ROADWORKS SUMMARY
Church Road, HEREFORD, HR1 1RR
Introduction
View current and future planned roadworks and road closures for Church Road, HR1 1RR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Church Road, HEREFORD, HR1 1RR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Church Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Wednesday
Cadent Gas are carrying out Utility asset works on Waterfield Road, Hereford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 October 2024 at 08:30 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:05.
31 Jan 2025
Herefordshire Council are carrying out Highway repair and maintenance works on Southbank Road, Hereford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 October 2024 at 09:45 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Herefordshire Council on 18 Nov 2024 at 11:21.
28 Oct and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Waterfield Road, Hereford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 11:06.
3 Mar 2025
Herefordshire Council are carrying out Highway repair and maintenance works on C1120 From A49 To Old School House Via Moreton-on-lugg, Moreton-on-lugg.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 02:04 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Herefordshire Council on 26 Nov 2024 at 15:04.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Commercial Road, Hereford.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 19:49 and could run through until 1 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 15:55.
Friday
Cadent Gas are proposing to carry out Utility asset works on Millard Close, Hereford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 10:58.
11 Dec 2024
Cadent Gas are carrying out Utility asset works on Millard Close, Hereford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 15:30 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 15:31.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Kempton Avenue, Hereford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 13:50 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:50.
Wednesday
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Roman Road Service Road, Hereford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 10:07.
Wednesday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Roman Road Service Road, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 15:47.
Wednesday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Roman Road Service Road, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 13:35.
Wednesday
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Roman Road Service Road, Hereford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:56.
10 and 12 Dec 2024
Welsh Water are proposing to carry out Utility asset works on Ruckhall Common Road, Eaton Bishop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 8 Nov 2024 at 13:30.
10 and 12 Dec 2024
Welsh Water are proposing to carry out Utility asset works on Ruckhall Common Road, Eaton Bishop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 4 Nov 2024 at 11:54.
2 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Kempton Avenue, Hereford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:47.
2 and 12 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on White Horse Street, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:41.
2 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Kempton Avenue, Hereford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 10:51.
2 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Sandown Drive, Hereford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:51.
2 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Grandstand Road, Hereford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:08.
6 and 10 Jan 2025
Herefordshire Council were proposing to carry out Highway repair and maintenance works on A4103 From A465 To Lumber Lane, Lugg Bridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Herefordshire Council on 12 Nov 2024 at 10:55.
7 and 9 Jan 2025
Herefordshire Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Herefordshire Council on 13 Nov 2024 at 10:57.
7 and 9 Jan 2025
Herefordshire Council are proposing to carry out Highway repair and maintenance works on Bridge Street, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Herefordshire Council on 14 Nov 2024 at 13:12.
8 and 10 Jan 2025
Herefordshire Council are proposing to carry out Highway improvement works on Weston Beggard Lane, Weston Beggard.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Herefordshire Council on 20 Nov 2024 at 12:14.
13 and 17 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Ruckhall Lane, Hereford, Eaton Bishop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Oct 2024 at 08:19.
13 and 17 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Ruckhall Lane, Hereford, Eaton Bishop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Oct 2024 at 12:40.
13 and 16 Jan 2025
Cadent Gas were proposing to carry out New service connection on Grafton Lane, Grafton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 16 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 08:44.
14 and 16 Jan 2025
Welsh Water are proposing to carry out Utility asset works on Shelwick Lane, Shelwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 28 Oct 2024 at 14:31.
14 and 16 Jan 2025
Welsh Water are proposing to carry out Utility asset works on Shelwick Lane, Shelwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 30 Oct 2024 at 15:53.
14 and 17 Jan 2025
Cadent Gas are proposing to carry out New service connection on Grafton Lane, Grafton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:09.
20 and 22 Jan 2025
Herefordshire Council were proposing to carry out Highway repair and maintenance works on Commercial Road, Hereford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Herefordshire Council on 18 Oct 2024 at 11:23.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oban Way, Hereford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 15:07.
20 Jan and 18 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Waterfield Road, Hereford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 15:09.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Rothesay Mead, Hereford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 15:53.
5 and 7 Feb 2025
Welsh Water are proposing to carry out Utility asset works on Allensmore Village Road, Allensmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 19 Nov 2024 at 10:40.
5 and 7 Feb 2025
Welsh Water are proposing to carry out Utility asset works on Allensmore Village Road, Allensmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 25 Nov 2024 at 08:48.
10 and 14 Feb 2025
Welsh Water are proposing to carry out Utility asset works on Widemarsh Street, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 27 Nov 2024 at 10:42.
10 and 21 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Berrington Street, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Nov 2024 at 15:47.
10 Feb and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on St Nicholas Street, Hereford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Nov 2024 at 15:40.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Dunoon Mead, Hereford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 15:53.
17 and 21 Feb 2025
Herefordshire Council are proposing to carry out Highway repair and maintenance works on Elm Road, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Herefordshire Council on 6 Nov 2024 at 15:56.
17 and 21 Feb 2025
Herefordshire Council are proposing to carry out Highway repair and maintenance works on Southbank Road, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Herefordshire Council on 6 Nov 2024 at 15:57.
17 and 21 Feb 2025
Herefordshire Council are proposing to carry out Highway repair and maintenance works on Southbank Road, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Herefordshire Council on 9 Oct 2024 at 11:08.
24 and 28 Feb 2025
Welsh Water are proposing to carry out Utility repair and maintenance works on Seaton Avenue, Hereford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Welsh Water on 27 Nov 2024 at 09:59.
Roadworks Map near to Church Road, HEREFORD, HR1 1RR
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Church Road, HEREFORD, HR1 1RR (5 Events)
(Scheduled Dates)
(miles)
(Scheduled: 27 Nov 2024 - 3 Dec 2024)
(Scheduled: 17 Oct 2024 - 31 Jan 2025)
(Scheduled: 1 Nov 2024 - 1 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.