ROADWORKS SUMMARY
Main Road, ATHERSTONE, CV9 3EH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Main Road, CV9 3EH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Main Road, ATHERSTONE, CV9 3EH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Main Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Western Power Distribution (East Midlands) logo
LONG TERM
Between
2 Sep 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Link Footway From Moor Lane Strteching 780m

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Link Footway From Moor Lane Strteching 780m, Tamworth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 September 2024 and could run through until 17 February 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Apr 2024 at 09:01.

Severn Trent Water logo
LONG TERM
Between
25 Nov 2024 and 27 Nov 2025
Details
View Map
Share
Orton Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Orton Lane, Twycross.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 16:09.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bridgewater Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgewater Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
St Georges Way

Staffordshire County Council are proposing to carry out Highway improvement works on St Georges Way, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 16:04.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fossdale Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fossdale Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Felspar Road

Staffordshire County Council are proposing to carry out Highway improvement works on Felspar Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Glascote Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Lane, Wilnecote, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 15:52.

Severn Trent Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Cottage Lane

Severn Trent Water were proposing to carry out Utility asset works on Cottage Lane, Norton Juxta Twycross, Twycross.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 12:58.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Bridgewater Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgewater Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:01.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:46.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 09:52.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
St Georges Way

Staffordshire County Council are proposing to carry out Highway improvement works on St Georges Way, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:18.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Felspar Road

Staffordshire County Council are proposing to carry out Highway improvement works on Felspar Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:31.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Collett

Staffordshire County Council were proposing to carry out Highway improvement works on Collett, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 18:56.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Glascote Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Glascote Lane, Wilnecote, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 16:17.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Fossdale Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fossdale Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:18.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Glascote Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Lane, Wilnecote, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:18.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Dumolos Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dumolos Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:21.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Dumolos Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dumolos Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Western Power Distribution (East Midlands) logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Main Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Snarestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 13 Nov 2024 at 15:02.

Western Power Distribution (East Midlands) logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Main Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Snarestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 21 Oct 2024 at 12:36.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Orton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orton Road, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 23 Sep 2024 at 17:26.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
John Street

Staffordshire County Council are proposing to carry out Highway improvement works on John Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 11:34.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
John Street

Staffordshire County Council are proposing to carry out Highway improvement works on John Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:39.

Western Power Distribution (East Midlands) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Main Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Snarestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Nov 2024 at 09:25.

Western Power Distribution (East Midlands) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Main Street

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Main Street, Snarestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 25 Nov 2024 at 13:56.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Argyle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Argyle Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:41.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Florendine Street

Staffordshire County Council are proposing to carry out Highway improvement works on Florendine Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:28.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rene Road

Staffordshire County Council are proposing to carry out Highway improvement works on Rene Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:41.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Main Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Main Street, Snarestone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 12:39.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Main Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Main Street, Snarestone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 12 Nov 2024 at 12:01.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Glascote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Road, Stonydelph, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 15:59.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Orton Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Orton Road, Polesworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 24 Oct 2024 at 10:27.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Orton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Orton Road, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 8 Oct 2024 at 16:35.

Warwickshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
St Helena Road

Warwickshire County Council are proposing to carry out Highway improvement works on St Helena Road, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 1 Nov 2024 at 13:07.

Warwickshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
St Helena Road

Warwickshire County Council are proposing to carry out Highway improvement works on St Helena Road, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 15 Oct 2024 at 09:01.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Ramscliff Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ramscliff Avenue, Oakthorpe And Donisthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 16:36.

Warwickshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
St Helena Road

Warwickshire County Council are proposing to carry out Highway improvement works on St Helena Road, Dordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 27 Nov 2024 at 07:04.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Ramscliff Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Ramscliff Avenue, Oakthorpe And Donisthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 8 Nov 2024 at 13:36.

Warwickshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
St Helena Road

Warwickshire County Council are proposing to carry out Highway improvement works on St Helena Road, Dordon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 15 Oct 2024 at 09:03.

Virgin Media logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Orton Road

Virgin Media are proposing to carry out Remedial works on Orton Road, Warton, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by Virgin Media on 30 Oct 2024 at 14:33.

Murphy Power Distribution logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Austrey Lane

Murphy Power Distribution are proposing to carry out Utility asset works on Austrey Lane, No Mans Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 28 Nov 2024 at 08:16.

Murphy Power Distribution logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Austrey Lane

Murphy Power Distribution are proposing to carry out Utility asset works on Austrey Lane, No Mans Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 26 Nov 2024 at 13:14.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Glascote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Road, Glascote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 15:13.

Western Power Distribution (East Midlands) logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Riley

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Riley, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 10:47.

Severn Trent Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Bowleys Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bowleys Lane, Appleby Magna.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 12:18.

Severn Trent Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Bowleys Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bowleys Lane, Appleby Magna.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Nov 2024 at 13:56.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Dordon Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Dordon Road, Dordon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 08:44.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Oakthorpe And Donisthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 11:59.

Leicestershire County Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Twycross Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Twycross Lane, Twycross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Oct 2024 at 14:56.

Leicestershire County Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Orton Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Orton Lane, Twycross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Oct 2024 at 14:56.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Church Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Street, Oakthorpe And Donisthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Nov 2024 at 16:36.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Austrey Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Austrey Lane, Twycross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Oct 2024 at 11:37.

Leicestershire County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Orton Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Orton Lane, Orton On The Hill, Twycross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Oct 2024 at 11:37.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Glascote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Road, Glascote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:52.

Severn Trent Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Potters Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Potters Lane, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 23 Nov 2024 at 11:59.

Leicestershire County Council logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Ratcliffe Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Ratcliffe Lane, Sheepy Magna, Sheepy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Oct 2024 at 11:37.

Leicestershire County Council logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Pinwall Lane

Leicestershire County Council are proposing to carry out Highway improvement works on Pinwall Lane, Sheepy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leicestershire County Council on 9 Oct 2024 at 11:37.

Severn Trent Water logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Cottage Lane

Severn Trent Water are proposing to carry out Utility asset works on Cottage Lane, Norton Juxta Twycross, Twycross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 08:31.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Florendine Street

Staffordshire County Council are proposing to carry out Highway improvement works on Florendine Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:24.

Severn Trent Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Dordon Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Dordon Road, Dordon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 30 Oct 2024 at 11:17.

Staffordshire County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Tamworth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Road, Amington, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 16:59.

Staffordshire County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Tamworth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Road, Amington, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 16:59.

Severn Trent Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
The Gullet

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Gullet, Polesworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Nov 2024 at 18:36.


Roadworks Map near to Main Road, ATHERSTONE, CV9 3EH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Main Road, ATHERSTONE, CV9 3EH (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.