ROADWORKS SUMMARY
Mutton Row, ONGAR, CM5 9QH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Mutton Row, CM5 9QH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Mutton Row, ONGAR, CM5 9QH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mutton Row are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Essex County Council logo
LONG TERM
Between
3 Sep 2024 and 4 Sep 2025
Details
View Map
Share
High Street

Essex County Council were proposing to carry out Highway improvement works on High Street, Epping Town, Epping.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2024 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 09:26.

Essex County Council logo
LONG TERM
Until
4 Feb 2025
Details
View Map
Share
Follow
Dagwood Lane

Essex County Council are carrying out Remedial works on Dagwood Lane, Doddinghurst.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 14:29 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 14:42.

Essex County Council logo
LONG TERM
Between
25 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Dagwood Lane

Essex County Council are proposing to carry out Remedial works on Dagwood Lane, Doddinghurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 22 Nov 2024 at 11:25.

Essex County Council logo
LONG TERM
Between
25 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Dagwood Lane

Essex County Council were proposing to carry out Remedial works on Dagwood Lane, Doddinghurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex County Council on 14 Oct 2024 at 12:09.

Essex County Council logo
Between
2 and 25 Dec 2024
Details
View Map
Share
Follow
Nine Ashes Road

Essex County Council are proposing to carry out Highway improvement works on Nine Ashes Road, Blackmore.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Nov 2024 at 14:40.

Essex County Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Stapleford Road

Essex County Council are carrying out Highway improvement works on Stapleford Road, Stapleford Abbotts, Epping.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Dec 2024 at 13:19.

Electricity Network Company logo
Finishing
Today
Details
View Map
Share
Follow
Stocks Lane

Electricity Network Company are proposing to carry out New service connection on Stocks Lane, Kelvedon Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Sep 2024 at 07:37.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Tysea Hill

Essex County Council are carrying out Highway improvement works on Tysea Hill, Stapleford Abbotts, Epping.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 15:09 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 9 Dec 2024 at 15:17.

Essex County Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
The Drummonds

Essex County Council are proposing to carry out Highway improvement works on The Drummonds, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 09:08.

Essex County Council logo
Finishing
Today
Details
View Map
Share
Follow
Tysea Hill

Essex County Council are proposing to carry out Highway improvement works on Tysea Hill, Stapleford Abbotts, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 08:29.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Pettits Lane

Cadent Gas are carrying out Utility repair and maintenance works on Pettits Lane, Wyatts Green.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 15:57 and could run through until 17 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:54.

Affinity Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Princes Road

Affinity Water are carrying out Utility repair and maintenance works on Princes Road, Navestock.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 08:55 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 12 Dec 2024 at 09:49.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Western Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Western Avenue, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 08:19.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Western Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Western Avenue, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Sep 2024 at 09:54.

UK Power Networks Eastern & London logo
Between
2 and 13 Jan 2025
Details
View Map
Share
Woolmongers Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Woolmongers Lane, High Ongar, Ongar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 13 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 13:21.

Essex County Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Beaconfield Avenue

Essex County Council are proposing to carry out Highway improvement works on Beaconfield Avenue, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Aug 2024 at 09:29.

Essex County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Crown Road

Essex County Council are proposing to carry out Highway improvement works on Crown Road, Kelvedon Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Dec 2024 at 09:24.

Essex County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Crown Road

Essex County Council are proposing to carry out Highway improvement works on Crown Road, Kelvedon Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 16:03.

Essex County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Crown Road

Essex County Council are proposing to carry out Highway improvement works on Crown Road, Kelvedon Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 15 Oct 2024 at 14:16.

Essex County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Navestock Side

Essex County Council are proposing to carry out Highway improvement works on Navestock Side, Kelvedon Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Nov 2024 at 16:07.

Essex County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Navestock Side

Essex County Council are proposing to carry out Highway improvement works on Navestock Side, Kelvedon Hatch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Dec 2024 at 09:25.

Affinity Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Woodside

Affinity Water were proposing to carry out Utility repair and maintenance works on Woodside, North Weald Bassett, Epping.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 14:19.

Affinity Water logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Moreton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Moreton Road, Fyfield, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 08:58.

Affinity Water logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Moreton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Moreton Road, Fyfield, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 09:00.

ESP Electricity logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lindsey Street

ESP Electricity are proposing to carry out Utility asset works on Lindsey Street, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 31 Oct 2024 at 10:09.

UK Power Networks Eastern & London logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Church Lane

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Church Lane, Doddinghurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 10:39.

ESP Electricity logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lindsey Street

ESP Electricity are proposing to carry out Utility asset works on Lindsey Street, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 15 Nov 2024 at 08:41.

Essex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
King Street

Essex County Council are proposing to carry out Highway improvement works on King Street, High Ongar, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 15:49.

Essex County Council logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Stapleford Tawney, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 12:11.

