ROADWORKS SUMMARY
STROUD, GL6 1NE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for GL6 1NE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to STROUD, GL6 1NE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Gloucestershire County Council logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Edge Road To Spring Acre

Gloucestershire County Council are carrying out Highway repair and maintenance works on Edge Road To Spring Acre, Edge, Stroud.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 11:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 12 Nov 2024 at 10:05.

Gloucestershire County Council logo
LONG TERM
Between
1 Nov 2024 and 31 May 2025
Details
View Map
Share
Follow
Gloucester Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Gloucester Road, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Gloucestershire County Council on 16 Jul 2024 at 10:00.

Gloucestershire County Council logo
LONG TERM
Between
1 Nov 2024 and 31 May 2025
Details
View Map
Share
Follow
B4008 Standish To Gloucester Road Stonehouse

Gloucestershire County Council are proposing to carry out Highway improvement works on B4008 Standish To Gloucester Road Stonehouse, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Gloucestershire County Council on 7 Aug 2024 at 10:52.

Gloucestershire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Butterrow Hill

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Butterrow Hill, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Gloucestershire County Council on 17 Sep 2024 at 10:11.

Gloucestershire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Butterrow Hill

Gloucestershire County Council are carrying out Highway repair and maintenance works on Butterrow Hill, Stroud.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Dec 2024 at 09:23.

Gloucestershire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Butterrow Lane

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Butterrow Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Gloucestershire County Council on 17 Sep 2024 at 10:17.

Gloucestershire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Butterrow Lane

Gloucestershire County Council are carrying out Highway repair and maintenance works on Butterrow Lane, Stroud.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Dec 2024 at 09:24.

Wales And West Utilities logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
The Roundabouts

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Roundabouts, Brimscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 8 Oct 2024 at 10:36.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Greenstyles To Bath Road Leonard Stanley

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Greenstyles To Bath Road Leonard Stanley, Stanley Downton, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:03.

Wales And West Utilities logo
LONG TERM
Until
4 Sep 2025
Details
View Map
Share
Follow
Greenstyles To Bath Road Leonard Stanley

Wales And West Utilities are carrying out Utility repair and maintenance works on Greenstyles To Bath Road Leonard Stanley, Stanley Downton, Stonehouse.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 17:00 and could run through until 4 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 2 Dec 2024 at 08:38.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Downton Farm To Railway Underpass

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Farm To Railway Underpass, Stanley Downton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 12:43.

Wales And West Utilities logo
LONG TERM
Until
4 Sep 2025
Details
View Map
Share
Follow
Downton Farm To Railway Underpass

Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Farm To Railway Underpass, Stanley Downton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 13:00 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 14:35.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Downton Road To Downton Farm

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Road To Downton Farm, Stanley Downton, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:03.

Wales And West Utilities logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Downton Road To Downton Farm

Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Road To Downton Farm, Stanley Downton, Stonehouse.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 13:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 14:13.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Downton Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Road, Bridgend, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Oct 2024 at 13:05.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Downton Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Downton Road, Bridgend, Stonehouse.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 31 Oct 2024 at 12:56.

Wales And West Utilities logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Downton Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Downton Road, Bridgend, Stonehouse.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 13:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Nov 2024 at 14:11.

Gloucestershire County Council logo
LONG TERM
Between
2 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Ebley Bypass

Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on Ebley Bypass, Stroud.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 15 Nov 2024 at 11:19.

Gloucestershire County Council logo
LONG TERM
Between
2 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Ebley Bypass

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Ebley Bypass, Stroud.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 15 Nov 2024 at 12:12.

Gloucestershire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Ebley Bypass

Gloucestershire County Council are carrying out Highway repair and maintenance works on Ebley Bypass, Stroud.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:30 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 2 Dec 2024 at 09:33.

Gloucestershire County Council logo
LONG TERM
Between
3 Dec 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Cirencester Road

Gloucestershire County Council are proposing to carry out Works for road purposes on Cirencester Road, Minchinhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 22 Oct 2024 at 11:35.

Gloucestershire County Council logo
Between
3 and 20 Dec 2024
Details
View Map
Share
A38 Moreton Valence Layby To Church Lane

Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on A38 Moreton Valence Layby To Church Lane, Moreton Valence, Gloucester.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Gloucestershire County Council on 28 Nov 2024 at 14:55.

Gloucestershire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Dr Browns Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Dr Browns Road, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Aug 2024 at 12:07.

Gloucestershire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Ricardo Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Ricardo Road, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Aug 2024 at 12:06.

