ROADWORKS SUMMARY
Swaynes Lane, GUILDFORD, GU1 2XX
Introduction
View current and future planned roadworks and road closures for Swaynes Lane, GU1 2XX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Swaynes Lane, GUILDFORD, GU1 2XX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Swaynes Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Jun 2021 and 1 Jun 2025
Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:32.
20 Dec 2024
National Highways are carrying out Highway improvement works on Ockham Road North, Ockham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2023 at 20:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 12:57.
20 Dec 2024
National Highways are carrying out Highway improvement works on Portsmouth Road, Ockham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2023 at 20:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 12:56.
Friday
BT are carrying out Utility asset works on High Street, Bramley, Guildford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 21:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 31 Oct 2024 at 13:34.
1 Aug 2024 and 1 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woodbridge Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 12 Mar 2024 at 14:27.
1 Sep 2024 and 1 Mar 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Clandon Road, West Clandon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2024 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:44.
1 Sep 2024 and 1 Mar 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Clandon Road, Send.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2024 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:44.
3 Sep and 6 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Broadford Road, Shalford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 2 May 2024 at 11:57.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Trodds Lane, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 11:13.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxburrow Hill Road, Bramley, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:41.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Foxburrow Hill Road, Bramley, Guildford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 09:32.
30 Sep and 2 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by BT on 17 Sep 2024 at 10:47.
2 Oct 2024 and 7 May 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 7 May 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:00.
5 Oct 2024 and 26 Apr 2025
Surrey County Council are proposing to carry out Works for road purposes on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2024 and could run through until 26 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Oct 2024 at 13:59.
26 Apr 2025
Surrey County Council are carrying out Works for road purposes on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2024 at 07:30 and could run through until 26 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 17 Oct 2024 at 09:54.
5 Oct 2024 and 24 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2024 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 24 Sep 2024 at 09:43.
24 Apr 2025
Surrey County Council are carrying out Highway improvement works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 October 2024 at 07:30 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 09:05.
Friday
Surrey County Council are carrying out roadworks on Millbrook, Guildford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 09:25.
7 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Maple Road, Send.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 08:00 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:25.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Woking Road, Woking.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 13:13.
7 Oct 2024 and 18 Apr 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 14:15.
9 Oct and 6 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by BT on 30 Sep 2024 at 12:21.
6 Dec 2024
BT are carrying out Utility repair and maintenance works on Leapale Road, Guildford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 9 October 2024 at 13:05 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Oct 2024 at 13:12.
20 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Shere Road, Albury.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 12:50.
14 Oct 2024 and 27 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Maybury Hill, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:43.
26 Oct and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Westfield Avenue, Westfield, Woking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 08:56.
28 Oct and 6 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Snowdenham Links Road, Bramley, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 08:53.
6 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Snowdenham Links Road, Bramley, Guildford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 10:09.
4 Dec 2024
UK Power Networks South Eastern are carrying out Statutory Infrastructure Works on Bellfields Road, Guildford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:00 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 10:51.
Friday
Surrey County Council are carrying out Highway repair and maintenance works on London Road, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 12:38.
Friday
Surrey County Council are carrying out Highway repair and maintenance works on Winterhill Way, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 14:18.
Tomorrow
Surrey County Council were proposing to carry out Highway repair and maintenance works on London Road, Guildford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 24 November 2024. The works were due to impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 22 Oct 2024 at 09:42.
30 Oct 2024 and 28 Mar 2025
Electricity Network Company were proposing to carry out Utility asset works on Newark Lane, Ripley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 October 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 18 Nov 2024 at 09:28.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woking Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 15:31.
5 Jun 2025
Thames Water are carrying out Disconnection or alteration of supply on Rooks Hill, Bramley, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 11:20 and could run through until 5 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:13.
4 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Snowdenham Links Road, Bramley, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:47.
4 Nov and 4 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Holly Lane, Worplesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:59.
4 Nov and 4 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Holly Lane, Worplesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 09:16.
4 Nov and 4 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Worplesdon Road, Worplesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:59.
4 Nov and 4 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Worplesdon Road, Worplesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 09:25.
4 Nov and 13 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 4 Nov 2024 at 14:48.
13 Dec 2024
Affinity Water are carrying out Utility asset works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 14:40 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 16:34.
4 Nov 2024 and 18 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Send Marsh Road, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 10:43.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Munstead Heath Road, Bramley, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Jun 2024 at 11:43.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Munstead Heath Road, Bramley, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 14:58.
5 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Munstead Heath Road, Bramley, Guildford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 18:00 and could run through until 5 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:08.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsham Road, Gosden Common.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:36.
Monday
Thames Water were proposing to carry out Utility asset works on Shere Road, Shere.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:35.
8 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Albury Byway 517/30, Albury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:15 and could run through until 8 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 11:26.
Monday
Surrey County Council are carrying out Highway repair and maintenance works on Southway, Guildford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:30 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 09:34.
