ROADWORKS SUMMARY
Burrow Road, CHIGWELL, IG7 4NF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Burrow Road, IG7 4NF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Burrow Road, CHIGWELL, IG7 4NF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Burrow Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Until
4 May 2026
Details
View Map
Share
Follow
Station Way

Essex County Council are carrying out Highway improvement works on Station Way, Buckhurst Hill.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 April 2023 at 08:33 and could run through until 4 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Jul 2024 at 07:13.

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Broadmead Road

London Borough Of Redbridge are carrying out Highway repair and maintenance works on Broadmead Road, Woodford Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2023 at 07:34 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 17 Jun 2024 at 12:01.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Dec 2024 at 10:44.

LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Dec 2024 at 10:44.

LONG TERM
Between
15 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Sheringham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 10 Dec 2024 at 10:42.

LONG TERM
Between
15 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Dersingham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 10 Dec 2024 at 10:42.

LONG TERM
Between
2 Sep 2024 and 25 Mar 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 25 March 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 9 Dec 2024 at 13:55.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
19 Jan 2025
Details
View Map
Share
Follow
Freshwater Road

London Borough Of Barking And Dagenham are carrying out roadworks on Freshwater Road, Dagenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 10:00 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 10 Dec 2024 at 15:48.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Pentire Road

Thames Water are proposing to carry out Utility asset works on Pentire Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:43.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Hillcrest Road

Thames Water are proposing to carry out Utility asset works on Hillcrest Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:54.

Thames Water logo
LONG TERM
Between
6 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Carnanton Road

Thames Water are proposing to carry out Utility asset works on Carnanton Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:54.

Thames Water logo
LONG TERM
Between
22 Oct 2024 and 5 Apr 2025
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility asset works on Station Road, Chingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 5 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 08:31.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Grange Road

Cadent Gas were proposing to carry out Utility asset works on Grange Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:47.

Network Rail logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 14 Aug 2024 at 10:21.

Network Rail logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 14:45.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
The Avenue

Cadent Gas are carrying out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 10:08 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:45.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Castleton Road

Thames Water are carrying out Utility asset works on Castleton Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 11:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:23.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Lambourne Road

Cadent Gas are carrying out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 12:39 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:38.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Grove Park

Cadent Gas were proposing to carry out Utility asset works on Grove Park, Wanstead, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 23 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:01.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 07:49.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 11:08.

Cadent Gas logo
LONG TERM
Between
11 Nov and 30 Dec 2024
Details
View Map
Share
Follow
Montalt Road

Cadent Gas are proposing to carry out Utility asset works on Montalt Road, Woodford Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 13:54.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Shillibeer Walk

Cadent Gas are carrying out Utility asset works on Shillibeer Walk, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:46 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:01.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:27.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 16:20.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 6 Apr 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:11.

London Borough Of Barking And Dagenham logo
Finishing
Friday
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 29 Aug 2024 at 09:33.

Cadent Gas logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:37.

Cadent Gas logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 12:47.

Cadent Gas logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:00.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Grosvenor Road

Cadent Gas were proposing to carry out Utility asset works on Grosvenor Road, Wanstead, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:52.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Bedford Road

Cadent Gas are proposing to carry out Utility asset works on Bedford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Bedford Road

Cadent Gas are proposing to carry out Utility asset works on Bedford Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 15:30.

Thames Water logo
Until
19 Dec 2024
Details
View Map
Share
Follow
Grantock Road

Thames Water are carrying out Utility asset works on Grantock Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:32 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 15:53.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Cleveland Road

Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Cleveland Road

Cadent Gas are proposing to carry out Utility asset works on Cleveland Road, South Woodford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 15:30.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Tweed Glen

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Tweed Glen, Romford.

The works should not impact the carriageway.

The works started on 27 November 2024 at 13:43 and could run through until 13 December 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 15:57.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
High Road

Cadent Gas are carrying out Utility repair and maintenance works on High Road, Goodmayes, Ilford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 19:21 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 12:45.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Malvern Avenue

Thames Water are carrying out Utility repair and maintenance works on Malvern Avenue, Chingford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:14.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 08:21.

Cadent Gas logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:27.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Vicarage Lane

Cadent Gas are proposing to carry out Utility asset works on Vicarage Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:55.

Essex County Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Stapleford Road

Essex County Council are carrying out Highway improvement works on Stapleford Road, Stapleford Abbotts, Epping.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Dec 2024 at 13:19.

Thames Water logo
Between
3 and 31 Dec 2024
Details
View Map
Share
Elm Walk

Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:09.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:06.

Transport for London (TfL) logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 08:05.