Gloucestershire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Windmill Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Windmill Road, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Aug 2024 at 12:10.

Wales And West Utilities logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Burleigh Lane

Wales And West Utilities are carrying out Utility repair and maintenance works on Burleigh Lane, Burleigh, Stroud.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 13:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Dec 2024 at 10:52.

Gloucestershire County Council logo
LONG TERM
Until
13 Feb 2025
Details
View Map
Share
Follow
Cirencester Road

Gloucestershire County Council are carrying out Works for road purposes on Cirencester Road, Minchinhampton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 08:00 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 9 Dec 2024 at 13:57.

Gloucestershire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Barton End Lane

Gloucestershire County Council are carrying out Highway repair and maintenance works on Barton End Lane, Washpool, Horsley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 December 2024 at 17:31 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Dec 2024 at 13:27.

Gloucestershire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Chapel Lane

Gloucestershire County Council are carrying out Highway repair and maintenance works on Chapel Lane, Minchinhampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 December 2024 at 10:21 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Dec 2024 at 13:25.

Gloucestershire County Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Theescombe Hill

Gloucestershire County Council are carrying out Highway repair and maintenance works on Theescombe Hill, Amberley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 December 2024 at 19:57 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Dec 2024 at 15:38.

Gigaclear logo
Finishing
Tomorrow
Details
View Map
Share
Woefuldane Bottom

Gigaclear were proposing to carry out Utility asset works on Woefuldane Bottom, Minchinhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 7 Nov 2024 at 10:47.

Gloucestershire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Dr Browns Road

Gloucestershire County Council are carrying out Highway improvement works on Dr Browns Road, Minchinhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 09:02 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 9 Dec 2024 at 09:07.

Gloucestershire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Ricardo Road

Gloucestershire County Council are carrying out Highway improvement works on Ricardo Road, Minchinhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 09:02 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 9 Dec 2024 at 09:07.

Gloucestershire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Windmill Road

Gloucestershire County Council are carrying out Highway improvement works on Windmill Road, Minchinhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 09:02 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 9 Dec 2024 at 09:07.

Wales And West Utilities logo
LONG TERM
Between
9 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
The Roundabouts

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on The Roundabouts, Brimscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 8 Oct 2024 at 11:33.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Oldends Lane

Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Jul 2024 at 09:53.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Oldends Lane

Network Rail were proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Oct 2024 at 09:53.

Severn Trent Water logo
Finishing
Today
Details
View Map
Share
Cheltenham Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Cheltenham Road, Bisley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Sep 2024 at 11:03.

Western Power Distribution (West Midlands) logo
Finishing
Today
Details
View Map
Share
Follow
Back Edge Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Back Edge Lane, Edge, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Oct 2024 at 11:15.

Western Power Distribution (West Midlands) logo
Finishing
Today
Details
View Map
Share
Follow
Back Edge Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Back Edge Lane, Edge, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Nov 2024 at 11:29.

Gloucestershire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Gatcombe Corner To Beeches Park

Gloucestershire County Council are proposing to carry out Highway improvement works on Gatcombe Corner To Beeches Park, Hampton Fields, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 6 Aug 2024 at 12:38.

Gloucestershire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Beeches Park To Junction With Cirencester Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Beeches Park To Junction With Cirencester Road, Crackstone, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 6 Aug 2024 at 12:38.

Gloucestershire County Council logo
Between
11 and 20 Dec 2024
Details
View Map
Share
Follow
Gatcombe Corner To Beeches Park

Gloucestershire County Council are proposing to carry out Highway improvement works on Gatcombe Corner To Beeches Park, Hampton Fields, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 14:40.

Gloucestershire County Council logo
Between
11 and 20 Dec 2024
Details
View Map
Share
Follow
Beeches Park To Junction With Cirencester Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Beeches Park To Junction With Cirencester Road, Crackstone, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 14:40.

Wales And West Utilities logo
Finishing
Tuesday
Details
View Map
Share
Follow
Horns Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Horns Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Sep 2024 at 12:21.

Gloucestershire County Council logo
Between
12 and 20 Dec 2024
Details
View Map
Share
Follow
Gatcombe Corner To Beeches Park

Gloucestershire County Council are proposing to carry out Highway improvement works on Gatcombe Corner To Beeches Park, Hampton Fields, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 31 Oct 2024 at 07:52.

Gloucestershire County Council logo
Between
12 and 20 Dec 2024
Details
View Map
Share
Follow
Beeches Park To Junction With Cirencester Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Beeches Park To Junction With Cirencester Road, Crackstone, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 31 Oct 2024 at 07:18.

