ROADWORKS SUMMARY
Ugley, BISHOP'S STORTFORD, CM22 6JB
Introduction
View current and future planned roadworks and road closures for CM22 6JB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Ugley, BISHOP'S STORTFORD, CM22 6JB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
25 Nov and 22 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Rickling Green Road, Rickling Green.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 16:43.
25 Nov and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cambridge Road, Quendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:50.
25 Nov and 22 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Cambridge Road, Quendon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 16:46.
Saturday
Cadent Gas are carrying out Utility repair and maintenance works on Stansted Road, Bishop's Stortford.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 11:00 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:33.
9 and 23 Dec 2024
Hertfordshire County Council are proposing to carry out Highway improvement works on Farnham Road, Bishop's Stortford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:07.
20 Dec 2024
Hertfordshire County Council are carrying out Highway improvement works on Farnham Road, Bishop's Stortford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 11 Dec 2024 at 21:53.
Monday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Rookery Lane, Wendens Ambo.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 09:59 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 09:18.
18 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 20 Nov 2024 at 16:16.
18 and 20 Dec 2024
Essex County Council are proposing to carry out Highway improvement works on Church Road, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 27 Nov 2024 at 11:11.
2 and 13 Jan 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on East End, Furneux Pelham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 29 Oct 2024 at 15:29.
3 and 31 Jan 2025
Electricity Network Company are proposing to carry out Utility asset works on Gipsy Lane, Birchanger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 25 Sep 2024 at 10:36.
3 and 31 Jan 2025
Electricity Network Company are proposing to carry out Utility asset works on Gipsy Lane, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 16 Sep 2024 at 07:55.
3 and 31 Jan 2025
Electricity Network Company are proposing to carry out Utility asset works on Gipsy Lane, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 17 Sep 2024 at 07:22.
6 and 31 Jan 2025
Hertfordshire County Council are proposing to carry out Works for road purposes on Farnham Road, Bishop's Stortford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 19 Jul 2024 at 09:04.
6 and 31 Jan 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Farnham Road, Bishop's Stortford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:07.
6 and 31 Jan 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Farnham Road, Bishop's Stortford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:15.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Hill, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 14:59.
6 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Grove Hill, Stansted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 15:02.
6 and 9 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Green Street, Elsenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 14:18.
6 and 9 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Green Street, Elsenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Affinity Water on 4 Nov 2024 at 09:46.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Stansted Road, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:38.
6 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Stansted Road, Stansted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 15:12.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Street, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:02.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Quendon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:31.
6 Jan and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Quendon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Dec 2024 at 15:02.
6 Jan and 9 May 2025
Cadent Gas are proposing to carry out Utility asset works on Cambridge Road, Quendon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 15:30.
7 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Birchanger Lane, Birchanger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 13:10.
7 and 9 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Birchanger Lane, Birchanger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 10:38.
13 Jan and 7 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Stane Street, Great Hallingbury.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 10:52.
13 and 17 Jan 2025
BT are proposing to carry out Utility asset works on Brick End Lane, Broxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 16 Oct 2024 at 18:08.
13 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Cambridge Road, Quendon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:36.
15 and 18 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Burton End Road, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 18 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 16:24.
20 and 24 Jan 2025
Essex County Council are proposing to carry out Remedial works on Parsonage Road, Takeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 11 Dec 2024 at 15:59.
20 Jan and 14 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Gipsy Lane, Birchanger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 19 Aug 2024 at 16:16.
20 Jan and 14 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Gipsy Lane, Birchanger.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 16 Sep 2024 at 14:40.
20 Jan and 14 Feb 2025
Electricity Network Company are proposing to carry out Utility asset works on Gipsy Lane, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 20 Aug 2024 at 14:45.
23 Jan and 3 Feb 2025
Hertfordshire County Council were proposing to carry out Highway improvement works on East End, Furneux Pelham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Oct 2024 at 08:36.
23 Jan and 3 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on East End, Furneux Pelham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 16 Oct 2024 at 11:04.
24 and 28 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Cambridge Road, Ugley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 10:56.
24 and 28 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Ugley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 10:56.
24 and 28 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Quendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 10:56.
24 and 28 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Cambridge Road, Quendon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 10:56.
24 and 28 Jan 2025
Essex County Council are proposing to carry out Remedial works on London Road, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 09:12.