Transport for London (TfL) logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 11:46.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hainault Road

Cadent Gas are carrying out Utility repair and maintenance works on Hainault Road, Chigwell Town, Chigwell.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 10:04 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 10:37.

Thames Water logo
Today
Details
View Map
Share
Aragon Drive

Thames Water carried out Utility repair and maintenance works on Aragon Drive, Hainault, Ilford.

The road was closed for some or all of the period.

The works were originally planned between 5 Dec 2024 and 11 Dec 2024 and were actually completed between 5 Dec 2024 (13:53) and 11 Dec 2024 (07:35). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 08:54.

Thames Water logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Oak Hill

Thames Water are carrying out Utility repair and maintenance works on Oak Hill, Woodford Green.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 09:15 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 10:26.

Cadent Gas logo
LONG TERM
Between
6 Dec 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Hatch Lane

Cadent Gas are proposing to carry out Utility asset works on Hatch Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 15:15.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Tysea Hill

Essex County Council are proposing to carry out Highway improvement works on Tysea Hill, Stapleford Abbotts, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 08:29.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Tysea Hill

Essex County Council are carrying out Highway improvement works on Tysea Hill, Stapleford Abbotts, Epping.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 15:09 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Dec 2024 at 15:17.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Springfield Road

Thames Water are proposing to carry out roadworks on Springfield Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:33.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Connaught Avenue

Thames Water are proposing to carry out roadworks on Connaught Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:26.

Cadent Gas logo
Until
18 Dec 2024
Details
View Map
Share
Follow
The Charter Road

Cadent Gas are carrying out Utility repair and maintenance works on The Charter Road, Woodford Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 08:48 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:50.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wellington Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wellington Hill, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 09:01.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wellington Hill

Thames Water are carrying out Utility repair and maintenance works on Wellington Hill, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 08:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:01.

Finishing
Friday
Details
View Map
Share
Follow
Havering Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Havering Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Nov 2024 at 15:14.

Finishing
Friday
Details
View Map
Share
Follow
Havering Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Havering Road, Romford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 09:38 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Dec 2024 at 09:39.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Empress Avenue

Thames Water are carrying out Utility repair and maintenance works on Empress Avenue, Woodford Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 08:30 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 10:30.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lower Road

Thames Water are carrying out Utility repair and maintenance works on Lower Road, Loughton Town, Loughton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 08:05 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 09:42.

Finishing
Tuesday
Details
View Map
Share
Follow
Noak Hill Road

London Borough Of Havering are proposing to carry out Highway improvement works on Noak Hill Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:53.

Finishing
Tuesday
Details
View Map
Share
Follow
Noak Hill Road

London Borough Of Havering are proposing to carry out Highway improvement works on Noak Hill Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Sep 2024 at 15:25.

Essex County Council logo
Between
12 and 22 Dec 2024
Details
View Map
Share
Follow
Lower Park Road

Essex County Council are proposing to carry out Highway improvement works on Lower Park Road, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 10:18.

Thames Water logo
Between
14 and 22 Dec 2024
Details
View Map
Share
Follow
Turpins Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:13.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Dersingham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:57.

Essex County Council logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Purlieu Way

Essex County Council are proposing to carry out Highway improvement works on Purlieu Way, Theydon Bois, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Aug 2024 at 09:51.

Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Main Road

London Borough Of Havering are proposing to carry out Highway improvement works on Main Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:40.

Essex County Council logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Daleside Gardens

Essex County Council are proposing to carry out Highway improvement works on Daleside Gardens, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 31 Oct 2024 at 09:06.

Essex County Council logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Daleside Gardens

Essex County Council are proposing to carry out Highway improvement works on Daleside Gardens, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 18 Nov 2024 at 09:25.

Essex County Council logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Daleside Gardens

Essex County Council are proposing to carry out Highway improvement works on Daleside Gardens, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Oct 2024 at 16:09.

Cadent Gas logo
Between
30 Dec 2024 and 26 Jan 2025
Details
View Map
Share
Lambourne Road

Cadent Gas were proposing to carry out Utility asset works on Lambourne Road, Chigwell Town, Chigwell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 26 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:25.

Thames Water logo
Between
2 and 30 Jan 2025
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:17.

Thames Water logo
LONG TERM
Between
2 Jan and 13 Mar 2025
Details
View Map
Share
Follow
Castleton Road

Thames Water are proposing to carry out Utility asset works on Castleton Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:55.

Thames Water logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Grantock Road

Thames Water are proposing to carry out Utility asset works on Grantock Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 11:20.