Gloucestershire County Council logo
Between
13 and 23 Dec 2024
Details
View Map
Share
Gatcombe Corner To Beeches Park

Gloucestershire County Council were proposing to carry out Highway improvement works on Gatcombe Corner To Beeches Park, Hampton Fields, Minchinhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 26 Nov 2024 at 11:21.

Gloucestershire County Council logo
Between
13 and 23 Dec 2024
Details
View Map
Share
Beeches Park To Junction With Cirencester Road

Gloucestershire County Council were proposing to carry out Highway improvement works on Beeches Park To Junction With Cirencester Road, Crackstone, Minchinhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 26 Nov 2024 at 11:21.

Gloucestershire County Council logo
Between
15 and 19 Dec 2024
Details
View Map
Share
Follow
Bath Road

Gloucestershire County Council are proposing to carry out roadworks on Bath Road, Haresfield, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Nov 2024 at 08:53.

Gigaclear logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Brimscombe Hill

Gigaclear are proposing to carry out Utility asset works on Brimscombe Hill, Burleigh, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 15 Oct 2024 at 09:31.

Gigaclear logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Burleigh Lane

Gigaclear were proposing to carry out Utility asset works on Burleigh Lane, Burleigh, Stroud.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 7 Nov 2024 at 09:35.

Gigaclear logo
Between
16 and 20 Dec 2024
Details
View Map
Share
The Roundabouts

Gigaclear were proposing to carry out Utility asset works on The Roundabouts, Brimscombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Oct 2024 at 08:24.

Gigaclear logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Brimscombe Hill

Gigaclear are proposing to carry out Utility asset works on Brimscombe Hill, Walls Quarry, Brimscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 15 Oct 2024 at 09:33.

Gloucestershire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Bowbridge Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Bowbridge Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:58.

Western Power Distribution (West Midlands) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Quarhouse Lane To Middle Lypiatt

Western Power Distribution (West Midlands) are proposing to carry out Disconnection or alteration of supply on Quarhouse Lane To Middle Lypiatt, Lypiatt, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Oct 2024 at 10:52.

Gloucestershire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Ebley Bypass

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Ebley Bypass, Stroud.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 15 Nov 2024 at 12:14.

Gloucestershire County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Ebley Bypass

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Ebley Bypass, Stroud.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 18 Nov 2024 at 13:46.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Gloucester Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Gloucester Road, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 19 Oct 2024 at 16:27.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan 2025 and 6 Jul 2026
Details
View Map
Share
Follow
Gloucester Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Gloucester Road, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 July 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 6 Nov 2024 at 10:01.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Gloucester Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Gloucester Road, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 15 Nov 2024 at 08:28.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 11 Apr 2025
Details
View Map
Share
Follow
B4008 Standish To Gloucester Road Stonehouse

Gloucestershire County Council are proposing to carry out Highway improvement works on B4008 Standish To Gloucester Road Stonehouse, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 19 Oct 2024 at 17:12.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan 2025 and 6 Jul 2026
Details
View Map
Share
Follow
B4008 Standish To Gloucester Road Stonehouse

Gloucestershire County Council are proposing to carry out Highway improvement works on B4008 Standish To Gloucester Road Stonehouse, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 July 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 6 Nov 2024 at 10:00.

Gloucestershire County Council logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
B4008 Standish To Gloucester Road Stonehouse

Gloucestershire County Council are proposing to carry out Highway improvement works on B4008 Standish To Gloucester Road Stonehouse, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 13 Nov 2024 at 09:35.

Gloucestershire County Council logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Upton Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Upton Lane, Brookthorpe, Gloucester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 14:26.

Gloucestershire County Council logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Upton Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Upton Lane, Brookthorpe, Gloucester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 15 Nov 2024 at 11:37.

Gloucestershire County Council logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Sneedhams Green

Gloucestershire County Council are proposing to carry out Highway improvement works on Sneedhams Green, Gloucester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Nov 2024 at 14:38.

Gloucestershire County Council logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Sneedhams Green

Gloucestershire County Council are proposing to carry out Highway improvement works on Sneedhams Green, Gloucester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 2 Dec 2024 at 16:36.

Gloucestershire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
The Bridle

Gloucestershire County Council were proposing to carry out Highway repair and maintenance works on The Bridle, Cashes Green, Stroud.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Gloucestershire County Council on 11 Dec 2024 at 17:09.

