ROADWORKS SUMMARY
Brereton Avenue, CLEETHORPES, DN35 7UP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Brereton Avenue, DN35 7UP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Brereton Avenue, CLEETHORPES, DN35 7UP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Brereton Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

North East Lincolnshire Council logo
LONG TERM
Until
6 Feb 2026
Details
View Map
Share
Follow
Corporation Road

North East Lincolnshire Council are carrying out Highway repair and maintenance works on Corporation Road, Grimsby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2023 at 11:00 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by North East Lincolnshire Council on 7 Aug 2024 at 09:14.

North East Lincolnshire Council logo
LONG TERM
Until
23 Aug 2025
Details
View Map
Share
Follow
Conway Avenue

North East Lincolnshire Council are carrying out Highway repair and maintenance works on Conway Avenue, Grimsby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 January 2024 at 10:30 and could run through until 23 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North East Lincolnshire Council on 26 Jan 2024 at 11:07.

North East Lincolnshire Council logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Gilbey Road Cycle Track

North East Lincolnshire Council are carrying out Highway repair and maintenance works on Gilbey Road Cycle Track, Grimsby.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 26 February 2024 at 09:30 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North East Lincolnshire Council on 6 Dec 2024 at 10:48.

North East Lincolnshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dudley Street

North East Lincolnshire Council are carrying out Highway repair and maintenance works on Dudley Street, Grimsby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 07:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North East Lincolnshire Council on 6 Dec 2024 at 10:50.

North East Lincolnshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Bargate

North East Lincolnshire Council are carrying out Highway repair and maintenance works on Bargate, Grimsby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 07:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North East Lincolnshire Council on 6 Dec 2024 at 10:50.

North East Lincolnshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Deansgate

North East Lincolnshire Council are carrying out Highway repair and maintenance works on Deansgate, Grimsby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 07:30 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by North East Lincolnshire Council on 6 Dec 2024 at 10:50.

North East Lincolnshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Grosvenor Street

North East Lincolnshire Council are carrying out Highway repair and maintenance works on Grosvenor Street, Grimsby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 07:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North East Lincolnshire Council on 6 Dec 2024 at 10:50.

North East Lincolnshire Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Cartergate

North East Lincolnshire Council are carrying out Highway repair and maintenance works on Cartergate, Grimsby.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 07:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by North East Lincolnshire Council on 6 Dec 2024 at 10:49.

Cadent Gas logo
LONG TERM
Between
30 Sep and 24 Dec 2024
Details
View Map
Share
Follow
Weelsby Road

Cadent Gas are proposing to carry out Utility asset works on Weelsby Road, Grimsby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 3 Jun 2024 at 13:05.

Cadent Gas logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Weelsby Road

Cadent Gas are carrying out Utility asset works on Weelsby Road, Grimsby.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:45 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:22.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Peaks Lane

Cadent Gas were proposing to carry out Utility asset works on Peaks Lane, Grimsby.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:52.

North East Lincolnshire Council logo
LONG TERM
Between
2 Nov and 20 Dec 2024
Details
View Map
Share
Follow
A180 From Lock Hill Roundabout To Pyewipe Roundabout

North East Lincolnshire Council are proposing to carry out Remedial works on A180 From Lock Hill Roundabout To Pyewipe Roundabout, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2024 and could run through until 20 December 2024. The works will impact the carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North East Lincolnshire Council on 1 Nov 2024 at 15:50.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Hainton Avenue

Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 14:54.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Station Road

Cadent Gas are carrying out Utility asset works on Station Road, Great Coates.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 08:43.

Northern Powergrid (Yorkshire) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lord Street

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Lord Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Nov 2024 at 16:28.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Lord Street

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Lord Street, Grimsby.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 12:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Dec 2024 at 13:30.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Weelsby Road

Cadent Gas were proposing to carry out Utility asset works on Weelsby Road, Grimsby.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 14:39.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Rowlandson Street

Network Rail are proposing to carry out Works for Rail Purposes on Rowlandson Street, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 May 2024 at 14:49.

North East Lincolnshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Peters Avenue

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on St Peters Avenue, Cleethorpes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North East Lincolnshire Council on 17 Sep 2024 at 14:42.

