ROADWORKS SUMMARY
Oak Tree Close, GUILDFORD, GU4 7JQ
Introduction
View current and future planned roadworks and road closures for Oak Tree Close, GU4 7JQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Oak Tree Close, GUILDFORD, GU4 7JQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Oak Tree Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:32.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Constitution Hill, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:59.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Mount Hermon Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:04.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Hill View Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:05.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on York Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:50.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Station Approach, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:44.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Bradfield Close, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 9 Feb 2021 at 12:42.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Heathside Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:03.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Heathside Crescent, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 9 Apr 2021 at 09:58.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:47.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Goldsworth Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:01.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Church Street West, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:57.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Forge End, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:00.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Victoria Way, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:49.
1 Nov 2022 and 31 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on Victoria Way, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2022 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 9 Jun 2021 at 06:50.
28 Feb 2025
National Highways are carrying out Highway improvement works on Ockham Road North, Ockham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2023 at 20:00 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Highways on 11 Dec 2024 at 15:30.
28 Feb 2025
National Highways are carrying out Highway improvement works on Portsmouth Road, Ockham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2023 at 20:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by National Highways on 11 Dec 2024 at 15:30.
31 Dec 2026
National Highways are carrying out Highway improvement works on Elm Lane, Ockham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2023 at 08:00 and could run through until 31 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 30 Sep 2024 at 11:22.
31 Jan 2025
BT are carrying out Utility asset works on High Street, Bramley, Guildford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 21:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 6 Dec 2024 at 15:37.
1 Aug 2024 and 1 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodbridge Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 12 Mar 2024 at 14:27.
1 Sep 2024 and 1 Mar 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Clandon Road, West Clandon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2024 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:44.
1 Sep 2024 and 1 Mar 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Clandon Road, Send.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2024 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:44.
5 Oct 2024 and 26 Apr 2025
Surrey County Council are proposing to carry out Works for road purposes on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2024 and could run through until 26 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Oct 2024 at 13:59.
26 Apr 2025
Surrey County Council are carrying out Works for road purposes on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2024 at 07:30 and could run through until 26 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 17 Oct 2024 at 09:54.
5 Oct 2024 and 24 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2024 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 24 Sep 2024 at 09:43.
24 Apr 2025
Surrey County Council are carrying out Highway improvement works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 October 2024 at 07:30 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 09:05.
7 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Maple Road, Send.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 08:00 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 07:42.
7 Oct 2024 and 18 Apr 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 14:15.
20 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Shere Road, Albury.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 12:50.
14 Oct 2024 and 27 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:43.
21 Oct 2024 and 2 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Heath Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 11:53.
26 Oct and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Westfield Avenue, Westfield, Woking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 08:56.
18 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Winterhill Way, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 11 Dec 2024 at 07:53.
30 Oct 2024 and 28 Mar 2025
Electricity Network Company were proposing to carry out Utility asset works on Newark Lane, Ripley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 October 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 18 Nov 2024 at 09:28.
1 Nov 2024 and 1 May 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 10:45.
Friday
Affinity Water are proposing to carry out Utility asset works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Affinity Water on 4 Nov 2024 at 14:48.
Friday
Affinity Water are carrying out Utility asset works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 14:40 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 16:34.
4 Nov 2024 and 18 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Send Marsh Road, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 10:43.
Today
Surrey County Council are proposing to carry out Highway repair and maintenance works on Worplesdon Road, Worplesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:01.
11 Nov 2024 and 31 Dec 2026
National Highways are proposing to carry out Works for road purposes on Wisley Lane, Wisley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 31 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Oct 2024 at 10:55.
31 Dec 2026
National Highways are carrying out Works for road purposes on Wisley Lane, Wisley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 00:01 and could run through until 31 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Nov 2024 at 08:51.
25 Jul 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Maybury Hill, Woking.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 07:55 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:37.
14 Nov and 21 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Church Hill, Pyrford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 31 Oct 2024 at 09:32.
21 Dec 2024
Electricity Network Company are carrying out Utility asset works on Church Hill, Pyrford, Woking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 10:30 and could run through until 21 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 14 Nov 2024 at 10:40.
Tuesday
UK Power Networks South Eastern are proposing to carry out New service connection on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Sep 2024 at 10:28.
18 Nov 2024 and 4 Jun 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Jun 2024 at 11:01.
Friday
Surrey County Council are carrying out Highway improvement works on Chertsey Street, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 09:23.
18 Nov 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:00.
18 Nov 2024 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Portsmouth Road, Send.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 09:52.
18 Nov 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:10.
19 Dec 2024
UK Power Networks South Eastern are carrying out Statutory Infrastructure Works on Slyfield Green, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 11:40 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Nov 2024 at 11:43.
19 Nov 2024 and 19 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Maybury Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 Aug 2024 at 15:48.
Friday
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Woking Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 28 Mar 2024 at 11:42.
Friday
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Woking Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 14:13.