11 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Holly Lane, Worplesdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 09:03.
11 Nov and 11 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Worplesdon Road, Worplesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:01.
11 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Worplesdon Road, Worplesdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 11 Nov 2024 at 09:03.
25 Jul 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Maybury Hill, Woking.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 07:55 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:37.
18 Nov and 17 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 6 Sep 2024 at 10:28.
17 Dec 2024
UK Power Networks South Eastern are carrying out New service connection on Brook Hill, Albury.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 10:00 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 10:45.
18 Nov 2024 and 4 Jun 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Jun 2024 at 11:01.
Today
Thames Water were proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:58.
Friday
Thames Water were proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:12.
18 Nov and 1 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:38.
1 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Halfpenny Lane, Chilworth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:45 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:47.
18 Nov and 6 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Chertsey Street, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 2 Aug 2024 at 10:02.
6 Dec 2024
Surrey County Council are carrying out Highway improvement works on Chertsey Street, Guildford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 08:23.
18 Nov 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnt Common Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 12:32.
18 Nov 2024 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Portsmouth Road, Send.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 09:52.
18 Nov 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:10.
19 Nov and 2 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Iron Lane, Bramley, Guildford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:45.
19 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Slyfield Green, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 09:37.
20 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Woking Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 28 Mar 2024 at 11:42.
20 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Woking Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 14:13.
20 Nov and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Woking Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 16:18.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Forest Road, East Horsley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 14:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 14:40.
Monday
Network Rail are proposing to carry out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Jul 2024 at 06:27.
Monday
Network Rail are carrying out Works for Rail Purposes on Bourne Road, Farncombe, Godalming.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 22:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Nov 2024 at 07:57.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Nov 2024 at 15:41.
Thursday
Affinity Water are proposing to carry out Utility asset works on Applegarth Avenue, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 10:17.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockham Road North, East Horsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 14:39.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ockham Road North, East Horsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 09:41.
28 Nov and 12 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 08:59.
28 Nov and 12 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Kingfield Road, Kingfield, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 09:11.
28 Nov and 12 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wych Hill Lane, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 12:46.
28 Nov and 12 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wych Hill Lane, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 09:14.
30 Nov and 2 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Aug 2024 at 12:35.
30 Nov and 2 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Sep 2024 at 10:39.
30 Nov and 2 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 16 Sep 2024 at 15:44.
30 Nov and 2 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Jul 2024 at 15:33.
30 Nov and 2 Dec 2024
Network Rail were proposing to carry out Works for Rail Purposes on New Road, Chilworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Nov 2024 at 14:34.
30 Nov and 2 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 1 Aug 2024 at 08:24.
30 Nov and 2 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 16 Sep 2024 at 14:55.
2 and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farncombe, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 09:41.
2 and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elm Road, Farncombe, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 07:48.
2 and 5 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Felday Road, Abinger Hammer, Dorking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 13:11.
2 and 6 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Halfpenny Lane, Chilworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 09:25.
2 and 20 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Send Marsh Road, Send.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 15 Nov 2024 at 09:55.
2 and 7 Dec 2024
National Highways are proposing to carry out Works for road purposes on Ockham Road North, Ockham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 20 Nov 2024 at 15:02.
2 and 7 Dec 2024
National Highways are proposing to carry out Works for road purposes on Ockham Road North, Ockham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Nov 2024 at 12:59.
2 Dec 2024 and 1 May 2025
Electricity Network Company were proposing to carry out Utility asset works on Newark Lane, Ripley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 1 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 22 Nov 2024 at 15:07.
3 and 6 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Jul 2024 at 15:15.
3 and 6 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Nov 2024 at 11:03.
9 and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Hoe Lane, Abinger Hammer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Sep 2024 at 15:59.
9 and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Hoe Lane, Abinger Hammer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Sep 2024 at 12:30.
9 and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Dorking Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Oct 2024 at 10:00.
9 and 11 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Raymond Crescent, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 08:31.
9 and 11 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Raymond Crescent, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 11:05.
9 and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Guildford Footpath 2/30, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Oct 2024 at 10:11.
9 and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Guildford Footpath 2/30, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 09:31.
9 and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Guildford Footpath 2/30, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Oct 2024 at 09:32.
9 and 13 Dec 2024
UK Power Networks South Eastern are proposing to carry out New service connection on Guildford Footpath 2/30, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 10:52.
10 and 13 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Applegarth Avenue, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 16:23.
13 and 15 Dec 2024
Thames Water are proposing to carry out Utility asset works on Markenfield Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 13:16.
16 and 18 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 09:38.
16 and 18 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Barn Drive, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 08:58.
16 and 19 Dec 2024
Affinity Water are proposing to carry out Utility asset works on Holly Bank Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 11:11.
19 and 21 Dec 2024
Thames Water were proposing to carry out New service connection on Blackheath Lane, Wonersh, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 21 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 10:43.
24 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 07:36.
24 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Oct 2024 at 08:25.
