ROADWORKS SUMMARY
Timber Hill Close, CHERTSEY, KT16 0NA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Timber Hill Close, KT16 0NA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Timber Hill Close, CHERTSEY, KT16 0NA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Timber Hill Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:32.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Constitution Hill

Surrey County Council are proposing to carry out Highway improvement works on Constitution Hill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:59.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Mount Hermon Road

Surrey County Council are proposing to carry out Highway improvement works on Mount Hermon Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:04.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Hill View Road

Surrey County Council are proposing to carry out Highway improvement works on Hill View Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:05.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
York Road

Surrey County Council are proposing to carry out Highway improvement works on York Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:50.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Station Approach

Surrey County Council are proposing to carry out Highway improvement works on Station Approach, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:44.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Bradfield Close

Surrey County Council are proposing to carry out Highway improvement works on Bradfield Close, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Feb 2021 at 12:42.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Heathside Road

Surrey County Council are proposing to carry out Highway improvement works on Heathside Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:03.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Heathside Crescent

Surrey County Council are proposing to carry out Highway improvement works on Heathside Crescent, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Apr 2021 at 09:58.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Victoria Road

Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:47.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Goldsworth Road

Surrey County Council are proposing to carry out Highway improvement works on Goldsworth Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:01.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Church Street West

Surrey County Council are proposing to carry out Highway improvement works on Church Street West, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:57.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Forge End

Surrey County Council are proposing to carry out Highway improvement works on Forge End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:00.

Surrey County Council logo
LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Follow
Victoria Way

Surrey County Council are proposing to carry out Highway improvement works on Victoria Way, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:49.

Network Rail logo
LONG TERM
Between
1 Nov 2022 and 31 May 2025
Details
View Map
Share
Follow
Victoria Way

Network Rail are proposing to carry out Works for Rail Purposes on Victoria Way, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2022 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 9 Jun 2021 at 06:50.

National Highways logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Ockham Road North

National Highways are carrying out Highway improvement works on Ockham Road North, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2023 at 20:00 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 11 Dec 2024 at 15:30.

National Highways logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Portsmouth Road

National Highways are carrying out Highway improvement works on Portsmouth Road, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2023 at 20:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 11 Dec 2024 at 15:30.

National Highways logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Elm Lane

National Highways are carrying out Highway improvement works on Elm Lane, Ockham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2023 at 08:00 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 30 Sep 2024 at 11:22.

Surrey County Council logo
LONG TERM
Between
1 Apr 2024 and 1 Apr 2026
Details
View Map
Share
Follow
Elmgrove Road

Surrey County Council are proposing to carry out Highway improvement works on Elmgrove Road, Weybridge.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 1 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 12:26.

Surrey County Council logo
LONG TERM
Between
20 May 2024 and 20 May 2026
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:44.

Surrey County Council logo
LONG TERM
Between
20 May 2024 and 20 May 2026
Details
View Map
Share
Follow
Monument Hill

Surrey County Council are proposing to carry out Highway improvement works on Monument Hill, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:45.

Surrey County Council logo
LONG TERM
Between
20 May 2024 and 20 May 2026
Details
View Map
Share
Follow
Monument Green

Surrey County Council are proposing to carry out Highway improvement works on Monument Green, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:44.

Surrey County Council logo
LONG TERM
Between
3 Jun 2024 and 1 Sep 2026
Details
View Map
Share
Old Wharf Way

Surrey County Council were proposing to carry out Highway improvement works on Old Wharf Way, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2024 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 16:43.

Surrey County Council logo
LONG TERM
Between
3 Jun 2024 and 1 Sep 2026
Details
View Map
Share
Bridge Road

Surrey County Council were proposing to carry out Highway improvement works on Bridge Road, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 June 2024 and run through until 1 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 16:44.

Surrey County Council logo
LONG TERM
Until
14 Mar 2025
Details
View Map
Share
Follow
Squires Bridge Road

Surrey County Council are carrying out Highway improvement works on Squires Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:00 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 2 Dec 2024 at 11:16.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Laleham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:19.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Staines Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:17.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Laleham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Feb 2024 at 13:45.

Surrey County Council logo
LONG TERM
Between
22 Jul 2024 and 22 Aug 2025
Details
View Map
Share
Follow
Guildford Road

Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 22 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 22 May 2024 at 08:24.

