ROADWORKS SUMMARY
Victoria Road, KINGSTON UPON THAMES, KT1 3DR
Introduction
View current and future planned roadworks and road closures for Victoria Road, KT1 3DR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Victoria Road, KINGSTON UPON THAMES, KT1 3DR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Victoria Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Burtons Road, Hampton Hill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:23.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Colne Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Hartington Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 07:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Winchester Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:53.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Strathmore Road, Teddington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Clifden Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Lion Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Copthall Gardens, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Staten Gardens, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Station Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Ripley Road, Hampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:24.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on St James's Avenue, Hampton Hill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:24.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Egerton Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:27.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Carrington Road, Richmond.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:54.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Lower Teddington Road, Kingston Upon Thames.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:22.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Meadlands Drive, Petersham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Elmsleigh Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:23.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on First Cross Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:28.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Amyand Park Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:25.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Rosedale Road, Stoneleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 14:06.
1 Jul 2024 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Princes Avenue, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
1 Jul 2024 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
1 Jul 2024 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Elgar Avenue, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
1 Jul 2024 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Red Lion Road, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
1 Jul 2024 and 31 Jul 2026
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
31 Jul 2026
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Egmont Road, Tolworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 14:00 and could run through until 31 July 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:28.
31 Dec 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Derby Road, Tolworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:26.
31 Dec 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Douglas Road, Tolworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:26.
31 Dec 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Broomfield Road, Tolworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:25.
31 Dec 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Worthington Road, Tolworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 14:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Oct 2024 at 14:25.
31 Jul 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Ditton Road, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 14:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
1 Jul 2024 and 31 Dec 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Beaconsfield Road, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
31 Jul 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Kingsdowne Road, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 14:00 and could run through until 31 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
1 Jul 2024 and 31 Jul 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Hollyfield Road, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Sep 2024 at 16:30.
1 Jul 2024 and 28 Feb 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Jun 2024 at 11:07.
28 Feb 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Browns Road, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Nov 2024 at 08:20.
28 Feb 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Langley Road, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 14 Oct 2024 at 08:38.
28 Feb 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on South Place, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 October 2024 at 14:50 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 11 Oct 2024 at 14:50.
1 Jul 2024 and 28 Feb 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Ewell Road, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 18 Jun 2024 at 10:38.
28 Feb 2025
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Oak Hill Crescent, Surbiton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 9 Sep 2024 at 08:27.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Common Road, Claygate, Esher.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 23 May 2024 at 12:56.
22 Aug 2024 and 9 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2024 and could run through until 9 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 10 Jan 2024 at 14:54.
27 Aug and 22 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 26 Jul 2024 at 14:09.
27 Aug and 22 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 12:37.
Today
London Borough Of Richmond Upon Thames are carrying out Highway improvement works on Waldegrave Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 22 Nov 2024 at 14:19.
27 Aug 2024 and 14 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:28.
27 Aug 2024 and 14 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on London Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:30.
1 Sep 2024 and 1 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Park, Walton-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Jun 2024 at 11:32.
26 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 08:06.
25 Jul 2025
Transport for London (TfL) are carrying out Highway improvement works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:08.
25 Jul 2025
Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:09.
25 Jul 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 10:09.
21 Oct 2024 and 25 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cole Park Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 16:21.
25 Jul 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 06:00 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 06:47.
21 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Stoneleigh Crescent, Stoneleigh.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 28 Oct 2024 at 09:17.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Traps Lane, New Malden.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 October 2024 at 01:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 12:49.
1 Nov 2024 and 1 May 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Hare Lane, Claygate, Esher.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 11:36.
Today
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Rowlls Road, Kingston Upon Thames.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 30 Oct 2024 at 15:17.
Today
Royal Borough Of Kingston Upon Thames are carrying out Highway improvement works on Rowlls Road, Kingston Upon Thames.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 6 Nov 2024 at 14:24.
17 Nov 2024 and 17 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Gadesden Road, West Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2024 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Aug 2024 at 08:30.
Today
Thames Water are carrying out Utility repair and maintenance works on Windsor Road, Teddington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:48 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:54.
23 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Weston Green Road, Thames Ditton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 00:30 and could run through until 23 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 09:13.
Sunday
Electricity Network Company are carrying out Utility asset works on Ravensbury Grove, Mitcham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 2 Dec 2024 at 15:52.
25 Nov 2024 and 27 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kingston Hill, Kingston Upon Thames.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 12:08.