24 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 08:00.
2 Jan and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Woodbridge Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 13 Nov 2024 at 09:41.
2 Jan and 7 Feb 2025
BT were proposing to carry out Utility repair and maintenance works on North Street, Guildford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 13 Nov 2024 at 09:42.
2 Jan and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on North Street, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Nov 2024 at 15:11.
2 Jan and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Nov 2024 at 15:04.
3 and 13 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Nov 2024 at 15:47.
6 Jan and 24 Apr 2025
Surrey County Council are proposing to carry out Highway improvement works on Meadrow, Godalming.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 April 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Surrey County Council on 2 May 2024 at 08:40.
6 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Aug 2024 at 12:20.
6 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 08:29.
6 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Oct 2024 at 09:06.
6 and 21 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 10:43.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on St Martha Footpath 260/10, St Martha.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 11:36.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on St Martha Footpath 260/10, St Martha.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 13:00.
6 Jan and 3 Feb 2025
Thames Water are proposing to carry out Utility asset works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:40.
6 Jan and 11 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on North Street, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 08:06.
6 Jan and 11 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Leapale Road, Guildford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 08:00.
6 and 8 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Grove Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 15:18.
6 Jan and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Trodds Lane, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 09:18.
6 Jan and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Trodds Lane, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 10:15.
6 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on The Street, West Clandon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 08:24.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Rickford, Worplesdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 13:14.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Bagshot Road, Woking.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 08:21.
6 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Berry Lane, Woking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 12 Sep 2024 at 08:24.
6 and 24 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Send Marsh Road, Ripley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 07:35.
7 and 9 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Woodhill Lane, Shamley Green, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:52.
7 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Guildford Road, Mayford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 17:30.
8 and 13 Jan 2025
Thames Water are proposing to carry out New service connection on Farncombe Street, Godalming.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 08:32.
10 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Oct 2024 at 08:28.
10 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on New Road, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 11:36.
10 and 13 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Jul 2024 at 15:15.
14 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Peaslake Lane, Peaslake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 15:40.
14 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Peaslake Lane, Peaslake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:55.
14 and 31 Jan 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Burrows Lane, Gomshall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Sep 2024 at 10:51.
16 Jan and 4 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Millbrook, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 09:36.
20 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Aug 2024 at 13:39.
23 and 27 Jan 2025
Thames Water were proposing to carry out New service connection on High View Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:20.
27 Jan and 4 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Peaslake Lane, Peaslake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 14:55.
27 Jan and 24 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Pewley Hill, Guildford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:46.
27 Jan and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on One Tree Hill Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the verge and cycleway.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 10:25.
27 Jan and 21 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Uplands Road, Christchurch, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 13:43.
27 Jan and 21 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Epsom Road, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 13:45.
27 Jan and 21 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Boxgrove Road, Guildford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 15:07.
27 Jan and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Smarts Heath Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 15:04.
27 Jan and 26 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 26 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 22 Nov 2024 at 15:11.
29 Jan and 4 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Church Lane, Shere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 15:50.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Brook Hill, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 31 Oct 2024 at 10:32.
31 Jan and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Burrows Lane, Gomshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 31 Oct 2024 at 12:49.
31 Jan and 28 Feb 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Shere Road, Shere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:07.
1 and 17 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Sample Oak Lane, Chilworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Sep 2024 at 10:29.
3 Feb and 30 Mar 2025
Thames Water are proposing to carry out Utility asset works on Tilehouse Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 16:25.
3 and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Pewley Hill, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:49.
10 and 13 Feb 2025
Thames Water are proposing to carry out New service connection on Brook Lane, Albury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:56.
13 and 25 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Envis Way, Fairlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Sep 2024 at 14:36.
15 Feb and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Stoke Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Mar 2024 at 14:18.
15 Feb and 17 Apr 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Stoke Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 09:06.
16 Feb and 16 May 2025
Surrey County Council are proposing to carry out Highway improvement works on The Street, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:03.
17 Feb and 17 May 2025
Surrey County Council are proposing to carry out Highway improvement works on Broadford Road, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:07.
17 Feb and 17 May 2025
Surrey County Council are proposing to carry out Highway improvement works on Kings Road, Shalford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 09:08.
17 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Warren Road, Guildford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 11:33.
17 and 21 Feb 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Sep 2024 at 15:18.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 7 Oct 2024 at 07:32.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Jenner Road, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Oct 2024 at 09:54.
17 Feb and 8 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Southway, Guildford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 14:44.
17 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 12:19.
17 Feb and 21 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hook Hill Lane, Mayford, Woking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 15:00.
17 Feb and 16 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Newark Lane, Ripley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 21 Aug 2024 at 15:04.
19 and 23 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Holly Bank Road, Woking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:05.
Roadworks Map near to Swaynes Lane, GUILDFORD, GU1 2XX
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Swaynes Lane, GUILDFORD, GU1 2XX (1 Events)
(Scheduled Dates)
(miles)