Friday
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Woking Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 16:18.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Forest Road, East Horsley.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 14:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 14:30.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on The Street, Shalford.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 12:00 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 14:07.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Orchard Road, Shalford.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 12:00 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 10:46.
12 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Shaftesbury Road, Woking.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 08:30 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:40.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Bury Lane, Horsell, Woking.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 12:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 15:18.
Tomorrow
Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 08:59.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 20:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 08:02.
Tomorrow
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wych Hill Lane, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 12:46.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Wych Hill Lane, Woking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 20:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 08:02.
2 and 20 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Send Marsh Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 15 Nov 2024 at 09:55.
20 Dec 2024
Surrey County Council are carrying out Highway improvement works on Send Marsh Road, Send.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 2 Dec 2024 at 13:57.
2 Dec 2024 and 1 May 2025
Electricity Network Company were proposing to carry out Utility asset works on Newark Lane, Ripley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 1 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 22 Nov 2024 at 15:07.
Today
BT are carrying out Utility repair and maintenance works on Leapale Lane, Guildford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 December 2024 at 07:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Dec 2024 at 13:03.
Tomorrow
Surrey County Council are carrying out Highway repair and maintenance works on Ripley Road, East Clandon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 December 2024 at 13:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 08:29.
Saturday
Surrey County Council are carrying out Highway repair and maintenance works on Victoria Way, Woking.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 December 2024 at 15:08 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 08:22.
Sunday
Surrey County Council are carrying out Highway repair and maintenance works on Blackmore Crescent, Sheerwater, Woking.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 December 2024 at 22:47 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 09:20.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Dorking Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Oct 2024 at 10:00.
Today
UK Power Networks South Eastern are proposing to carry out New service connection on Raymond Crescent, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 08:31.
Today
UK Power Networks South Eastern were proposing to carry out New service connection on Raymond Crescent, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway and footpath.
This roadwork event was last updated by UK Power Networks South Eastern on 28 Nov 2024 at 12:55.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Guildford Footpath 2/30, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Oct 2024 at 10:11.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Guildford Footpath 2/30, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 09:31.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Guildford Footpath 2/30, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Oct 2024 at 09:32.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on Guildford Footpath 2/30, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 10:52.
9 Dec 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:57.
9 Dec 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 16:25.
9 Dec 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 14:03.
Monday
Surrey County Council are carrying out Highway repair and maintenance works on Hook Heath Road, Woking.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 04:00 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 16:41.
Monday
Surrey County Council were proposing to carry out Highway repair and maintenance works on Hook Heath Road, Woking.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 08:57.
18 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Horsham Road, Shalford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 07:16 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 10:40.
Friday
Affinity Water are proposing to carry out Utility asset works on Applegarth Avenue, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 16:23.
Friday
Thames Water were proposing to carry out Utility asset works on Markenfield Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 12:44.
Sunday
Thames Water are proposing to carry out Utility asset works on Markenfield Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 13:16.
16 and 18 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 09:38.
16 and 18 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Barn Drive, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 08:58.
16 and 19 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Holly Bank Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 11:11.
19 and 21 Dec 2024
Thames Water were proposing to carry out New service connection on Blackheath Lane, Wonersh, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 21 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 10:43.
24 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 07:36.
24 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Nov 2024 at 15:41.
24 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Oct 2024 at 08:25.
24 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Nov 2024 at 15:45.
24 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 08:00.
24 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Nov 2024 at 15:42.
2 Jan and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Woodbridge Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Dec 2024 at 14:14.
2 Jan and 7 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on North Street, Guildford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 13 Nov 2024 at 09:42.
2 Jan and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on North Street, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Nov 2024 at 15:11.
2 Jan and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Nov 2024 at 15:04.
3 and 13 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Dec 2024 at 13:56.
6 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Aug 2024 at 12:20.
6 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 08:29.
6 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Oct 2024 at 09:06.
6 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 10:43.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on St Martha Footpath 260/10, St Martha.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 11:36.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on St Martha Footpath 260/10, St Martha.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 13:00.
6 Jan and 3 Feb 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:17.
6 Jan and 3 Feb 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:32.
6 Jan and 11 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on North Street, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 08:06.
6 Jan and 11 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Nov 2024 at 16:18.
6 and 8 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Grove Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 15:18.
6 Jan and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Trodds Lane, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 09:18.
6 Jan and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Trodds Lane, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 10:15.
6 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Woking Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Dec 2024 at 12:15.
6 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Street, West Clandon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 08:24.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Rickford, Worplesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 13:14.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Bagshot Road, Woking.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 08:21.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Berry Lane, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 08:24.
6 and 24 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Send Marsh Road, Ripley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 07:35.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Cemetery Pales, Brookwood, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 08:23.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Connaught Road, Brookwood, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 08:14.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Brookwood Lye Road, Brookwood, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 08:27.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Hermitage Road, St Johns, Woking.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 08:29.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Gorsewood Road, St Johns, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 08:12.
