ROADWORKS SUMMARY
Roundel Drive, LEIGHTON BUZZARD, LU7 4FW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Roundel Drive, LU7 4FW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Roundel Drive, LEIGHTON BUZZARD, LU7 4FW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Roundel Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Central Bedfordshire Council logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Leighton Road

Central Bedfordshire Council were proposing to carry out Highway improvement works on Leighton Road, Stanbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Central Bedfordshire Council on 7 Aug 2024 at 09:05.

Central Bedfordshire Council logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Bedford Road

Central Bedfordshire Council were proposing to carry out Section 50 on Bedford Road, Houghton Regis.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 4 Oct 2024 at 15:01.

Central Bedfordshire Council logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Bedford Road

Central Bedfordshire Council are proposing to carry out Section 50 on Bedford Road, Houghton Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 3 Oct 2024 at 12:30.

Anglian Water logo
LONG TERM
Between
5 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Northall Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Northall Road, Eaton Bray.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 22 Oct 2024 at 14:54.

Central Bedfordshire Council logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Bedford Road

Central Bedfordshire Council are carrying out Section 50 on Bedford Road, Houghton Regis.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 09:35 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 7 Nov 2024 at 10:23.

Central Bedfordshire Council logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Leighton Buzzard Bypass

Central Bedfordshire Council are proposing to carry out Section 58 on Leighton Buzzard Bypass, Leighton Buzzard.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 2 Sep 2024 at 09:15.

Anglian Water logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Northall Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Northall Road, Eaton Bray.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 12 Nov 2024 at 10:59.

Anglian Water logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Northall Road

Anglian Water carried out Utility repair and maintenance works on Northall Road, Eaton Bray.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 18 Nov 2024 and 23 Dec 2024 and were actually completed between 21 Nov 2024 (19:02) and 23 Nov 2024 (01:20). The works impacted the footway and carriageway.

This roadwork event was last updated by Anglian Water on 23 Nov 2024 at 01:20.

Central Bedfordshire Council logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Thorn Road

Central Bedfordshire Council are carrying out Highway improvement works on Thorn Road, Houghton Regis.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 18 Nov 2024 at 11:10.

Central Bedfordshire Council logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Thorn Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Thorn Road, Houghton Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 7 Oct 2024 at 14:52.

Central Bedfordshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Meadway

Central Bedfordshire Council are proposing to carry out Section 58 on Meadway, Dunstable.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 27 Aug 2024 at 11:21.

Central Bedfordshire Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Leighton Buzzard Bypass

Central Bedfordshire Council are proposing to carry out Section 58 on Leighton Buzzard Bypass, Leighton Buzzard.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 4 Nov 2024 at 10:05.

Anglian Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Leighton Road

Anglian Water are carrying out Utility repair and maintenance works on Leighton Road, Wing.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 13:42 and could run through until 28 November 2024. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 12:09.

Central Bedfordshire Council logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Meadway

Central Bedfordshire Council are carrying out Section 58 on Meadway, Dunstable.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 08:30 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 21 Nov 2024 at 08:31.

Buckinghamshire Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Aylesbury Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Aylesbury Road, Wing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 23 Jul 2024 at 13:18.

Buckinghamshire Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Aylesbury Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Aylesbury Road, Wing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Aug 2024 at 09:49.

Central Bedfordshire Council logo
Finishing
Friday
Details
View Map
Share
Wing Road

Central Bedfordshire Council were proposing to carry out Highway repair and maintenance works on Wing Road, Linslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 23 Oct 2024 at 13:04.

Network Rail logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Old Linslade Road

Network Rail are proposing to carry out Works for Rail Purposes on Old Linslade Road, Heath And Reach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Aug 2024 at 16:34.

Network Rail logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Old Linslade Road

Network Rail are proposing to carry out Works for Rail Purposes on Old Linslade Road, Heath And Reach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 11:55.

BT logo
Between
25 Nov and 14 Dec 2024
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, Milton Bryan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 2 Sep 2024 at 14:01.

