ROADWORKS SUMMARY
Flanders Drive, KINGSWINFORD, DY6 7RG
Introduction
View current and future planned roadworks and road closures for Flanders Drive, DY6 7RG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Flanders Drive, KINGSWINFORD, DY6 7RG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Flanders Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
2 May 2025
Transport for West Midlands (TfWM) are carrying out roadworks on Trindle Road, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2023 at 16:30 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:24.
2 May 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Birmingham Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 October 2023 at 00:01 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:03.
31 Mar 2025
Transport for West Midlands (TfWM) are carrying out roadworks on King Street, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 November 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 2 Sep 2024 at 08:50.
2 May 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on King Street, Dudley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 November 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:23.
2 May 2025
Transport for West Midlands (TfWM) are carrying out roadworks on Birmingham Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:03.
2 May 2025
Transport for West Midlands (TfWM) are carrying out Works for Rail Purposes on Station Drive, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2023 at 07:00 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Nov 2024 at 11:02.
11 Apr 2024 and 28 Mar 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Hill, Brierley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:34.
11 Apr 2024 and 28 Mar 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mill Street, Brierley Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:35.
11 Apr 2024 and 28 Mar 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Level Street, Brierley Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:49.
24 Jul 2025
Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Trindle Road, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 May 2024 at 08:00 and could run through until 24 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 Nov 2024 at 15:09.
8 Jun 2025
Dudley Metropolitan Borough Council are carrying out Highway repair and maintenance works on St Joseph Street, Dudley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 May 2024 at 11:00 and could run through until 8 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 May 2024 at 10:56.
20 Dec 2024
Severn Trent Water are carrying out Utility asset works on Langley Road, Lower Penn.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 August 2024 at 08:35 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 2 Dec 2024 at 16:06.
26 Aug 2024 and 17 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bayswater Road, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:48.
26 Aug 2024 and 17 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bayswater Road, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:28.
2 May 2025
Transport for West Midlands (TfWM) are carrying out Works for road purposes on The Broadway, Dudley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 09:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Nov 2024 at 12:24.
Today
Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 17 Jul 2024 at 13:13.
Thursday
Cadent Gas are carrying out Utility asset works on Racecourse Lane, Norton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 September 2024 at 12:37 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:38.
7 Oct and 20 Dec 2024
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Finchley Close, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:49.
7 Oct and 20 Dec 2024
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Finchley Close, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:29.
21 Oct 2024 and 17 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wealdstone Drive, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:50.
21 Oct 2024 and 17 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wealdstone Drive, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:30.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Wollescote Road, Stourbridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 15:52.
4 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Wollaston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 11:17.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Wentworth Road, Wollaston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 10:05.
Today
Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 09:51.
Today
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Leasowes Drive, Wolverhampton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 08:11.
Monday
Cadent Gas were proposing to carry out Utility asset works on High Street, Wollaston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 15:22.
18 Nov and 20 Dec 2024
Severn Trent Water were proposing to carry out New service connection on Gibbet Lane, Whittington.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 16:45.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on School Road, Himley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 09:15.
18 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 09:00.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Gerald Road, Wollaston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 09:53.
20 Dec 2024
GTC Pipelines are carrying out Utility asset works on Maple Road, Dudley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by GTC Pipelines on 12 Dec 2024 at 12:15.
20 Dec 2024
Indigo Power are carrying out Utility asset works on Maple Road, Dudley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Indigo Power on 11 Dec 2024 at 07:27.
25 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Pinfold Lane, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:25.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Pinfold Lane, Wolverhampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 11:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 11:27.
26 Nov 2024 and 15 Jan 2025
Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Groveland Road, Tipton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 15 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 10:44.
2 Dec 2024 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Bluebell Road, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:27.
2 Dec 2024 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Bluebell Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:31.
2 Dec 2024 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Central Drive, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 May 2024 at 12:59.
Today
Cadent Gas are proposing to carry out Utility asset works on Lytton Avenue, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 09:21.
20 Dec 2024
Cadent Gas are carrying out Utility asset works on Woodhall Road, Wolverhampton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 December 2024 at 17:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 08:52.
9 and 20 Dec 2024
Sandwell Metropolitan Borough Council are proposing to carry out Works for road purposes on Claremont Street, Cradley Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 4 Sep 2024 at 14:45.
Today
Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:57.
9 Dec 2024 and 8 Jan 2025
ESP Electricity were proposing to carry out Utility asset works on Birmingham Road, Dudley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 23 Oct 2024 at 08:46.
9 Dec 2024 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:54.
9 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 12:32.
Today
Staffordshire County Council are carrying out Highway improvement works on Showell Lane, Orton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 16:07 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 17:36.
9 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Lytton Avenue, Wolverhampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 16:42.
9 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Woodhall Road, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:08.
Today
Staffordshire County Council are carrying out Highway improvement works on Whittington Hall Lane, Whittington.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 13:32 and could run through until 13 December 2024. The works will impact the verge only.
This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 15:52.
Tuesday
Staffordshire County Council are carrying out Highway improvement works on Crab Lane, Bobbington.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 12:40 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 14:06.