Thames Water logo
LONG TERM
Between
2 Jan and 13 Mar 2025
Details
View Map
Share
Follow
Grantock Road

Thames Water are proposing to carry out Utility asset works on Grantock Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:53.

Thames Water logo
Between
3 and 6 Jan 2025
Details
View Map
Share
Follow
The Forest

Thames Water are proposing to carry out Remedial works on The Forest, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:16.

Cadent Gas logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Richmond Road

Cadent Gas were proposing to carry out Utility asset works on Richmond Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:31.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Fels Farm Avenue

Cadent Gas are proposing to carry out New service connection on Fels Farm Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 14:25.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Clarendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Clarendon Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:37.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Clarendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Clarendon Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 12:47.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Clarendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Clarendon Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:00.

Thames Water logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Turpins Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 12:46.

London Borough Of Barking And Dagenham logo
Between
9 and 13 Jan 2025
Details
View Map
Share
Follow
Farmway

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Farmway, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Dec 2024 at 10:29.

Thames Water logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Connaught Road

Thames Water were proposing to carry out roadworks on Connaught Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:20.

Thames Water logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Connaught Road

Thames Water are proposing to carry out roadworks on Connaught Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:15.

Essex County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
High Road

Essex County Council are proposing to carry out Highway improvement works on High Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 08:51.

Essex County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Manor Road

Essex County Council are proposing to carry out Highway improvement works on Manor Road, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 08:49.

T-Mobile (UK) logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Ladyfields

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Ladyfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 15 Nov 2024 at 09:35.

T-Mobile (UK) logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Ladyfields

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Ladyfields, Loughton Town, Loughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 18 Nov 2024 at 10:51.

Thames Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Wellington Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wellington Hill, Waltham Abbey Town, Waltham Abbey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:52.

Essex County Council logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Theydon Bois, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 12:16.

Essex County Council logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Stapleford Tawney, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 12:11.

Essex County Council logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Theydon Garnon, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 12:15.

Essex County Council logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Theydon Mount, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 12:13.

Thames Water logo
Between
15 and 23 Jan 2025
Details
View Map
Share
Monmouth Road

Thames Water were proposing to carry out Utility repair and maintenance works on Monmouth Road, Dagenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:15.

Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Lower Bedfords Road

Essex And Suffolk Water are proposing to carry out Remedial works on Lower Bedfords Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 12:05.

London Borough Of Barking And Dagenham logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Rusholme Avenue

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Rusholme Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Dec 2024 at 10:28.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:53.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 16:10.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 12:00.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 13:50.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:47.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:00.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:45.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 10 Apr 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Beehive Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:15.

UK Power Networks Eastern & London logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Keswick Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Keswick Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 13:00.

UK Power Networks Eastern & London logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Keswick Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Keswick Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 12:45.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Woodford Bridge Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Woodford Bridge Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.

Thames Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Elm Walk

Thames Water were proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:18.

Thames Water logo
Between
20 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Woodford New Road

Thames Water are proposing to carry out Utility asset works on Woodford New Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:22.

Essex County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Gravel Lane

Essex County Council are proposing to carry out Highway improvement works on Gravel Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 25 Oct 2024 at 10:10.

Essex County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Gravel Lane

Essex County Council are proposing to carry out Highway improvement works on Gravel Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Dec 2024 at 08:52.

Transport for London (TfL) logo
Between
21 Jan and 12 Feb 2025
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 10:07.

Transport for London (TfL) logo
Between
21 Jan and 12 Feb 2025
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:46.

Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 25 Oct 2024 at 12:48.

UK Power Networks Eastern & London logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Widecombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Widecombe Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 10:00.

Essex County Council logo
Between
24 and 26 Jan 2025
Details
View Map
Share
Follow
Palace Gardens

Essex County Council are proposing to carry out Highway improvement works on Palace Gardens, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 13:02.

Thames Water logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Leyburn Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:17.

Thames Water logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Leyburn Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Leyburn Crescent, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 13:54.

UK Power Networks Eastern & London logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Lodge Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Lodge Lane, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 13:01.

Thames Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Uphall Road

Thames Water were proposing to carry out Utility repair and maintenance works on Uphall Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 15:48.

Affinity Water logo
Between
2 and 5 Feb 2025
Details
View Map
Share
Follow
Murthering Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 29 Oct 2024 at 05:48.

Affinity Water logo
Between
2 and 5 Feb 2025
Details
View Map
Share
Follow
Murthering Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 08:58.

Affinity Water logo
Between
2 and 5 Feb 2025
Details
View Map
Share
Follow
Murthering Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 15:40.

Cadent Gas logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:15.

Cadent Gas logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Brisbane Road

Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 09:30.