Central Bedfordshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bower Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Bower Lane, Eaton Bray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Aug 2024 at 15:39.

Central Bedfordshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bower Lane

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Bower Lane, Eaton Bray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 28 Aug 2024 at 07:48.

BT logo
Between
25 Nov and 14 Dec 2024
Details
View Map
Share
Follow
London Road

BT are proposing to carry out Utility asset works on London Road, Milton Bryan.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 13:21.

Western Power Distribution (East Midlands) logo
Between
26 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Heath Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Heath Road, Great Brickhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 23 Aug 2024 at 12:46.

Western Power Distribution (East Midlands) logo
Between
26 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Heath Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Heath Road, Great Brickhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Sep 2024 at 11:45.

Anglian Water logo
Between
1 and 13 Dec 2024
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Wing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Sep 2024 at 12:03.

Anglian Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Princes Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Princes Street, Toddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 11:18.

Anglian Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Princes Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Princes Street, Toddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 9 Jul 2024 at 11:14.

BT logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Harling Road

BT are proposing to carry out Utility asset works on Harling Road, Eaton Bray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 12 Nov 2024 at 12:23.

BT logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Harling Road

BT are proposing to carry out Utility asset works on Harling Road, Eaton Bray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 9 Sep 2024 at 11:42.

Central Bedfordshire Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Greenways

Central Bedfordshire Council are proposing to carry out Highway improvement works on Greenways, Eaton Bray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 14 Feb 2024 at 19:34.

Anglian Water logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Wing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Sep 2024 at 12:05.

Telefonica UK logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Leighton Road

Telefonica UK were proposing to carry out Utility asset works on Leighton Road, Three Locks, Soulbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Telefonica UK on 16 Sep 2024 at 10:24.

Telefonica UK logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Leighton Road

Telefonica UK are proposing to carry out Utility asset works on Leighton Road, Three Locks, Soulbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the verge only.

This roadwork event was last updated by Telefonica UK on 17 Sep 2024 at 16:05.

Anglian Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Rotten Row

Anglian Water were proposing to carry out Utility repair and maintenance works on Rotten Row, Great Brickhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 19 Nov 2024 at 14:50.

Central Bedfordshire Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Old Linslade Road

Central Bedfordshire Council are proposing to carry out Highway improvement works on Old Linslade Road, Heath And Reach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 25 Sep 2024 at 11:20.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Ashwell Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Ashwell Street, Leighton Buzzard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 11:20.

BT logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Woburn Road

BT are proposing to carry out Utility asset works on Woburn Road, Heath And Reach.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 2 Oct 2024 at 11:29.

BT logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Sheep Lane

BT are proposing to carry out Utility asset works on Sheep Lane, Potsgrove.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Oct 2024 at 11:30.

BT logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
A5 From End Of Dualling South East Of Little Brickhill To J A4012

BT are proposing to carry out Utility asset works on A5 From End Of Dualling South East Of Little Brickhill To J A4012, South Bedfordshire.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 Oct 2024 at 09:44.

BT logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
A5 From End Of Dualling South East Of Little Brickhill To J A4012

BT are proposing to carry out Utility asset works on A5 From End Of Dualling South East Of Little Brickhill To J A4012, South Bedfordshire.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 3 Oct 2024 at 08:27.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Summer Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Summer Street, Leighton Buzzard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 19 Sep 2024 at 18:27.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Soulbury Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Soulbury Road, Stewkley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 14:29.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Soulbury Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Soulbury Road, Stewkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Nov 2024 at 08:13.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Soulbury Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Soulbury Road, Stewkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 09:53.

Anglian Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Soulbury Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Soulbury Road, Stewkley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 7 Nov 2024 at 14:33.

Anglian Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
St Andrews Street

Anglian Water are proposing to carry out Utility repair and maintenance works on St Andrews Street, Leighton Buzzard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 24 Sep 2024 at 12:13.

Anglian Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Little Brickhill Lane

Anglian Water were proposing to carry out Utility repair and maintenance works on Little Brickhill Lane, Great Brickhill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 26 Sep 2024 at 08:25.

