ROADWORKS SUMMARY
Thorncombe Street, GUILDFORD, GU5 0NA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Thorncombe Street, GU5 0NA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Thorncombe Street, GUILDFORD, GU5 0NA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Thorncombe Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

BT logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
High Street

BT are carrying out Utility asset works on High Street, Bramley, Guildford.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 21:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 31 Oct 2024 at 13:34.

Surrey County Council logo
LONG TERM
Between
1 Aug 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Elstead Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Elstead Road, Elstead, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 1 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Mar 2024 at 16:43.

Thames Water logo
LONG TERM
Between
2 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Guildford Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Guildford Road, Cranleigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Aug 2024 at 07:36.

Thames Water logo
LONG TERM
Between
2 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Guildford Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Guildford Road, Cranleigh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 10:08.

Thames Water logo
LONG TERM
Between
2 Sep and 6 Dec 2024
Details
View Map
Share
Guildford Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Guildford Road, Cranleigh.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:38.

Surrey County Council logo
LONG TERM
Between
3 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Broadford Road

Surrey County Council are proposing to carry out Highway improvement works on Broadford Road, Shalford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 2 May 2024 at 11:57.

Surrey County Council logo
LONG TERM
Between
15 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Catteshall Road

Surrey County Council are proposing to carry out Highway improvement works on Catteshall Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:42.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 9 Dec 2024
Details
View Map
Share
Petworth Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 15:18.

Southern Gas Networks logo
LONG TERM
Between
30 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Petworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:25.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Foxburrow Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxburrow Hill Road, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:41.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Foxburrow Hill Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Foxburrow Hill Road, Bramley, Guildford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 09:32.

BT logo
LONG TERM
Between
30 Sep and 2 Dec 2024
Details
View Map
Share
Follow
Leapale Road

BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by BT on 17 Sep 2024 at 10:47.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 7 May 2025
Details
View Map
Share
Follow
Horsham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Horsham Road, Grafham, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:57.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 7 May 2025
Details
View Map
Share
Follow
Rooks Hill

Thames Water are proposing to carry out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:00.

Surrey County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Millbrook

Surrey County Council are carrying out roadworks on Millbrook, Guildford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 09:25.

BT logo
LONG TERM
Between
9 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Leapale Road

BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by BT on 30 Sep 2024 at 12:21.

BT logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Leapale Road

BT are carrying out Utility repair and maintenance works on Leapale Road, Guildford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 13:05 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Oct 2024 at 13:12.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Petworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 14:09.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Petworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Wormley, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 08:07.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Snowdenham Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Snowdenham Links Road, Bramley, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 08:53.

Southern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Snowdenham Links Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Snowdenham Links Road, Bramley, Guildford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 10:09.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Skinners Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Skinners Lane, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 24 Jul 2024 at 08:35.

Thames Water logo
LONG TERM
Until
5 Jun 2025
Details
View Map
Share
Follow
Horsham Road

Thames Water are carrying out Disconnection or alteration of supply on Horsham Road, Grafham, Guildford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 11:20 and could run through until 5 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:14.

Thames Water logo
LONG TERM
Until
5 Jun 2025
Details
View Map
Share
Follow
Rooks Hill

Thames Water are carrying out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 11:20 and could run through until 5 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:13.

Southern Gas Networks logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Snowdenham Links Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Snowdenham Links Road, Bramley, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:47.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Munstead Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Munstead Heath Road, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:43.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Munstead Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Munstead Heath Road, Bramley, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 14:58.

Southern Gas Networks logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Munstead Heath Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Munstead Heath Road, Bramley, Guildford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 18:00 and could run through until 5 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:08.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Horsham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsham Road, Gosden Common.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:36.

Thames Water logo
Until
8 Dec 2024
Details
View Map
Share
Follow
Albury Byway 517/30

Thames Water are carrying out Utility repair and maintenance works on Albury Byway 517/30, Albury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:15 and could run through until 8 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 11:26.

UK Power Networks South Eastern logo
Between
18 Nov and 17 Dec 2024
Details
View Map
Share
Follow
Brook Hill

UK Power Networks South Eastern are proposing to carry out New service connection on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Sep 2024 at 10:28.

UK Power Networks South Eastern logo
Until
17 Dec 2024
Details
View Map
Share
Follow
Brook Hill

UK Power Networks South Eastern are carrying out New service connection on Brook Hill, Albury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:00 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 10:45.

Thames Water logo
Finishing
Today
Details
View Map
Share
Halfpenny Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Halfpenny Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:12.