23 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Queens Road, Kingston Upon Thames.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 14:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:34.
27 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Kingston Vale, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 00:25 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 12:15.
Today
Thames Water are carrying out Utility repair and maintenance works on West Barnes Lane, New Malden.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 16:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Nov 2024 at 22:52.
23 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Roehampton Vale, Roehampton, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 02:45 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:35.
2 and 22 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:27.
2 and 20 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Sep 2024 at 09:09.
2 and 20 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Sep 2024 at 09:24.
2 and 20 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Burlington Road, New Malden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Nov 2024 at 08:43.
Monday
Thames Water are carrying out Utility asset works on Derwent Avenue, Kingston Vale.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:45 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 10:54.
Tuesday
Thames Water were proposing to carry out Utility asset works on Hampton Road East, Feltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 16:08.
Thursday
London Borough Of Richmond Upon Thames are proposing to carry out Section 50 on Kneller Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 2 Dec 2024 at 14:55.
Thursday
London Borough Of Richmond Upon Thames are carrying out Section 50 on Kneller Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 2 Dec 2024 at 15:17.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Hare Lane, Claygate, Esher.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 01:40 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:46.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Kingston Road, New Malden.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 December 2024 at 18:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 10:37.
Sunday
Transport for London (TfL) are proposing to carry out Highway improvement works on Leatherhead Road, Chessington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 11:36.
Today
Thames Water were proposing to carry out Utility repair and maintenance works on Hampton Road West, Feltham.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 11:37.
Sunday
Thames Water were proposing to carry out Utility asset works on London Road, Twickenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 15:19.
Today
London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Merton on 14 Nov 2024 at 11:35.
11 Dec 2024 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:46.
11 Dec 2024 and 3 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:47.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Fairmead, Tolworth.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 10:13 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 10:13.
12 and 30 Dec 2024
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Surbiton Hill Park, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 6 Dec 2024 at 11:19.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Ridgway, Wimbledon.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 11:20 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 14:49.
Thursday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St James's Road, Hampton Hill.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 11:37.
Tuesday
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 December 2024 and run through until 17 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 08:07.
Tomorrow
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 11:35.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Epsom Road, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:09.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Epsom Road, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 15:34.
16 and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Leatherhead Road, Chessington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 10:21.
Wednesday
BT are proposing to carry out Utility asset works on York Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 12:00.
27 and 31 Dec 2024
BT were proposing to carry out Utility asset works on Cromwell Place, Mortlake.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Oct 2024 at 12:03.
2 Jan and 1 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Barnes Lane, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 13:53.
2 Jan and 1 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Barnes Lane, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:04.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:48.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:24.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:50.
6 and 20 Jan 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clayton Road, Chessington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 21 Nov 2024 at 10:01.
6 and 30 Jan 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Thornhill Road, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 3 Oct 2024 at 13:53.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Pyne Road, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Sep 2024 at 16:18.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Southdown Road, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 08:34.
6 and 8 Jan 2025
BT are proposing to carry out Utility asset works on Walpole Place, Teddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Dec 2024 at 12:29.
6 and 16 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 14 Nov 2024 at 15:46.
6 and 16 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 08:10.
6 and 16 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 14:45.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility asset works on Richmond Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:45.
6 Jan and 6 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Kneller Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 09:04.
6 and 31 Jan 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Pagoda Avenue, Richmond.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2024 at 13:11.
7 and 20 Jan 2025
Thames Water are proposing to carry out New service connection on Percy Road, Hampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:20.
7 and 20 Jan 2025
Thames Water are proposing to carry out New service connection on Percy Road, Hampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 11:53.
7 and 9 Jan 2025
BT are proposing to carry out Utility asset works on Mullins Path, Mortlake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 8 Oct 2024 at 10:07.
10 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:43.
10 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:20.
10 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:42.
10 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:23.
13 and 17 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 14:26.
13 and 27 Jan 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clayton Road, Chessington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 26 Nov 2024 at 15:44.
13 and 27 Jan 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Clayton Road, Chessington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 2 Dec 2024 at 09:09.
13 and 24 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on St Mark's Hill, Surbiton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and footpath.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 16:43.
13 Jan and 10 Feb 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Lingfield Avenue, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 26 Nov 2024 at 15:41.
13 Jan and 10 Feb 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Lingfield Avenue, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 2 Dec 2024 at 10:55.
13 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out Remedial works on Eden Street, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:10.