Anglian Water logo
Between
15 and 24 Jan 2025
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Wing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 13:12.

Central Bedfordshire Council logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Hockliffe Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Hockliffe Road, Leighton Buzzard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 10 Oct 2024 at 09:14.

Central Bedfordshire Council logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Hockliffe Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Hockliffe Road, Leighton Buzzard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 9 Oct 2024 at 12:00.

Central Bedfordshire Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Old Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Old Road, Linslade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Oct 2024 at 12:18.

Central Bedfordshire Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Old Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Old Road, Linslade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 24 Oct 2024 at 10:33.

Central Bedfordshire Council logo
Between
21 Jan and 3 Feb 2025
Details
View Map
Share
Woburn Road

Central Bedfordshire Council were proposing to carry out Highway improvement works on Woburn Road, Heath And Reach.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 3 February 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Central Bedfordshire Council on 18 Nov 2024 at 14:04.

Anglian Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Soulbury Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Soulbury Road, Stewkley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 22 Nov 2024 at 14:31.

Hutchinson 3G logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Shenley Hill Road

Hutchinson 3G are proposing to carry out Utility asset works on Shenley Hill Road, Leighton Buzzard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hutchinson 3G on 19 Nov 2024 at 14:48.

Anglian Water logo
Between
30 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Church Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Church Street, Wing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 09:52.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Ship Road

BT are proposing to carry out Utility asset works on Ship Road, Linslade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Nov 2024 at 13:30.

Anglian Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Bragenham Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Bragenham Lane, Heath And Reach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 5 Nov 2024 at 10:47.

BT logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Ship Road

BT are proposing to carry out Utility asset works on Ship Road, Linslade.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 7 Nov 2024 at 16:14.

Buckinghamshire Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Great Brickhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Nov 2024 at 13:49.

Buckinghamshire Council logo
Between
12 and 21 Feb 2025
Details
View Map
Share
Follow
Stapleford Mill Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Stapleford Mill Road, Soulbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Nov 2024 at 14:50.

Buckinghamshire Council logo
Between
12 and 21 Feb 2025
Details
View Map
Share
Follow
Partridge Hill

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Partridge Hill, Great Brickhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Nov 2024 at 14:47.

Central Bedfordshire Council logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hockliffe Road

Central Bedfordshire Council are proposing to carry out Highway repair and maintenance works on Hockliffe Road, Leighton Buzzard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Central Bedfordshire Council on 14 Nov 2024 at 09:56.


Roadworks Map near to Roundel Drive, LEIGHTON BUZZARD, LU7 4FW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 15:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Roundel Drive, LEIGHTON BUZZARD, LU7 4FW (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Central Bedfordshire Council logo
MAJOR
  
LEIGHTON ROAD 
(0.1 miles)
Central Bedfordshire Council
Highway improvement works - Carriageway, Footpath - Road closure
Cancelled
(Scheduled: 4 Nov 2024 - 13 Dec 2024)
0.1
Details
Share
2
Anglian Water logo
LEIGHTON ROAD 
(0.4 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.4
Details
Share
Follow
3
Central Bedfordshire Council logo
MAJOR
  
LEIGHTON BUZZARD BYPASS 
(0.8 miles)
Central Bedfordshire Council
Section 58 - Carriageway - Two-way signals
Planned
Scheduled: 11 Nov 2024 - 6 Dec 2024
0.8
Details
Share
Follow
4
Central Bedfordshire Council logo
MAJOR
  
LEIGHTON BUZZARD BYPASS 
(0.8 miles)
Central Bedfordshire Council
Section 58 - Carriageway - Two-way signals
Planned
Scheduled: 18 Nov 2024 - 6 Dec 2024
0.8
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
EDEN WAY 
(0.8 miles)
Southern Gas Networks
New service connection - Footway, Carriageway, Verge - Multi-way signals
Complete
11 Nov 2024 08:51 - 20 Nov 2024 12:00
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.