ROADWORKS SUMMARY
Low Park Corner, ELY, CB7 5GR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Low Park Corner, CB7 5GR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Low Park Corner, ELY, CB7 5GR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Low Park Corner are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Anglian Water logo
LONG TERM
Until
22 Mar 2025
Details
View Map
Share
Follow
Dane Hill Road

Anglian Water are carrying out Utility asset works on Dane Hill Road, Kennett.

These works are categorised as Major.

The works started on 23 October 2023 at 07:00 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2023 at 06:20.

Anglian Water logo
LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
Red Lodge Link Road

Anglian Water are carrying out Utility asset works on Red Lodge Link Road, Chippenham.

These works are categorised as Major.

The works started on 23 October 2023 at 07:30 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2023 at 06:52.

Anglian Water logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
Badlingham Road

Anglian Water are carrying out Utility asset works on Badlingham Road, Chippenham.

These works are categorised as Major.

The works started on 1 November 2023 at 07:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 1 Nov 2023 at 07:06.

Anglian Water logo
LONG TERM
Until
19 May 2025
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are carrying out Utility asset works on Gazeley Road, Kentford.

These works are categorised as Major.

The works started on 21 November 2023 at 11:00 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 21 Nov 2023 at 11:12.

Anglian Water logo
LONG TERM
Until
26 May 2025
Details
View Map
Share
Follow
Beck Road (C144)

Anglian Water are carrying out Utility asset works on Beck Road (C144), Isleham.

These works are categorised as Major.

The works started on 27 November 2023 at 10:00 and could run through until 26 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Nov 2023 at 11:51.

Anglian Water logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Sheldricks Road

Anglian Water are carrying out Utility asset works on Sheldricks Road, Isleham.

These works are categorised as Major.

The works started on 11 December 2023 at 13:30 and could run through until 10 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 11 Dec 2023 at 13:54.

Anglian Water logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Herringswell Road

Anglian Water are carrying out Utility asset works on Herringswell Road, Kentford.

These works are categorised as Major.

The works started on 2 January 2024 at 09:30 and could run through until 1 July 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 30 Jan 2024 at 13:21.

Anglian Water logo
LONG TERM
Until
8 Jun 2025
Details
View Map
Share
Follow
East Fen Road

Anglian Water are carrying out Utility asset works on East Fen Road, Isleham.

These works are categorised as Major.

The works started on 9 January 2024 at 14:42 and could run through until 8 June 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 9 Jan 2024 at 14:42.

Anglian Water logo
LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
Station Road

Anglian Water are carrying out Utility asset works on Station Road, Isleham.

These works are categorised as Major.

The works started on 26 January 2024 at 17:13 and could run through until 26 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 26 Jan 2024 at 17:23.

Finishing
Friday
Details
View Map
Share
Follow
Hall Barn Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Hall Barn Road, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 16 Sep 2024 at 11:39.

Electricity Network Company logo
Between
22 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Willie Snaith Road

Electricity Network Company are proposing to carry out Utility asset works on Willie Snaith Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 6 Sep 2024 at 09:56.

Electricity Network Company logo
Between
22 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Willie Snaith Road

Electricity Network Company are proposing to carry out Utility asset works on Willie Snaith Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 9 Sep 2024 at 08:33.

Electricity Network Company logo
Between
22 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Willie Snaith Road

Electricity Network Company are proposing to carry out Utility asset works on Willie Snaith Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 10 Sep 2024 at 08:00.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Moulton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Moulton Road, Gazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Sep 2024 at 11:21.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Moulton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Moulton Road, Gazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 11:33.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Centre Drive

Anglian Water are proposing to carry out Utility repair and maintenance works on Centre Drive, Cheveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Sep 2024 at 13:56.

Anglian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Centre Drive

Anglian Water are proposing to carry out Utility repair and maintenance works on Centre Drive, Cheveley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 20 Nov 2024 at 16:26.

UK Power Networks Eastern & London logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Dane Hill Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Dane Hill Road, Kennett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 10:18.

UK Power Networks Eastern & London logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Dane Hill Road

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Dane Hill Road, Kennett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:29.

UK Power Networks Eastern & London logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Dane Hill Road

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Dane Hill Road, Kennett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 17 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2024 at 09:51.

Anglian Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
The Street

Anglian Water were proposing to carry out Utility repair and maintenance works on The Street, Barton Mills.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 4 Nov 2024 at 10:59.

Anglian Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
The Street

Anglian Water are proposing to carry out Utility repair and maintenance works on The Street, Barton Mills.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 15 Nov 2024 at 14:40.

Electricity Network Company logo
LONG TERM
Between
6 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Exning Road

Electricity Network Company are proposing to carry out Utility asset works on Exning Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 13 Nov 2024 at 08:55.

Suffolk County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Mildenhall Road

Suffolk County Council were proposing to carry out Highway improvement works on Mildenhall Road, West Row.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 20 Nov 2024 at 12:01.

Suffolk County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Mildenhall Road

Suffolk County Council are proposing to carry out Highway improvement works on Mildenhall Road, West Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 21 Nov 2024 at 09:17.

Suffolk County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Jarmans Lane

Suffolk County Council are proposing to carry out Highway improvement works on Jarmans Lane, West Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Suffolk County Council on 21 Nov 2024 at 09:18.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Hall Barn Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Hall Barn Road, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2024 at 16:21.

Electricity Network Company logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Exning Road

Electricity Network Company are proposing to carry out Utility asset works on Exning Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 13 Nov 2024 at 12:58.

Electricity Network Company logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Exning Road

Electricity Network Company are proposing to carry out Utility asset works on Exning Road, Newmarket.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 13 Nov 2024 at 08:52.

Anglian Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gazeley Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 6 Nov 2024 at 08:48.

Anglian Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gazeley Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 13 Nov 2024 at 10:03.

Anglian Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Gazeley Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Gazeley Road, Moulton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 14 Nov 2024 at 14:41.

Cambridgeshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Pound Lane

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Pound Lane, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 16:02.

Cambridgeshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Prickwillow Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Prickwillow Road, Isleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 16:01.


Roadworks Map near to Low Park Corner, ELY, CB7 5GR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 13:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Low Park Corner, ELY, CB7 5GR (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
MAJOR
  
BADLINGHAM ROAD 
(0.9 miles)
Anglian Water
Utility asset works - Carriageway - Stop/go boards
In Progress
Since: 1 Nov 2023 07:00
(Scheduled: 1 Nov 2023 - 30 May 2025)
0.9
Details
Share
Follow
2
Anglian Water logo
MAJOR
  
HIGH STREET 
(0.9 miles)
Anglian Water
Utility asset works - Carriageway -
In Progress
Since: 10 Nov 2023 07:00
(Scheduled: 10 Nov 2023 - 11 Apr 2025)
0.9
Details
Share
Follow
3
Anglian Water logo
MAJOR
  
RED LODGE LINK ROAD 
(1.0 miles)
Anglian Water
Utility asset works - Carriageway - Stop/go boards
In Progress
Since: 23 Oct 2023 07:30
(Scheduled: 22 Oct 2023 - 21 Apr 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.