Nexfibre Networks Limited logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Etheldene Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Etheldene Road, Cashes Green, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Nov 2024 at 09:03.

Nexfibre Networks Limited logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Etheldene Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Etheldene Road, Cashes Green, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 6 Nov 2024 at 11:47.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Cheltenham Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cheltenham Road, Bisley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 1 Nov 2024 at 12:53.

Nexfibre Networks Limited logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
John Bevan Close

Nexfibre Networks Limited are proposing to carry out Utility asset works on John Bevan Close, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Nov 2024 at 08:09.

Nexfibre Networks Limited logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
John Bevan Close

Nexfibre Networks Limited are proposing to carry out Utility asset works on John Bevan Close, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Nov 2024 at 08:22.

Nexfibre Networks Limited logo
Between
17 and 23 Jan 2025
Details
View Map
Share
Follow
Folly Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Folly Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Nov 2024 at 08:35.

Nexfibre Networks Limited logo
Between
17 and 23 Jan 2025
Details
View Map
Share
Follow
Folly Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Folly Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Nov 2024 at 08:22.

Gloucestershire County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Cirencester Road

Gloucestershire County Council are proposing to carry out Works for road purposes on Cirencester Road, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 19 Nov 2024 at 14:53.

Gloucestershire County Council logo
LONG TERM
Between
20 Jan and 18 Apr 2025
Details
View Map
Share
Follow
Rowcroft Retreat

Gloucestershire County Council are proposing to carry out Works for road purposes on Rowcroft Retreat, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 6 Dec 2024 at 14:35.

Nexfibre Networks Limited logo
Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Springfield Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Springfield Road, Uplands, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Nov 2024 at 08:40.

Nexfibre Networks Limited logo
Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Springfield Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Springfield Road, Uplands, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Nov 2024 at 08:30.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Oldends Lane

Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jul 2024 at 12:58.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Oldends Lane

Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Aug 2024 at 08:29.

Western Power Distribution (West Midlands) logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Main Road Middleyard To The Grove

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Main Road Middleyard To The Grove, Selsley West, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Dec 2024 at 09:47.

Gloucestershire County Council logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Follow
Bowbridge Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Bowbridge Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 09:44.

Gigaclear logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Brimscombe Hill

Gigaclear are proposing to carry out Utility asset works on Brimscombe Hill, Walls Quarry, Brimscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 23 Oct 2024 at 11:12.

Gigaclear logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Spring Lane

Gigaclear are proposing to carry out Utility asset works on Spring Lane, Thrupp, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 12 Nov 2024 at 14:08.

Gigaclear logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Spring Lane

Gigaclear are proposing to carry out Utility asset works on Spring Lane, Thrupp, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 18 Nov 2024 at 13:58.

Nexfibre Networks Limited logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Foxmoor Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Foxmoor Lane, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 14:25.

Gigaclear logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Shortwood Road

Gigaclear are proposing to carry out Utility asset works on Shortwood Road, Nailsworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 5 Nov 2024 at 10:39.

Gigaclear logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Shortwood Road

Gigaclear were proposing to carry out Utility asset works on Shortwood Road, Nailsworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 18 Nov 2024 at 07:51.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Culver Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Culver Hill, Amberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 13:52.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Culver Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Culver Hill, Amberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 08:29.

Gloucestershire County Council logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Bath Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Bath Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 9 Dec 2024 at 07:55.

Gloucestershire County Council logo
Between
31 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Walkley Hill

Gloucestershire County Council are proposing to carry out Highway improvement works on Walkley Hill, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 9 Dec 2024 at 08:57.

Nexfibre Networks Limited logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Church Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Church Road, Leonard Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 27 Nov 2024 at 11:54.

Nexfibre Networks Limited logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Church Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Church Road, Leonard Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 2 Dec 2024 at 10:00.

Nexfibre Networks Limited logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hillfield

Nexfibre Networks Limited are proposing to carry out Utility asset works on Hillfield, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 2 Dec 2024 at 10:19.

Nexfibre Networks Limited logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hillfield

Nexfibre Networks Limited are proposing to carry out Utility asset works on Hillfield, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 08:04.

Nexfibre Networks Limited logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Quietways

Nexfibre Networks Limited are proposing to carry out Utility asset works on Quietways, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 2 Dec 2024 at 10:33.

Nexfibre Networks Limited logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Quietways

Nexfibre Networks Limited are proposing to carry out Utility asset works on Quietways, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 08:04.

Gloucestershire County Council logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Naas Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Naas Lane, Quedgeley, Gloucester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 10 Dec 2024 at 15:46.

