ROADWORKS SUMMARY
Preston St. Mary, SUDBURY, CO10 9ND
Introduction
View current and future planned roadworks and road closures for CO10 9ND and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Preston St. Mary, SUDBURY, CO10 9ND
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
15 Aug 2025
Anglian Water are carrying out Utility asset works on Dakings Lane, Felsham.
These works are categorised as Major.
The works started on 16 February 2024 at 16:30 and could run through until 15 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:33.
15 Aug 2025
Anglian Water are carrying out Utility asset works on Buxhall Road, Brettenham.
These works are categorised as Major.
The works started on 16 February 2024 at 16:30 and could run through until 15 August 2025. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 16 Feb 2024 at 17:34.
8 Sep 2025
Anglian Water are carrying out Utility asset works on Cockfield Road, Felsham.
These works are categorised as Major.
The works started on 11 March 2024 at 05:50 and could run through until 8 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 05:55.
8 Sep 2025
Anglian Water are carrying out Utility asset works on Cooks Green, Hitcham.
These works are categorised as Major.
The works started on 11 March 2024 at 05:50 and could run through until 8 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 11 Mar 2024 at 05:56.
22 Sep 2025
Anglian Water are carrying out Utility asset works on Bradfield St George Road, Bradfield St Clare.
These works are categorised as Major.
The works started on 24 March 2024 at 06:00 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 24 Mar 2024 at 06:27.
10 Oct 2025
Anglian Water are carrying out Utility asset works on Church Road, Brettenham.
These works are categorised as Major.
The works started on 12 April 2024 at 07:21 and could run through until 10 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 12 Apr 2024 at 06:21.
22 Apr 2024 and 21 Oct 2025
Anglian Water are proposing to carry out Utility asset works on Nedging Road, Nedging With Naughton.
These works are categorised as Major.
The works will start on or after 22 April 2024 and could run through until 21 October 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Anglian Water on 27 Mar 2024 at 13:53.
2 Nov 2025
Anglian Water are carrying out Utility asset works on Dux Street, Brettenham.
These works are categorised as Major.
The works started on 8 May 2024 at 08:30 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 8 May 2024 at 07:58.
9 Nov 2025
Anglian Water are carrying out Utility asset works on Bildeston Road, Wattisham.
These works are categorised as Major.
The works started on 10 May 2024 at 06:25 and could run through until 9 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 10 May 2024 at 05:26.
12 Nov 2025
Anglian Water are carrying out Utility asset works on Ipswich Road, Nedging With Naughton.
These works are categorised as Major.
The works started on 13 May 2024 at 07:00 and could run through until 12 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 13 May 2024 at 06:21.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Waldingfield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 14:04.
6 and 8 Jan 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on High Street, Bildeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 21 Oct 2024 at 15:09.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Melford Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 13:39.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Melford Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 14:04.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Melford Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 08:48.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Bull Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 13:40.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Bull Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 14:06.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Bull Lane, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 08:57.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on High Street, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 13:40.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Waldingfield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 08:48.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on High Street, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 26 Nov 2024 at 08:48.
6 and 8 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on Waldingfield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 13:40.
6 and 10 Jan 2025
Suffolk County Council are proposing to carry out Highway improvement works on High Street, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 18 Nov 2024 at 14:04.
8 and 10 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on The Street, Lawshall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 7 Oct 2024 at 11:42.
13 and 15 Jan 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Water Street, Lavenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Anglian Water on 4 Oct 2024 at 11:27.
20 and 31 Jan 2025
Anglian Water are proposing to carry out Utility asset works on Cooks Green, Hitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 28 Oct 2024 at 10:42.
20 and 31 Jan 2025
Anglian Water are proposing to carry out Utility asset works on Cockfield Road, Felsham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 9 Oct 2024 at 16:08.
27 Jan and 4 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Howe Lane, Cockfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 10:41.
27 Jan and 4 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Howe Lane, Cockfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 12:50.
3 and 14 Feb 2025
Anglian Water were proposing to carry out Section 58 on Cooks Green, Hitcham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 18 Oct 2024 at 10:20.
3 and 7 Feb 2025
Suffolk County Council were proposing to carry out Highway improvement works on Road From B1115 To A1141, Monks Eleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:24.
3 and 14 Feb 2025
Anglian Water are proposing to carry out Utility asset works on Buxhall Road, Brettenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 28 Oct 2024 at 10:28.
3 and 14 Feb 2025
Anglian Water are proposing to carry out Utility asset works on Buxhall Road, Brettenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 10:14.
3 and 7 Feb 2025
Suffolk County Council were proposing to carry out Highway improvement works on Coombes Hill, Monks Eleigh.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:28.
3 and 14 Feb 2025
Anglian Water were proposing to carry out Utility asset works on Church Road, Brettenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 30 Oct 2024 at 09:04.
3 and 7 Feb 2025
Suffolk County Council were proposing to carry out Highway improvement works on Coombes Hill, Milden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:30.
3 and 7 Feb 2025
Suffolk County Council were proposing to carry out Highway improvement works on Milden Hall, Milden.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:32.
3 and 7 Feb 2025
Suffolk County Council were proposing to carry out Highway improvement works on Humble Green, Little Waldingfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:35.
4 and 6 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Duke Street, Bildeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 2 Dec 2024 at 12:24.
11 and 18 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Howe Lane, Cockfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 13:15.
17 and 28 Feb 2025
Anglian Water are proposing to carry out Utility asset works on Bradfield St George Road, Bradfield St Clare.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 24 Oct 2024 at 11:08.
17 and 19 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on The Street, Lawshall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Anglian Water on 8 Oct 2024 at 08:33.
18 and 20 Feb 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Howe Lane, Cockfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 28 Nov 2024 at 10:28.
18 and 20 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Howe Lane, Cockfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 28 Nov 2024 at 10:20.
26 and 28 Feb 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Howe Lane, Cockfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 12:42.
3 and 5 Mar 2025
Anglian Water were proposing to carry out Utility repair and maintenance works on Howe Lane, Cockfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 15:28.
3 and 5 Mar 2025
Anglian Water are proposing to carry out Utility repair and maintenance works on Howe Lane, Cockfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Dec 2024 at 08:31.
3 and 15 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on Road From B1115 To A1141, Monks Eleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:27.
3 and 7 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Great Green, Cockfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:32.
3 and 15 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on Milden Hall, Milden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:34.
3 and 7 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on Humble Green, Little Waldingfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:36.
10 and 15 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on Coombes Hill, Monks Eleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:29.
10 and 15 Mar 2025
Suffolk County Council are proposing to carry out Highway improvement works on Coombes Hill, Milden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Suffolk County Council on 11 Dec 2024 at 14:32.
Roadworks Map near to Preston St. Mary, SUDBURY, CO10 9ND
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Preston St. Mary, SUDBURY, CO10 9ND (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.