Thames Water logo
Between
18 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Halfpenny Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:38.

Thames Water logo
Until
1 Dec 2024
Details
View Map
Share
Follow
Halfpenny Lane

Thames Water are carrying out Utility repair and maintenance works on Halfpenny Lane, Chilworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:45 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:47.

Surrey County Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Chertsey Street

Surrey County Council are proposing to carry out Highway improvement works on Chertsey Street, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Aug 2024 at 10:02.

Surrey County Council logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Chertsey Street

Surrey County Council are carrying out Highway improvement works on Chertsey Street, Guildford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 08:23.

Southern Gas Networks logo
Between
19 Nov and 2 Dec 2024
Details
View Map
Share
Iron Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Iron Lane, Bramley, Guildford.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:45.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Bourne Road

Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Jul 2024 at 06:27.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Bourne Road

Network Rail are carrying out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 22:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Nov 2024 at 07:57.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Petworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Chiddingfold, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 12:59.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
New Road

UK Power Networks South Eastern are proposing to carry out New service connection on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Nov 2024 at 15:41.

West Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Shillinglee Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shillinglee Road, Plaistow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Aug 2024 at 11:55.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Ockford Ridge

Thames Water were proposing to carry out New service connection on Ockford Ridge, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 09:00.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Station Lane

Network Rail were proposing to carry out Works for Rail Purposes on Station Lane, Enton, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 08:35.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Aug 2024 at 12:35.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Sep 2024 at 10:39.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 15:44.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
New Road

Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Jul 2024 at 15:33.

Network Rail logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
New Road

Network Rail were proposing to carry out Works for Rail Purposes on New Road, Chilworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 14:34.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
New Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road, Wormley, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 10:29.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Lane End

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lane End, Hambledon, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 12:11.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Green Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farncombe, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 09:41.

Southern Gas Networks logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
Elm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elm Road, Farncombe, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 07:48.

Thames Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Halfpenny Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 09:25.

Network Rail logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Sample Oak Lane

Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Jul 2024 at 15:15.

Network Rail logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Sample Oak Lane

Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Nov 2024 at 11:03.

UK Power Networks South Eastern logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Dorking Road

UK Power Networks South Eastern are proposing to carry out New service connection on Dorking Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 4 Oct 2024 at 10:00.

UK Power Networks South Eastern logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Raymond Crescent

UK Power Networks South Eastern are proposing to carry out New service connection on Raymond Crescent, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 08:31.

UK Power Networks South Eastern logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Raymond Crescent

UK Power Networks South Eastern are proposing to carry out New service connection on Raymond Crescent, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 11:05.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:41.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:42.

Surrey County Council logo
Between
11 and 20 Dec 2024
Details
View Map
Share
Follow
Winterfold Heath Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Winterfold Heath Road, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Oct 2024 at 09:09.

Surrey County Council logo
Between
11 and 20 Dec 2024
Details
View Map
Share
Follow
Winterfold Heath Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Winterfold Heath Road, Ewhurst, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 08:12.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:43.

BT logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Tuesley Lane

BT are proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:43.

Thames Water logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Markenfield Road

Thames Water are proposing to carry out Utility asset works on Markenfield Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 13:16.

BT logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Holloway Hill

BT were proposing to carry out Utility asset works on Holloway Hill, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Oct 2024 at 14:46.

BT logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 23 Oct 2024 at 09:20.

Thames Water logo
Between
19 and 21 Dec 2024
Details
View Map
Share
Blackheath Lane

Thames Water were proposing to carry out New service connection on Blackheath Lane, Wonersh, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 21 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 10:43.

Network Rail logo
Between
24 and 27 Dec 2024
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Oct 2024 at 07:36.

Network Rail logo
Between
24 and 27 Dec 2024
Details
View Map
Share
Follow
New Road

Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Oct 2024 at 08:25.

BT logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Woodbridge Road

BT are proposing to carry out Utility repair and maintenance works on Woodbridge Road, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Nov 2024 at 09:41.

BT logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
North Street

BT were proposing to carry out Utility repair and maintenance works on North Street, Guildford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Nov 2024 at 09:42.

BT logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Follow
North Street

BT are proposing to carry out Utility repair and maintenance works on North Street, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Nov 2024 at 15:11.

BT logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Leapale Road

BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Nov 2024 at 15:04.

UK Power Networks South Eastern logo
Between
3 and 13 Jan 2025
Details
View Map
Share
Follow
New Road

UK Power Networks South Eastern are proposing to carry out New service connection on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Nov 2024 at 15:47.

