ROADWORKS SUMMARY
Rose Paddock, BRAMPTON, CA8 9AN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Rose Paddock, CA8 9AN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Rose Paddock, BRAMPTON, CA8 9AN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Rose Paddock are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cumberland Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Cumwhinton Drive

Cumberland Council are carrying out Highway repair and maintenance works on Cumwhinton Drive, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 5 Nov 2024 at 10:51.

Cumberland Council logo
Between
22 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 17 Oct 2024 at 15:14.

Cumberland Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 22 Nov 2024 at 15:59.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Road Leading From High Moor Farm South To Ring Gate Lodge Via Cowranbridge

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Road Leading From High Moor Farm South To Ring Gate Lodge Via Cowranbridge, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Nov 2024 at 13:48.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Road Leading From High Moor Farm South To Ring Gate Lodge Via Cowranbridge

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Road Leading From High Moor Farm South To Ring Gate Lodge Via Cowranbridge, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 12 Sep 2024 at 09:10.

Fibrus Networks logo
Between
1 and 5 Dec 2024
Details
View Map
Share
Follow
From The C1024 To The C1035

Fibrus Networks are proposing to carry out Utility asset works on From The C1024 To The C1035, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 5 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 18 Oct 2024 at 11:48.

Fibrus Networks logo
Between
1 and 5 Dec 2024
Details
View Map
Share
Follow
Fenton Lane End

Fibrus Networks are proposing to carry out Utility asset works on Fenton Lane End, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 5 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 18 Oct 2024 at 11:49.

Fibrus Networks logo
Between
6 and 9 Dec 2024
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 22 Nov 2024 at 14:00.

Fibrus Networks logo
Between
6 and 9 Dec 2024
Details
View Map
Share
Follow
Road Leading From Whin Hill To Closehead Via How Mill

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From Whin Hill To Closehead Via How Mill, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 22 Nov 2024 at 13:15.

Cumberland Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
M6 J42 Leave N

Cumberland Council are proposing to carry out Highway improvement works on M6 J42 Leave N, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 8 Oct 2024 at 12:57.

Cumberland Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council were proposing to carry out Utility asset works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 9 Sep 2024 at 12:52.

Cumberland Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Utility asset works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 12 Sep 2024 at 08:50.

Cumberland Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Utility asset works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 20 Nov 2024 at 14:41.

Fibrus Networks logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Road Leading From High Moor Farm South To Ring Gate Lodge Via Cowranbridge

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From High Moor Farm South To Ring Gate Lodge Via Cowranbridge, How Mill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 18 Oct 2024 at 11:50.

Fibrus Networks logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Road Leading Into Cotehill From Armathwaite

Fibrus Networks were proposing to carry out Utility asset works on Road Leading Into Cotehill From Armathwaite, Armathwaite.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 2 Sep 2024 at 09:22.

Fibrus Networks logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Road Leading Into Cotehill From Armathwaite

Fibrus Networks were proposing to carry out Utility asset works on Road Leading Into Cotehill From Armathwaite, Armathwaite.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 21 Oct 2024 at 09:41.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Road Leading From Junction South Of Irthington To Laversdale Lane Junction Via Laversdale

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Road Leading From Junction South Of Irthington To Laversdale Lane Junction Via Laversdale, Irthington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Oct 2024 at 13:14.

Cumberland Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 22 Nov 2024 at 13:07.

Fibrus Networks logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Road Leading From Carlatton Mill Bridge South To Far Hornsby Gate

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Carlatton Mill Bridge South To Far Hornsby Gate, Heads Nook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 January 2025 and run through until 11 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 29 Oct 2024 at 12:06.

Fibrus Networks logo
Between
12 and 14 Jan 2025
Details
View Map
Share
Road Leading From Cairn Bridge To Hornsby Gate Via Cumwhitton

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Cairn Bridge To Hornsby Gate Via Cumwhitton, Cumwhitton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 29 Oct 2024 at 12:07.

Cumberland Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Tree Road

Cumberland Council are proposing to carry out Highway improvement works on Tree Road, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 11 Sep 2024 at 14:15.

Cumberland Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Tree Road

Cumberland Council are proposing to carry out Highway improvement works on Tree Road, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Sep 2024 at 13:45.

United Utilities Water (formerly North West Water) logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Farlam

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Farlam, Farlam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Oct 2024 at 13:46.

Fibrus Networks logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Road Leading From Carlatton Mill Bridge South To Far Hornsby Gate

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Carlatton Mill Bridge South To Far Hornsby Gate, Heads Nook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 29 Oct 2024 at 12:10.

Fibrus Networks logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Road Leading From Carlatton Mill Bridge South To Far Hornsby Gate

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Carlatton Mill Bridge South To Far Hornsby Gate, Heads Nook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 26 Sep 2024 at 11:46.

Fibrus Networks logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Road Leading From Cumrew To Alby Field

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Cumrew To Alby Field, Heads Nook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 29 Oct 2024 at 12:09.

Fibrus Networks logo
Between
18 and 20 Jan 2025
Details
View Map
Share
Road Leading From Carlatton Mill To Gillfoot Bridge

Fibrus Networks were proposing to carry out Utility asset works on Road Leading From Carlatton Mill To Gillfoot Bridge, Heads Nook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 29 Oct 2024 at 12:10.

Fibrus Networks logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Road Leading From End Rectory Road To Carrick Fell Junction

Fibrus Networks are proposing to carry out Utility asset works on Road Leading From End Rectory Road To Carrick Fell Junction, Heads Nook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 6 Sep 2024 at 12:37.

Cumberland Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Beverley Rise

Cumberland Council are proposing to carry out Highway improvement works on Beverley Rise, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 22 Nov 2024 at 10:48.

Cumberland Council logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Front Street

Cumberland Council are proposing to carry out Highway repair and maintenance works on Front Street, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 13 Nov 2024 at 11:14.

Cumberland Council logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Front Street

Cumberland Council are proposing to carry out Highway repair and maintenance works on Front Street, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 15 Nov 2024 at 07:33.

Network Rail logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 31 Jul 2024 at 16:25.

Network Rail logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Oct 2024 at 09:22.

Network Rail logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Tarn Road

Network Rail are proposing to carry out Works for Rail Purposes on Tarn Road, Castle Carrock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 10:05.


Roadworks Map near to Rose Paddock, BRAMPTON, CA8 9AN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 15:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Rose Paddock, BRAMPTON, CA8 9AN (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.