ROADWORKS SUMMARY
Spendells Close, WALTON ON THE NAZE, CO14 8JG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Spendells Close, CO14 8JG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Spendells Close, WALTON ON THE NAZE, CO14 8JG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Spendells Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Lodge Road

Cadent Gas were proposing to carry out Utility asset works on Lodge Road, Little Oakley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:00.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Lodge Road

Cadent Gas are proposing to carry out Utility asset works on Lodge Road, Little Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 16:30.

Cadent Gas logo
LONG TERM
Between
3 Dec 2024 and 4 Apr 2025
Details
View Map
Share
Follow
Wittonwood Road

Cadent Gas are proposing to carry out Utility asset works on Wittonwood Road, Frinton On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 16:30.

Cadent Gas logo
LONG TERM
Between
3 Dec 2024 and 4 Apr 2025
Details
View Map
Share
Wittonwood Road

Cadent Gas were proposing to carry out Utility asset works on Wittonwood Road, Frinton On Sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 10:14.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 7 Mar 2025
Details
View Map
Share
Follow
The Esplanade

Cadent Gas are proposing to carry out Utility asset works on The Esplanade, Frinton On Sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 08:22.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 7 Mar 2025
Details
View Map
Share
Follow
The Esplanade

Cadent Gas are proposing to carry out Utility asset works on The Esplanade, Frinton On Sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 12:00.

Essex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Kreswell Grove

Essex County Council are proposing to carry out Highway improvement works on Kreswell Grove, Dovercourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 10:43.

Cadent Gas logo
LONG TERM
Between
6 Jan and 15 Apr 2025
Details
View Map
Share
The Esplanade

Cadent Gas were proposing to carry out Utility asset works on The Esplanade, Frinton On Sea.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 15 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 13:26.

Cadent Gas logo
LONG TERM
Between
6 Jan and 15 Apr 2025
Details
View Map
Share
Follow
The Esplanade

Cadent Gas are proposing to carry out Utility asset works on The Esplanade, Frinton On Sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:37.

Cadent Gas logo
LONG TERM
Between
6 Jan and 15 Apr 2025
Details
View Map
Share
Follow
The Esplanade

Cadent Gas are proposing to carry out Utility asset works on The Esplanade, Frinton On Sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 12:10.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
The Crescent

Cadent Gas are proposing to carry out Utility asset works on The Crescent, Frinton On Sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:00.

Cadent Gas logo
LONG TERM
Between
13 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Wittonwood Road

Cadent Gas are proposing to carry out Utility asset works on Wittonwood Road, Frinton On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 15:32.

Cadent Gas logo
LONG TERM
Between
13 Jan and 3 Mar 2025
Details
View Map
Share
Wittonwood Road

Cadent Gas were proposing to carry out Utility asset works on Wittonwood Road, Frinton On Sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:27.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
School Road

Cadent Gas were proposing to carry out Utility asset works on School Road, Frinton On Sea.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:30.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Elm Tree Avenue

Essex County Council are proposing to carry out Highway improvement works on Elm Tree Avenue, Walton On The Naze.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 13:47.

Essex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Elm Tree Avenue

Essex County Council are proposing to carry out Highway improvement works on Elm Tree Avenue, Walton On The Naze.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 11:16.

Affinity Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
The Street

Affinity Water are proposing to carry out Utility repair and maintenance works on The Street, Kirby Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 8 Nov 2024 at 14:23.

Essex County Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Halstead Road

Essex County Council are proposing to carry out Highway improvement works on Halstead Road, Kirby Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 10:27.

Essex County Council logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Halstead Road

Essex County Council are proposing to carry out Highway improvement works on Halstead Road, Kirby Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Nov 2024 at 08:04.

Essex County Council logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
Abbey Street

Essex County Council are proposing to carry out Highway improvement works on Abbey Street, Thorpe Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 2 Dec 2024 at 12:14.

Essex County Council logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
Landermere Road

Essex County Council are proposing to carry out Highway improvement works on Landermere Road, Thorpe Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 14:57.

Essex County Council logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
High Street

Essex County Council are proposing to carry out Highway improvement works on High Street, Thorpe Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 14:49.

Essex County Council logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
Abbey Street

Essex County Council are proposing to carry out Highway improvement works on Abbey Street, Thorpe Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:52.

Essex County Council logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
Station Road

Essex County Council are proposing to carry out Highway improvement works on Station Road, Thorpe Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 14:59.

Essex County Council logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
Frinton Road

Essex County Council are proposing to carry out Highway improvement works on Frinton Road, Thorpe Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 3 Dec 2024 at 14:38.

Essex County Council logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
Frinton Road

Essex County Council are proposing to carry out Highway improvement works on Frinton Road, Thorpe Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 28 Nov 2024 at 13:52.

Essex County Council logo
LONG TERM
Between
17 Feb 2025 and 18 Feb 2028
Details
View Map
Share
Follow
Beaumont Road

Essex County Council are proposing to carry out Highway improvement works on Beaumont Road, Great Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 18 February 2028. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 4 Nov 2024 at 18:48.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Beaumont Road

Essex County Council are proposing to carry out Highway improvement works on Beaumont Road, Great Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 8 Nov 2024 at 11:15.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Beaumont Road

Essex County Council are proposing to carry out Highway improvement works on Beaumont Road, Great Oakley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:02.

UK Power Networks Eastern & London logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Pork Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Pork Lane, Great Holland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 15:22.

Essex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
The Drive

Essex County Council are proposing to carry out Highway improvement works on The Drive, Dovercourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 11:21.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
The Street

Affinity Water are proposing to carry out Utility repair and maintenance works on The Street, Kirby Le Soken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 11:12.

Cadent Gas logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Wittonwood Road

Cadent Gas are proposing to carry out Utility asset works on Wittonwood Road, Frinton On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:55.

Cadent Gas logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Wittonwood Road

Cadent Gas are proposing to carry out Utility asset works on Wittonwood Road, Frinton On Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 12:18.

Cadent Gas logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Wittonwood Road

Cadent Gas were proposing to carry out Utility asset works on Wittonwood Road, Frinton On Sea.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 12:28.


Roadworks Map near to Spendells Close, WALTON ON THE NAZE, CO14 8JG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 22:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Spendells Close, WALTON ON THE NAZE, CO14 8JG (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks Eastern & London logo
URGENT
  
STATION STREET 
(0.8 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Give and take
Complete
5 Dec 2024 10:39 - 10 Dec 2024 14:25
0.8
Details
Share