harlestone.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 22 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Dec 2024 at 08:40.

West Northamptonshire Council logo
LONG TERM
Between
13 Jan and 22 Mar 2025
Details
View Map
Share
C204 Northampton Road

West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on C204 Northampton Road, Harlestone.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 22 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Dec 2024 at 08:42.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
High Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Ecton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Oct 2024 at 09:29.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
High Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on High Street, Ecton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Nov 2024 at 10:04.

West Northamptonshire Council logo
LONG TERM
Between
13 Jan and 22 Mar 2025
Details
View Map
Share
Harlestone Road

West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Harlestone Road, Harlestone.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 22 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Dec 2024 at 08:39.

Cadent Gas logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Resthaven Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Resthaven Road, Wootton, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 11:35.

West Northamptonshire Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Rothersthorpe Road

West Northamptonshire Council are proposing to carry out Core Sampling on Rothersthorpe Road, Kislingbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Nov 2024 at 05:09.

West Northamptonshire Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Spring Gardens

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Spring Gardens, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 10:04.

West Northamptonshire Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Derngate

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Derngate, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 09:53.

West Northamptonshire Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Scholars Court

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Scholars Court, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 10:02.

West Northamptonshire Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Hazelwood Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Hazelwood Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 10:00.

West Northamptonshire Council logo
Between
20 Jan and 9 Feb 2025
Details
View Map
Share
Follow
St Crispin Drive

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on St Crispin Drive, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 18 Oct 2024 at 10:24.

West Northamptonshire Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Castilian Street

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Castilian Street, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 09:54.

West Northamptonshire Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Derngate

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Derngate, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 09:58.

Anglian Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Einstein Crescent

Anglian Water are proposing to carry out Utility repair and maintenance works on Einstein Crescent, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 12:40.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Kingsthorpe, Northampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:25.

Cadent Gas logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wellingborough Road

Cadent Gas are proposing to carry out Utility asset works on Wellingborough Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:42.

Anglian Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Harlestone Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Harlestone Road, Harlestone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 10:15.

Anglian Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Harlestone Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Harlestone Road, Harlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 12 Dec 2024 at 11:58.

West Northamptonshire Council logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Albion Place

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Albion Place, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 15 Jul 2024 at 09:51.

Anglian Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Junction Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Junction Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 13:08.

West Northamptonshire Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Acre Lane

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Acre Lane, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Sep 2024 at 12:08.

West Northamptonshire Council logo
Between
25 and 30 Jan 2025
Details
View Map
Share
Follow
Oxford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Oxford Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 4 Nov 2024 at 09:43.

ES Pipelines logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Marefair

ES Pipelines are proposing to carry out Utility asset works on Marefair, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ES Pipelines on 22 Nov 2024 at 10:24.

West Northamptonshire Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Tollgate Way

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Tollgate Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 09:24.

West Northamptonshire Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Westgate Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Westgate Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 09:25.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Oliver Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Oliver Street, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 13:09.

Cadent Gas logo
Between
27 Jan and 18 Feb 2025
Details
View Map
Share
Follow
Highfield Road

Cadent Gas are proposing to carry out Utility asset works on Highfield Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:21.

Cadent Gas logo
Between
27 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Park Avenue North

Cadent Gas are proposing to carry out Utility asset works on Park Avenue North, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 11:14.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wildacre Drive

Cadent Gas are proposing to carry out Utility asset works on Wildacre Drive, Billing, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:27.

West Northamptonshire Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Welford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Chapel Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 22 Nov 2024 at 09:14.

West Northamptonshire Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Welford Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Spratton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 22 Nov 2024 at 09:16.

West Northamptonshire Council logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
East Park Parade

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on East Park Parade, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 11 Sep 2024 at 10:00.

West Northamptonshire Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on High Street, Wootton, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 29 Oct 2024 at 08:23.

Anglian Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Chestnut Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Chestnut Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 24 Oct 2024 at 09:59.

West Northamptonshire Council logo
Between
30 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Nene Rise

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Nene Rise, Cogenhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 10 Oct 2024 at 07:17.

West Northamptonshire Council logo
Between
30 Jan and 24 Feb 2025
Details
View Map
Share
Follow
St Peters Way

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on St Peters Way, Cogenhoe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 10 Oct 2024 at 07:21.

West Northamptonshire Council logo
Between
31 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Kettering Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kettering Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Aug 2024 at 14:26.

West Northamptonshire Council logo
Between
31 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Park Avenue North

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Park Avenue North, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 16 Aug 2024 at 09:04.