Essex County Council logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Theydon Mount, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 12:13.

Essex County Council logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Theydon Bois, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 12:16.

Essex County Council logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Epping Lane

Essex County Council are proposing to carry out Remedial works on Epping Lane, Theydon Garnon, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 12:15.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Blackmore Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Blackmore Road, Blackmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 11:54.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Wenlocks Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Wenlocks Lane, Blackmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 8 Nov 2024 at 13:41.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Wenlocks Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Wenlocks Lane, Blackmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 13:46.

Affinity Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Blackmore Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Blackmore Road, Blackmore.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 10:15.

Essex County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Campions

Essex County Council are proposing to carry out Highway improvement works on Campions, Epping Town, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Sep 2024 at 10:16.

Affinity Water logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Rookery Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Rookery Road, High Ongar, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 30 Sep 2024 at 09:04.

Affinity Water logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Rookery Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Rookery Road, High Ongar, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 4 Oct 2024 at 10:18.

UK Power Networks Eastern & London logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Birds Green

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Birds Green, Willingale, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 12:37.

UK Power Networks Eastern & London logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Woolmongers Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Woolmongers Lane, High Ongar, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 12:33.

Affinity Water logo
Between
2 and 5 Feb 2025
Details
View Map
Share
Follow
Murthering Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 15:40.

Affinity Water logo
Between
2 and 5 Feb 2025
Details
View Map
Share
Follow
Murthering Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 29 Oct 2024 at 05:48.

Affinity Water logo
Between
2 and 5 Feb 2025
Details
View Map
Share
Follow
Murthering Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Murthering Lane, Navestock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 08:58.

Essex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Coronation Hill

Essex County Council are proposing to carry out Highway improvement works on Coronation Hill, Epping Town, Epping.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 6 Aug 2024 at 09:43.

Essex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Coronation Hill

Essex County Council are proposing to carry out Highway improvement works on Coronation Hill, Epping Town, Epping.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 21 Aug 2024 at 15:25.

Affinity Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
London Road

Affinity Water are proposing to carry out Utility repair and maintenance works on London Road, Stanford Rivers, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Dec 2024 at 18:00.

Affinity Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
London Road

Affinity Water are proposing to carry out Utility repair and maintenance works on London Road, Stanford Rivers, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 11:38.

Affinity Water logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Faggoters Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on Faggoters Lane, High Laver, Ongar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 10 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 08:30.

Affinity Water logo
Between
6 and 10 Feb 2025
Details
View Map
Share
Follow
Workers Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Workers Road, High Laver, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 10 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 11 Dec 2024 at 13:18.

Affinity Water logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Mountnessing Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Mountnessing Lane, Doddinghurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 06:45.

Essex County Council logo
Between
7 and 9 Feb 2025
Details
View Map
Share
Follow
Canes Lane

Essex County Council are proposing to carry out Highway improvement works on Canes Lane, North Weald Bassett, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 17:15.

Affinity Water logo
Between
7 and 11 Feb 2025
Details
View Map
Share
Follow
Mountnessing Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Mountnessing Lane, Doddinghurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 14:58.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Nine Ashes Road

Affinity Water are proposing to carry out Utility asset works on Nine Ashes Road, Blackmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 29 Oct 2024 at 06:24.

Essex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Chelmsford Road Straightening

Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road Straightening, High Ongar, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 11:44.

ESP Electricity logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Rayfield

ESP Electricity were proposing to carry out Utility asset works on Rayfield, Epping Town, Epping.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 28 Nov 2024 at 10:39.

Essex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Chelmsford Road

Essex County Council are proposing to carry out Highway improvement works on Chelmsford Road, High Ongar, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 11:46.

Affinity Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Ingatestone Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Ingatestone Road, Blackmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 25 Nov 2024 at 13:17.

Affinity Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
School Road

Affinity Water are proposing to carry out Utility repair and maintenance works on School Road, Stondon Massey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 28 Nov 2024 at 14:21.

Affinity Water logo
Between
27 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Workers Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Workers Road, High Laver, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 10 Dec 2024 at 11:15.

Affinity Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Maltings Hill

Affinity Water are proposing to carry out Utility repair and maintenance works on Maltings Hill, Moreton, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Dec 2024 at 11:30.

UK Power Networks Eastern & London logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Workers Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Workers Road, High Laver, Ongar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 15:56.

Affinity Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Chelmsford Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Chelmsford Road, Blackmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 10:30.

Affinity Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Chelmsford Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Chelmsford Road, Blackmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Dec 2024 at 11:25.

Affinity Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Woodside

Affinity Water are proposing to carry out Utility repair and maintenance works on Woodside, North Weald Bassett, Epping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 10 Dec 2024 at 11:27.


Roadworks Map near to Mutton Row, ONGAR, CM5 9QH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Dec 2024 02:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Mutton Row, ONGAR, CM5 9QH (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.