ROADWORKS SUMMARY
Flitmead, CAMBRIDGE, CB23 6GF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Flitmead, CB23 6GF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Flitmead, CAMBRIDGE, CB23 6GF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Flitmead are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Between
26 Feb 2024 and 1 Apr 2027
Details
View Map
Share
Follow
St Ives Road (B1040)

National Highways are proposing to carry out Works for road purposes on St Ives Road (B1040), Eltisley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2024 and could run through until 1 April 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 6 Mar 2024 at 12:35.

National Highways logo
LONG TERM
Until
6 Apr 2027
Details
View Map
Share
Follow
Toseland Road

National Highways are carrying out Works for road purposes on Toseland Road, Croxton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 07:00 and could run through until 6 April 2027. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 28 Mar 2024 at 15:42.

National Highways logo
LONG TERM
Until
25 Mar 2027
Details
View Map
Share
Follow
St Ives Road (B1040)

National Highways are carrying out Works for road purposes on St Ives Road (B1040), Eltisley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 25 March 2027. The works will impact the verge only.

This roadwork event was last updated by National Highways on 2 Apr 2024 at 10:09.

National Highways logo
LONG TERM
Between
22 Apr 2024 and 25 Mar 2027
Details
View Map
Share
Follow
St Ives Road (B1040)

National Highways are proposing to carry out Highway improvement works on St Ives Road (B1040), Eltisley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 25 March 2027. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 21 Mar 2024 at 15:56.

National Highways logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
St Ives Road (B1040)

National Highways are carrying out Highway improvement works on St Ives Road (B1040), Eltisley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:00 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by National Highways on 5 Aug 2024 at 09:27.

National Highways logo
LONG TERM
Until
6 Jun 2025
Details
View Map
Share
Follow
Cambridge Road

National Highways are carrying out Highway improvement works on Cambridge Road, Eltisley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 07:00 and could run through until 6 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 27 Aug 2024 at 07:08.

Cadent Gas logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Footpath Leading To Gladeside And Almond Grove

Cadent Gas are carrying out Utility asset works on Footpath Leading To Gladeside And Almond Grove, Bar Hill.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 4 November 2024 at 11:14 and could run through until 6 December 2024. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 14:10.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Footpath Leading To Gladeside And Almond Grove

Cadent Gas are proposing to carry out Utility asset works on Footpath Leading To Gladeside And Almond Grove, Bar Hill.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, verge and footpath.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 14:35.

Cadent Gas logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Trafalgar Way

Cadent Gas were proposing to carry out Utility asset works on Trafalgar Way, Bar Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 14:25.

Cadent Gas logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Crafts Way

Cadent Gas were proposing to carry out Utility asset works on Crafts Way, Bar Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:31.

Cadent Gas logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Hollytrees

Cadent Gas were proposing to carry out Utility asset works on Hollytrees, Bar Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:31.

Cambridgeshire County Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Gransden Road

Cambridgeshire County Council were proposing to carry out Highway repair and maintenance works on Gransden Road, Caxton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 11 Nov 2024 at 09:31.

Cambridgeshire County Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Gransden Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Gransden Road, Caxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Aug 2024 at 15:20.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crafts Way

Cadent Gas are proposing to carry out Utility asset works on Crafts Way, Bar Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 14:50.

Cambridgeshire County Council logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Huntingdon Road Westbound

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Westbound, Fen Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Oct 2024 at 15:22.

Cambridgeshire County Council logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Huntingdon Road Westbound

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Westbound, Fen Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 08:23.

Cambridgeshire County Council logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Huntingdon Road Eastbound

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Eastbound, Fen Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 18 Oct 2024 at 15:22.

Cambridgeshire County Council logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Huntingdon Road Eastbound

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Huntingdon Road Eastbound, Fen Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 08:23.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Hollytrees

Cadent Gas are proposing to carry out Utility asset works on Hollytrees, Bar Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:18.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
The Brambles

Cadent Gas were proposing to carry out Utility asset works on The Brambles, Bar Hill.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 09:39.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
The Brambles

Cadent Gas are proposing to carry out Utility asset works on The Brambles, Bar Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:17.

Cambridgeshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Conington Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Conington Road, Fenstanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 09:00.

Cambridgeshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Conington Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Conington Road, Conington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 09:03.

Cambridgeshire County Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Broadway

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Broadway, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 16:05.

Cambridgeshire County Council logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Gransden Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Gransden Road, Caxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 12:00.

Cambridgeshire County Council logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Caxton Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Caxton Road, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 12:06.

Cambridgeshire County Council logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Alms Hill

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Alms Hill, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 14:36.

Cambridgeshire County Council logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
Caxton End

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Caxton End, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 12:16.

Cambridgeshire County Council logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Bourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 14:45.

Cambridgeshire County Council logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Longstowe Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Longstowe Road, Little Gransden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 09:20.

Cambridgeshire County Council logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Longstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 09:24.

Cityfibre Metro Networks logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
South Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 11:57.

Cityfibre Metro Networks logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
South Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on South Street, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 09:30.

Cityfibre Metro Networks logo
Between
29 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Swaynes Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Swaynes Lane, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 11:56.

Cityfibre Metro Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Barton Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Barton Road, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 11:56.

Cityfibre Metro Networks logo
Between
13 and 19 Feb 2025
Details
View Map
Share
Follow
Hines Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hines Lane, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Nov 2024 at 10:29.

Cambridgeshire County Council logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Jeavons Lane

Cambridgeshire County Council are proposing to carry out Highway improvement works on Jeavons Lane, Cambourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 6 Nov 2024 at 13:07.

Cityfibre Metro Networks logo
Between
18 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Green End

Cityfibre Metro Networks are proposing to carry out Utility asset works on Green End, Comberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Nov 2024 at 10:41.


Roadworks Map near to Flitmead, CAMBRIDGE, CB23 6GF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 16:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Flitmead, CAMBRIDGE, CB23 6GF (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Anglian Water logo
URGENT
  
HIGH STREET 
(0.3 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
19 Nov 2024 13:30 - 17:01
0.3
Details
Share
2
Anglian Water logo
URGENT
  
HIGH STREET 
(0.3 miles)
Anglian Water
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
0.3
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.