West Northamptonshire Council logo
Between
31 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Kenmuir Avenue

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kenmuir Avenue, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 15 Aug 2024 at 10:41.

West Northamptonshire Council logo
Between
31 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Harborough Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harborough Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 16 Aug 2024 at 09:06.

ES Pipelines logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Follow
Marefair

ES Pipelines are proposing to carry out Utility asset works on Marefair, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ES Pipelines on 22 Nov 2024 at 09:29.

Western Power Distribution (East Midlands) logo
Between
2 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Gas Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Gas Street, Northampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Nov 2024 at 11:25.

Cadent Gas logo
Between
3 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Collingwood Road

Cadent Gas are proposing to carry out Utility asset works on Collingwood Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:12.

Cadent Gas logo
Between
3 and 22 Feb 2025
Details
View Map
Share
Follow
Kingsley Park Terrace

Cadent Gas are proposing to carry out Utility asset works on Kingsley Park Terrace, Northampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 11:31.

West Northamptonshire Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Meadow Close

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Meadow Close, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 24 Oct 2024 at 12:57.

Cadent Gas logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Cottage Gardens

Cadent Gas are proposing to carry out Utility asset works on Cottage Gardens, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:29.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Standing Stones

Cadent Gas are proposing to carry out Utility asset works on Standing Stones, Billing, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:30.

West Northamptonshire Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Watermeadow Drive

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Watermeadow Drive, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Sep 2024 at 10:36.

Anglian Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Milton Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Milton Street, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 15:37.

Anglian Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Berrywood Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Berrywood Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 09:38.

West Northamptonshire Council logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Harlestone Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Harlestone Road, Harlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 11 Nov 2024 at 10:07.

West Northamptonshire Council logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
The Green

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on The Green, Great Houghton, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 17 Oct 2024 at 15:33.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
St Peters Way

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on St Peters Way, Northampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Dec 2024 at 09:08.

West Northamptonshire Council logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Kettering Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kettering Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 19 Nov 2024 at 13:22.

West Northamptonshire Council logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Clare Street

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Clare Street, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 19 Nov 2024 at 13:25.

West Northamptonshire Council logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Clare Street

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Clare Street, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 18 Oct 2024 at 10:21.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
East Park Parade

Cadent Gas are proposing to carry out Utility asset works on East Park Parade, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 11:56.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
The Drive

Cadent Gas are proposing to carry out Utility asset works on The Drive, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:22.

Anglian Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Shelley Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Shelley Street, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 15:36.

West Northamptonshire Council logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Wellingborough Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Wellingborough Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 5 Dec 2024 at 16:19.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Firsview Drive

Cadent Gas are proposing to carry out Utility asset works on Firsview Drive, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 11:42.

North Northamptonshire Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Quinton Road

North Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Quinton Road, Wootton, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Northamptonshire Council on 29 Oct 2024 at 15:51.

West Northamptonshire Council logo
Between
17 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Weedon Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Weedon Road, Harpole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 18 Nov 2024 at 05:50.

Western Power Distribution (East Midlands) logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
St Francis Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on St Francis Avenue, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 13:11.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Byron Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Byron Street, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 11:25.

Anglian Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Balmoral Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Balmoral Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 10:20.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Overstone Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Overstone Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 09:46.

West Northamptonshire Council logo
Between
19 and 22 Feb 2025
Details
View Map
Share
Follow
Edgar Mobbs Way

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Edgar Mobbs Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 18 Nov 2024 at 11:52.

West Northamptonshire Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Sandy Lane

West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on Sandy Lane, Harlestone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Dec 2024 at 08:45.

West Northamptonshire Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
C204 Northampton Road

West Northamptonshire Council were proposing to carry out Highway repair and maintenance works on C204 Northampton Road, Harlestone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 12 Dec 2024 at 08:43.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
24 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Horseshoe Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Horseshoe Street, Northampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Nov 2024 at 11:26.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
24 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Gold Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Gold Street, Northampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 4 Nov 2024 at 11:23.

Cadent Gas logo
Between
24 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Fir Tree Walk

Cadent Gas are proposing to carry out Utility asset works on Fir Tree Walk, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:55.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:40.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:10.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Moore Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Moore Street, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Oct 2024 at 13:25.

Cadent Gas logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Lumbertubs Way

Cadent Gas are proposing to carry out Utility asset works on Lumbertubs Way, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:40.

Cadent Gas logo
LONG TERM
Between
24 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Wellingborough Road

Cadent Gas are proposing to carry out Utility asset works on Wellingborough Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:52.

