ROADWORKS SUMMARY
Laughton, LUTTERWORTH, LE17 6QA
Introduction
View current and future planned roadworks and road closures for LE17 6QA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Laughton, LUTTERWORTH, LE17 6QA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Jul 2024 and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Bowden Lane, Market Harborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 12:16.
31 Jul 2024 and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on The Broadway, Market Harborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 12:16.
31 Jul 2024 and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Meadow Street, Market Harborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leicestershire County Council on 23 May 2024 at 12:16.
11 Nov and 16 Dec 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Foxton Road, Lubenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 6 Nov 2024 at 13:56.
16 Dec 2024
Western Power Distribution (East Midlands) are carrying out Utility asset works on Foxton Road, Lubenham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 14:00 and could run through until 16 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Nov 2024 at 14:31.
Wednesday
Anglian Water are carrying out Utility repair and maintenance works on Westhorpe, Sibbertoft.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 10:01 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Nov 2024 at 13:09.
Friday
Gigaclear are proposing to carry out Utility asset works on Old Hall Lane, Lubenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 11 Nov 2024 at 12:26.
Friday
Gigaclear are proposing to carry out Utility asset works on Old Hall Lane, Lubenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 24 Sep 2024 at 17:29.
Friday
Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, East Farndon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 16 Sep 2024 at 14:47.
Friday
Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, East Farndon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 7 Nov 2024 at 09:44.
2 and 13 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Church Street, Sibbertoft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 7 Nov 2024 at 11:26.
10 and 14 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sibbertoft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 9 Oct 2024 at 09:27.
10 and 14 Dec 2024
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sulby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 9 Oct 2024 at 09:28.
16 Dec 2024 and 24 Feb 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Welland Park Road, Market Harborough.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 24 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 11:05.
16 Dec 2024 and 24 Feb 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Farndon Road, Market Harborough.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 24 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 11:06.
16 Dec 2024 and 24 Feb 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Welland Park Road, Market Harborough.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 24 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 11:05.
17 and 19 Dec 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on From Bunkers Hill To Long Close Lane, Laughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 26 Sep 2024 at 17:26.
17 and 19 Dec 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on From Bunkers Hill To Long Close Lane, Laughton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the verge only.
This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 17:56.
17 Dec 2024 and 24 Feb 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Foxton Road, Lubenham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 11:06.
19 Dec 2024 and 17 Feb 2025
Western Power Distribution (East Midlands) were proposing to carry out Utility asset works on Lubenham Hill, Market Harborough.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 17 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 19 Nov 2024 at 11:07.
6 and 13 Jan 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Welford Road, Arnesby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 4 Oct 2024 at 10:36.
6 and 10 Jan 2025
Leicestershire County Council were proposing to carry out Highway improvement works on Welford Road, Arnesby.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 29 Oct 2024 at 14:56.
6 Jan and 28 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Foxton Road, Lubenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 10:49.
6 Jan and 28 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Foxton Road, Lubenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 14:36.
6 and 10 Jan 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Welford Road, Arnesby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 19 Nov 2024 at 14:46.
6 and 10 Jan 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Welford Road, Arnesby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 19 Nov 2024 at 17:56.
6 Jan and 28 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Lubenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 15:16.
6 Jan and 28 Feb 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Lubenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 10:50.
6 and 10 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sibbertoft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 7 Nov 2024 at 11:29.
6 and 10 Jan 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sulby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 7 Nov 2024 at 11:30.
6 Jan and 24 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lubenham Hill, Market Harborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2024 at 10:36.
6 Jan and 23 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Station Road, North Kilworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 21 Nov 2024 at 16:07.
6 Jan and 14 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lubenham Hill, Market Harborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 10:52.
6 Jan and 14 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lubenham Hill, Market Harborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 15:16.
20 Jan and 17 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Harborough Road, Lubenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 8 Oct 2024 at 10:36.
27 and 31 Jan 2025
Western Power Distribution (East Midlands) are proposing to carry out New service connection on High Street, Fleckney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 16:26.
27 and 31 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Swingbridge Street, Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 19 Nov 2024 at 12:16.
27 and 31 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Swingbridge Street, Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 15 Nov 2024 at 12:36.
27 and 31 Jan 2025
Gigaclear are proposing to carry out Utility asset works on Swingbridge Street, Foxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Gigaclear on 14 Nov 2024 at 16:30.
17 Feb and 18 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Welland Park Road, Market Harborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 10:53.
17 Feb and 18 Mar 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Welland Park Road, Market Harborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 15:16.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Meadow Street, Market Harborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Nov 2024 at 18:26.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Meadow Street, Market Harborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on The Broadway, Market Harborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Nov 2024 at 18:26.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on The Broadway, Market Harborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 12 Nov 2024 at 09:26.
17 Feb and 2 May 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Harborough Road, Lubenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 15:16.
17 Feb and 2 May 2025
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Harborough Road, Lubenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 18 Nov 2024 at 10:51.
17 Feb and 31 Mar 2025
Leicestershire County Council are proposing to carry out Highway improvement works on Bowden Lane, Market Harborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leicestershire County Council on 15 Nov 2024 at 18:56.
19 and 23 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sibbertoft.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 19 Nov 2024 at 15:55.
19 and 23 Feb 2025
West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Welford Road, Sulby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Northamptonshire Council on 19 Nov 2024 at 15:51.
Roadworks Map near to Laughton, LUTTERWORTH, LE17 6QA
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Laughton, LUTTERWORTH, LE17 6QA (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.