Leah Gardens, GLOUCESTER, GL19 3JN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Leah Gardens, GL19 3JN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Leah Gardens, GLOUCESTER, GL19 3JN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Leah Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Lower Road

Cadent Gas were proposing to carry out Utility asset works on Lower Road, Ledbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 11:43.

Cadent Gas logo
Between
19 Nov and 9 Dec 2024
Details
View Map
Share
Little Marcle Road

Cadent Gas were proposing to carry out Utility asset works on Little Marcle Road, Ledbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 11:43.

BT logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
A438 From A449 To Hollybush

BT are proposing to carry out Utility asset works on A438 From A449 To Hollybush, Eastnor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 14:21.

BT logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Worcester Road

BT are proposing to carry out Utility asset works on Worcester Road, Ledbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Sep 2024 at 10:36.

BT logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Worcester Road

BT are proposing to carry out Utility asset works on Worcester Road, Ledbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 14:12.

BT logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
A449 From A438 To Halfway House

BT are proposing to carry out Utility asset works on A449 From A438 To Halfway House, Eastnor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Sep 2024 at 10:36.

BT logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
A449 From A438 To Halfway House

BT are proposing to carry out Utility asset works on A449 From A438 To Halfway House, Eastnor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 14:14.

BT logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
A438 From A449 To Hollybush

BT are proposing to carry out Utility asset works on A438 From A449 To Hollybush, Eastnor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Sep 2024 at 10:36.

Gloucestershire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Forge Lane

Gloucestershire County Council are carrying out Highway repair and maintenance works on Forge Lane, Upleadon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 15:00 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 29 Nov 2024 at 10:22.

Gloucestershire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Road From The Causeway To Junction With The Lottery

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Road From The Causeway To Junction With The Lottery, Redmarley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 17 Sep 2024 at 11:28.

Severn Trent Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Gloucester Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gloucester Road, Upleadon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Sep 2024 at 12:22.

Severn Trent Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Gloucester Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gloucester Road, Upleadon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Sep 2024 at 12:49.

Severn Trent Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Newent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 12:03.

Severn Trent Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Newent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 12:13.

Severn Trent Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Ledbury Road Crescent

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Ledbury Road Crescent, Staunton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 11:32.

Severn Trent Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Ledbury Road Crescent

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ledbury Road Crescent, Staunton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 16:13.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Upleadon Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Upleadon Road, Highleadon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 25 Sep 2024 at 12:26.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Upleadon Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Upleadon Road, Highleadon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 12:06.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Lower Road

Cadent Gas are proposing to carry out Utility asset works on Lower Road, Ledbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 12:15.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Little Marcle Road

Cadent Gas are proposing to carry out Utility asset works on Little Marcle Road, Ledbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 12:15.

BT logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Follow
Worcester Road

BT are proposing to carry out Utility asset works on Worcester Road, Ledbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Nov 2024 at 12:06.

BT logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Follow
A449 From A438 To Halfway House

BT are proposing to carry out Utility asset works on A449 From A438 To Halfway House, Eastnor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 13 Nov 2024 at 12:06.

BT logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Follow
A438 From A449 To Hollybush

BT are proposing to carry out Utility asset works on A438 From A449 To Hollybush, Eastnor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 14 Nov 2024 at 11:33.

Between
13 and 17 Jan 2025
Details
View Map
Share
A438 From A449 To Hollybush

Herefordshire Council were proposing to carry out Highway repair and maintenance works on A438 From A449 To Hollybush, Eastnor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Herefordshire Council on 12 Nov 2024 at 10:57.

Gloucestershire County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Normansland Road

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Normansland Road, Dymock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 25 Nov 2024 at 09:25.

Gloucestershire County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Normansland Road

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Normansland Road, Dymock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 9 Aug 2024 at 13:05.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Beach Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Beach Lane, Bromsberrow Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 13:15.

Severn Trent Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Bell Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bell Lane, Bromsberrow Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 13:15.

Severn Trent Water logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Bell Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bell Lane, Bromsberrow Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 16:41.

Severn Trent Water logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Bell Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bell Lane, Bromsberrow Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 14:49.

Western Power Distribution (West Midlands) logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Chase End Street

Western Power Distribution (West Midlands) are proposing to carry out Diversionary works on Chase End Street, Bromsberrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Nov 2024 at 10:52.

Between
17 and 21 Feb 2025
Details
View Map
Share
A417 From Ledbury Bypass To Gloucestershire Boundary

Herefordshire Council were proposing to carry out Highway repair and maintenance works on A417 From Ledbury Bypass To Gloucestershire Boundary, Ledbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Herefordshire Council on 12 Nov 2024 at 11:02.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Southend

Cadent Gas are proposing to carry out New service connection on The Southend, Ledbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 11:41.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Southend

Cadent Gas are proposing to carry out New service connection on The Southend, Ledbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 15:56.

Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Ross Road

Herefordshire Council are proposing to carry out Highway repair and maintenance works on Ross Road, Ledbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Herefordshire Council on 25 Sep 2024 at 13:38.

Gloucestershire County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Ryton Road

Gloucestershire County Council are proposing to carry out Highway repair and maintenance works on Ryton Road, Dymock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 26 Nov 2024 at 14:34.


Roadworks Map near to Leah Gardens, GLOUCESTER, GL19 3JN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Leah Gardens, GLOUCESTER, GL19 3JN (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.