Surrey County Council logo
LONG TERM
Between
2 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Bridge Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 11:49.

Surrey County Council logo
LONG TERM
Between
2 Sep 2024 and 1 Sep 2026
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 16 Feb 2024 at 09:46.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Benner Lane

Surrey County Council are proposing to carry out Highway improvement works on Benner Lane, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 31 Jul 2024 at 07:47.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
St Georges Avenue

Surrey County Council are proposing to carry out Highway improvement works on St Georges Avenue, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 08:21.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Manygate Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Manygate Lane, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Jul 2024 at 07:40.

Cadent Gas logo
LONG TERM
Between
3 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 12:45.

Cadent Gas logo
LONG TERM
Between
3 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 15:20.

Cadent Gas logo
LONG TERM
Until
7 Jan 2025
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are carrying out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 13:04 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
7 Oct 2024 and 18 Apr 2025
Details
View Map
Share
Maybury Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 18 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 14:15.

Cadent Gas logo
LONG TERM
Until
16 Jan 2025
Details
View Map
Share
Follow
Green Road

Cadent Gas are carrying out Utility asset works on Green Road, Thorpe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:40 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:47.

Southern Gas Networks logo
LONG TERM
Between
14 Oct 2024 and 27 Jun 2025
Details
View Map
Share
Maybury Hill

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:43.

Surrey County Council logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Gaston Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Gaston Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 14:34.

Surrey County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Gaston Bridge Road

Surrey County Council are carrying out Highway improvement works on Gaston Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 14:55.

Southern Gas Networks logo
LONG TERM
Between
26 Oct and 20 Dec 2024
Details
View Map
Share
Westfield Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Westfield Avenue, Westfield, Woking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 08:56.

Electricity Network Company logo
LONG TERM
Between
30 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Newark Lane

Electricity Network Company were proposing to carry out Utility asset works on Newark Lane, Ripley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 18 Nov 2024 at 09:28.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Barrs Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Barrs Lane, Knaphill, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 14:46.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Heath Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Heath Road, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 11:33.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Chobham Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Chobham Lane, Chertsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 13:34.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Chobham Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Chobham Lane, Longcross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 13:31.

Southern Gas Networks logo
LONG TERM
Between
4 Nov 2024 and 18 Apr 2025
Details
View Map
Share
Follow
Send Marsh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Send Marsh Road, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 10:43.

Surrey County Council logo
LONG TERM
Between
4 Nov and 30 Dec 2024
Details
View Map
Share
Old Wharf Way

Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Wharf Way, Weybridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 30 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 16:01.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Shepperton Road

Cadent Gas are carrying out Utility asset works on Shepperton Road, Shepperton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 15:24 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:13.

UK Power Networks South Eastern logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Woodham Lane

UK Power Networks South Eastern are carrying out New service connection on Woodham Lane, Addlestone.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 10:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 10:21.

Surrey County Council logo
LONG TERM
Between
6 Nov 2024 and 23 Mar 2026
Details
View Map
Share
Follow
Staines Road

Surrey County Council are proposing to carry out Highway improvement works on Staines Road, Chertsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 23 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Jun 2024 at 09:37.

National Highways logo
LONG TERM
Between
11 Nov 2024 and 31 Dec 2026
Details
View Map
Share
Follow
Wisley Lane

National Highways are proposing to carry out Works for road purposes on Wisley Lane, Wisley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Oct 2024 at 10:55.

National Highways logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
Wisley Lane

National Highways are carrying out Works for road purposes on Wisley Lane, Wisley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Nov 2024 at 08:51.

Southern Gas Networks logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Maybury Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Maybury Hill, Woking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:55 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:37.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 12:52.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:25.

Electricity Network Company logo
LONG TERM
Between
14 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Church Hill

Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 31 Oct 2024 at 09:32.

Electricity Network Company logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Church Hill

Electricity Network Company are carrying out Utility asset works on Church Hill, Pyrford, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 10:30 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 14 Nov 2024 at 10:40.

Surrey County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Sandpit Hall Road

Surrey County Council are carrying out Highway repair and maintenance works on Sandpit Hall Road, Chobham, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Dec 2024 at 09:26.