Western Power Distribution (East Midlands) logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Gas Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Gas Street, Northampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Dec 2024 at 09:09.

West Northamptonshire Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Broadway

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Broadway, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 11 Nov 2024 at 13:54.

West Northamptonshire Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Broadway East

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Broadway East, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 11 Nov 2024 at 14:10.

West Northamptonshire Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Park Avenue North

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Park Avenue North, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 11 Nov 2024 at 13:53.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Quarry Road

Cadent Gas are proposing to carry out Utility asset works on Quarry Road, Northampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 16:05.

West Northamptonshire Council logo
LONG TERM
Between
5 Mar and 5 Oct 2025
Details
View Map
Share
Follow
Sandy Lane

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Sandy Lane, Chapel Brampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 6 Dec 2024 at 14:07.

West Northamptonshire Council logo
LONG TERM
Between
9 Mar and 13 Dec 2025
Details
View Map
Share
Follow
Rushmere Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Rushmere Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 27 Nov 2024 at 13:02.

West Northamptonshire Council logo
Between
9 and 13 Mar 2025
Details
View Map
Share
Follow
Billing Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Billing Road, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 27 Nov 2024 at 13:02.

West Northamptonshire Council logo
Between
9 and 13 Mar 2025
Details
View Map
Share
Follow
Park Avenue South

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Park Avenue South, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 27 Nov 2024 at 12:59.

West Northamptonshire Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
West Oval

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on West Oval, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 14 Oct 2024 at 12:54.

West Northamptonshire Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
South Oval

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on South Oval, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 14 Oct 2024 at 12:55.

Anglian Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Ridgeway

Anglian Water are proposing to carry out Utility repair and maintenance works on Ridgeway, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Nov 2024 at 11:50.

West Northamptonshire Council logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Kenmuir Avenue

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Kenmuir Avenue, Northampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 13 Nov 2024 at 08:58.


Roadworks Map near to Wellington Place, Barrack Road, NORTHAMPTON, NN1 3RQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Dec 2024 01:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wellington Place, Barrack Road, NORTHAMPTON, NN1 3RQ (25 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (East Midlands) logo
URGENT
  
ST ANDREWS ROAD 
(0.3 miles)
Western Power Distribution (East Midlands)
Utility repair and maintenance works - Footway, Carriageway - Lane closure
In Progress
Since: 3 Dec 2024 15:15
(Scheduled: 3 Dec 2024 - 16 Dec 2024)
0.3
Details
Share
Follow
2
West Northamptonshire Council logo
GREYFRIARS 
(0.3 miles)
West Northamptonshire Council
Highway repair and maintenance works - Footpath - No carriageway incursion
In Progress
Since: 12 Dec 2024 08:00
(Scheduled: 12 Dec 2024 - 13 Dec 2024)
0.3
Details
Share
Follow
3
Cadent Gas logo
EMERGENCY
  
OVERSTONE ROAD 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 24 Nov 2024 06:00
(Scheduled: 24 Nov 2024 - 31 Dec 2024)
0.3
Details
Share
Follow
4
Western Power Distribution (East Midlands) logo
HUNTER STREET 
(0.4 miles)
Western Power Distribution (East Midlands)
New service connection - Footway - Some carriageway incursion
In Progress
Since: 9 Dec 2024 17:03
(Scheduled: 9 Dec 2024 - 16 Dec 2024)
0.4
Details
Share
Follow
5
Anglian Water logo
URGENT
  
WELLINGBOROUGH ROAD 
(0.5 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 12 Dec 2024 08:46
(Scheduled: 12 Dec 2024 - 18 Dec 2024)
0.5
Details
Share
Follow
6
Anglian Water logo
URGENT
  
KINGSWELL STREET 
(0.5 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Complete
10 Dec 2024 15:37 - 12 Dec 2024 14:40
0.5
Details
Share
7
Anglian Water logo
PYTCHLEY STREET 
(0.6 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 12 Dec 2024 - 16 Dec 2024
0.6
Details
Share
Follow
8
BT logo
CHEPSTOW CLOSE 
(0.6 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
Complete
10 Dec 2024 16:40 - 11 Dec 2024 09:02
0.6
Details
Share
9
Cadent Gas logo
MAJOR
  
COMMERCIAL STREET 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 13 Nov 2024 - 28 Feb 2025
0.6
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
COMMERCIAL STREET 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 13 Nov 2024 - 28 Feb 2025
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.