North East Lincolnshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Freeman Street

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Freeman Street, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North East Lincolnshire Council on 17 Sep 2024 at 14:50.

North East Lincolnshire Council logo
Between
17 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Birchin Way

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Birchin Way, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North East Lincolnshire Council on 17 Sep 2024 at 14:23.

North East Lincolnshire Council logo
Between
27 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Trinity Road

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Trinity Road, Cleethorpes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North East Lincolnshire Council on 4 Oct 2024 at 10:45.

North East Lincolnshire Council logo
Between
27 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Littlefield Lane

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Littlefield Lane, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North East Lincolnshire Council on 8 Oct 2024 at 13:48.

North East Lincolnshire Council logo
Between
27 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Town Hall Street

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Town Hall Street, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North East Lincolnshire Council on 8 Oct 2024 at 13:46.

North East Lincolnshire Council logo
Between
27 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Victoria Street West

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Victoria Street West, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by North East Lincolnshire Council on 8 Oct 2024 at 13:44.

Cadent Gas logo
LONG TERM
Between
2 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Clee Road

Cadent Gas are proposing to carry out Utility asset works on Clee Road, Cleethorpes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 11:58.

Cadent Gas logo
Between
2 and 16 Jan 2025
Details
View Map
Share
Follow
Kelham Road

Cadent Gas are proposing to carry out Utility asset works on Kelham Road, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 11:59.

Cadent Gas logo
LONG TERM
Between
2 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Tyler Avenue

Cadent Gas are proposing to carry out Utility asset works on Tyler Avenue, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:13.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Kelham Road

Cadent Gas are proposing to carry out Utility asset works on Kelham Road, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:08.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Kelham Road

Cadent Gas are proposing to carry out Utility asset works on Kelham Road, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:04.

Cadent Gas logo
Between
6 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Clee Road

Cadent Gas are proposing to carry out Utility asset works on Clee Road, Cleethorpes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:07.

Cadent Gas logo
Between
6 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Clee Road

Cadent Gas are proposing to carry out Utility asset works on Clee Road, Cleethorpes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:41.

Cadent Gas logo
Between
6 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Clee Road

Cadent Gas are proposing to carry out Utility asset works on Clee Road, Cleethorpes.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 14:46.

Anglian Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Rosemary Way

Anglian Water were proposing to carry out Utility repair and maintenance works on Rosemary Way, Cleethorpes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 Sep 2024 at 10:44.

Cadent Gas logo
Between
9 and 23 Jan 2025
Details
View Map
Share
Follow
Beacon Avenue

Cadent Gas are proposing to carry out Utility asset works on Beacon Avenue, Cleethorpes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 14:58.

Cadent Gas logo
Between
9 and 23 Jan 2025
Details
View Map
Share
Follow
Beacon Avenue

Cadent Gas are proposing to carry out Utility asset works on Beacon Avenue, Cleethorpes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:41.

Cadent Gas logo
Between
9 and 23 Jan 2025
Details
View Map
Share
Follow
Beacon Avenue

Cadent Gas are proposing to carry out Utility asset works on Beacon Avenue, Cleethorpes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:07.

Cadent Gas logo
Between
9 and 23 Jan 2025
Details
View Map
Share
Follow
Beacon Court

Cadent Gas are proposing to carry out Utility asset works on Beacon Court, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:00.

Cadent Gas logo
Between
9 and 23 Jan 2025
Details
View Map
Share
Follow
Beacon Court

Cadent Gas are proposing to carry out Utility asset works on Beacon Court, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 15:08.

Cadent Gas logo
Between
9 and 23 Jan 2025
Details
View Map
Share
Follow
Beacon Avenue

Cadent Gas are proposing to carry out Utility asset works on Beacon Avenue, Cleethorpes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 11:59.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Beacon Avenue

Cadent Gas are proposing to carry out Utility asset works on Beacon Avenue, Cleethorpes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 10:00.

Cadent Gas logo
Between
16 and 30 Jan 2025
Details
View Map
Share
Follow
Kelham Road

Cadent Gas are proposing to carry out Utility asset works on Kelham Road, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:19.