Surrey County Council logo
LONG TERM
Between
19 Nov 2024 and 19 May 2025
Details
View Map
Share
Follow
Maybury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Maybury Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Aug 2024 at 15:48.

Electricity Network Company logo
LONG TERM
Between
19 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Barnes Wallis Drive

Electricity Network Company are proposing to carry out Utility asset works on Barnes Wallis Drive, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 24 Sep 2024 at 16:02.

Southern Gas Networks logo
LONG TERM
Until
12 Feb 2025
Details
View Map
Share
Follow
Shaftesbury Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Shaftesbury Road, Woking.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 08:30 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:40.

UK Power Networks South Eastern logo
Between
25 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Grange Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on Grange Road, New Haw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 15:38.

Cadent Gas logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Bedford Lane

Cadent Gas are carrying out Utility asset works on Bedford Lane, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 07:10 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 16:25.

Southern Gas Networks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Bury Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Bury Lane, Horsell, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 12:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 15:18.

UK Power Networks South Eastern logo
Until
23 Dec 2024
Details
View Map
Share
Follow
Grange Road

UK Power Networks South Eastern are carrying out Utility asset works on Grange Road, New Haw.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 14:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Nov 2024 at 15:29.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Kingfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 08:59.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Kingfield Road

Surrey County Council are carrying out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 20:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 08:02.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wych Hill Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wych Hill Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 12:46.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wych Hill Lane

Surrey County Council are carrying out Highway repair and maintenance works on Wych Hill Lane, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 20:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 08:02.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Station Road

Surrey County Council are carrying out Highway repair and maintenance works on Station Road, Addlestone.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 20:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 14:08.

Surrey County Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Send Marsh Road

Surrey County Council are proposing to carry out Highway improvement works on Send Marsh Road, Send.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 15 Nov 2024 at 09:55.

Surrey County Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Send Marsh Road

Surrey County Council are carrying out Highway improvement works on Send Marsh Road, Send.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 2 Dec 2024 at 13:57.

Electricity Network Company logo
LONG TERM
Between
2 Dec 2024 and 1 May 2025
Details
View Map
Share
Newark Lane

Electricity Network Company were proposing to carry out Utility asset works on Newark Lane, Ripley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 1 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 22 Nov 2024 at 15:07.

UK Power Networks South Eastern logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Almners Road

UK Power Networks South Eastern are proposing to carry out New service connection on Almners Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 30 Sep 2024 at 16:15.

UK Power Networks South Eastern logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Almners Road

UK Power Networks South Eastern are carrying out New service connection on Almners Road, Chertsey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Dec 2024 at 09:13.

Surrey County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Victoria Way

Surrey County Council are carrying out Highway repair and maintenance works on Victoria Way, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 December 2024 at 15:08 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 08:22.

Surrey County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Coombelands Lane

Surrey County Council are carrying out Highway repair and maintenance works on Coombelands Lane, Addlestone.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 December 2024 at 20:40 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 09:15.

Surrey County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Blackmore Crescent

Surrey County Council are carrying out Highway repair and maintenance works on Blackmore Crescent, Sheerwater, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 December 2024 at 22:47 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 09:20.

Surrey County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Hook Heath Road

Surrey County Council are carrying out Highway repair and maintenance works on Hook Heath Road, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 04:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 16:41.

Surrey County Council logo
Finishing
Monday
Details
View Map
Share
Hook Heath Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Hook Heath Road, Woking.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 08:57.

National Highways logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Byfleet Road

National Highways are proposing to carry out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 24 Oct 2024 at 12:48.

National Highways logo
Until
19 Dec 2024
Details
View Map
Share
Follow
Byfleet Road

National Highways are carrying out Works for road purposes on Byfleet Road, Cobham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 20:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Dec 2024 at 20:22.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Pennypot Lane

Surrey County Council are carrying out Highway repair and maintenance works on Pennypot Lane, Chobham, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 09:19 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 09:58.

Affinity Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Holly Bank Road

Affinity Water are proposing to carry out Utility asset works on Holly Bank Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 11:11.

Affinity Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Ruxbury Road

Affinity Water are proposing to carry out Utility asset works on Ruxbury Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 16:07.

Affinity Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Ruxbury Road

Affinity Water are proposing to carry out Utility asset works on Ruxbury Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 13:42.

Surrey County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Commercial Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 07:17.

