ROADWORKS SUMMARY
Mary Draper Lane, KIDDERMINSTER, DY14 9XJ
Introduction
View current and future planned roadworks and road closures for Mary Draper Lane, DY14 9XJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Mary Draper Lane, KIDDERMINSTER, DY14 9XJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mary Draper Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
7 Feb 2025
The Environment Agency are carrying out Statutory Infrastructure Works on Stourport Road, Bewdley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 October 2023 at 05:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 25 Apr 2024 at 08:38.
4 Sep 2023 and 7 Feb 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Stourport Road, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2023 and could run through until 7 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Worcestershire County Council on 27 Jun 2023 at 10:54.
2 Oct 2023 and 28 Feb 2025
Worcestershire County Council are proposing to carry out Highway improvement works on Beales Corner, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2023 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Worcestershire County Council on 4 Jul 2023 at 10:53.
27 Oct 2025
The Environment Agency are carrying out Statutory Infrastructure Works on Beales Corner, Bewdley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 October 2023 at 06:00 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 13 Aug 2024 at 14:17.
10 Jan 2025
Shropshire Council are carrying out Highway improvement works on A4117 From Station Road End To Hereford And Worcester County Boundary Lem Hill, Cleobury Mortimer.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 February 2024 at 07:54 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Shropshire Council on 8 Nov 2024 at 15:18.
24 Jul 2024 and 26 Jul 2027
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Gorst Hill, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2024 and could run through until 26 July 2027. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 8 Mar 2024 at 13:31.
27 Jul 2025
Worcestershire County Council are carrying out Highway improvement works on Bewdley By Pass, Bewdley.
The works started on 26 July 2024 at 13:00 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 26 Jul 2024 at 13:45.
14 Oct 2024 and 28 Feb 2025
Severn Trent Water were proposing to carry out Statutory Infrastructure Works on A4117 From Station Road End To Hereford And Worcester County Boundary Lem Hill, Cleobury Mortimer.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 28 February 2025. The works were due to impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Severn Trent Water on 8 Aug 2024 at 10:10.
24 Jan 2025
Cadent Gas are carrying out Utility asset works on Windermere Way, Stourport On Severn.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:26.
18 Nov 2024 and 29 Aug 2025
The Environment Agency are proposing to carry out Statutory Infrastructure Works on Beales Corner, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 11 Nov 2024 at 14:59.
18 Nov 2024 and 29 Aug 2025
The Environment Agency are proposing to carry out Statutory Infrastructure Works on Stourport Road, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by The Environment Agency on 11 Nov 2024 at 14:59.
30 May 2025
Worcestershire County Council are carrying out roadworks on Dunley Road, Stourport On Severn.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 15:00 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Worcestershire County Council on 22 Nov 2024 at 07:45.
Monday
Severn Trent Water are carrying out Utility repair and maintenance works on C2192 Menith Wood To Malvern Hills Bound, Menith Wood.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 13:31 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 14:08.
Thursday
Western Power Distribution (West Midlands) are proposing to carry out New service connection on B4194 From Clogs Bank End To Dowles Road Start, Buttonoak, Kinlet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Sep 2024 at 20:21.
Friday
Severn Trent Water are proposing to carry out New service connection on Dowles Road, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 27 Sep 2024 at 13:29.
4 and 10 Dec 2024
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Stourport Road, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Sep 2024 at 14:31.
9 and 13 Dec 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Summer Road, Kidderminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 16:18.
9 and 12 Dec 2024
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Garland Road, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Sep 2024 at 09:31.
9 and 20 Dec 2024
Shropshire Council are proposing to carry out Highway improvement works on B4363 From Cleobury Mortimer A4117 Junction To Start Of Kinlet Bank, Cleobury Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Shropshire Council on 25 Nov 2024 at 10:14.
9 and 20 Dec 2024
Shropshire Council are proposing to carry out Highway improvement works on Baveney Lane, Neen Savage, Cleobury Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Shropshire Council on 25 Nov 2024 at 10:13.
