ROADWORKS SUMMARY
Flanders Drive, KINGSWINFORD, DY6 7RG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Flanders Drive, DY6 7RG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Flanders Drive, KINGSWINFORD, DY6 7RG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Flanders Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Trindle Road

Transport for West Midlands (TfWM) are carrying out roadworks on Trindle Road, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 April 2023 at 16:30 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:24.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Birmingham Street

Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Birmingham Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 October 2023 at 00:01 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:03.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
King Street

Transport for West Midlands (TfWM) are carrying out roadworks on King Street, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 November 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 2 Sep 2024 at 08:50.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
King Street

Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on King Street, Dudley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 November 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:23.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Birmingham Street

Transport for West Midlands (TfWM) are carrying out roadworks on Birmingham Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:03.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Station Drive

Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Station Drive, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:02.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Church Hill

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Hill, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:34.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mill Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:35.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Level Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Level Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:49.

LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Trindle Road

Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Trindle Road, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 08:00 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 Nov 2024 at 15:09.

LONG TERM
Until
8 Jun 2025
Details
View Map
Share
Follow
St Joseph Street

Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on St Joseph Street, Dudley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 May 2024 at 11:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 May 2024 at 10:56.

Severn Trent Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Langley Road

Severn Trent Water are carrying out Utility asset works on Langley Road, Lower Penn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 August 2024 at 08:35 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 16:06.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
26 Aug 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Bayswater Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bayswater Road, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:48.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
26 Aug 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Bayswater Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bayswater Road, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:28.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
The Broadway

Transport for West Midlands (TfWM) are carrying out Works for road purposes on The Broadway, Dudley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:24.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Jul 2024 at 13:13.

Cadent Gas logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are carrying out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 12:37 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:38.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Finchley Close

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Finchley Close, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:49.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Finchley Close

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Finchley Close, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:29.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
21 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Wealdstone Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wealdstone Drive, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:50.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
21 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Wealdstone Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wealdstone Drive, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:30.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are carrying out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 15:52.

Cadent Gas logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 11:17.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are carrying out Utility asset works on Wentworth Road, Wollaston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 10:05.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Somerset Drive

Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 09:51.

Severn Trent Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Leasowes Drive

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Leasowes Drive, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 08:11.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Wollaston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 15:22.

Severn Trent Water logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Gibbet Lane

Severn Trent Water were proposing to carry out New service connection on Gibbet Lane, Whittington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 16:45.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
School Road

Cadent Gas are carrying out Utility asset works on School Road, Himley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 09:15.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 09:00.

Cadent Gas logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are carrying out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 09:53.

Until
20 Dec 2024
Details
View Map
Share
Follow
Maple Road

GTC Pipelines are carrying out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 12 Dec 2024 at 12:15.

Indigo Power logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Maple Road

Indigo Power are carrying out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 11 Dec 2024 at 07:27.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinfold Lane

Cadent Gas are proposing to carry out Utility asset works on Pinfold Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:25.

Cadent Gas logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Pinfold Lane

Cadent Gas are carrying out Utility asset works on Pinfold Lane, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 11:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 11:27.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
26 Nov 2024 and 15 Jan 2025
Details
View Map
Share
Groveland Road

Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Groveland Road, Tipton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 15 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 10:44.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Bluebell Road

Cadent Gas were proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:27.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Bluebell Road

Cadent Gas are proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:31.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Central Drive

Cadent Gas are proposing to carry out Utility asset works on Central Drive, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2024 at 12:59.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Lytton Avenue

Cadent Gas are proposing to carry out Utility asset works on Lytton Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 09:21.

Cadent Gas logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Woodhall Road

Cadent Gas are carrying out Utility asset works on Woodhall Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 08:52.

Sandwell Metropolitan Borough Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Claremont Street

Sandwell Metropolitan Borough Council are proposing to carry out Works for road purposes on Claremont Street, Cradley Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Sep 2024 at 14:45.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:57.

