ROADWORKS SUMMARY
The Village, CHESTER, CH2 4HU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Village, CH2 4HU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Village, CHESTER, CH2 4HU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Village are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

The Environment Agency logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Chase Way

The Environment Agency are carrying out Utility repair and maintenance works on Chase Way, Great Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:30 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by The Environment Agency on 28 Jan 2025 at 13:24.

Cheshire West And Chester Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Salters Lane

Cheshire West And Chester Council are carrying out Highway improvement works on Salters Lane, Picton, Chester.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2025 at 08:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cheshire West And Chester Council on 23 Jan 2025 at 14:19.

Cadent Gas logo
LONG TERM
Until
13 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are carrying out Utility asset works on Chester Road, Frodsham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 10:25 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 08:31.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:31.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Orchard Close

Cadent Gas are proposing to carry out Utility asset works on Orchard Close, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:21.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Howey Lane

Cadent Gas are proposing to carry out Utility asset works on Howey Lane, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.

Cadent Gas logo
LONG TERM
Between
10 Feb and 20 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:32.

Cadent Gas logo
Between
20 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Helsby, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 11:05.

Cadent Gas logo
Between
20 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Callender Way

Cadent Gas are proposing to carry out Utility asset works on Callender Way, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:27.

Cadent Gas logo
Between
20 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Callender Way

Cadent Gas are proposing to carry out Utility asset works on Callender Way, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 09:49.

Cadent Gas logo
Between
20 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Callender Way

Cadent Gas are proposing to carry out Utility asset works on Callender Way, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 11:04.

Cadent Gas logo
Between
20 Feb and 19 Mar 2025
Details
View Map
Share
Callender Way

Cadent Gas were proposing to carry out Utility asset works on Callender Way, Frodsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Feb 2025 at 09:02.

Cadent Gas logo
Between
20 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Helsby, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:26.

Cadent Gas logo
Between
20 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Chester Road

Cadent Gas are proposing to carry out Utility asset works on Chester Road, Helsby, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 10:12.

Cadent Gas logo
Between
20 Feb and 13 Mar 2025
Details
View Map
Share
Chester Road

Cadent Gas were proposing to carry out Utility asset works on Chester Road, Helsby, Frodsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 13 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Feb 2025 at 09:01.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bache Drive

Severn Trent Water are carrying out Remedial works on Bache Drive, Chester.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 09:40 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Feb 2025 at 09:40.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Cable Drive

Cadent Gas were proposing to carry out Utility asset works on Cable Drive, Frodsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Feb 2025 at 09:02.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Cable Drive

Cadent Gas are proposing to carry out Utility asset works on Cable Drive, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:54.

Cadent Gas logo
LONG TERM
Until
27 Mar 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are carrying out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 16:32 and could run through until 27 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 08:17.

United Utilities Water (formerly North West Water) logo
Finishing
Monday
Details
View Map
Share
Follow
Alvanley Road

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Alvanley Road, Helsby, Frodsham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 08:58 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Feb 2025 at 09:42.

Cadent Gas logo
Between
3 and 23 Mar 2025
Details
View Map
Share
Follow
Howey Lane

Cadent Gas are proposing to carry out Utility asset works on Howey Lane, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 13:32.

Cheshire West And Chester Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Overpool Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Overpool Road, Great Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 25 Feb 2025 at 13:48.

Cheshire West And Chester Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Overpool Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Overpool Road, Great Sutton, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 25 Feb 2025 at 14:18.

Cheshire West And Chester Council logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
New Bridge Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on New Bridge Road, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 21 Feb 2025 at 14:47.

Cheshire West And Chester Council logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
New Bridge Road

Cheshire West And Chester Council are proposing to carry out Highway improvement works on New Bridge Road, Ellesmere Port.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 24 Feb 2025 at 08:06.

Cadent Gas logo
Between
3 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 13:29.

Cadent Gas logo
Between
3 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 15:59.

Network Rail logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
Bridges Road

Network Rail are proposing to carry out Works for Rail Purposes on Bridges Road, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Dec 2024 at 09:13.

Network Rail logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
Bridges Road

Network Rail are proposing to carry out Works for Rail Purposes on Bridges Road, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Feb 2025 at 08:44.