Surrey County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Commercial Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 08:06.

Cornerstone Telecommunications Infrastructure logo
Between
20 and 22 Dec 2024
Details
View Map
Share
Follow
Camphill Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Camphill Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 22 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 15 Nov 2024 at 10:39.

Cornerstone Telecommunications Infrastructure logo
Between
20 and 22 Dec 2024
Details
View Map
Share
Follow
Camphill Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Camphill Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 22 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 4 Dec 2024 at 09:10.

Network Rail logo
Between
21 and 23 Dec 2024
Details
View Map
Share
Guildford Road

Network Rail were proposing to carry out Works for Rail Purposes on Guildford Road, Chertsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Sep 2024 at 11:03.

Cornerstone Telecommunications Infrastructure logo
Between
2 and 5 Jan 2025
Details
View Map
Share
Follow
Camphill Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Camphill Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 24 Oct 2024 at 13:52.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Church Lane

Surrey County Council are proposing to carry out Highway improvement works on Church Lane, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:48.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Devonshire Road

Surrey County Council are proposing to carry out Highway improvement works on Devonshire Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:42.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Balfour Road

Surrey County Council are proposing to carry out Highway improvement works on Balfour Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:06.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Weybridge Road

Surrey County Council are proposing to carry out Highway improvement works on Weybridge Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:48.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Churchfield Road

Surrey County Council are proposing to carry out Highway improvement works on Churchfield Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:15.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Baker Street

Surrey County Council are proposing to carry out Highway improvement works on Baker Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:06.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Church Street

Surrey County Council are proposing to carry out Highway improvement works on Church Street, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 15 Feb 2024 at 13:25.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Minorca Road

Surrey County Council are proposing to carry out Highway improvement works on Minorca Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:43.

Surrey County Council logo
LONG TERM
Between
2 Jan and 19 Dec 2025
Details
View Map
Share
Follow
Portmore Park Road

Surrey County Council are proposing to carry out Highway improvement works on Portmore Park Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:46.

UK Power Networks South Eastern logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Send Marsh Road

UK Power Networks South Eastern are proposing to carry out New service connection on Send Marsh Road, Ripley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 07:35.

BT logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Gorsewood Road

BT are proposing to carry out Utility asset works on Gorsewood Road, St Johns, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Sep 2024 at 08:12.

Surrey County Council logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Lane End Drive

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lane End Drive, Knaphill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Dec 2024 at 14:48.

Surrey County Council logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Lane End Drive

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lane End Drive, Knaphill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 10:23.

Cadent Gas logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Pennypot Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Pennypot Lane, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 08:11.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Balfour Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Balfour Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:01.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Balfour Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Balfour Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 09:04.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Balfour Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Balfour Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 15:42.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Church Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:02.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Church Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:37.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Devonshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Devonshire Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:55.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Devonshire Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Devonshire Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 09:17.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Round Oak Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Round Oak Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:37.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Round Oak Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Round Oak Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 09:30.

Network Rail logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Guildford Road

Network Rail are proposing to carry out Works for Rail Purposes on Guildford Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Oct 2024 at 17:04.

Network Rail logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Guildford Road

Network Rail are proposing to carry out Works for Rail Purposes on Guildford Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Nov 2024 at 10:32.

Affinity Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Ruxbury Road

Affinity Water are proposing to carry out Utility asset works on Ruxbury Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 12:38.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Bedford Lane

Cadent Gas are proposing to carry out Utility asset works on Bedford Lane, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.

Surrey County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lyne Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:22.

Surrey County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Lyne Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Lyne Lane, Egham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 14:43.

Surrey County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lyne Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:23.

Affinity Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Church Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Church Road, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 10:26.

Affinity Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Church Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Church Road, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Oct 2024 at 12:06.

Affinity Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Guildford Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Guildford Road, Mayford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 17:30.

UK Power Networks South Eastern logo
Between
7 and 16 Jan 2025
Details
View Map
Share
Follow
Accommodation Road

UK Power Networks South Eastern are proposing to carry out New service connection on Accommodation Road, Chertsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 14:24.

Cadent Gas logo
LONG TERM
Between
8 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:14.

Cadent Gas logo
LONG TERM
Between
8 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:09.

Cadent Gas logo
LONG TERM
Between
8 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Stroude Road

Cadent Gas are proposing to carry out Utility asset works on Stroude Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 12:27.