Surrey County Council logo
LONG TERM
Between
5 Jan and 20 Sep 2025
Details
View Map
Share
Follow
Post Office Service Road

Surrey County Council are proposing to carry out Highway improvement works on Post Office Service Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2024 at 09:24.

Surrey County Council logo
LONG TERM
Between
5 Jan and 20 Sep 2025
Details
View Map
Share
Follow
Knowle Lane

Surrey County Council are proposing to carry out Highway improvement works on Knowle Lane, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2024 at 14:11.

Surrey County Council logo
LONG TERM
Between
5 Jan and 20 Sep 2025
Details
View Map
Share
Follow
Rowland Road

Surrey County Council are proposing to carry out Highway improvement works on Rowland Road, Cranleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2024 at 09:24.

Surrey County Council logo
LONG TERM
Between
5 Jan and 20 Sep 2025
Details
View Map
Share
Follow
Bank Buildings Road

Surrey County Council are proposing to carry out Highway improvement works on Bank Buildings Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2024 at 09:23.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Petworth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Petworth Road, Chiddingfold, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 10:27.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wormley Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 12:19.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wormley Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wormley Lane, Hambledon, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 16:05.

Surrey County Council logo
LONG TERM
Between
6 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Elmbridge Road

Surrey County Council are proposing to carry out Highway improvement works on Elmbridge Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 21 Jun 2024 at 08:24.

Surrey County Council logo
LONG TERM
Between
6 Jan and 19 Sep 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 6 Feb 2024 at 08:08.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Sherrydon

Thames Water are proposing to carry out Utility asset works on Sherrydon, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 06:59.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Sherrydon

Thames Water are proposing to carry out Utility asset works on Sherrydon, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:05.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Barhatch Road

Thames Water are proposing to carry out New service connection on Barhatch Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:16.

Surrey County Council logo
LONG TERM
Between
6 Jan and 24 Apr 2025
Details
View Map
Share
Follow
Meadrow

Surrey County Council are proposing to carry out Highway improvement works on Meadrow, Godalming.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:40.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
St Martha Footpath 260/10

Thames Water are proposing to carry out New service connection on St Martha Footpath 260/10, St Martha.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 11:36.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
St Martha Footpath 260/10

Thames Water are proposing to carry out New service connection on St Martha Footpath 260/10, St Martha.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 13:00.

BT logo
LONG TERM
Between
6 Jan and 11 Feb 2025
Details
View Map
Share
Follow
North Street

BT are proposing to carry out Utility repair and maintenance works on North Street, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 08:06.

BT logo
LONG TERM
Between
6 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Leapale Road

BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 08:00.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Woodhill Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Woodhill Lane, Shamley Green, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:52.

Thames Water logo
Between
8 and 11 Jan 2025
Details
View Map
Share
Follow
Godalming Footpath 27/50

Thames Water are proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:03.

Thames Water logo
Between
8 and 13 Jan 2025
Details
View Map
Share
Follow
Farncombe Street

Thames Water are proposing to carry out New service connection on Farncombe Street, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:32.

Network Rail logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Oct 2024 at 08:28.

Network Rail logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
New Road

Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 11:36.

Surrey County Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Horsham Road

Surrey County Council are proposing to carry out Highway improvement works on Horsham Road, Cranleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 26 Jun 2024 at 07:52.

Surrey County Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Cranleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 26 Jun 2024 at 07:51.

Surrey County Council logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Ewhurst Road

Surrey County Council are proposing to carry out Highway improvement works on Ewhurst Road, Cranleigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 26 Jun 2024 at 07:51.

Thames Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Ockford Ridge

Thames Water are proposing to carry out New service connection on Ockford Ridge, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:27.

UK Power Networks South Eastern logo
Between
16 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Millbrook

UK Power Networks South Eastern are proposing to carry out New service connection on Millbrook, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 09:36.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
New Road

Thames Water were proposing to carry out New service connection on New Road, Wormley, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:04.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
New Road

Thames Water were proposing to carry out New service connection on New Road, Wormley, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:21.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Godalming Footpath 27/50

Thames Water were proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:52.

Thames Water logo
Between
21 and 22 Jan 2025
Details
View Map
Share
Follow
Godalming Footpath 27/50

Thames Water are proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 22 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 07:53.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Godalming Footpath 27/50

Thames Water were proposing to carry out New service connection on Godalming Footpath 27/50, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:27.

Thames Water logo
Between
22 and 25 Jan 2025
Details
View Map
Share
Follow
Pickhurst Road

Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:45.