Cheshire West And Chester Council logo
LONG TERM
Between
10 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Whitby Lane

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Whitby Lane, Backford, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 21 Feb 2025 at 14:40.

Cheshire West And Chester Council logo
LONG TERM
Between
10 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Whitby Lane

Cheshire West And Chester Council are proposing to carry out Highway improvement works on Whitby Lane, Backford, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cheshire West And Chester Council on 24 Feb 2025 at 09:28.

Cadent Gas logo
Between
10 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Carriage Drive

Cadent Gas are proposing to carry out Utility asset works on Carriage Drive, Frodsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:18.

Nexfibre Networks Limited logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Littleton Lane

Nexfibre Networks Limited are proposing to carry out Utility asset works on Littleton Lane, Littleton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 11 Feb 2025 at 11:48.

United Utilities Water (formerly North West Water) logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Hillcrest Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Hillcrest Road, Little Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jan 2025 at 10:57.

United Utilities Water (formerly North West Water) logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Hillcrest Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Hillcrest Road, Little Sutton, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Jan 2025 at 13:41.

Severn Trent Water logo
Between
20 and 22 Mar 2025
Details
View Map
Share
Follow
Townfield Lane

Severn Trent Water are proposing to carry out New service connection on Townfield Lane, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 22 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 23 Dec 2024 at 09:35.

Severn Trent Water logo
Between
20 and 22 Mar 2025
Details
View Map
Share
Townfield Lane

Severn Trent Water were proposing to carry out New service connection on Townfield Lane, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 March 2025 and run through until 22 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 12:46.

Severn Trent Water logo
Between
20 and 22 Mar 2025
Details
View Map
Share
Follow
Townfield Lane

Severn Trent Water are proposing to carry out New service connection on Townfield Lane, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 March 2025 and could run through until 22 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 23 Jan 2025 at 13:11.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 20 Jul 2025
Details
View Map
Share
Station Lane

Severn Trent Water were proposing to carry out Utility asset works on Station Lane, Barrow, Chester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 20 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 12:28.

Severn Trent Water logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Chester Road

Severn Trent Water were proposing to carry out Utility asset works on Chester Road, Dunham On The Hill, Chester.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Feb 2025 at 10:04.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Follow
Long Green

Severn Trent Water are proposing to carry out Utility asset works on Long Green, Barrow, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Feb 2025 at 10:00.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Follow
Long Green

Severn Trent Water are proposing to carry out Utility asset works on Long Green, Barrow, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 11:20.

Severn Trent Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Townfield Lane

Severn Trent Water were proposing to carry out New service connection on Townfield Lane, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 2 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 30 Jan 2025 at 13:09.

Severn Trent Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Townfield Lane

Severn Trent Water are proposing to carry out New service connection on Townfield Lane, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 30 Dec 2024 at 15:47.

Cityfibre Metro Networks logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mill Lane, Upton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 26 Feb 2025 at 15:39.

Cityfibre Metro Networks logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mill Lane, Upton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Feb 2025 at 13:15.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Station Lane

Severn Trent Water are proposing to carry out Utility asset works on Station Lane, Barrow, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 20 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 27 Dec 2024 at 08:28.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 20 Jun 2025
Details
View Map
Share
Follow
Station Lane

Severn Trent Water are proposing to carry out Utility asset works on Station Lane, Barrow, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Feb 2025 at 10:20.

United Utilities Water (formerly North West Water) logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Westminster Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Westminster Road, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Feb 2025 at 09:38.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 20 Jul 2025
Details
View Map
Share
Barrow Lane

Severn Trent Water were proposing to carry out Utility asset works on Barrow Lane, Barrow, Chester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 20 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 12:22.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Barrow Lane

Severn Trent Water are proposing to carry out Utility asset works on Barrow Lane, Barrow, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 20 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 27 Dec 2024 at 08:33.

Severn Trent Water logo
LONG TERM
Between
31 Mar and 20 Jun 2025
Details
View Map
Share
Follow
Barrow Lane

Severn Trent Water are proposing to carry out Utility asset works on Barrow Lane, Barrow, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Feb 2025 at 10:16.

Severn Trent Water logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Chester Road

Severn Trent Water were proposing to carry out Utility asset works on Chester Road, Dunham On The Hill, Chester.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 12:16.

