ROADWORKS SUMMARY
Hartland Drive, EDGWARE, HA8 8RJ
Introduction
View current and future planned roadworks and road closures for Hartland Drive, HA8 8RJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hartland Drive, EDGWARE, HA8 8RJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hartland Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Mar 2025
London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.
These works are categorised as Major.
The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.
1 Mar 2024 and 1 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.
28 Apr 2024 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 1 May 2024 at 07:27.
28 Apr 2024 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 16 May 2024 at 07:13.
10 Oct 2025
London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.
24 Dec 2024
London Borough Of Barnet are carrying out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2024 at 23:00 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 May 2024 at 10:16.
17 Jun 2025
London Borough Of Barnet are carrying out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2024 at 00:00 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2024 at 08:43.
4 Jun 2024 and 31 Mar 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.
31 May 2025
London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.
13 Mar 2025
Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.
9 Dec 2024
London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 09:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 29 Oct 2024 at 14:57.
21 Dec 2024
National Highways are carrying out Highway repair and maintenance works on Bushey Bridleway And Footpath 040, Bushey.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 12 August 2024 at 00:00 and could run through until 21 December 2024. The works will impact the verge only.
This roadwork event was last updated by National Highways on 26 Nov 2024 at 13:46.
15 Aug 2024 and 24 Dec 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.
25 Feb 2025
London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.
19 Sep 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Cooper Road, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 11:00 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 14:17.
6 Oct and 7 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 13:37.
14 Oct and 20 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, The Hale, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 11 Oct 2024 at 14:10.
16 Oct and 17 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 12:56.
16 Oct and 17 Dec 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on Otterspool Way, Watford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 October 2024 and run through until 17 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 10:53.
21 Oct and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Bushey Hall Road, Bushey.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 12:26.
17 Dec 2024
UK Power Networks Eastern & London are carrying out New service connection on Otterspool Way, Watford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 11:30 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 12:25.
25 Oct 2025
Thames Water are carrying out Utility repair and maintenance works on Barnet Road, Barnet.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 09:30 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:25.
Friday
UK Power Networks Eastern & London are carrying out New service connection on Downhurst Avenue, Mill Hill, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:28.
29 Oct 2024 and 21 Jan 2025
Electricity Network Company are proposing to carry out Utility asset works on Booth Road, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 21 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity Network Company on 6 Aug 2024 at 13:20.
13 Dec 2024
Cadent Gas are carrying out Utility asset works on Woodlands Road, Bushey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 09:04 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 13:59.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Elstree And Borehamwood Footpath 022, Borehamwood.
The works started on 1 November 2024 at 11:00 and could run through until 5 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 14:06.
Today
UK Power Networks Eastern & London are proposing to carry out New service connection on Downhurst Avenue, Mill Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 08:17.
6 Nov 2024 and 13 Mar 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Shirehall Lane, Hendon, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 13 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:37.
7 Nov 2024 and 13 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.
Friday
London Borough Of Barnet are proposing to carry out Highway improvement works on Eaton Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 16 Oct 2024 at 14:45.
Today
UK Power Networks Eastern & London are proposing to carry out New service connection on The Broadway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2024 at 15:13.
Today
UK Power Networks Eastern & London are proposing to carry out New service connection on The Broadway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:43.
Today
UK Power Networks Eastern & London were proposing to carry out New service connection on The Broadway, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 09:19.
Today
UK Power Networks Eastern & London are carrying out New service connection on The Broadway, Mill Hill, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 20:15 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 09:24.
11 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Bushey Hall Road, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 15:21.
16 Dec 2024
Cadent Gas are carrying out Utility asset works on Bushey Hall Road, Bushey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 11:14 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:16.
Today
London Borough Of Barnet are proposing to carry out Highway improvement works on Wessex Gardens, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Jul 2024 at 14:30.
14 Nov and 10 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on North Western Avenue, Bushey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 10 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 26 Sep 2024 at 15:24.
12 Dec 2024
Hertfordshire County Council are carrying out Highway improvement works on North Western Avenue, Bushey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 22:00 and could run through until 12 December 2024. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 25 Nov 2024 at 10:54.
Friday
London Borough Of Barnet are carrying out Highway improvement works on Eaton Road, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 14:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 15 Nov 2024 at 14:37.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Bolton Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:19.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on East End Road, Finchley, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 12:40 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:36.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Briar Close, East Finchley, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 12:35 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:21.
25 Nov 2024 and 5 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:20.
25 Nov 2024 and 16 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.
25 Nov 2024 and 17 Jan 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.
25 Nov 2024 and 17 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.
25 Nov and 20 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 13:52.
25 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Forest Walk, Bushey.
These works are categorised as Major.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:46.