7 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Guildford Road, Mayford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 17:30.
10 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 08:28.
10 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 11:36.
10 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Jul 2024 at 15:15.
13 and 17 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Snowdenham Lane, Bramley, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 08:07.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 08:59.
13 Jan and 25 Apr 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 25 April 2025. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 12:54.
13 Jan and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Old Portsmouth Road, Peasmarsh, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 10 Dec 2024 at 13:41.
14 and 31 Jan 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Burrows Lane, Gomshall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Sep 2024 at 10:51.
14 and 16 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Sandy Lane, Maybury, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 10:44.
16 Jan and 4 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Millbrook, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 09:36.
17 and 20 Jan 2025
National Highways are proposing to carry out Works for road purposes on Guileshill Lane, Ockham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Dec 2024 at 15:29.
17 and 20 Jan 2025
National Highways are proposing to carry out Works for road purposes on Guileshill Lane, Ockham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Dec 2024 at 15:43.
20 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 13:39.
21 and 23 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Wisley Lane, Wisley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 10:09.
23 and 27 Jan 2025
Thames Water were proposing to carry out New service connection on High View Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:20.
27 Jan and 24 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Pewley Hill, Guildford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:46.
27 Jan and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 10:25.
27 Jan and 14 Feb 2025
UK Power Networks South Eastern were proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 10:37.
27 Jan and 21 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Uplands Road, Christchurch, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 13:43.
27 Jan and 21 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Epsom Road, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 13:45.
27 Jan and 21 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Boxgrove Road, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 15:07.
27 and 29 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Kings Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 6 Dec 2024 at 16:03.
27 Jan and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Smarts Heath Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 15:04.
27 Jan and 26 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 26 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 4 Dec 2024 at 11:33.
29 Jan and 4 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Church Lane, Shere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 15:50.
29 Jan and 4 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Church Lane, Shere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:23.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Nov 2024 at 10:31.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Nov 2024 at 10:58.
31 Jan and 28 Feb 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:07.
1 and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Sep 2024 at 10:29.
3 Feb and 30 Mar 2025
Thames Water are proposing to carry out Utility asset works on Tilehouse Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 16:25.
3 and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Pewley Hill, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:49.
10 and 13 Feb 2025
Thames Water are proposing to carry out New service connection on Brook Lane, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 09:40.
10 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pembroke Road, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 10:13.
11 Feb and 3 Mar 2025
UK Power Networks South Eastern were proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 February 2025 and run through until 3 March 2025. The works were due to impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Dec 2024 at 14:12.
13 and 25 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Envis Way, Fairlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Sep 2024 at 14:36.
15 Feb and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Stoke Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Mar 2024 at 14:18.
15 Feb and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Stoke Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 09:06.
16 Feb and 16 May 2025
Surrey County Council are proposing to carry out Highway improvement works on The Street, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:03.
17 Feb and 17 May 2025
Surrey County Council are proposing to carry out Highway improvement works on Broadford Road, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:07.
17 Feb and 17 May 2025
Surrey County Council are proposing to carry out Highway improvement works on Kings Road, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:08.
17 Feb and 7 Mar 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Dec 2024 at 14:29.
17 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Road, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 11:33.
17 and 21 Feb 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 15:18.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:32.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 09:54.
17 Feb and 8 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Southway, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 13:26.
17 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 12:19.
17 Feb and 21 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 15:00.
17 Feb and 16 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 21 Aug 2024 at 15:04.
17 and 28 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Amstel Way, St Johns, Woking.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 12:10.
19 and 23 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Holly Bank Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:05.
20 and 26 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Raymond Crescent, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by UK Power Networks South Eastern on 5 Dec 2024 at 12:28.
24 and 28 Feb 2025
Southern Gas Networks were proposing to carry out New service connection on Guildown Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 14:39.
24 Feb and 22 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on Egley Road, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 22 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:11.
28 Feb and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 11:11.
28 Feb and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Pewley Hill, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:06.
3 Mar and 30 May 2025
Surrey County Council are proposing to carry out Highway improvement works on Bury Lane, Horsell, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 12:43.
4 and 6 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Queens Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Nov 2024 at 09:39.
5 and 7 Mar 2025
BT are proposing to carry out Utility asset works on Saunders Lane, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 3 Dec 2024 at 08:36.
8 and 10 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on St Johns Hill Road, St Johns, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 10 Dec 2024 at 12:52.
10 and 24 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Station Road, Shalford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 16:46.
Roadworks Map near to Oak Tree Close, GUILDFORD, GU4 7JQ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Oak Tree Close, GUILDFORD, GU4 7JQ (11 Events)
(Scheduled Dates)
(miles)
(Scheduled: 28 Oct 2024 - 18 Dec 2024)
(Scheduled: 11 Dec 2024)
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
(Scheduled: 11 Dec 2024 - 13 Dec 2024)