ESP Electricity logo
Between
9 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Birmingham Road

ESP Electricity were proposing to carry out Utility asset works on Birmingham Road, Dudley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 23 Oct 2024 at 08:46.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:54.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Milton Road

Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 12:32.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Showell Lane

Staffordshire County Council are carrying out Highway improvement works on Showell Lane, Orton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 16:07 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 17:36.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Lytton Avenue

Cadent Gas are proposing to carry out Utility asset works on Lytton Avenue, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 16:42.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Woodhall Road

Cadent Gas are proposing to carry out Utility asset works on Woodhall Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:08.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Whittington Hall Lane

Staffordshire County Council are carrying out Highway improvement works on Whittington Hall Lane, Whittington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 13:32 and could run through until 13 December 2024. The works will impact the verge only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 15:52.

Staffordshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Crab Lane

Staffordshire County Council are carrying out Highway improvement works on Crab Lane, Bobbington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 12:40 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 14:06.

Staffordshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
The Holloway

Staffordshire County Council are carrying out Highway improvement works on The Holloway, Ebstree.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 14:55 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 17:16.

Staffordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Windsor Holloway

Staffordshire County Council are carrying out Highway improvement works on Windsor Holloway, Kinver.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 14:56 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 10:39.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Factory Road

Cadent Gas are carrying out Utility repair and maintenance works on Factory Road, Tipton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 15:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 16:06.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Coppice Street

Cadent Gas are carrying out Utility asset works on Coppice Street, Tipton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 15:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 16:02.

Staffordshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Woodford Lane

Staffordshire County Council are carrying out Highway improvement works on Woodford Lane, Trysull.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 11:35 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 17:17.

Finishing
Thursday
Details
View Map
Share
Follow
Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Farm Road, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Sep 2024 at 10:05.

Finishing
Thursday
Details
View Map
Share
Follow
Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Farm Road, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 14 Oct 2024 at 12:35.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Morfe Hall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Morfe Hall Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 08:16.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Elder Grove

Staffordshire County Council are proposing to carry out Highway improvement works on Elder Grove, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brook Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brook Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Wood Hill Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Hill Drive, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Lamb Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:52.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
The Roughs

Staffordshire County Council are proposing to carry out Highway improvement works on The Roughs, Trescott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:36.

Between
19 and 23 Dec 2024
Details
View Map
Share
Follow
Poplar Crescent

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Crescent, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 08:58.

Between
19 and 23 Dec 2024
Details
View Map
Share
Follow
Poplar Crescent

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Crescent, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 10:51.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Sytch Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Sytch Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:53.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Jenks Road

Staffordshire County Council are proposing to carry out Highway improvement works on Jenks Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 14:40.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:53.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Hyde Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hyde Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Sep 2024 at 13:36.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Blundies Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Blundies Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 09:48.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Greensforge

Staffordshire County Council were proposing to carry out Highway improvement works on Greensforge, Greensforge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 1 Oct 2024 at 10:49.

Cadent Gas logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Castle Mill Road

Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jul 2024 at 09:54.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Racecourse Lane

Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:29.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 08:22.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Hyde Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Hyde Lane, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:56.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Barrack Lane

Cadent Gas were proposing to carry out Utility asset works on Barrack Lane, Cradley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:58.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Engine Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Engine Lane, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 10:00.

Severn Trent Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Engine Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Engine Lane, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 08:36.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Somerset Drive

Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 12:48.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tack Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 15:05.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tack Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 11:22.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Blackbrook Valley Industrial Estate, Netherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 14:31.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Greensforge

Staffordshire County Council are proposing to carry out Highway improvement works on Greensforge, Greensforge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 09:48.

Cadent Gas logo
Between
6 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Paganel Drive

Cadent Gas are proposing to carry out Utility asset works on Paganel Drive, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:37.

Western Power Distribution (West Midlands) logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Tipton Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Nov 2024 at 11:07.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Bluebell Road

Cadent Gas are proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:39.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:47.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
The Warings

Staffordshire County Council are proposing to carry out Highway improvement works on The Warings, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 12:49.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Lamb Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 14:56.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Bridge Street

Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2024 at 11:57.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Milton Road

Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2024 at 11:36.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Newhall Street

Cadent Gas are proposing to carry out Utility asset works on Newhall Street, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:29.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Princes End, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:54.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Trysull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:02.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Orton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Orton Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 12:34.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Springhill Lane

Cadent Gas are proposing to carry out Utility asset works on Springhill Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:24.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Grendon Gardens

Cadent Gas were proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 08:55.