13 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out Remedial works on Lady Booth Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:18.
13 Jan and 2 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Worple Road, Wimbledon, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.
13 Jan and 2 Feb 2025
Thames Water are proposing to carry out roadworks on Thornton Hill, Wimbledon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.
13 Jan and 2 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Cranbrook Road, Wimbledon, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:09.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath From 89 Latchmere Lane To 206 Tudor Drive, Kingston Upon Thames.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:31.
13 and 28 Jan 2025
Thames Water are proposing to carry out Utility asset works on Hampton Road East, Feltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 10:21.
13 Jan and 21 Feb 2025
London Borough Of Hounslow were proposing to carry out Highway improvement works on North Street, Isleworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 11 Dec 2024 at 10:01.
13 Jan and 21 Feb 2025
London Borough Of Hounslow were proposing to carry out Highway improvement works on St Johns Road, Isleworth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 11 Dec 2024 at 10:02.
13 Jan and 21 Feb 2025
London Borough Of Hounslow were proposing to carry out Highway improvement works on Twickenham Road, Isleworth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 11 Dec 2024 at 10:01.
13 and 17 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Nov 2024 at 09:41.
13 and 17 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Nov 2024 at 10:06.
14 and 17 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Fullers Way South, Chessington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Oct 2024 at 11:36.
17 and 20 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on The Parade, Claygate, Esher.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Oct 2024 at 15:32.
18 and 20 Jan 2025
Network Rail were proposing to carry out Works for Rail Purposes on The Parade, Claygate, Esher.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 10 Sep 2024 at 08:22.
18 Jan and 22 Feb 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Eden Street, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 16 Aug 2024 at 15:36.
20 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fullers Way South, Chessington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Oct 2024 at 12:13.
20 and 24 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Hook Rise South, Chessington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 11:18.
20 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hook Rise South, Chessington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 11:21.
20 and 24 Jan 2025
Network Rail were proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 25 Sep 2024 at 16:40.
20 and 24 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Sep 2024 at 08:04.
20 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 08:29.
20 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:38.
20 and 31 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Martin Way, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 09:33.
20 and 31 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 16:06.
20 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:45.
20 and 22 Jan 2025
BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 07:41.
20 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 14:49.
24 and 27 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on The Parade, Claygate, Esher.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Oct 2024 at 15:29.
25 and 27 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on King Charles Road, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Oct 2024 at 10:25.
27 and 31 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Nov 2024 at 16:55.
27 and 31 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Plough Road, West Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 14:25.
27 Jan and 14 Mar 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Elmcroft Drive, Chessington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Dec 2024 at 14:49.
27 Jan and 14 Mar 2025
Transport for London (TfL) are proposing to carry out New service connection on Ace Parade, Chessington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 14:44.
27 Jan and 1 Feb 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Alexandra Drive, Surbiton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 1 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 7 Nov 2024 at 13:08.
27 Jan and 1 Feb 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Alexandra Drive, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 12 Nov 2024 at 10:13.
27 Jan and 1 Feb 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Alexandra Drive, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 14 Nov 2024 at 09:48.
27 Jan and 1 Feb 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Alexandra Drive, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 14 Nov 2024 at 09:59.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:02.
27 Jan and 28 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Central Road, Morden.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 14:46.
27 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:47.
27 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:26.
27 Jan and 4 Feb 2025
Thames Water are proposing to carry out New service connection on Bloomfield Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:27.
27 Jan and 4 Feb 2025
Thames Water are proposing to carry out New service connection on Bloomfield Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 11:17.
27 and 31 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Albert Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:21.
31 Jan and 3 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on The Parade, Claygate, Esher.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Oct 2024 at 15:31.
3 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:46.
3 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:32.
3 and 28 Feb 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Orchard Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 24 Oct 2024 at 11:04.
3 and 5 Feb 2025
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hampton Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 8 Nov 2024 at 16:30.
3 and 5 Feb 2025
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hampton Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Nov 2024 at 15:36.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kingston Road, Roehampton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 13:41.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kingston Road, Roehampton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:01.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 13:40.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 09:58.
3 and 10 Feb 2025
Thames Water are proposing to carry out New service connection on Camborne Road, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 08:53.
8 and 16 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on London Road, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Dec 2024 at 13:33.
10 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coverts Road, Claygate, Esher.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 19:41.
10 and 13 Feb 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Red Lion Road, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 6 Dec 2024 at 10:51.