Severn Trent Water logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Chester Road

Severn Trent Water are proposing to carry out Utility asset works on Chester Road, Dunham On The Hill, Chester.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Feb 2025 at 11:30.

Severn Trent Water logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Chester Road

Severn Trent Water were proposing to carry out Utility asset works on Chester Road, Dunham On The Hill, Chester.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Feb 2025 at 11:27.

Severn Trent Water logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Chester Road

Severn Trent Water were proposing to carry out Utility asset works on Chester Road, Dunham On The Hill, Chester.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Feb 2025 at 12:36.

Severn Trent Water logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Chester Road

Severn Trent Water were proposing to carry out Utility asset works on Chester Road, Dunham On The Hill, Chester.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Feb 2025 at 11:00.

Severn Trent Water logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Chester Road

Severn Trent Water are proposing to carry out Utility asset works on Chester Road, Dunham On The Hill, Chester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 27 Dec 2024 at 08:55.

United Utilities Water (formerly North West Water) logo
Between
2 and 15 Apr 2025
Details
View Map
Share
Follow
Westminster Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Westminster Road, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Jan 2025 at 11:26.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Jan 2025 at 15:11.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Jan 2025 at 14:31.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Jan 2025 at 13:10.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Feb 2025 at 15:54.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Jan 2025 at 11:36.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Jan 2025 at 15:39.

United Utilities Water (formerly North West Water) logo
Between
3 and 18 Apr 2025
Details
View Map
Share
Follow
Commonside

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Commonside, Alvanley, Frodsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 18 April 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Jan 2025 at 11:36.

Severn Trent Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Townfield Lane

Severn Trent Water are proposing to carry out New service connection on Townfield Lane, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 10 Jan 2025 at 12:30.

Severn Trent Water logo
Between
17 and 22 Apr 2025
Details
View Map
Share
Faulkner Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Faulkner Street, Chester.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 April 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 17 Jan 2025 at 08:29.

Network Rail logo
Between
28 Apr and 5 May 2025
Details
View Map
Share
Follow
Bridges Road

Network Rail are proposing to carry out Works for Rail Purposes on Bridges Road, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Feb 2025 at 16:10.

G2 Energy IDNO logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Rake Lane

G2 Energy IDNO are proposing to carry out Utility asset works on Rake Lane, Little Stanney, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 28 Jan 2025 at 11:54.

G2 Energy IDNO logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Rake Lane

G2 Energy IDNO are proposing to carry out Utility asset works on Rake Lane, Little Stanney, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 17 Jan 2025 at 12:01.

G2 Energy IDNO logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Rake Lane

G2 Energy IDNO are proposing to carry out Utility asset works on Rake Lane, Little Stanney, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 14 Jan 2025 at 15:43.

Cadent Gas logo
LONG TERM
Between
5 May and 6 Jun 2025
Details
View Map
Share
Follow
Rochester Drive

Cadent Gas are proposing to carry out Utility asset works on Rochester Drive, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 15:31.

Severn Trent Water logo
LONG TERM
Between
5 May and 6 Jun 2025
Details
View Map
Share
Follow
Barnhouse Lane

Severn Trent Water are proposing to carry out Utility asset works on Barnhouse Lane, Barrow, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Feb 2025 at 09:36.

Severn Trent Water logo
LONG TERM
Between
5 May and 6 Jun 2025
Details
View Map
Share
Follow
Barnhouse Lane

Severn Trent Water are proposing to carry out Utility asset works on Barnhouse Lane, Barrow, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 6 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 24 Dec 2024 at 11:37.

Severn Trent Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Bache Drive

Severn Trent Water are proposing to carry out Remedial works on Bache Drive, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 9 Jan 2025 at 12:36.

Cadent Gas logo
Between
20 May and 6 Jun 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:14.

Cityfibre Metro Networks logo
Between
20 and 27 May 2025
Details
View Map
Share
Follow
Mill Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Mill Lane, Upton, Chester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Feb 2025 at 14:16.

Cadent Gas logo
Between
26 May and 23 Jun 2025
Details
View Map
Share
Follow
Park Road

Cadent Gas are proposing to carry out Utility asset works on Park Road, Ellesmere Port.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:15.


Roadworks Map near to The Village, CHESTER, CH2 4HU (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 26 Feb 2025 23:31
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Village, CHESTER, CH2 4HU (0 Events)