Between
8 and 21 Jan 2025
Details
View Map
Share
Follow
Barrack Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barrack Lane, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Oct 2024 at 07:09.

Between
8 and 21 Jan 2025
Details
View Map
Share
Follow
Blue Ball Lane

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Blue Ball Lane, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Oct 2024 at 07:13.

Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Old Hall Close

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Hall Close, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 15:38.

Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Old Hall Close

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Hall Close, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 12:08.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
9 Jan and 1 Oct 2025
Details
View Map
Share
Follow
Trindle Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Trindle Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Nov 2024 at 08:33.

South Staffordshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
High Street

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on High Street, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 17 Sep 2024 at 10:26.

Staffordshire County Council logo
LONG TERM
Between
13 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Stone Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Stone Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 09:42.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Lilac Road

Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:32.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Lilac Road

Cadent Gas were proposing to carry out Utility asset works on Lilac Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:31.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Laburnum Road

Cadent Gas are proposing to carry out Utility asset works on Laburnum Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:03.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:33.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Maple Road

Cadent Gas were proposing to carry out Utility asset works on Maple Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:36.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 11:05.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:11.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:40.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Mill Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:53.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Mill Lane

Staffordshire County Council were proposing to carry out Remedial works on Mill Lane, Wombourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:53.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Greyhound Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Greyhound Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 11:00.

Sandwell Metropolitan Borough Council logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Malthouse Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Malthouse Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 18 Sep 2024 at 14:13.

Cadent Gas logo
LONG TERM
Between
15 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Mount Road

Cadent Gas are proposing to carry out Utility asset works on Mount Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 12:00.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Randle Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Randle Road, Oldswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:19.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Randle Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Randle Road, Oldswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 07:46.

Staffordshire County Council logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Hyde Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Hyde Lane, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:48.

Cadent Gas logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Pennine Way

Cadent Gas were proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:47.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
James Scott Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on James Scott Road, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 11:57.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:11.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:06.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Castle Mill Road

Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:52.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Planks Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Planks Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 15:35.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Princes End, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2024 at 10:21.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Dirty Foot Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dirty Foot Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 10:29.

Cadent Gas logo
LONG TERM
Between
21 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.

Cadent Gas logo
Between
21 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wollescote Road

Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.

South Staffordshire Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Long Innage

South Staffordshire Water are proposing to carry out Remedial works on Long Innage, Cradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 10:43.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Oak Park Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 14:35.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Oak Park Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 11:33.

Western Power Distribution (West Midlands) logo
Between
21 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Tipton Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Dec 2024 at 09:04.

Western Power Distribution (West Midlands) logo
Between
21 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Tipton Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 14:06.

Cadent Gas logo
LONG TERM
Between
22 Jan and 11 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:47.

Cadent Gas logo
Between
24 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Old Ham Lane

Cadent Gas are proposing to carry out Utility asset works on Old Ham Lane, Pedmore.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:38.

Cadent Gas logo
Between
24 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Leys Road

Cadent Gas are proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:52.

Staffordshire County Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
The Compa

Staffordshire County Council are proposing to carry out Highway improvement works on The Compa, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 15:37.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Enville Road

Staffordshire County Council are proposing to carry out Highway improvement works on Enville Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:28.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:32.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:49.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 12:19.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:07.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Morfe Hall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Morfe Hall Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 15:49.

Transport for West Midlands (TfWM) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Duncan Edwards Way

Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Duncan Edwards Way, Dudley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Dec 2024 at 11:07.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Groveland Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Groveland Road, Tipton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Dec 2024 at 14:03.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Oak Road

Cadent Gas are proposing to carry out Utility asset works on Oak Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:48.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lavender Road

Cadent Gas are proposing to carry out Utility asset works on Lavender Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:04.

Cadent Gas logo
LONG TERM
Between
27 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:04.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
High Arcal Road

Staffordshire County Council are proposing to carry out Highway improvement works on High Arcal Road, Himley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:54.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Priory Road

Cadent Gas were proposing to carry out Utility asset works on Priory Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:42.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Priory Road

Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:22.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Priory Road

Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 09:09.