North East Lincolnshire Council logo
Between
20 Jan and 4 Feb 2025
Details
View Map
Share
Poplar Road

North East Lincolnshire Council were proposing to carry out Highway repair and maintenance works on Poplar Road, Cleethorpes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North East Lincolnshire Council on 11 Nov 2024 at 14:49.

North East Lincolnshire Council logo
LONG TERM
Between
20 Jan and 29 Mar 2025
Details
View Map
Share
Follow
Armstrong Street

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Armstrong Street, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North East Lincolnshire Council on 25 Jun 2024 at 10:33.

Network Rail logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Cartergate

Network Rail are proposing to carry out Works for Rail Purposes on Cartergate, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 13:30.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Woad Lane

Cadent Gas are proposing to carry out Utility asset works on Woad Lane, Great Coates, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jun 2024 at 10:40.

Cadent Gas logo
LONG TERM
Between
27 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Hainton Avenue

Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:53.

Cadent Gas logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Hainton Avenue

Cadent Gas are proposing to carry out roadworks on Hainton Avenue, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:49.

Cadent Gas logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Welholme Road

Cadent Gas are proposing to carry out Utility asset works on Welholme Road, Grimsby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:08.

Cadent Gas logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Welholme Road

Cadent Gas are proposing to carry out Utility asset works on Welholme Road, Grimsby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:52.

Cadent Gas logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Welholme Road

Cadent Gas are proposing to carry out Utility asset works on Welholme Road, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:37.

Cadent Gas logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Hainton Avenue

Cadent Gas are proposing to carry out roadworks on Hainton Avenue, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:00.

Cadent Gas logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Hainton Avenue

Cadent Gas are proposing to carry out roadworks on Hainton Avenue, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:42.

Cadent Gas logo
LONG TERM
Between
27 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Hainton Avenue

Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 16:39.

Cadent Gas logo
LONG TERM
Between
27 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Hainton Avenue

Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:35.

Cadent Gas logo
Between
6 and 20 Feb 2025
Details
View Map
Share
Follow
Granville Street

Cadent Gas are proposing to carry out Utility asset works on Granville Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:36.

Cadent Gas logo
Between
6 and 20 Feb 2025
Details
View Map
Share
Follow
Granville Street

Cadent Gas are proposing to carry out Utility asset works on Granville Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:46.

North East Lincolnshire Council logo
Between
10 and 16 Feb 2025
Details
View Map
Share
Follow
Westward Ho

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Westward Ho, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North East Lincolnshire Council on 19 Jun 2024 at 14:57.

Cadent Gas logo
Between
13 and 27 Feb 2025
Details
View Map
Share
Follow
Patrick Street

Cadent Gas are proposing to carry out Utility asset works on Patrick Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:36.

Cadent Gas logo
Between
13 and 27 Feb 2025
Details
View Map
Share
Follow
Patrick Street

Cadent Gas are proposing to carry out Utility asset works on Patrick Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:43.

Cadent Gas logo
Between
13 and 27 Feb 2025
Details
View Map
Share
Follow
Patrick Street

Cadent Gas are proposing to carry out Utility asset works on Patrick Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:30.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Heneage Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Heneage Road, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 13:39.

Cadent Gas logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Welholme Road

Cadent Gas are proposing to carry out Utility asset works on Welholme Road, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 16:24.

Cadent Gas logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Hainton Avenue

Cadent Gas are proposing to carry out Utility asset works on Hainton Avenue, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 16:25.

Cadent Gas logo
Between
20 Feb and 6 Mar 2025
Details
View Map
Share
Follow
David Street

Cadent Gas are proposing to carry out Utility asset works on David Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:00.

Cadent Gas logo
Between
20 Feb and 6 Mar 2025
Details
View Map
Share
Follow
David Street

Cadent Gas are proposing to carry out Utility asset works on David Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:48.

Cadent Gas logo
Between
20 Feb and 6 Mar 2025
Details
View Map
Share
Follow
David Street

Cadent Gas are proposing to carry out Utility asset works on David Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:37.

Cadent Gas logo
Between
27 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Torrington Street

Cadent Gas are proposing to carry out Utility asset works on Torrington Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:37.

Cadent Gas logo
Between
27 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Torrington Street

Cadent Gas are proposing to carry out Utility asset works on Torrington Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:00.

