ROADWORKS SUMMARY
Pine Ridge Drive, FARNHAM, GU10 3JW
Introduction
View current and future planned roadworks and road closures for Pine Ridge Drive, GU10 3JW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Pine Ridge Drive, FARNHAM, GU10 3JW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pine Ridge Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
2 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Windsor Way, Aldershot.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 00:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 14:57.
2 Dec 2024
Hampshire County Council are carrying out Highway improvement works on Victoria Road, Aldershot.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 00:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 7 Nov 2024 at 11:17.
6 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Moor Park Lane, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 Oct 2024 at 11:08.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Station Hill, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:36.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Farnham By-pass, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:38.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Longbridge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:42.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Lower Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:43.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Union Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:41.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Upper Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:45.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:40.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on West Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:46.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Downing Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:44.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Bear Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on The Borough, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:48.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Woolmead, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:49.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on East Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:50.
1 Sep 2024 and 1 Sep 2026
Surrey County Council are proposing to carry out Highway improvement works on Castle Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:47.
1 Sep and 20 Dec 2024
Hampshire County Council are proposing to carry out Section 50 on Clubhouse Road, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Hampshire County Council on 31 Jul 2024 at 08:14.
Wednesday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Knollys Road, Aldershot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 11:55.
28 Sep and 13 Dec 2024
Veolia Water Outsourcing were proposing to carry out Utility repair and maintenance works on Clubhouse Road, Aldershot.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Veolia Water Outsourcing on 8 Aug 2024 at 07:04.
1 Oct 2024 and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 08:39.
1 Oct 2024 and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Farnham Footpath 171/20, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 March 2025. The works will impact the footpath only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 12:48.
7 Oct and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 12 Feb 2024 at 12:08.
14 Oct and 30 Nov 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Monkton Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 07:09.
14 Oct and 30 Nov 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Monkton Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 14:19.
14 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Monkton Lane, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 20:00 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 09:25.
14 Oct and 30 Nov 2024
Surrey County Council were proposing to carry out Highway repair and maintenance works on Weybourne Road, Farnham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 30 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 13:38.
14 Oct and 30 Nov 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Weybourne Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 07:08.
14 Oct and 30 Nov 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Weybourne Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 14:18.
14 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Weybourne Road, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 19:00 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 08:37.
14 Oct and 30 Nov 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Bullers Road, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 07:10.
14 Oct and 30 Nov 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Bullers Road, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 19 Aug 2024 at 14:19.
14 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Bullers Road, Farnham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 20:00 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 15 Oct 2024 at 09:27.
28 Oct 2024 and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 14:12.
23 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 09:08.
28 Oct 2024 and 25 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Suffield Lane, Puttenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 14:33.
1 May 2025
Surrey County Council are carrying out Highway repair and maintenance works on Suffield Lane, Puttenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 November 2024 at 07:00 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 1 Nov 2024 at 10:12.
29 Oct 2024 and 18 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Compton Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Jan 2024 at 08:52.
4 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 09:06.
Monday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgway Road, Farnham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 13:49.
Monday
Hampshire County Council are carrying out Highway improvement works on Harvest Lane, Aldershot.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 08:00 and could run through until 25 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 13 Nov 2024 at 10:07.
18 Nov and 2 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgway Road, Farnham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 14:29.
Wednesday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hale House Lane, Churt, Farnham.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:21.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Crossways, Churt, Farnham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 23:30 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:31.
19 Nov 2024 and 19 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lickfolds Road, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 11:44.
Monday
South East Water are carrying out New service connection on Wellington Lane, Farnham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 08:43 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 23 Nov 2024 at 07:00.
25 Nov and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on The Street, Wrecclesham, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:53.
25 Nov and 13 Dec 2024
Thames Water were proposing to carry out Utility asset works on The Street, Wrecclesham, Farnham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:36.
25 Nov and 13 Dec 2024
Thames Water were proposing to carry out Utility asset works on The Street, Wrecclesham, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 15:24.
25 Nov 2024 and 19 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Lane, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Jan 2024 at 14:11.
25 Nov and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stoneyfields, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Jan 2024 at 08:37.
2 Dec 2024 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jubilee Lane, Boundstone, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 12:42.
2 Dec 2024 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jubilee Lane, Boundstone, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 14:29.
2 and 7 Dec 2024
Neoscorp were proposing to carry out Utility asset works on Hale Road, Farnham.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 7 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Neoscorp on 9 Oct 2024 at 13:57.