G2 Energy IDNO logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Dean Street

G2 Energy IDNO are proposing to carry out New service connection on Dean Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 18 Nov 2024 at 13:05.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
The Roughs

Staffordshire County Council are proposing to carry out Highway improvement works on The Roughs, Trescott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:58.

G2 Energy IDNO logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Dean Street

G2 Energy IDNO are proposing to carry out New service connection on Dean Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 18 Nov 2024 at 08:59.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Manor Road

Cadent Gas are proposing to carry out Utility asset works on Manor Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hinstock Close

Cadent Gas are proposing to carry out Utility asset works on Hinstock Close, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Enville Road

Staffordshire County Council are proposing to carry out Highway improvement works on Enville Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 09:19.

Cadent Gas logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Pennine Way

Cadent Gas were proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:19.

Cadent Gas logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:45.

Cadent Gas logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Bridge Street

Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:33.

Cadent Gas logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Milton Road

Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:34.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Smout Crescent

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Smout Crescent, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:17.

Severn Trent Water logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Pugh Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pugh Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:26.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Showell Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Showell Lane, Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 08:34.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Grendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:56.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Grendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:51.

Cadent Gas logo
LONG TERM
Between
5 Feb and 30 Jun 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.

Cadent Gas logo
LONG TERM
Between
5 Feb and 30 Jun 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:12.

Cadent Gas logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Blackbrook Valley Industrial Estate, Netherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.

Severn Trent Water logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Firs Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Firs Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 13:30.

Severn Trent Water logo
Between
5 and 12 Feb 2025
Details
View Map
Share
Chapel Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Chapel Lane, Smestow.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:59.

Cadent Gas logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Long Innage

Cadent Gas are proposing to carry out Utility repair and maintenance works on Long Innage, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:50.

Cadent Gas logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:08.

Cadent Gas logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:49.

Cadent Gas logo
Between
7 Feb and 6 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:46.

Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Studley Gate

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Studley Gate, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 5 Nov 2024 at 12:02.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Pennine Way

Cadent Gas are proposing to carry out Utility asset works on Pennine Way, Amblecote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:20.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:42.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:57.

South Staffordshire Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
High Street

South Staffordshire Water were proposing to carry out Utility repair and maintenance works on High Street, Cradley Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 12 Nov 2024 at 09:21.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Lawnswood Road

Cadent Gas are proposing to carry out Utility asset works on Lawnswood Road, Wordsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 07:31.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Cole Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cole Street, Netherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 15:01.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Castle Mill Road

Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:20.

Western Power Distribution (West Midlands) logo
Between
10 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Dudley Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dudley Road, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 14:54.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lamb Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 13:32.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Langley Road

Staffordshire County Council were proposing to carry out Highway improvement works on Langley Road, Lower Penn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:22.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Follow
Worcester Lane

Network Rail are proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Worcester Lane

Network Rail were proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Follow
Redlake Road

Network Rail are proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Redlake Road

Network Rail were proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.

Network Rail logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Racecourse Lane

Network Rail were proposing to carry out Works for Rail Purposes on Racecourse Lane, Norton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Nov 2024 at 11:00.

Western Power Distribution (West Midlands) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Redwood Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 11:06.

Western Power Distribution (West Midlands) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Redwood Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 08:35.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
17 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Castle Hill

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Castle Hill, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Dec 2024 at 11:50.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
17 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Castle Hill

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Castle Hill, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Dec 2024 at 10:32.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:26.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:27.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:48.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 10:57.

Western Power Distribution (West Midlands) logo
Between
17 and 26 Feb 2025
Details
View Map
Share
Follow
Birmingham New Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Birmingham New Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Dec 2024 at 11:57.

Cadent Gas logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:24.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 09:13.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ounsdale Road

Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:01.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ounsdale Road

Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 08:51.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 09:56.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 11:13.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Birmingham New Road

Cadent Gas are proposing to carry out Utility asset works on Birmingham New Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:00.

Cadent Gas logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Hilston Avenue

Cadent Gas are proposing to carry out Utility asset works on Hilston Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:49.