Tuesday
Staffordshire County Council are carrying out Highway improvement works on The Holloway, Ebstree.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 14:55 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 17:16.
Wednesday
Staffordshire County Council are carrying out Highway improvement works on Windsor Holloway, Kinver.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 14:56 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 10:39.
Thursday
Cadent Gas are carrying out Utility repair and maintenance works on Factory Road, Tipton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 15:00 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 16:06.
Thursday
Cadent Gas are carrying out Utility asset works on Coppice Street, Tipton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 15:00 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 16:02.
Tuesday
Staffordshire County Council are carrying out Highway improvement works on Woodford Lane, Trysull.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 11:35 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 17:17.
Thursday
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Farm Road, Netherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Sep 2024 at 10:05.
Thursday
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Farm Road, Netherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 14 Oct 2024 at 12:35.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Morfe Hall Lane, Enville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 08:16.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Elder Grove, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Brook Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Wood Hill Drive, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:52.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on The Roughs, Trescott.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:36.
19 and 23 Dec 2024
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Crescent, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 08:58.
19 and 23 Dec 2024
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Poplar Crescent, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 10:51.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Sytch Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:53.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Jenks Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 14:40.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:53.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hyde Lane, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Sep 2024 at 13:36.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blundies Lane, Enville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 09:48.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Greensforge, Greensforge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 1 Oct 2024 at 10:49.
2 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:42.
6 Jan and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jul 2024 at 09:54.
6 Jan and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Racecourse Lane, Norton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:29.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 08:22.
6 and 10 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Hyde Lane, Kinver.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:56.
6 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Barrack Lane, Cradley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 10:58.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Engine Lane, Lye.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 10:00.
6 and 8 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Engine Lane, Lye.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 08:36.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 12:48.
6 and 10 Jan 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 15:05.
6 and 10 Jan 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 11:22.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Blackbrook Valley Industrial Estate, Netherton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 14:31.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Greensforge, Greensforge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 09:48.
6 Jan and 5 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Paganel Drive, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:37.
6 and 31 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Nov 2024 at 11:07.
6 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Bluebell Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 10:39.
6 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:47.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Warings, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 12:49.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 14:56.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 May 2024 at 11:57.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 May 2024 at 11:36.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Newhall Street, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:29.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Princes End, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:54.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Trysull.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:02.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Orton Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 12:34.
6 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Springhill Lane, Lower Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:24.
6 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 08:55.
8 and 21 Jan 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barrack Lane, Cradley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Oct 2024 at 07:09.
8 and 21 Jan 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Blue Ball Lane, Cradley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 16 Oct 2024 at 07:13.
8 and 10 Jan 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Hall Close, Amblecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 15:38.
8 and 10 Jan 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Old Hall Close, Amblecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 12:08.
9 Jan and 1 Oct 2025
Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Trindle Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Nov 2024 at 08:33.
13 and 15 Jan 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on High Street, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 17 Sep 2024 at 10:26.
13 Jan and 31 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stone Lane, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 09:42.
13 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:32.
13 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Lilac Road, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:31.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Laburnum Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:03.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:33.
13 Jan and 7 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Maple Road, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:36.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 11:05.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:11.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:40.
13 and 17 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Mill Lane, Wombourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:53.
13 and 17 Jan 2025
Staffordshire County Council were proposing to carry out Remedial works on Mill Lane, Wombourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:53.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Greyhound Lane, Lower Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 11:00.
14 and 16 Jan 2025
Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Malthouse Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Sandwell Metropolitan Borough Council on 18 Sep 2024 at 14:13.
15 Jan and 28 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Mount Road, Penn, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.
20 and 22 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on High Street, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 12:00.
20 and 22 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Randle Road, Oldswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:19.
20 and 22 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Randle Road, Oldswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 07:46.
20 and 22 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Hyde Lane, Kinver.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:48.
20 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Pennine Way, Amblecote.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:47.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on James Scott Road, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 11:57.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:11.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:06.
20 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:52.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Planks Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 15:35.
20 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Princes End, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jun 2024 at 10:21.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dirty Foot Lane, Lower Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 10:29.
21 Jan and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.
21 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wollescote Road, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 17:01.
21 and 23 Jan 2025
South Staffordshire Water are proposing to carry out Remedial works on Long Innage, Cradley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 10:43.
21 and 24 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 14:35.
21 and 24 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 11:33.
21 Jan and 7 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 3 Dec 2024 at 09:04.
21 Jan and 7 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Tipton Road, Dudley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 14:06.
22 Jan and 11 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:47.
24 Jan and 11 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Old Ham Lane, Pedmore.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:38.
24 Jan and 20 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Leys Road, Brockmoor.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:52.
27 Jan and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Compa, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 15:37.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Enville Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:28.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Wollaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:32.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:49.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 12:19.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:07.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Morfe Hall Lane, Enville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 15:49.
27 Jan and 16 Feb 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Duncan Edwards Way, Dudley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 3 Dec 2024 at 11:07.
27 Jan and 7 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Groveland Road, Tipton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Dec 2024 at 14:03.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Oak Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:48.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lavender Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:04.