3 and 9 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Aldershot Road, Church Crookham, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 29 Oct 2024 at 12:00.
6 and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgway Road, Farnham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:15.
6 and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Weydon Hill Road, Farnham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:00.
11 and 17 Dec 2024
Hampshire County Council are proposing to carry out Highway improvement works on Aldershot Road, Church Crookham, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 31 Oct 2024 at 11:17.
1 Jan and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Alton Road, Farnham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 08:26.
6 and 8 Jan 2025
Gigaclear were proposing to carry out Utility asset works on Churt Road, Churt, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Gigaclear on 15 Oct 2024 at 13:53.
6 and 20 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on High Street, Aldershot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 4 Nov 2024 at 11:57.
6 and 20 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on High Street, Aldershot.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hampshire County Council on 5 Nov 2024 at 09:08.
6 and 24 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Bourley Road, Church Crookham, Fleet.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Apr 2024 at 14:00.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Oct 2024 at 09:50.
13 and 15 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Summerfield Lane, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 07:55.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Station Hill, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:49.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Farnham By-pass, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:46.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Longbridge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:40.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Lower Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:44.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Upper Church Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:48.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on South Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:50.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Union Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:47.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on West Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:37.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:46.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Downing Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:46.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on The Borough, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:39.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Bear Lane, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:35.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway repair and maintenance works on Woolmead, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:49.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on East Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:32.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Park Row, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:45.
13 Jan 2025 and 13 Jan 2027
Surrey County Council were proposing to carry out Highway improvement works on High Park Road, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 January 2027. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 10:11.
13 Jan 2025 and 13 Jan 2027
Surrey County Council are proposing to carry out Highway improvement works on Castle Street, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 08:48.
13 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Farnborough Road, Aldershot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 29 May 2024 at 07:33.
13 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Fleet Road, Aldershot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 29 May 2024 at 08:53.
13 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Clubhouse Road, Aldershot.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 28 May 2024 at 10:33.
15 and 17 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Summerfield Lane, Rowledge, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 07:17.
20 and 22 Jan 2025
South East Water are proposing to carry out New service connection on Boundary Road, Dockenfield, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 29 Oct 2024 at 13:33.
20 and 22 Jan 2025
South East Water are proposing to carry out New service connection on Boundary Road, Dockenfield, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 8 Nov 2024 at 10:16.
20 Jan and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:10.
20 and 23 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Dippenhall Road, Dippenhall, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 11 Oct 2024 at 09:18.
20 and 23 Jan 2025
South East Water are proposing to carry out Utility repair and maintenance works on Dippenhall Road, Dippenhall, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 8 Nov 2024 at 09:28.
22 and 24 Jan 2025
South East Water are proposing to carry out New service connection on High Thicket Road, Dockenfield, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 29 Oct 2024 at 12:25.
22 and 24 Jan 2025
South East Water are proposing to carry out New service connection on High Thicket Road, Dockenfield, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 8 Nov 2024 at 10:15.
23 and 29 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Isington Road, Binsted, Alton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 10:59.
27 Jan and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Street, Frensham, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Oct 2024 at 09:12.
27 and 31 Jan 2025
Hampshire County Council are proposing to carry out Highway improvement works on Aldershot Road, Church Crookham, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 6 Nov 2024 at 13:56.
3 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:47.
3 Feb and 31 Mar 2025
Hampshire County Council are proposing to carry out Section 50 on Clubhouse Road, Aldershot.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hampshire County Council on 22 Nov 2024 at 13:58.
4 Feb and 4 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bourne Grove, Lower Bourne, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Nov 2024 at 07:52.
6 and 8 Feb 2025
Hampshire County Council are proposing to carry out Highway repair and maintenance works on Main Road, Bucks Horn Oak, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hampshire County Council on 5 Nov 2024 at 12:13.
17 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hale House Lane, Churt, Farnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:36.
17 Feb and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tilford Road, Lower Bourne, Farnham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:20.
17 and 21 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Wrecclesham Road, Wrecclesham, Farnham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 12:41.
17 Feb and 22 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ash Street, Ash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Sep 2024 at 08:03.
Roadworks Map near to Pine Ridge Drive, FARNHAM, GU10 3JW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Pine Ridge Drive, FARNHAM, GU10 3JW (10 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Nov 2024 - 29 Nov 2024)
(Scheduled: 16 Sep 2024 - 20 Jan 2025)
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.