Cadent Gas logo
Between
27 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Torrington Street

Cadent Gas are proposing to carry out Utility asset works on Torrington Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:47.

Cadent Gas logo
Between
3 and 24 Mar 2025
Details
View Map
Share
Follow
Wingate Road

Cadent Gas are proposing to carry out Utility asset works on Wingate Road, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 16:49.

Network Rail logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Rowlandson Street

Network Rail are proposing to carry out Works for Rail Purposes on Rowlandson Street, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 15:29.

Cadent Gas logo
Between
6 and 27 Mar 2025
Details
View Map
Share
Follow
Heneage Road

Cadent Gas are proposing to carry out Utility asset works on Heneage Road, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:31.

Cadent Gas logo
Between
6 Mar and 3 Apr 2025
Details
View Map
Share
Follow
Larmour Road

Cadent Gas are proposing to carry out Utility asset works on Larmour Road, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 16:48.

North East Lincolnshire Council logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Armstrong Street

North East Lincolnshire Council are proposing to carry out Highway repair and maintenance works on Armstrong Street, Grimsby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by North East Lincolnshire Council on 8 Oct 2024 at 15:32.

Lincolnshire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Tetney Lock Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Tetney Lock Road, Tetney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 25 Oct 2024 at 08:33.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Catherine Street

Cadent Gas are proposing to carry out Utility asset works on Catherine Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:33.

Cadent Gas logo
Between
10 and 24 Mar 2025
Details
View Map
Share
Follow
Margaret Street

Cadent Gas are proposing to carry out Utility asset works on Margaret Street, Grimsby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:32.

Lincolnshire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Tetney Lock Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Tetney Lock Road, Tetney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 16 Oct 2024 at 14:23.


Roadworks Map near to Brereton Avenue, CLEETHORPES, DN35 7UP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 21:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Brereton Avenue, CLEETHORPES, DN35 7UP (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
CAMPDEN CRESCENT 
(0.1 miles)
Anglian Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
10 Dec 2024 20:55 - 11 Dec 2024 01:16
0.1
Details
Share
2
POPLAR ROAD 
(0.4 miles)
Grain Communications (formerly Solway Communications)
Statutory Infrastructure Works - Footway, Carriageway - Give and take
Planned
Scheduled: 11 Dec 2024 - 17 Dec 2024
0.4
Details
Share
Follow
3
Anglian Water logo
BRERETON AVENUE 
(0.5 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 12 Dec 2024
0.5
Details
Share
Follow
4
Anglian Water logo
BARCROFT STREET 
(0.5 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 12 Dec 2024
0.5
Details
Share
Follow
5
Northern Powergrid (Yorkshire) logo
EVELYN GROVE SOUTH 
(0.6 miles)
Northern Powergrid (Yorkshire)
New service connection - Footway - Some carriageway incursion
In Progress
Since: 9 Dec 2024 12:15
(Scheduled: 9 Dec 2024 - 17 Dec 2024)
0.6
Details
Share
Follow
6
North East Lincolnshire Council logo
MAJOR
  
ST PETERS AVENUE 
(0.7 miles)
North East Lincolnshire Council
Highway repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 10 Dec 2024 - 12 Dec 2024
0.7
Details
Share
Follow
7
Northern Powergrid (Yorkshire) logo
URGENT
  
SEA ROAD 
(0.7 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 9 Dec 2024 09:05
(Scheduled: 9 Dec 2024 - 19 Dec 2024)
0.7
Details
Share
Follow
8
Anglian Water logo
URGENT
  
FAIRMONT ROAD 
(0.8 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 10 Dec 2024 11:31
(Scheduled: 10 Dec 2024 - 16 Dec 2024)
0.8
Details
Share
Follow
9
WILLIAM STREET 
(0.8 miles)
Grain Communications (formerly Solway Communications)
Statutory Infrastructure Works - Footway, Carriageway - Give and take
In Progress
Since: 29 Nov 2024 08:00
(Scheduled: 25 Nov 2024 - 12 Dec 2024)
0.8
Details
Share
Follow
10
Anglian Water logo
URGENT
  
HILDYARD STREET 
(0.8 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 10 Dec 2024 11:20
(Scheduled: 10 Dec 2024 - 16 Dec 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.