Gloucestershire County Council logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Naas Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Naas Lane, Quedgeley, Gloucester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gloucestershire County Council on 10 Dec 2024 at 15:47.

Nexfibre Networks Limited logo
Between
4 and 13 Feb 2025
Details
View Map
Share
Follow
Bowl Hill

Nexfibre Networks Limited are proposing to carry out Utility asset works on Bowl Hill, Kingscourt, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 14:10.

Nexfibre Networks Limited logo
Between
4 and 13 Feb 2025
Details
View Map
Share
Follow
Kingscourt Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingscourt Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 14:19.

Gigaclear logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Culver Hill To Watledge Road

Gigaclear are proposing to carry out Utility asset works on Culver Hill To Watledge Road, Theescombe, Amberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 13 Nov 2024 at 12:30.

Gigaclear logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Culver Hill To Watledge Road

Gigaclear are proposing to carry out Utility asset works on Culver Hill To Watledge Road, Theescombe, Amberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 18 Nov 2024 at 13:59.

Nexfibre Networks Limited logo
Between
5 and 10 Feb 2025
Details
View Map
Share
Follow
Spillmans Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Spillmans Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 09:44.

Nexfibre Networks Limited logo
Between
5 and 10 Feb 2025
Details
View Map
Share
Follow
Spillmans Pitch

Nexfibre Networks Limited are proposing to carry out Utility asset works on Spillmans Pitch, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 10:02.

Nexfibre Networks Limited logo
Between
5 and 10 Feb 2025
Details
View Map
Share
Follow
Spillmans Pitch

Nexfibre Networks Limited are proposing to carry out Utility asset works on Spillmans Pitch, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Dec 2024 at 12:25.

Nexfibre Networks Limited logo
Between
5 and 10 Feb 2025
Details
View Map
Share
Follow
Spillmans Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Spillmans Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 11:29.

Nexfibre Networks Limited logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Stonehouse Footpath 66

Nexfibre Networks Limited are proposing to carry out Utility asset works on Stonehouse Footpath 66, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the footpath only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 09:21.

Nexfibre Networks Limited logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Stonehouse Footpath 66

Nexfibre Networks Limited are proposing to carry out Utility asset works on Stonehouse Footpath 66, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the footpath only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 15:20.

Nexfibre Networks Limited logo
Between
5 and 13 Feb 2025
Details
View Map
Share
Follow
Cotswold Green

Nexfibre Networks Limited are proposing to carry out Utility asset works on Cotswold Green, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 2 Dec 2024 at 11:00.

Nexfibre Networks Limited logo
Between
6 and 13 Feb 2025
Details
View Map
Share
Follow
Bowl Hill

Nexfibre Networks Limited are proposing to carry out Utility asset works on Bowl Hill, Kingscourt, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 10:14.

Nexfibre Networks Limited logo
Between
6 and 13 Feb 2025
Details
View Map
Share
Follow
Kingscourt Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Kingscourt Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 10:43.

Nexfibre Networks Limited logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Footway Adjoining 20 Pheasant Mead And 18 Juniper Way

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 20 Pheasant Mead And 18 Juniper Way, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 15:19.

Nexfibre Networks Limited logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Footway Adjoining 20 Pheasant Mead And 18 Juniper Way

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 20 Pheasant Mead And 18 Juniper Way, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Dec 2024 at 12:22.

Nexfibre Networks Limited logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Footway Adjoining 67 Pheasant Mead And 16 Juniper Way

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 67 Pheasant Mead And 16 Juniper Way, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 15:19.

Nexfibre Networks Limited logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Footway Adjoining 67 Pheasant Mead And 16 Juniper Way

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway Adjoining 67 Pheasant Mead And 16 Juniper Way, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Dec 2024 at 12:19.

Nexfibre Networks Limited logo
Between
8 and 14 Feb 2025
Details
View Map
Share
Follow
Middle Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Middle Street, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 14:33.

Nexfibre Networks Limited logo
Between
8 and 14 Feb 2025
Details
View Map
Share
Follow
Middle Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Middle Street, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 10:45.

Gigaclear logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Besbury Lane

Gigaclear are proposing to carry out Utility asset works on Besbury Lane, Minchinhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 20 Nov 2024 at 13:49.

Nexfibre Networks Limited logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Dudbridge Hill

Nexfibre Networks Limited are proposing to carry out Utility asset works on Dudbridge Hill, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 11:30.