30 Dec 2024
Cadent Gas are carrying out Utility asset works on Forest Walk, Bushey.
These works are categorised as Major.
The works started on 29 November 2024 at 12:51 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 12:55.
Monday
Affinity Water are carrying out Utility repair and maintenance works on Beechwood Avenue, Finchley, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 10:06 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 13:07.
Tuesday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Moss Lane, Pinner.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 14:43 and could run through until 3 December 2024. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 16:30.
Today
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:25.
Tomorrow
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 27 Nov 2024 at 16:10.
Monday
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on The Ridgeway, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.
Friday
London Borough Of Barnet are proposing to carry out Highway improvement works on Fairmead Crescent, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2024 at 12:39.
29 Nov and 24 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Station Road, The Hale, Edgware.
These works were categorised as Major.
The works were originally planned to start 29 November 2024 and run through until 24 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:39.
9 Dec 2024
Cadent Gas are carrying out Utility repair and maintenance works on Hartspring Lane, Bushey.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 18:28 and could run through until 9 December 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 23:32.
Wednesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Pinner Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 15:08.
Monday
Affinity Water are proposing to carry out Utility repair and maintenance works on Pinner Road, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 12:24.
2 and 8 Dec 2024
Thames Water were proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:05.
Wednesday
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Marsworth Avenue, Hatch End.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:55.
Wednesday
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:08.
Thursday
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:24.
Thursday
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Fallowfield, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 24 Sep 2024 at 12:39.
Wednesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Heathbourne Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 6 Sep 2024 at 10:19.
Wednesday
Affinity Water were proposing to carry out Utility repair and maintenance works on Heathbourne Road, Bushey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 11:53.
Wednesday
Cadent Gas are proposing to carry out New service connection on Bournehall Lane, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 09:44.
2 and 18 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Woodhall Lane, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 30 Sep 2024 at 15:36.
2 and 18 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Woodhall Lane, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hertfordshire County Council on 14 Oct 2024 at 10:36.
3 and 11 Dec 2024
Affinity Water were proposing to carry out Utility asset works on Borthwick Road, Colindale, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 10:14.
Friday
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 5 Sep 2024 at 13:42.
Friday
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Naresby Fold, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 12 Sep 2024 at 11:49.
5 and 8 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 December 2024 and run through until 8 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 11:13.
6 and 13 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on St James Avenue, Whetstone, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 11 Nov 2024 at 09:33.
6 and 13 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on St James Avenue, Whetstone, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 21 Nov 2024 at 15:48.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 12:02.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:19.
9 and 13 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Gardens, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:31.
9 and 13 Dec 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Oct 2024 at 14:54.
9 and 13 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Varley Parade Service Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:38.
9 and 12 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Parkfield Gardens, Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Oct 2024 at 11:29.
9 Dec 2024 and 15 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 24 Sep 2024 at 14:32.
9 and 11 Dec 2024
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Weston Drive, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 12:09.
9 and 12 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Weston Drive, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 18 Oct 2024 at 09:24.
9 and 12 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Granville Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 27 Sep 2024 at 14:47.
9 and 23 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Masefield Avenue, Stanmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:04.
9 and 13 Dec 2024
Thames Water were proposing to carry out Utility asset works on Torrington Park, North Finchley, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 09:24.
9 and 13 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Way, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 12:22.
9 and 20 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 14:45.
9 and 20 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:01.
9 and 20 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:19.
9 and 11 Dec 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Magnaville Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 11:29.
9 and 13 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Great North Road, Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 09:16.
10 and 12 Dec 2024
London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2024 at 17:25.
10 and 12 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Watford Heath, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 20 Sep 2024 at 12:40.
10 and 12 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Little Bushey Lane, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 13:40.
11 and 18 Dec 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.
11 and 22 Dec 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:48.
11 and 16 Dec 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Kymberley Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 19 Sep 2024 at 09:50.
11 and 18 Dec 2024
London Borough Of Harrow were proposing to carry out roadworks on Havelock Place, Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:44.
11 and 13 Dec 2024
BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Oct 2024 at 09:19.
11 and 13 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 13:24.
11 and 13 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 15:35.
12 and 14 Dec 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Lower Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 12:38.
16 and 19 Dec 2024
National Highways are proposing to carry out Works for road purposes on St Albans Road, South Mimms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 Nov 2024 at 09:49.
16 and 19 Dec 2024
National Highways are proposing to carry out Works for road purposes on St Albans Road, South Mimms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 14 Nov 2024 at 11:14.
18 and 21 Dec 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 21 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 22 Oct 2024 at 15:34.
23 and 31 Dec 2024
Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:48.
24 and 31 Dec 2024
London Borough Of Barnet were proposing to carry out Highway improvement works on Woodside, Golders Green, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2024 at 08:55.