Thames Water logo
Between
22 and 25 Jan 2025
Details
View Map
Share
Follow
Pickhurst Road

Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 08:05.

Thames Water logo
Between
22 and 25 Jan 2025
Details
View Map
Share
Follow
Pickhurst Road

Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 10:00.

Thames Water logo
Between
23 and 27 Jan 2025
Details
View Map
Share
Elmbridge Road

Thames Water were proposing to carry out New service connection on Elmbridge Road, Cranleigh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 16:12.

Thames Water logo
Between
23 and 27 Jan 2025
Details
View Map
Share
High View Road

Thames Water were proposing to carry out New service connection on High View Road, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:20.

Thames Water logo
LONG TERM
Between
27 Jan and 24 Mar 2025
Details
View Map
Share
Pewley Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Pewley Hill, Guildford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:46.

UK Power Networks South Eastern logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
One Tree Hill Road

UK Power Networks South Eastern are proposing to carry out Utility asset works on One Tree Hill Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the verge and cycleway.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 10:25.

Surrey County Council logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Uplands Road

Surrey County Council are proposing to carry out Highway improvement works on Uplands Road, Christchurch, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 13:43.

Surrey County Council logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Epsom Road

Surrey County Council are proposing to carry out Highway improvement works on Epsom Road, Guildford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 13:45.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Croft Road

Thames Water are proposing to carry out New service connection on Croft Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:33.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Croft Road

Thames Water are proposing to carry out New service connection on Croft Road, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:37.

Thames Water logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Aarons Hill

Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:58.

Thames Water logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Aarons Hill

Thames Water were proposing to carry out New service connection on Aarons Hill, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:33.

Network Rail logo
Between
31 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Brook Hill

Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 31 Oct 2024 at 10:32.

Network Rail logo
Between
1 and 17 Feb 2025
Details
View Map
Share
Follow
Sample Oak Lane

Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Sep 2024 at 10:29.

Surrey County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Elmbridge Road

Surrey County Council are proposing to carry out Highway improvement works on Elmbridge Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 24 Jul 2024 at 09:43.

Surrey County Council logo
LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
The Burys

Surrey County Council are proposing to carry out Highway improvement works on The Burys, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 13:45.

Thames Water logo
LONG TERM
Between
3 Feb and 30 Mar 2025
Details
View Map
Share
Follow
Tilehouse Road

Thames Water are proposing to carry out Utility asset works on Tilehouse Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 16:25.

Thames Water logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Pewley Hill

Thames Water are proposing to carry out Utility asset works on Pewley Hill, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:49.

Thames Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Brook Lane

Thames Water are proposing to carry out New service connection on Brook Lane, Albury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:56.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Water Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Water Lane, Enton, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:10.

Surrey County Council logo
LONG TERM
Between
16 Feb and 16 May 2025
Details
View Map
Share
Follow
The Street

Surrey County Council are proposing to carry out Highway improvement works on The Street, Shalford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:03.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
New Road

Thames Water are proposing to carry out New service connection on New Road, Wormley, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:24.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Alfold Road

Surrey County Council are proposing to carry out Highway improvement works on Alfold Road, Cranleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 7 Nov 2024 at 12:38.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:21.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:27.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:26.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Tuesley Lane

BT were proposing to carry out Utility asset works on Tuesley Lane, Godalming.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 09:32.

BT logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Holloway Hill

BT are proposing to carry out Utility asset works on Holloway Hill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Oct 2024 at 12:07.

Surrey County Council logo
LONG TERM
Between
17 Feb and 17 May 2025
Details
View Map
Share
Follow
Broadford Road

Surrey County Council are proposing to carry out Highway improvement works on Broadford Road, Shalford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:07.

Surrey County Council logo
LONG TERM
Between
17 Feb and 17 May 2025
Details
View Map
Share
Follow
Kings Road

Surrey County Council are proposing to carry out Highway improvement works on Kings Road, Shalford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:08.

Southern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Warren Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Road, Guildford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 11:33.

Surrey County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Jenner Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 15:18.

Surrey County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Jenner Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:32.

Surrey County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Jenner Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 09:54.

Thames Water logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Pickhurst Road

Thames Water are proposing to carry out New service connection on Pickhurst Road, Chiddingfold, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 11:40.

Thames Water logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Aarons Hill

Thames Water are proposing to carry out New service connection on Aarons Hill, Godalming.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:35.


Roadworks Map near to Thorncombe Street, GUILDFORD, GU5 0NA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 13:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Thorncombe Street, GUILDFORD, GU5 0NA (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.