ROADWORKS SUMMARY
Sudbury Road, HALSTEAD, CO9 2RR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Sudbury Road, CO9 2RR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Sudbury Road, HALSTEAD, CO9 2RR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Sudbury Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Queen Street

Essex County Council are carrying out Highway improvement works on Queen Street, Castle Hedingham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 February 2024 at 09:52 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Feb 2024 at 13:41.

Essex County Council logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
High Garrett

Essex County Council are carrying out Highway improvement works on High Garrett, Braintree And Bocking, Braintree.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 00:00 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Sep 2024 at 09:01.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Earls Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:18.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Earls Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:13.

Essex County Council logo
Between
11 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Station Road

Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 24 Sep 2024 at 14:27.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Colne Road

Cadent Gas are proposing to carry out Utility asset works on Colne Road, Halstead Urban, Halstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:30.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Coggeshall Way

Cadent Gas are proposing to carry out Utility asset works on Coggeshall Way, Halstead Urban, Halstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 08:35.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Upper Holt Street

Cadent Gas are proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:20.

Essex County Council logo
Between
11 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Station Road

Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 7 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 3 Oct 2024 at 08:06.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Upper Holt Street

Cadent Gas were proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:44.

Essex County Council logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Factory Lane West

Essex County Council were proposing to carry out Highway improvement works on Factory Lane West, Halstead Urban, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 14 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 30 Aug 2024 at 09:19.

Cadent Gas logo
Between
18 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Earls Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 14:12.

Cadent Gas logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Upper Holt Street

Cadent Gas are proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 09:30.

Essex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Bures Road

Essex County Council are proposing to carry out Highway improvement works on Bures Road, Wakes Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 15:16.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Church Hill

Cadent Gas were proposing to carry out Utility asset works on Church Hill, Earls Colne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:55.

Cadent Gas logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Earls Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:44.

Essex County Council logo
Between
28 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Station Road

Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 3 Oct 2024 at 08:39.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
High Garrett

Cadent Gas are carrying out Utility repair and maintenance works on High Garrett, Braintree And Bocking, Braintree.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 12:54 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 16:09.

Essex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Ronald Road

Essex County Council are proposing to carry out Highway improvement works on Ronald Road, Halstead Urban, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Nov 2024 at 14:00.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hornes Green Road

Essex County Council are proposing to carry out Highway improvement works on Hornes Green Road, Bures Hamlet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 09:30.

Cadent Gas logo
Between
2 and 30 Dec 2024
Details
View Map
Share
Follow
Lower Holt Street

Cadent Gas are proposing to carry out Utility asset works on Lower Holt Street, Earls Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:28.

Cadent Gas logo
Between
2 and 30 Dec 2024
Details
View Map
Share
Follow
Lower Holt Street

Cadent Gas are proposing to carry out Utility asset works on Lower Holt Street, Earls Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:22.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bures Road

Essex County Council are proposing to carry out Remedial works on Bures Road, Alphamstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 7 Nov 2024 at 12:22.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bures Road

Essex County Council are proposing to carry out Remedial works on Bures Road, Alphamstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 13 Nov 2024 at 11:41.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Upper Holt Street

Cadent Gas were proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 16:14.

BT logo
Finishing
Thursday
Details
View Map
Share
Wethersfield Road

BT were proposing to carry out Utility asset works on Wethersfield Road, Sible Hedingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Sep 2024 at 10:18.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Colne Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Colne Road, Halstead Urban, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Sep 2024 at 13:47.

Essex County Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Station Road

Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 09:20.

Essex County Council logo
Between
12 and 14 Dec 2024
Details
View Map
Share
Follow
North End Road

Essex County Council are proposing to carry out Highway improvement works on North End Road, Gestingthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 13:30.

Essex County Council logo
Between
12 and 14 Dec 2024
Details
View Map
Share
Follow
North End Road

Essex County Council are proposing to carry out Highway improvement works on North End Road, Gestingthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 24 Oct 2024 at 09:58.

Essex County Council logo
Between
12 and 14 Dec 2024
Details
View Map
Share
Follow
Hall Green

Essex County Council are proposing to carry out Highway improvement works on Hall Green, Little Yeldham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 13:29.

Anglian Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Factory Lane West

Anglian Water were proposing to carry out Utility repair and maintenance works on Factory Lane West, Halstead Urban, Halstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 12:18.

Anglian Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Factory Lane West

Anglian Water are proposing to carry out Utility repair and maintenance works on Factory Lane West, Halstead Urban, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Oct 2024 at 11:35.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
Colchester Road

Cadent Gas are proposing to carry out Utility asset works on Colchester Road, White Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:30.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
Colne Park Road

Cadent Gas are proposing to carry out Utility asset works on Colne Park Road, White Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 09:55.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
Colneford Hill

Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 11:24.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
Colne Park Road

Cadent Gas are proposing to carry out Utility asset works on Colne Park Road, White Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 10:29.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
Colneford Hill

Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 08:48.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
Colneford Hill

Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 11:22.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Braintree Road

Cadent Gas are proposing to carry out Utility asset works on Braintree Road, Gosfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 15:53.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Almshouse Green

BT were proposing to carry out Utility asset works on Almshouse Green, Sible Hedingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Sep 2024 at 14:31.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Lower Holt Street

Cadent Gas are proposing to carry out Utility asset works on Lower Holt Street, Earls Colne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:40.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Lower Holt Street

Cadent Gas are proposing to carry out Utility asset works on Lower Holt Street, Earls Colne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:21.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Fenn Road

Cadent Gas are proposing to carry out Utility asset works on Fenn Road, Halstead Urban, Halstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 13:58.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Colchester Road

Cadent Gas are proposing to carry out Utility asset works on Colchester Road, Halstead Urban, Halstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 08:54.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Colchester Road

Cadent Gas are proposing to carry out Utility asset works on Colchester Road, Halstead Urban, Halstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:30.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Braintree Road

Cadent Gas are proposing to carry out Utility asset works on Braintree Road, Gosfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 12:52.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Braintree Road

Cadent Gas are proposing to carry out Utility asset works on Braintree Road, Gosfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:22.