26 Dec 2024
London Borough Of Barnet are carrying out Highway improvement works on Claverley Villas, Finchley, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 December 2024 at 00:00 and could run through until 26 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2024 at 09:19.
24 and 26 Dec 2024
London Borough Of Barnet carried out Highway improvement works on Rectory Lane, Edgware.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 24 Dec 2024 and 26 Dec 2024 and were actually completed on between and . The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Oct 2024 at 12:56.
24 and 26 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Granville Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 29 Aug 2024 at 11:08.
26 Dec 2024 and 19 Jan 2025
Murphy Power Distribution are proposing to carry out New service connection on Glengall Road, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 December 2024 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 9 Oct 2024 at 14:47.
28 Dec 2024
Vodafone are proposing to carry out Utility repair and maintenance works on Edgwarebury Lane Rbw (2nd Section), Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 28 December 2024 and are due to last for only one day. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 10 Sep 2024 at 13:37.
2 and 22 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 08:04.
2 and 22 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Aug 2024 at 10:43.
2 and 22 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 11:50.
2 and 22 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Nether Street, Ballards Lane To Dollis Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:51.
2 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Borehamwood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:49.
2 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Bushey Mill Lane, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 13:10.
2 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:31.
2 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 15:40.
3 Jan and 28 Feb 2025
Leep Utilities Electric are proposing to carry out New service connection on Hilfield Lane, Aldenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leep Utilities Electric on 12 Nov 2024 at 15:50.
4 and 7 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on School Lane, Bushey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Sep 2024 at 10:25.
6 and 17 Jan 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on The Avenue, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 18 Oct 2024 at 13:15.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:34.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:12.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:13.
6 Jan and 17 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 09:07.
6 Jan and 17 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 09:27.
6 Jan and 17 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 16:42.
6 Jan and 17 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 13:35.
6 and 10 Jan 2025
Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Sep 2024 at 13:05.
6 and 13 Jan 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on Junction Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:50.
6 and 13 Jan 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on Havelock Place, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 30 Sep 2024 at 07:43.
6 and 8 Jan 2025
BT are proposing to carry out Utility asset works on Nibthwaite Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 10:18.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 20:57.
6 Jan and 7 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on The Hyde, Colindale, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:30.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 20:57.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:52.
6 Jan and 14 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:13.
6 Jan and 14 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.
6 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Langstone Way, Mill Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 15:30.
6 and 24 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Elton Way, Bushey.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 18 Oct 2024 at 07:33.
6 and 24 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Elton Way, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 10:49.
6 and 24 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Elton Way, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 5 Nov 2024 at 16:16.
7 Jan and 31 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 29 Oct 2024 at 08:45.
7 and 9 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Western Avenue (Watford Bypass), Elstree.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Oct 2024 at 09:08.
7 and 9 Jan 2025
Vodafone are proposing to carry out Utility asset works on Barnet Lane, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Vodafone on 5 Nov 2024 at 14:11.
7 and 9 Jan 2025
Vodafone are proposing to carry out Utility asset works on Barnet Lane, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Vodafone on 29 Nov 2024 at 10:55.
11 and 18 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 22 Oct 2024 at 14:25.
11 and 18 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 23 Oct 2024 at 15:48.
13 and 17 Jan 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 24 Oct 2024 at 14:17.
13 and 31 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Colin Park Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:59.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 08:38.
13 and 15 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Holden Road, Westbury Road To Gainsborough Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 14:33.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:30.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:32.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Watergate, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Oct 2024 at 15:26.
13 and 15 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on The Watergate, Carpenders Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 7 Nov 2024 at 14:36.
13 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Brockley Hill, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 14:25.
14 Jan and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.
14 and 16 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Barnet Lane, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Oct 2024 at 09:30.
14 and 16 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Barnet Lane, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 08:26.
15 and 17 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Clitheroe Gardens, South Oxhey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 3 Oct 2024 at 13:44.
18 and 20 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Elstree Road, Bushey Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 10:14.
20 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:51.
20 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:38.
20 Jan and 5 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.
20 Jan and 10 Feb 2025
London Borough Of Harrow are proposing to carry out Highway improvement works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 20 Nov 2024 at 08:01.
20 and 28 Jan 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 22 Nov 2024 at 07:21.
20 Jan and 23 May 2025
Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:13.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mimms Lane, Ridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Oct 2024 at 09:13.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mimms Lane, Ridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:10.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Earls Lane, South Mimms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Oct 2024 at 10:29.
20 and 22 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Earls Lane, South Mimms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:08.
25 and 29 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Rudolph Road, Bushey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 09:59.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Coles Green Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:13.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Coles Green Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 19:29.
27 and 30 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Oct 2024 at 09:48.
27 and 30 Jan 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Elstree Road, Bushey Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 14 Nov 2024 at 12:57.