Nexfibre Networks Limited logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Dudbridge Hill

Nexfibre Networks Limited are proposing to carry out Utility asset works on Dudbridge Hill, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 13:13.

Gloucestershire County Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Westward Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Westward Road, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:25.

Gloucestershire County Council logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Westward Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Westward Road, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Dec 2024 at 08:13.

Gloucestershire County Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Ebley Wharf

Gloucestershire County Council are proposing to carry out Highway improvement works on Ebley Wharf, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:30.

Gloucestershire County Council logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Ebley Wharf

Gloucestershire County Council are proposing to carry out Highway improvement works on Ebley Wharf, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Dec 2024 at 08:14.

Gloucestershire County Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Chapel Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Chapel Lane, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:30.

Gloucestershire County Council logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Chapel Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Chapel Lane, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Dec 2024 at 08:14.

Gloucestershire County Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Foxmoor Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Foxmoor Lane, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:30.

Gloucestershire County Council logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Foxmoor Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Foxmoor Lane, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Dec 2024 at 08:14.

Gloucestershire County Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Ebley Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Ebley Road, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:25.

Gloucestershire County Council logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Ebley Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Ebley Road, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Dec 2024 at 08:13.

Gloucestershire County Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Westward Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Westward Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:25.

Gloucestershire County Council logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Westward Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Westward Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Dec 2024 at 08:13.

Gloucestershire County Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Church Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Church Road, Cainscross, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:30.

Gloucestershire County Council logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Church Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Church Road, Cainscross, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Dec 2024 at 08:15.

Gloucestershire County Council logo
Between
11 and 21 Feb 2025
Details
View Map
Share
Follow
Cashes Green Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Cashes Green Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:30.

Gloucestershire County Council logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Cashes Green Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Cashes Green Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 4 Dec 2024 at 08:14.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Dark Lane

Severn Trent Water are proposing to carry out New service connection on Dark Lane, Nailsworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 15:20.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Dark Lane

Severn Trent Water are proposing to carry out New service connection on Dark Lane, Nailsworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 07:42.

Gigaclear logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Old Neighbourhood

Gigaclear were proposing to carry out Utility asset works on Old Neighbourhood, Chalford, Stroud.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 19 Nov 2024 at 09:03.

Nexfibre Networks Limited logo
Between
12 and 21 Feb 2025
Details
View Map
Share
Follow
Horns Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Horns Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 12:03.

Nexfibre Networks Limited logo
Between
12 and 21 Feb 2025
Details
View Map
Share
Follow
Horns Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Horns Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 08:09.

Gloucestershire County Council logo
Between
12 and 18 Feb 2025
Details
View Map
Share
Road From Stroud Road To Bird In Hand

Gloucestershire County Council were proposing to carry out Highway improvement works on Road From Stroud Road To Bird In Hand, Edge, Stroud.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 26 Nov 2024 at 11:21.

Gloucestershire County Council logo
Between
12 and 18 Feb 2025
Details
View Map
Share
Haresfield Lane

Gloucestershire County Council were proposing to carry out Highway improvement works on Haresfield Lane, Edge, Stroud.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 26 Nov 2024 at 11:27.

Gloucestershire County Council logo
Between
12 and 18 Feb 2025
Details
View Map
Share
Edge Road To Spring Acre

Gloucestershire County Council were proposing to carry out Highway improvement works on Edge Road To Spring Acre, Edge, Stroud.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 26 Nov 2024 at 11:27.

Gloucestershire County Council logo
Between
12 and 18 Feb 2025
Details
View Map
Share
Edge Lane

Gloucestershire County Council were proposing to carry out Highway improvement works on Edge Lane, Edge, Stroud.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 18 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 26 Nov 2024 at 11:27.

Gloucestershire County Council logo
Between
14 and 17 Feb 2025
Details
View Map
Share
Follow
Road To Church Farm

Gloucestershire County Council are proposing to carry out Highway improvement works on Road To Church Farm, Harescombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 5 Sep 2024 at 08:13.

Gloucestershire County Council logo
Between
15 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Bowl Hill

Gloucestershire County Council are proposing to carry out Highway improvement works on Bowl Hill, Kingscourt, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 22 Oct 2024 at 07:53.

Gloucestershire County Council logo
Between
15 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Kingscourt Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Kingscourt Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 10:58.

Gloucestershire County Council logo
Between
15 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Kitesnest Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Kitesnest Lane, Lightpill, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 23 Oct 2024 at 08:50.

Gloucestershire County Council logo
Between
15 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Tabernacle Walk

Gloucestershire County Council are proposing to carry out Highway improvement works on Tabernacle Walk, Rodborough, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 10:52.