UK Power Networks Eastern & London logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Ambleside Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Ambleside Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 10:00.

Cadent Gas logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Arneways Avenue

Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.

Cadent Gas logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Arneways Avenue

Cadent Gas are proposing to carry out Utility asset works on Arneways Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 15:19.

BT logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Oakhurst Gardens

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Gardens, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 Nov 2024 at 15:39.

BT logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Oakhurst Close

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Close, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Nov 2024 at 15:43.

BT logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Oakhurst Close

BT are proposing to carry out Utility repair and maintenance works on Oakhurst Close, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Nov 2024 at 11:11.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Oakleafe Gardens

Cadent Gas are proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

Cadent Gas logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Oakleafe Gardens

Cadent Gas were proposing to carry out Utility asset works on Oakleafe Gardens, Barkingside, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:05.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Upper Brentwood Road

Cadent Gas are proposing to carry out Utility asset works on Upper Brentwood Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 13:51.

Essex County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Broadfield Way

Essex County Council are proposing to carry out Highway improvement works on Broadfield Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 08:26.

Essex County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Field Close

Essex County Council are proposing to carry out Highway improvement works on Field Close, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 08:27.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out roadworks on Garfield Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:13.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Buxton Road

Thames Water are proposing to carry out roadworks on Buxton Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 14:59.

Thames Water logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Cart Lane

Thames Water are proposing to carry out roadworks on Cart Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:27.

Thames Water logo
Between
4 and 17 Feb 2025
Details
View Map
Share
Follow
Elm Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Walk, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:48.

UK Power Networks Eastern & London logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Victoria Road

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Victoria Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 12:22.

Affinity Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Abridge Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Abridge Road, Theydon Bois, Epping.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Nov 2024 at 15:11.

Affinity Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Abridge Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Abridge Road, Theydon Bois, Epping.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Nov 2024 at 15:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Babbacombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Babbacombe Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 13:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Babbacombe Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Babbacombe Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 15:00.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Auckland Road

Cadent Gas are proposing to carry out Utility asset works on Auckland Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 14:45.

Cadent Gas logo
LONG TERM
Between
10 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Longwood Gardens

Cadent Gas are proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 15:15.

Thames Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Stag Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Stag Lane, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:06.

UK Power Networks Eastern & London logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Woodford Bridge Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Woodford Bridge Road, Ilford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 13:15.

Thames Water logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Marlborough Road

Thames Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, South Woodford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:15.

Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Thorold Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 3 Dec 2024 at 13:00.

Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Thorold Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 10 Dec 2024 at 15:00.

Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Thorold Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 10 Dec 2024 at 16:29.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Coventry Road

Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Coventry Road

Cadent Gas are proposing to carry out Utility asset works on Coventry Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Hollybush Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Hollybush Hill, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:15.

Cadent Gas logo
LONG TERM
Between
17 Feb and 6 Apr 2025
Details
View Map
Share
Longwood Gardens

Cadent Gas were proposing to carry out Utility asset works on Longwood Gardens, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:04.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:15.

Cadent Gas logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Greenleafe Drive

Cadent Gas are proposing to carry out Utility asset works on Greenleafe Drive, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Turpins Lane

Cadent Gas are proposing to carry out Utility asset works on Turpins Lane, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:06.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Station Way

Essex County Council are proposing to carry out Highway improvement works on Station Way, Buckhurst Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 15:22.

Thames Water logo
Between
18 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Vine Gardens

Thames Water are proposing to carry out Permanent reinstatement on Vine Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 10:10.

London Borough Of Barking And Dagenham logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Dec 2024 at 13:38.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Dunkeld Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 13:21.

Thames Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Baron Road

Thames Water are proposing to carry out Utility repair and maintenance works on Baron Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 12:33.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Wellesley Road

Cadent Gas are proposing to carry out Utility asset works on Wellesley Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Wellesley Road

Cadent Gas are proposing to carry out Utility asset works on Wellesley Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.

Cadent Gas logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Longhayes Avenue

Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:12.

Cadent Gas logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Longhayes Avenue

Cadent Gas are proposing to carry out Utility asset works on Longhayes Avenue, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 13:08.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 14:13.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:15.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:15.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Beaminster Gardens

Cadent Gas are proposing to carry out Utility asset works on Beaminster Gardens, Barkingside, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 27 Nov 2024 at 16:34.

Thames Water logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Willow Street

Thames Water are proposing to carry out Utility asset works on Willow Street, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:03.

Thames Water logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Stanley Road

Thames Water are proposing to carry out roadworks on Stanley Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:13.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Seven Kings Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seven Kings Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:30.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Haslemere Road

Thames Water are proposing to carry out Utility repair and maintenance works on Haslemere Road, Seven Kings, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:30.