27 and 30 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Elstree Road, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 27 Nov 2024 at 12:00.
27 and 29 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lytton Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 12:14.
28 and 31 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Station Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 16:02.
28 Jan and 2 Feb 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 2 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 24 Oct 2024 at 09:17.
28 and 30 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 15:48.
3 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Castleton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 3 Nov 2024 at 19:10.
3 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 13:45.
3 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 12:12.
3 and 5 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Fernside Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 08:44.
3 and 16 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bells Hill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 10:40.
3 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Bushey Lane, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 8 Oct 2024 at 11:38.
3 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Bushey Lane, Bushey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 10:38.
3 and 16 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 16 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 10:19.
4 and 7 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 11:23.
4 and 7 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Norval Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 23:04.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Oct 2024 at 13:20.
6 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Grange Lane, Letchmore Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 19 Nov 2024 at 10:00.
7 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Oct 2024 at 09:16.
7 and 10 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Windmill Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:16.
7 and 11 Feb 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Otterspool Way, Watford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 09:50.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:39.
10 and 12 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Blenheim Road, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 10:47.
10 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Langstone Way, Mill Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 14:41.
11 and 13 Feb 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on North Western Avenue, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the verge only.
This roadwork event was last updated by Hertfordshire County Council on 22 Nov 2024 at 09:50.
13 Feb and 8 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Milton Avenue, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 13:35.
15 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 08:03.
15 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 15:43.
15 and 22 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Oct 2024 at 13:23.
15 and 22 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 12:13.
16 and 18 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 09:18.
16 and 18 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 6 Nov 2024 at 09:19.
17 and 19 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Clarendon Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 21:31.
17 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 16:05.
17 and 23 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:51.
17 and 23 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.
17 and 23 Feb 2025
Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 08:17.
17 and 23 Feb 2025
Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:58.
17 and 23 Feb 2025
Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 12:20.
17 and 21 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 14:42.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 14 Oct 2024 at 11:50.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 12:13.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 15:15.
17 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Brockenhurst Gardens, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 10:51.
17 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Brockenhurst Gardens, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 09:04.
17 and 21 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on High Road, Whetstone, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 11:31.
17 and 21 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 12:11.
17 Feb and 24 Mar 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 13:54.
17 and 24 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Nov 2024 at 09:59.
17 Feb and 15 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Vale Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:30.
17 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Nov 2024 at 12:31.
17 and 19 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Knebworth Path, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:19.
17 and 19 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bullhead Road, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Nov 2024 at 12:05.
17 and 21 Feb 2025
Cadent Gas are proposing to carry out New service connection on Salisbury Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 12:03.
17 Feb and 13 Mar 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Gills Hill Lane, Radlett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Nov 2024 at 07:24.
18 Feb and 3 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Palmerston Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 11:28.
18 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Monksmead, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:20.
18 and 20 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 08:41.
18 and 20 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 15:38.
18 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Lexington Close, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:51.
18 and 20 Feb 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Lexington Close, Borehamwood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 14:36.
18 and 20 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Theobald Street, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 09:46.
19 and 21 Feb 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Arkley Lane, Arkley, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 14:56.
19 and 21 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Spring Close, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:22.
20 and 24 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Little Potters, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:16.
20 and 24 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ivinghoe Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:09.
20 and 24 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Russet Drive, Shenley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:24.
21 and 27 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 14:13.
21 and 24 Feb 2025
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Kenmore Avenue, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 21 Nov 2024 at 13:48.
21 and 25 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Richfield Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 12 Nov 2024 at 10:21.
21 and 25 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 11:16.
21 and 26 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 14:35.
24 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Blackbird Hill, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:41.
10 Mar 2025
London Borough Of Barnet are carrying out Highway improvement works on Shirehall Lane, Hendon, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 00:00 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:28.
24 Feb and 14 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.
24 Feb and 14 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.
24 Feb and 14 Mar 2025
Affinity Water are proposing to carry out Utility asset works on North Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.
24 Feb and 14 Mar 2025
Affinity Water are proposing to carry out Utility asset works on North Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.
24 and 26 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 14:50.
24 and 26 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 11:05.
24 and 26 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 11:12.
24 Feb and 1 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Westcombe Drive, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Nov 2024 at 15:51.
25 Feb and 3 Mar 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 11:12.
25 Feb and 18 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Elms Road, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 09:24.
25 and 27 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Rudolph Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 11:23.
Roadworks Map near to Hartland Drive, EDGWARE, HA8 8RJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hartland Drive, EDGWARE, HA8 8RJ (13 Events)
(Scheduled Dates)
(miles)
(Scheduled: 20 Jul 2024 - 15 Dec 2024)
(Scheduled: 27 Nov 2024 - 16 Dec 2024)
(Scheduled: 28 Nov 2024 - 2 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data