Essex County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bures Road

Essex County Council are proposing to carry out Highway improvement works on Bures Road, Wakes Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 10:51.

Anglian Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
The Green

Anglian Water were proposing to carry out Utility repair and maintenance works on The Green, Twinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 09:00.

Cadent Gas logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Foundry Lane

Cadent Gas are proposing to carry out Utility asset works on Foundry Lane, Earls Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 09:01.

Cadent Gas logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Foundry Lane

Cadent Gas are proposing to carry out Utility asset works on Foundry Lane, Earls Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:30.

Essex County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Station Road

Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 29 Nov 2024 at 16:38.

Essex County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Station Road

Essex County Council are proposing to carry out Highway improvement works on Station Road, Earls Colne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex County Council on 11 Nov 2024 at 12:52.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Coggeshall Way

Cadent Gas are proposing to carry out Utility asset works on Coggeshall Way, Halstead Urban, Halstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:21.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Colne Road

Cadent Gas were proposing to carry out Utility asset works on Colne Road, Halstead Urban, Halstead.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 13:33.

Essex County Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Rectory Road

Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Sible Hedingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Nov 2024 at 10:13.

Essex County Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Bewick Court

Essex County Council are proposing to carry out Highway improvement works on Bewick Court, Sible Hedingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Nov 2024 at 10:13.

Essex County Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Swan Street

Essex County Council are proposing to carry out Highway improvement works on Swan Street, Sible Hedingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Nov 2024 at 10:13.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Gestingthorpe Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gestingthorpe Road, Little Maplestead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 13:57.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Gestingthorpe Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gestingthorpe Road, Little Maplestead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 11 Nov 2024 at 13:26.

Essex County Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Lamarsh Road

Essex County Council are proposing to carry out Highway improvement works on Lamarsh Road, Alphamstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 14:56.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Upper Holt Street

Cadent Gas are proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 16:30.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility asset works on Park Lane, Earls Colne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:22.

Cadent Gas logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Park Lane

Cadent Gas are proposing to carry out Utility asset works on Park Lane, Earls Colne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 10:36.

Anglian Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
The Green

Anglian Water are proposing to carry out Utility repair and maintenance works on The Green, Twinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 10:54.

Anglian Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
The Green

Anglian Water are proposing to carry out Utility repair and maintenance works on The Green, Twinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 11:55.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Lower Holt Street

Cadent Gas are proposing to carry out Utility asset works on Lower Holt Street, Earls Colne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 16:08.

Cadent Gas logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Upper Holt Street

Cadent Gas were proposing to carry out Utility asset works on Upper Holt Street, Earls Colne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 15:50.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Colneford Hill

Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:21.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Colneford Hill

Cadent Gas are proposing to carry out Utility asset works on Colneford Hill, White Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:09.

Cadent Gas logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Colne Park Road

Cadent Gas are proposing to carry out Utility asset works on Colne Park Road, White Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 17:00.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Colne Park Road

Cadent Gas were proposing to carry out Utility asset works on Colne Park Road, White Colne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 5 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 16:23.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Colne Park Road

Cadent Gas are proposing to carry out Utility asset works on Colne Park Road, White Colne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:21.

Anglian Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Cross End

Anglian Water are proposing to carry out Utility repair and maintenance works on Cross End, Pebmarsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 25 Nov 2024 at 11:12.


Roadworks Map near to Sudbury Road, HALSTEAD, CO9 2RR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 11:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Sudbury Road, HALSTEAD, CO9 2RR (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
BEECH AVENUE, HALSTEAD URBAN 
(0.8 miles)
Anglian Water
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 29 Nov 2024 - 5 Dec 2024
0.8
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
COLNE ROAD, HALSTEAD URBAN 
(0.9 miles)
Cadent Gas
Utility asset works - Carriageway, Verge - Multi-way signals
Planned
Scheduled: 11 Nov 2024 - 6 Dec 2024
0.9
Details
Share
Follow
3
Cadent Gas logo
MAJOR
  
COGGESHALL WAY, HALSTEAD URBAN 
(0.9 miles)
Cadent Gas
Utility asset works - Carriageway, Verge - Multi-way signals
Planned
Scheduled: 11 Nov 2024 - 6 Dec 2024
0.9
Details
Share
Follow
4
Cadent Gas logo
COGGESHALL WAY, HALSTEAD URBAN 
(0.9 miles)
Cadent Gas
Utility asset works - Carriageway, Verge - Multi-way signals
In Progress
Since: 20 Nov 2024 08:00
(Scheduled: 20 Nov 2024 - 3 Dec 2024)
0.9
Details
Share
Follow
5
Cadent Gas logo
COLNE ROAD, HALSTEAD URBAN 
(0.9 miles)
Cadent Gas
Utility asset works - Carriageway - Multi-way signals
In Progress
Since: 20 Nov 2024 08:00
(Scheduled: 20 Nov 2024 - 3 Dec 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.