Cadent Gas logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Long Innage

Cadent Gas are proposing to carry out Utility repair and maintenance works on Long Innage, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:39.

Cadent Gas logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:13.

Cadent Gas logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:40.

Cadent Gas logo
Between
20 Feb and 10 Mar 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Brockmoor.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:39.

Cadent Gas logo
Between
21 and 28 Feb 2025
Details
View Map
Share
Follow
Sandhurst Drive

Cadent Gas are proposing to carry out Utility asset works on Sandhurst Drive, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

South Staffordshire Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Horse Bridge Lane

South Staffordshire Water were proposing to carry out Utility repair and maintenance works on Horse Bridge Lane, Kinver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 10 Nov 2024 at 16:24.

Cadent Gas logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:45.

Cadent Gas logo
LONG TERM
Between
24 Feb and 6 Jun 2025
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:41.

Staffordshire County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Morfe Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Morfe Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 17:30.

Staffordshire County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Morfe Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Morfe Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:22.

Cadent Gas logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Lilac Road

Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:47.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lilac Road

Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 10:56.

Transport for West Midlands (TfWM) logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Sedgley Road East

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Sedgley Road East, Tipton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Dec 2024 at 12:01.

Cadent Gas logo
Between
24 Feb and 19 Mar 2025
Details
View Map
Share
Upper Ettingshall Road

Cadent Gas were proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:09.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Upper Ettingshall Road

Cadent Gas were proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:35.

Cadent Gas logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Upper Ettingshall Road

Cadent Gas are proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 16:44.

Cadent Gas logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:14.

Cadent Gas logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:41.

Cadent Gas logo
Between
28 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Sandringham Road

Cadent Gas are proposing to carry out Utility asset works on Sandringham Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
LONG TERM
Between
3 Mar and 30 May 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:00.

Cadent Gas logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:43.

Severn Trent Water logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Seagers Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Seagers Lane, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 08:52.

ESP Electricity logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Castlegate Drive

ESP Electricity are proposing to carry out Utility asset works on Castlegate Drive, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by ESP Electricity on 11 Dec 2024 at 10:55.

South Staffordshire Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Castle Mill Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Castle Mill Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 3 Dec 2024 at 12:42.

Cadent Gas logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Clifton Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Clifton Street, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:30.

Severn Trent Water logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Eversley Grove

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Eversley Grove, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 10:01.

South Staffordshire Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Horse Bridge Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Horse Bridge Lane, Kinver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 4 Dec 2024 at 13:54.

Severn Trent Water logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Brickbridge Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brickbridge Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 11:46.

Staffordshire County Council logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Wodehouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wodehouse Lane, Gospel End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 10:54.

Cadent Gas logo
Between
4 and 31 Mar 2025
Details
View Map
Share
Follow
Upper Ettingshall Road

Cadent Gas are proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:03.

Cadent Gas logo
Between
7 and 21 Mar 2025
Details
View Map
Share
Follow
Belmont Road

Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:59.

Cadent Gas logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
St Marks Road

Cadent Gas are proposing to carry out Utility asset works on St Marks Road, Lye.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:10.

Cadent Gas logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:28.

Cadent Gas logo
Between
10 and 28 Mar 2025
Details
View Map
Share
Follow
Oak Road

Cadent Gas are proposing to carry out Utility asset works on Oak Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:15.

Cadent Gas logo
LONG TERM
Between
10 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Central Drive

Cadent Gas are proposing to carry out Utility asset works on Central Drive, Coseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 12:30.


Roadworks Map near to Flanders Drive, KINGSWINFORD, DY6 7RG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Dec 2024 02:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Flanders Drive, KINGSWINFORD, DY6 7RG (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
HOLCROFT ROAD 
(0.4 miles)
Virgin Media
New service connection - Footway, Verge - No carriageway incursion
Complete
11 Dec 2024 10:40 - 11:03
0.4
Details
Share
2
BT logo
MANOR PARK 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 14 Dec 2024 - 15 Dec 2024
0.7
Details
Share
Follow
3
Severn Trent Water logo
SCHOOL ROAD 
(0.9 miles)
Severn Trent Water
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 13 Dec 2024 - 16 Dec 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.