UK Power Networks Eastern & London logo
Between
26 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Roding Lane South

UK Power Networks Eastern & London are proposing to carry out New service connection on Roding Lane South, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 11:00.

UK Power Networks Eastern & London logo
Between
27 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Derwent Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Derwent Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 10:00.

Cadent Gas logo
LONG TERM
Between
3 Mar and 7 May 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
3 Mar and 7 May 2025
Details
View Map
Share
Follow
Windsor Road

Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Neville Road

Cadent Gas are proposing to carry out Utility asset works on Neville Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 23:33.

Cadent Gas logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Becontree Avenue

Cadent Gas are proposing to carry out Utility asset works on Becontree Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:45.

Cadent Gas logo
Between
3 and 23 Mar 2025
Details
View Map
Share
Follow
Balfour Road

Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.

Cadent Gas logo
Between
3 and 23 Mar 2025
Details
View Map
Share
Follow
Balfour Road

Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:00.

Thames Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Brunel Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brunel Road, Chigwell Town, Chigwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 11:13.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Southend Arterial Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southend Arterial Road, Hornchurch.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 18:50.

Transport for London (TfL) logo
Between
4 and 28 Mar 2025
Details
View Map
Share
Follow
Eastern Avenue East

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue East, Romford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 18:55.

UK Power Networks Eastern & London logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Stanhope Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Stanhope Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 14:30.

Thames Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Greenside

Thames Water are proposing to carry out Utility repair and maintenance works on Greenside, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 11:04.

UK Power Networks Eastern & London logo
Between
6 and 10 Mar 2025
Details
View Map
Share
Follow
Coniston Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Coniston Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 11:00.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Becontree Avenue

Cadent Gas are proposing to carry out Utility asset works on Becontree Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:37.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Neville Road

Cadent Gas are proposing to carry out Utility asset works on Neville Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:38.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:27.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:07.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:51.

Cadent Gas logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Padnall Road

Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:06.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Hatfield Close

Cadent Gas were proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 30 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:04.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Hatfield Close

Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Hatfield Close

Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 14:45.

Cadent Gas logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Hatfield Close

Cadent Gas are proposing to carry out Utility asset works on Hatfield Close, Barkingside, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 15:15.

UK Power Networks Eastern & London logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Manor Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Manor Road, Lambourne, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 08:29.


Roadworks Map near to Burrow Road, CHIGWELL, IG7 4NF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 23:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Burrow Road, CHIGWELL, IG7 4NF (22 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MAJOR
  
MANFORD WAY 
(0.2 miles)
BT
Utility asset works - Footway, Footpath - Road closure
Cancelled
(Scheduled: 11 Dec 2024)
0.2
Details
Share
2
BT logo
MAJOR
  
MANFORD WAY 
(0.2 miles)
BT
Utility asset works - Footway, Footpath - Road closure
Planned
Scheduled: 11 Dec 2024
0.2
Details
Share
Follow
3
BT logo
BROCKET WAY 
(0.3 miles)
BT
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 12 Dec 2024 - 16 Dec 2024
0.3
Details
Share
Follow
4
BT logo
THE LOWE 
(0.3 miles)
BT
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 12 Dec 2024 - 16 Dec 2024
0.3
Details
Share
Follow
5
Virgin Media logo
REGARDER ROAD 
(0.3 miles)
Virgin Media
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 12 Dec 2024 - 13 Dec 2024
0.3
Details
Share
Follow
6
Cadent Gas logo
EMERGENCY
  
ARROWSMITH ROAD 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 29 Nov 2024 09:47
(Scheduled: 29 Nov 2024 - 17 Dec 2024)
0.3
Details
Share
Follow
7
BT logo
LODGE CLOSE, CHIGWELL TOWN 
(0.4 miles)
BT
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
In Progress
Since: 10 Dec 2024 08:49
(Scheduled: 10 Dec 2024 - 13 Dec 2024)
0.4
Details
Share
Follow
8
BT logo
LAMBOURNE ROAD, CHIGWELL TOWN 
(0.4 miles)
BT
Utility repair and maintenance works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 10 Dec 2024 - 12 Dec 2024
0.4
Details
Share
Follow
9
Cadent Gas logo
EMERGENCY
  
GROVE LANE, CHIGWELL TOWN 
(0.5 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 9 Dec 2024 11:32
(Scheduled: 9 Dec 2024 - 17 Dec 2024)
0.5
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
SHILLIBEER WALK, CHIGWELL TOWN 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 18 Nov 2024 11:46
(Scheduled: 18 Nov 2024 - 20 Dec 2024)
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data