Surrey County Council logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Windlesham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Windlesham Road, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 07:54.

UK Power Networks South Eastern logo
Between
11 and 23 Jan 2025
Details
View Map
Share
Follow
Littlewick Road

UK Power Networks South Eastern are proposing to carry out New service connection on Littlewick Road, Knaphill, Woking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 23 January 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Sep 2024 at 15:02.

UK Power Networks South Eastern logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Littlewick Road

UK Power Networks South Eastern were proposing to carry out New service connection on Littlewick Road, Knaphill, Woking.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 29 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 09:14.

Electricity Network Company logo
LONG TERM
Between
13 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Barnes Wallis Drive

Electricity Network Company are proposing to carry out Utility asset works on Barnes Wallis Drive, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 23 Oct 2024 at 15:24.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Coworth Close

Cadent Gas are proposing to carry out Utility asset works on Coworth Close, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:58.

Affinity Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Sandy Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Maybury, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 10:44.

Affinity Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Brooklands Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Brooklands Lane, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 09:38.

Energy Assets Pipelines logo
Between
17 and 23 Jan 2025
Details
View Map
Share
Follow
Rosemary Lane

Energy Assets Pipelines are proposing to carry out Utility asset works on Rosemary Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 15 Oct 2024 at 16:28.

Energy Assets Pipelines logo
Between
17 and 23 Jan 2025
Details
View Map
Share
Follow
Rosemary Lane

Energy Assets Pipelines are proposing to carry out Utility asset works on Rosemary Lane, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Energy Assets Pipelines on 16 Oct 2024 at 13:42.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hook Hill Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 13:39.

Surrey County Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hare Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Hill, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Aug 2024 at 07:04.

Surrey County Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hare Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Hare Hill, Addlestone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 13:54.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wey Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wey Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:38.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wey Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wey Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 09:29.

Surrey County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Trumps Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Trumps Green Road, Virginia Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 10:12.

Surrey County Council logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lyne Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 09:33.

Surrey County Council logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lyne Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lyne Lane, Egham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 09:33.

Affinity Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Wisley Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Wisley Lane, Wisley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 10:09.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Smarts Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Smarts Heath Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 15:04.

Electricity Network Company logo
LONG TERM
Between
27 Jan and 26 Jun 2025
Details
View Map
Share
Follow
Newark Lane

Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 26 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 4 Dec 2024 at 11:33.

Surrey County Council logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Lane End Drive

Surrey County Council were proposing to carry out Highway repair and maintenance works on Lane End Drive, Knaphill, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 14:59.

Surrey County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Bridge Road, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Jul 2024 at 10:41.

Surrey County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Addlestone Road

Surrey County Council are proposing to carry out Highway improvement works on Addlestone Road, Addlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Jul 2024 at 13:52.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Village Road

Cadent Gas are proposing to carry out Utility asset works on Village Road, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 15:13.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Giles Travers Close

Cadent Gas are proposing to carry out Utility asset works on Giles Travers Close, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 13:33.

Surrey County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Woburn Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woburn Hill, Addlestone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Sep 2024 at 17:10.

Surrey County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Woburn Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Woburn Hill, Addlestone.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Oct 2024 at 09:13.

Esso Petroleum Co logo
Between
3 and 15 Feb 2025
Details
View Map
Share
Follow
Canford Drive

Esso Petroleum Co are proposing to carry out Utility asset works on Canford Drive, Addlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Esso Petroleum Co on 20 Nov 2024 at 13:53.

Esso Petroleum Co logo
Between
3 and 15 Feb 2025
Details
View Map
Share
Follow
Canford Drive

Esso Petroleum Co are proposing to carry out Utility asset works on Canford Drive, Addlestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Esso Petroleum Co on 26 Nov 2024 at 11:00.

Surrey County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Trumps Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Trumps Green Road, Virginia Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Nov 2024 at 12:56.

Surrey County Council logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Trumps Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Trumps Green Road, Virginia Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Dec 2024 at 16:08.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Green Road

Cadent Gas are proposing to carry out Utility asset works on Green Road, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:30.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Green Road

Cadent Gas are proposing to carry out Utility asset works on Green Road, Thorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:42.

Southern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Pembroke Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pembroke Road, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 10:13.