10 and 12 Dec 2024
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Porchbrook Road, Rock.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 26 Sep 2024 at 15:41.
16 and 18 Dec 2024
Nexfibre Networks Limited are proposing to carry out Remedial works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 29 Nov 2024 at 15:54.
18 and 20 Dec 2024
Nexfibre Networks Limited are proposing to carry out Utility asset works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 11 Nov 2024 at 10:09.
18 and 20 Dec 2024
Nexfibre Networks Limited were proposing to carry out Utility asset works on Park Lane, Bewdley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 7 Nov 2024 at 16:20.
18 and 20 Dec 2024
Nexfibre Networks Limited are proposing to carry out Utility asset works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Nexfibre Networks Limited on 8 Nov 2024 at 15:12.
6 Jan and 7 Feb 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Habberley Road, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Pipelines on 18 Oct 2024 at 13:45.
6 Jan and 7 Feb 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Habberley Road, Kidderminster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Energy Assets Pipelines on 7 Oct 2024 at 15:29.
6 and 8 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Pearl Lane, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 14 Oct 2024 at 15:03.
6 and 8 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 13 Nov 2024 at 13:48.
6 and 8 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Park Lane, Bewdley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Nexfibre Networks Limited on 14 Nov 2024 at 13:35.
6 and 8 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Pearl Lane, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 15 Oct 2024 at 14:40.
6 and 8 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Elm Grove, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 21 Nov 2024 at 14:06.
6 and 8 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Elm Grove, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 21 Nov 2024 at 10:55.
10 and 13 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on B4194 From Clogs Bank End To Dowles Road Start, Buttonoak, Kinlet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Sep 2024 at 15:21.
13 and 24 Jan 2025
Shropshire Council are proposing to carry out Highway improvement works on Baveney Lane, Neen Savage, Cleobury Mortimer.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Shropshire Council on 1 Nov 2024 at 10:56.
13 Jan and 13 Jun 2025
Severn Trent Water are proposing to carry out Utility asset works on A4117 From Station Road End To Hereford And Worcester County Boundary Lem Hill, Cleobury Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 11:47.
13 and 24 Jan 2025
Shropshire Council are proposing to carry out Highway improvement works on B4363 From Cleobury Mortimer A4117 Junction To Start Of Kinlet Bank, Cleobury Mortimer.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Shropshire Council on 1 Nov 2024 at 10:58.
14 and 16 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Porchbrook Road, Rock.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 16 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 11 Oct 2024 at 14:22.
20 and 23 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Porchbrook Road, Rock.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 11:53.
20 and 22 Jan 2025
Severn Trent Water were proposing to carry out Disconnection or alteration of supply on Raven Street, Stourport On Severn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 14:36.
27 and 29 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Raven Street, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 08:13.
27 and 29 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Raven Street, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 13:01.
3 and 5 Feb 2025
Cadent Gas are proposing to carry out New service connection on Raven Street, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 13:41.
10 Feb and 15 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Windermere Way, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:17.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orleton, Stanford Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 14:42.
10 Feb and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Layamon Walk, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Oct 2024 at 08:29.
10 Feb and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hermitage Way, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Oct 2024 at 08:31.
10 and 12 Feb 2025
Cadent Gas are proposing to carry out New service connection on Raven Street, Stourport On Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:57.
10 and 12 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orleton, Stanford Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 15:32.
17 Feb and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Layamon Walk, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Nov 2024 at 15:14.
17 Feb and 14 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Hermitage Way, Stourport On Severn.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Nov 2024 at 15:14.
Roadworks Map near to Mary Draper Lane, KIDDERMINSTER, DY14 9XJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Mary Draper Lane, KIDDERMINSTER, DY14 9XJ (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 8 Jan 2024 - 28 Feb 2025)
(Scheduled: 8 Jan 2024 - 28 Feb 2025)
(Scheduled: 8 Jan 2024 - 28 Feb 2025)
Contains public sector information licensed under the Open Government Licence v3.0.