10 and 27 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 11:04.
10 Feb and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:51.
10 Feb and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:54.
10 and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gibbon Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Nov 2024 at 11:56.
10 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 13:59.
10 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 14:50.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility asset works on Elborough Street, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:17.
12 and 14 Feb 2025
BT are proposing to carry out Utility asset works on Walpole Place, Teddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 13 Nov 2024 at 10:14.
15 and 22 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Hampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 10:41.
15 Feb and 23 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Barnes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:57.
17 Feb and 29 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Copsem Lane, Esher.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:33.
17 Feb and 11 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Copsem Lane, Esher.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:34.
17 Feb and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hilbert Road, North Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 17:10.
17 Feb and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hilbert Road, North Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:44.
17 Feb and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wrayfield Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 17:07.
17 Feb and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wrayfield Road, Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:46.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Tolworth Rise South, Tolworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Oct 2024 at 11:00.
17 and 27 Feb 2025
Surrey County Council were proposing to carry out Highway improvement works on Portsmouth Road, Long Ditton, Surbiton.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 14:51.
17 and 20 Feb 2025
Thames Water are proposing to carry out New service connection on The Roystons, Surbiton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 08:10.
17 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northway, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:34.
17 and 27 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Hampton Court Way, East Molesey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:07.
17 and 27 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Hampton Court Way, East Molesey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 12:04.
17 and 28 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 12 Dec 2024 at 15:52.
17 and 20 Feb 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Burntwood Lane, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 21 Nov 2024 at 10:04.
17 and 19 Feb 2025
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Crown Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 6 Dec 2024 at 13:13.
17 and 19 Feb 2025
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Crown Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Dec 2024 at 10:44.
17 and 19 Feb 2025
London Borough Of Lewisham were proposing to carry out Highway improvement works on Crown Road, Twickenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 6 Dec 2024 at 10:16.
18 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street, Ewell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:49.
18 and 28 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Kingsley Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 08:05.
18 and 28 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Kingsley Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 14:40.
22 Feb and 23 Apr 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Hook Rise South, Chessington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:31.
24 and 28 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Marham Gardens, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Dec 2024 at 08:10.
24 and 28 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on West Barnes Lane, New Malden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Oct 2024 at 08:58.
24 Feb and 11 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belmont Avenue, New Malden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 13:47.
24 Feb and 11 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Belmont Avenue, New Malden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 08:26.
24 Feb and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cherrywood Lane, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:37.
24 Feb and 1 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Thames Street, Sunbury On Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 10:39.
25 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Embankment, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 14:58.
26 Feb and 1 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Kingston Road, Raynes Park.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:02.
26 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Dec 2024 at 08:58.
26 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Dec 2024 at 08:54.
3 and 8 Mar 2025
Telefonica UK are proposing to carry out Utility asset works on Jubilee Way, Chessington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 12 Nov 2024 at 10:23.
3 Mar and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hayes Crescent, North Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 17:11.
3 Mar and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hayes Crescent, North Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:49.
3 and 12 Mar 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Victoria Avenue, West Molesey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 12 Dec 2024 at 09:46.
3 and 12 Mar 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Victoria Avenue, West Molesey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 12 Dec 2024 at 11:33.
3 and 21 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on French Street, Sunbury On Thames.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 13:50.
3 and 17 Mar 2025
Thames Water were proposing to carry out Utility asset works on Ashburnham Road, Ham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 15:57.
3 and 23 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Strathville Road, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 06:46.
3 and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Holly Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Nov 2024 at 10:37.
10 and 14 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gilders Road, Chessington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 13:43.
10 and 21 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cox Lane, West Ewell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:51.
10 and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buxton Crescent, North Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 17:12.
10 and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buxton Crescent, North Cheam.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:47.
10 and 13 Mar 2025
Thames Water are proposing to carry out New service connection on Southsea Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:55.
Roadworks Map near to Victoria Road, KINGSTON UPON THAMES, KT1 3DR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Victoria Road, KINGSTON UPON THAMES, KT1 3DR (53 Events)
(Scheduled Dates)
(miles)
(Scheduled: 6 Nov 2024 - 13 Dec 2024)
(Scheduled: 12 Dec 2024 - 19 Dec 2024)
(Scheduled: 12 Dec 2024 - 19 Dec 2024)
(Scheduled: 11 Dec 2024 - 13 Dec 2024)
(Scheduled: 12 Dec 2024 - 16 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data