Gloucestershire County Council logo
Between
15 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Chandos Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Chandos Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 22 Oct 2024 at 07:54.

Gloucestershire County Council logo
Between
15 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Stringers Drive

Gloucestershire County Council are proposing to carry out Highway improvement works on Stringers Drive, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 10:48.

Gloucestershire County Council logo
Between
15 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Court Way

Gloucestershire County Council are proposing to carry out Highway improvement works on Court Way, Rodborough, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 22 Oct 2024 at 07:53.

Gloucestershire County Council logo
Between
15 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Walkley Hill

Gloucestershire County Council are proposing to carry out Highway improvement works on Walkley Hill, Stroud.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 10:53.

Gigaclear logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Brimscombe Hill

Gigaclear are proposing to carry out Utility asset works on Brimscombe Hill, Burleigh, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 2 Dec 2024 at 15:30.

Gigaclear logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Brimscombe Hill

Gigaclear are proposing to carry out Utility asset works on Brimscombe Hill, Walls Quarry, Brimscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 2 Dec 2024 at 15:30.

Gigaclear logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Thrupp Lane

Gigaclear are proposing to carry out Utility asset works on Thrupp Lane, Thrupp, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 9 Dec 2024 at 09:20.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Dudbridge Hill

Severn Trent Water were proposing to carry out Utility asset works on Dudbridge Hill, Stroud.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 14:50.

Nexfibre Networks Limited logo
Between
17 and 25 Feb 2025
Details
View Map
Share
Follow
Spider Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Spider Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 12:12.

Nexfibre Networks Limited logo
Between
17 and 25 Feb 2025
Details
View Map
Share
Follow
Spider Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Spider Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 08:05.

Nexfibre Networks Limited logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Foxmoor Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Foxmoor Lane, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 14:22.

Nexfibre Networks Limited logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Footway From Reservoir Close To Bisley Old Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Reservoir Close To Bisley Old Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 11:55.

Nexfibre Networks Limited logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Footway From Reservoir Close To Bisley Old Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Footway From Reservoir Close To Bisley Old Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway only.

This roadwork event was last updated by Nexfibre Networks Limited on 4 Dec 2024 at 14:50.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Cheltenham Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cheltenham Road, Bisley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 10:26.

Gloucestershire County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Haresfield Lane

Gloucestershire County Council are proposing to carry out Works for road purposes on Haresfield Lane, Brookthorpe, Gloucester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 15 Nov 2024 at 12:04.

Nexfibre Networks Limited logo
Between
19 and 27 Feb 2025
Details
View Map
Share
Follow
Summer Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Summer Street, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Dec 2024 at 08:45.

Nexfibre Networks Limited logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Belmont Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Belmont Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 5 Dec 2024 at 10:53.

Nexfibre Networks Limited logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Belmont Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Belmont Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 10 Dec 2024 at 12:14.

Severn Trent Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
High Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on High Street, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 13:19.

Severn Trent Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
High Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on High Street, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 08:00.

Gloucestershire County Council logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Bowl Hill

Gloucestershire County Council are proposing to carry out Highway improvement works on Bowl Hill, Kingscourt, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 09:55.

Gloucestershire County Council logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Kingscourt Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Kingscourt Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 09:55.

Gloucestershire County Council logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Kitesnest Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Kitesnest Lane, Lightpill, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 10:11.

Gloucestershire County Council logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Tabernacle Walk

Gloucestershire County Council are proposing to carry out Highway improvement works on Tabernacle Walk, Rodborough, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 10:11.

Gloucestershire County Council logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Chandos Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Chandos Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 10:11.

Gloucestershire County Council logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Stringers Drive

Gloucestershire County Council are proposing to carry out Highway improvement works on Stringers Drive, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 10:11.

Gloucestershire County Council logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Court Way

Gloucestershire County Council are proposing to carry out Highway improvement works on Court Way, Rodborough, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 10:11.

Gloucestershire County Council logo
Between
24 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Walkley Hill

Gloucestershire County Council are proposing to carry out Highway improvement works on Walkley Hill, Stroud.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 10:16.

Gloucestershire County Council logo
Between
24 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Walkley Hill

Gloucestershire County Council are proposing to carry out Highway improvement works on Walkley Hill, Stroud.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Dec 2024 at 13:25.

Network Rail logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Rowcroft

Network Rail are proposing to carry out Works for Rail Purposes on Rowcroft, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Dec 2024 at 10:22.