27 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:04.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on High Arcal Road, Himley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:54.
27 Jan and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Priory Road, Dudley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:42.
27 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:22.
27 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 09:09.
27 and 29 Jan 2025
G2 Energy IDNO are proposing to carry out New service connection on Dean Street, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 18 Nov 2024 at 13:05.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Roughs, Trescott.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:58.
28 and 30 Jan 2025
G2 Energy IDNO are proposing to carry out New service connection on Dean Street, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 18 Nov 2024 at 08:59.
31 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Manor Road, Penn, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.
31 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Hinstock Close, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Enville Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 09:19.
3 and 14 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Pennine Way, Amblecote.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:19.
3 Feb and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:45.
3 Feb and 4 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:33.
3 Feb and 4 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:34.
3 and 14 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Smout Crescent, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:17.
3 Feb and 14 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pugh Road, Wolverhampton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:26.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Showell Lane, Orton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 08:34.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:56.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:51.
5 Feb and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.
5 Feb and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:12.
5 and 25 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Blackbrook Valley Industrial Estate, Netherton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.
5 and 11 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Firs Road, Kingswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 13:30.
5 and 12 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Chapel Lane, Smestow.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:59.
7 and 18 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Long Innage, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:50.
7 and 18 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:08.
7 and 18 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:49.
7 Feb and 6 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:46.
10 and 12 Feb 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Studley Gate, Wollaston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 5 Nov 2024 at 12:02.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Pennine Way, Amblecote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:20.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:42.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:57.
10 and 12 Feb 2025
South Staffordshire Water were proposing to carry out Utility repair and maintenance works on High Street, Cradley Heath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 12 Nov 2024 at 09:21.
10 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lawnswood Road, Wordsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 07:31.
10 and 21 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cole Street, Netherton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 15:01.
10 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:20.
10 Feb and 12 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Dudley Road, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 14:54.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 13:32.
10 and 14 Feb 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Langley Road, Lower Penn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:22.
16 and 23 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.
16 and 23 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Worcester Lane, Stourbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.
16 and 23 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Nov 2024 at 12:34.
16 and 23 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Redlake Road, Stourbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 13:23.
16 and 23 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on Racecourse Lane, Norton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 11:00.
17 and 21 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Dec 2024 at 11:06.
17 and 21 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Redwood Road, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 08:35.
17 Feb and 23 Mar 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Castle Hill, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Dec 2024 at 11:50.
17 Feb and 23 Mar 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Castle Hill, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 12 Dec 2024 at 10:32.
17 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:26.
17 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:27.
17 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:48.
17 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 10:57.
17 and 26 Feb 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Birmingham New Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Dec 2024 at 11:57.
17 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:24.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 09:13.
17 Feb and 21 Mar 2025
Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:01.
17 Feb and 21 Mar 2025
Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 08:51.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 09:56.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 11:13.
17 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Birmingham New Road, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:00.
17 and 24 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Hilston Avenue, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:49.
18 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Long Innage, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:39.
18 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:13.
18 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:40.
20 Feb and 10 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, Brockmoor.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:39.
21 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Sandhurst Drive, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.
24 and 26 Feb 2025
South Staffordshire Water were proposing to carry out Utility repair and maintenance works on Horse Bridge Lane, Kinver.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 10 Nov 2024 at 16:24.
24 Feb and 6 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:45.
24 Feb and 6 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, Stourbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:41.
24 Feb and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Morfe Lane, Enville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 17:30.
24 Feb and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Morfe Lane, Enville.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:22.
24 Feb and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:47.
24 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 10:56.
24 and 28 Feb 2025
Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Sedgley Road East, Tipton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Dec 2024 at 12:01.
24 Feb and 19 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:09.
24 Feb and 21 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:35.
24 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 16:44.
28 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:14.
28 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility repair and maintenance works on Park Lane, Cradley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 13:41.
28 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Sandringham Road, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.
3 Mar and 30 May 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:00.
3 Mar and 18 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Stourbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Jul 2024 at 13:43.
3 and 14 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Seagers Lane, Brierley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 4 Dec 2024 at 08:52.
3 and 14 Mar 2025
ESP Electricity are proposing to carry out Utility asset works on Castlegate Drive, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by ESP Electricity on 11 Dec 2024 at 10:55.
3 and 5 Mar 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Castle Mill Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 3 Dec 2024 at 12:42.
3 and 6 Mar 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Clifton Street, Coseley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:30.
3 and 14 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Eversley Grove, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 10:01.
4 and 6 Mar 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Horse Bridge Lane, Kinver.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 4 Dec 2024 at 13:54.
4 and 7 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Brickbridge Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 11:46.
4 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wodehouse Lane, Gospel End.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 10:54.
4 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:03.
7 and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Belmont Road, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:59.
10 Mar and 11 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on St Marks Road, Lye.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:10.
10 and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:28.
10 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Oak Road, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:15.
10 Mar and 22 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Central Drive, Coseley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 12:30.
Roadworks Map near to Flanders Drive, KINGSWINFORD, DY6 7RG
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Flanders Drive, KINGSWINFORD, DY6 7RG (3 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.