Southern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Sheerwater Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheerwater Road, West Byfleet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Jun 2024 at 10:36.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Madeira Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Madeira Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Jun 2024 at 07:37.

Affinity Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Red Lion Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Red Lion Road, Chobham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 11:59.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Portmore Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portmore Park Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:35.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Portmore Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portmore Park Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:31.

Network Rail logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
London Road

Network Rail are proposing to carry out Works for Rail Purposes on London Road, Sunningdale, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Oct 2024 at 08:31.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Hook Hill Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 12:19.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Hook Hill Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 15:00.

Electricity Network Company logo
Between
17 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Newark Lane

Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 21 Aug 2024 at 15:04.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Amstel Way

Surrey County Council are proposing to carry out Highway improvement works on Amstel Way, St Johns, Woking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 12:10.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Common Close

BT are proposing to carry out Utility asset works on Common Close, Horsell, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 12 Nov 2024 at 16:31.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Common Close

BT are proposing to carry out Utility asset works on Common Close, Horsell, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 10 Dec 2024 at 12:34.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Camphill Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Camphill Road, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 12:59.

Affinity Water logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Holly Bank Road

Affinity Water are proposing to carry out Utility asset works on Holly Bank Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:05.

Surrey County Council logo
LONG TERM
Between
24 Feb and 22 Apr 2025
Details
View Map
Share
Follow
Egley Road

Surrey County Council are proposing to carry out Highway improvement works on Egley Road, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:11.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Giles Travers Close

Cadent Gas are proposing to carry out Utility asset works on Giles Travers Close, Thorpe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:55.

Surrey County Council logo
LONG TERM
Between
26 Feb and 18 Jun 2025
Details
View Map
Share
Follow
The Broadway

Surrey County Council are proposing to carry out Highway improvement works on The Broadway, Laleham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 10 Apr 2024 at 06:52.

Surrey County Council logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
Bury Lane

Surrey County Council are proposing to carry out Highway improvement works on Bury Lane, Horsell, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 12:43.

Affinity Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility repair and maintenance works on High Road, Byfleet, West Byfleet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 08:13.

Surrey County Council logo
LONG TERM
Between
3 Mar and 27 Jun 2025
Details
View Map
Share
Follow
The Broadway

Surrey County Council are proposing to carry out Highway improvement works on The Broadway, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 27 Jun 2024 at 07:43.

Surrey County Council logo
LONG TERM
Between
3 Mar and 27 Jun 2025
Details
View Map
Share
Follow
Shepperton Road

Surrey County Council are proposing to carry out Highway improvement works on Shepperton Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 27 Jun 2024 at 07:43.

Surrey County Council logo
LONG TERM
Between
3 Mar and 27 Jun 2025
Details
View Map
Share
Follow
Staines Road

Surrey County Council are proposing to carry out Highway improvement works on Staines Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 27 Jun 2024 at 07:43.

Network Rail logo
Between
8 and 10 Mar 2025
Details
View Map
Share
Follow
St Johns Hill Road

Network Rail are proposing to carry out Works for Rail Purposes on St Johns Hill Road, St Johns, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Dec 2024 at 12:52.

Southern Gas Networks logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Pine Grove

Southern Gas Networks are proposing to carry out New service connection on Pine Grove, Weybridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 10:07.

Southern Gas Networks logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Thames Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thames Street, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 11:27.

Southern Gas Networks logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Grotto Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grotto Road, Weybridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 08:33.

Affinity Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Sandhills Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Sandhills Lane, Virginia Water.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 15:20.


Roadworks Map near to Timber Hill Close, CHERTSEY, KT16 0NA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 23:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Timber Hill Close, CHERTSEY, KT16 0NA (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Affinity Water logo
BROX ROAD 
(0.2 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 12 Dec 2024 - 16 Dec 2024
0.2
Details
Share
Follow
2
Surrey County Council logo
BROX ROAD 
(0.3 miles)
Surrey County Council
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 11 Dec 2024 08:00
(Scheduled: 11 Dec 2024 - 23 Dec 2024)
0.3
Details
Share
Follow
3
UK Power Networks South Eastern logo
URGENT
  
GUILDFORD ROAD 
(0.7 miles)
UK Power Networks South Eastern
Utility repair and maintenance works - Verge - Two-way signals
Complete
6 Dec 2024 06:43 - 15:35
0.7
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.