ROADWORK EVENT SUMMARY
Heyrod Street, Stalybridge between 27 Nov and 6 Dec 2024

For local roadworks happening in your street and local area, enter your postcode for a detailed report
Type your postcode

Works Description for Heyrod Street, Stalybridge

BT are proposing to carry out Utility asset works on Heyrod Street, Stalybridge.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 27 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

The information for these works was last updated by BT on 13 November 2024 at 11:12.


Share
Follow

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Works Map for Heyrod Street, Stalybridge

Works Details

WORKS PLANNED
BT logo
These works are handled by:
BT
Tameside Metropolitan Borough Council logo
Local Authority:
Tameside Metropolitan Borough Council
Works Reference BC004WFSNRP1C
Permit Number 01
Place Name Heyrod Street
Stalybridge
Proposed Start 27 Nov 2024
Proposed End 6 Dec 2024
Actual Start
Actual End
Traffic Management Give and take
Impact Footway, Carriageway, Verge
Coordinates
Lat, Lon
53.500234
-2.031779
Last Updated 13 Nov 2024 11:12
Contact Details for Activity BC004WFSNRP1C (Heyrod Street, Stalybridge)

In the event that you have an issue with these works, please contact BT, the works operator in the first instance if details are available, as they are most likely to be able to assist and resolve the issue more quickly.

Should the issue remain, you may also contact the local authority, Tameside Metropolitan Borough Council that authorised the works.

It would assist the organisations if you quote the work reference number of BC004WFSNRP1C.

BT
Telephone03301 233 753
Works History for Activity BC004WFSNRP1C (Heyrod Street, Stalybridge)
Proposed
Actual
Date
Activity
Start
End
Start
End
Status
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
13 Nov 2024
10:55
Permit Submitted
27 Nov 2024
00:00
6 Dec 2024
00:00
Planned
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
13 Nov 2024
11:12
Permit Granted
27 Nov 2024
00:00
6 Dec 2024
00:00
Planned

Works Permits for Heyrod Street, Stalybridge

+
NCT01a (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date or, in the case of 'immediate works', the start date contained in the application for immediate works and must end by the estimated end date provided on this permit. The proposed start date, actual start date and estimated end date will be as defined.

Applies to all permits.

+
NCT01b (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date and must commence within the valid starting window period or in the case of immediate works by the actual start date contained in the application for immediate works. Once the activities have commenced, the activities must take no more than [x number of] days in total to be completed. The proposed start date, actual start date and estimated end date are as defined.

Applies to all permits.

+
NCT11a (Display of Permit Number)

For the activities hereby permitted, it is a condition of this permit that activities shall not be carried out unless a site information board(s) displaying the permit reference number is on the site at all times for the duration of the works. This must be displayed in a prominent place at all times so that it may be read easily by the public, clearly displaying the correct permit reference number. For immediate works, the display of the permit reference number is required by 10.00am on the next working day after the works have started on site.

Applies to all permits.

Notes

Proposed Work Dates

Roadworks are planned in advance and sometimes are proposed to run over a number of days. It may well be that the roadworks start after the proposed start date due to bad weather or other operational delays. Equally, works may complete before the proposed end date as the works may have included a few extra days just in case.

Problems with roadworks?

On rare occasions, issues may occur during or after the completion of roadworks, such as:

  • Poor reinstatement of the footpath or the carriageway.
  • Rubbish and mess remaining after the works have completed.
  • Traffic management issues during the works.
  • Equipment left behind after the works have completed.
  • Any other issues or disruption that the works may be causing.

In such instances, you should try and contact the organisation carrying out the works in the first instance. If we have contact details available they are shown on the detailed roadworks page.

In the event that the organistion cannot help, then the local authority that authorised the works may be able to help and again, if their contact details are published then we have provided their contact information on our detailed roadworks page.

Unfortunately, here at StreetGuide, we are only publishers of the data provided by the organisations and cannot provide information or assistance on individual works.

Contains public sector information licensed under the Open Government Licence v3.0.