27 and 31 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Wicken Road, Arkesden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 07:55.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Cambridge Road, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 10:37.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Mutlow Hill, Wendens Ambo.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 10:25.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on London Road, Wendens Ambo.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 10:25.
30 Jan and 3 Feb 2025
Gigaclear were proposing to carry out Utility asset works on Bentfield Green, Stansted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 January 2025 and run through until 3 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 2 Oct 2024 at 15:35.
30 Jan and 3 Feb 2025
Gigaclear are proposing to carry out Utility asset works on Bentfield Green, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Gigaclear on 11 Nov 2024 at 14:00.
31 Jan and 4 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Urban Road, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Nov 2024 at 15:12.
31 Jan and 4 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Urban Road, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 6 Dec 2024 at 14:51.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Terrace, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Nov 2024 at 15:13.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on North Terrace, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 10 Dec 2024 at 12:55.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Alconbury, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 21 Nov 2024 at 15:08.
3 and 5 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Alconbury, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Dec 2024 at 15:25.
3 and 7 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Chickney Road, Debden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 11 Nov 2024 at 16:14.
3 and 7 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Chickney Road, Debden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 14:51.
3 and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Newport.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:15.
3 and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Newport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 14:02.
3 and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Frambury Lane, Newport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:07.
3 and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Frambury Lane, Newport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 08:22.
3 and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Station Road, Newport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 16:09.
3 and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, Newport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 16:31.
5 and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Langley Road, Clavering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 12:16.
5 and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Langley Road, Clavering.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 11:02.
5 and 7 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Royston Road, Wendens Ambo.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 08:50.
5 and 7 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Royston Road, Wendens Ambo.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 15:42.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Hill, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 16:05.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Grove Hill, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:54.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Stansted Road, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:55.
10 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Stansted Road, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:48.
11 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Burton End Road, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 12:46.
12 and 14 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Classified Road C107 North From Graves End To East End, Furneux Pelham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Nov 2024 at 13:05.
12 and 14 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Classified Road C107 North From Graves End To East End, Furneux Pelham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 11:05.
15 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Frambury Lane, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 15:56.
15 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Frambury Lane, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 11:30.
15 and 28 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Frambury Lane, Newport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:40.
15 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 15:55.
15 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Newport.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 11:30.
15 and 28 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on High Street, Newport.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 15:25.
17 and 25 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Stortford Hall Park, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 11 Dec 2024 at 20:50.
17 and 21 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Rye Street, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2024 at 14:10.
17 and 21 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Rye Street, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Aug 2024 at 14:05.
17 and 21 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Rye Street, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Aug 2024 at 11:59.
17 and 19 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ginns Road, Stocking Pelham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Nov 2024 at 13:14.
17 and 19 Feb 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Ginns Road, Stocking Pelham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Nov 2024 at 15:22.
24 Feb and 17 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Bambers Green Road, Takeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 11:21.
24 Feb and 17 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Bambers Green Road, Takeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 11 Dec 2024 at 12:37.
24 Feb and 17 Mar 2025
Affinity Water are proposing to carry out Utility asset works on Cobbs Lane, Takeley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 11:11.
28 Feb and 4 Mar 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Brick Kiln Lane, Rickling Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 3 Dec 2024 at 09:30.
3 and 30 Mar 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Farnham Road, Bishop's Stortford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:07.
3 Mar and 12 Apr 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Farnham Road, Bishop's Stortford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:16.
3 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Street, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 12:13.
3 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Street, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 16:10.
3 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on High Lane, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 11:55.
3 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on High Lane, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 16:10.
7 and 9 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Grove Hill, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 09:38.
7 and 9 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Stansted Road, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 4 Dec 2024 at 09:38.
8 and 23 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Church Road, Stansted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 March 2025 and could run through until 23 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex County Council on 2 Dec 2024 at 12:24.
10 and 13 Mar 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Farnham Road, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:08.
10 and 13 Mar 2025
Hertfordshire County Council are proposing to carry out Highway improvement works on Farnham Road, Bishop's Stortford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hertfordshire County Council on 8 Nov 2024 at 15:16.
10 and 12 Mar 2025
Essex County Council are proposing to carry out Highway improvement works on Church End, Broxted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 5 Dec 2024 at 13:21.
Roadworks Map near to Ugley, BISHOP'S STORTFORD, CM22 6JB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Ugley, BISHOP'S STORTFORD, CM22 6JB (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.