Network Rail logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Rowcroft

Network Rail are proposing to carry out Works for Rail Purposes on Rowcroft, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 9 Dec 2024 at 09:58.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Westward Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Westward Road, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 15:13.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Westward Road

Gloucestershire County Council were proposing to carry out Highway improvement works on Westward Road, Ebley, Stroud.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 12:55.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Ebley Wharf

Gloucestershire County Council are proposing to carry out Highway improvement works on Ebley Wharf, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 15:18.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Chapel Lane, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 15:18.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Foxmoor Lane

Gloucestershire County Council are proposing to carry out Highway improvement works on Foxmoor Lane, Ebley, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 15:18.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Ebley Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Ebley Road, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 15:13.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Ebley Road

Gloucestershire County Council were proposing to carry out Highway improvement works on Ebley Road, Stonehouse.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Sep 2024 at 12:55.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Westward Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Westward Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 15:18.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Church Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Church Road, Cainscross, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 15:19.

Gloucestershire County Council logo
Between
28 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Cashes Green Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Cashes Green Road, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 3 Oct 2024 at 15:18.

Gigaclear logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Box Cottage To Halfway House Inn

Gigaclear are proposing to carry out Utility asset works on Box Cottage To Halfway House Inn, Box.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 3 Dec 2024 at 08:36.

Severn Trent Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
The Green To Fidges Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Green To Fidges Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 11:00.

Severn Trent Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
The Green To Fidges Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Green To Fidges Lane, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Dec 2024 at 13:35.

Nexfibre Networks Limited logo
Between
3 and 12 Mar 2025
Details
View Map
Share
Follow
Summer Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Summer Street, Stroud.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Dec 2024 at 10:47.

Network Rail logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Oldends Lane

Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jul 2024 at 11:31.

Network Rail logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Oldends Lane

Network Rail are proposing to carry out Works for Rail Purposes on Oldends Lane, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Aug 2024 at 08:28.

Wales And West Utilities logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Grove Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Grove Lane, Westend, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 11:38.

Wales And West Utilities logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Grove Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Grove Lane, Westend, Stonehouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 12:23.

Severn Trent Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Calfway

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Calfway, Bisley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Nov 2024 at 07:17.

Wales And West Utilities logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Tibbiwell Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Tibbiwell Lane, Painswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 10 Dec 2024 at 11:36.

Severn Trent Water logo
Between
6 and 8 Mar 2025
Details
View Map
Share
Follow
Road From B4070 To Sam Scotts Sheepscomb

Severn Trent Water are proposing to carry out New service connection on Road From B4070 To Sam Scotts Sheepscomb, Sheepscombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 8 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 09:01.


Roadworks Map near to STROUD, GL6 1NE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 23:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to STROUD, GL6 1NE (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Gloucestershire County Council logo
URGENT
  
KING STREET 
(0.5 miles)
Gloucestershire County Council
Highway repair and maintenance works - Carriageway - No carriageway incursion
In Progress
Since: 6 Dec 2024 11:31
(Scheduled: 6 Dec 2024 - 3 Jan 2025)
0.5
Details
Share
Follow
2
Severn Trent Water logo
EMERGENCY
  
SLAD ROAD 
(0.6 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
10 Dec 2024 14:38 - 15:11
0.6
Details
Share
3
BT logo
THE CHUR 
(0.7 miles)
BT
Utility asset works - Verge -
Cancelled
(Scheduled: 11 Dec 2024)
0.7
Details
Share
4
Gloucestershire County Council logo
URGENT
  
FIELD ROAD 
(0.9 miles)
Gloucestershire County Council
Highway repair and maintenance works - Carriageway - Give and take
In Progress
Since: 7 Sep 2024 20:25
(Scheduled: 7 Sep 2024 - 20 Dec 2024)
0.9
Details
Share
Follow
5
Severn Trent Water logo
URGENT
  
LANGTOFT ROAD 
(1.0 miles)
Severn Trent Water
Utility repair and maintenance works - Verge - Give and take
Complete
9 Dec 2024 18:25 - 10 Dec 2024 00:02
1.0
Details
Share
6
Severn Trent Water logo
URGENT
  
SUMMER STREET 
(1.0 miles)
Severn Trent Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
8 Dec 2024 09:11 - 11 Dec 2024 14:27
1.0
Details
Share
7
Nexfibre Networks Limited logo
THE BUTTS, RODBOROUGH 
(1.0 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Give and take
Planned
Scheduled: 11 Dec 2024 - 13 Dec 2024
1.0
Details
Share
Follow