ROADWORKS SUMMARY
Wyndham Close, CA15 7FD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wyndham Close, CA15 7FD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wyndham Close, CA15 7FD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wyndham Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cumberland Council logo
LONG TERM
Until
20 May 2025
Details
View Map
Share
Follow
Camerton To Great Broughton

Cumberland Council are carrying out Highway repair and maintenance works on Camerton To Great Broughton, Camerton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2023 at 07:00 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 16 May 2024 at 04:58.

Cumberland Council logo
LONG TERM
Between
2 Jan 2024 and 30 May 2025
Details
View Map
Share
Follow
Central Way

Cumberland Council are proposing to carry out Highway improvement works on Central Way, Workington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 30 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 19 Oct 2023 at 13:01.

Westmorland And Furness Council logo
LONG TERM
Between
2 Jan 2024 and 29 May 2025
Details
View Map
Share
Follow
Central Way

Westmorland And Furness Council are proposing to carry out Highway improvement works on Central Way, Workington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 29 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Westmorland And Furness Council on 18 Oct 2023 at 11:22.

Cumberland Council logo
Finishing
Friday
Details
View Map
Share
Follow
Strawberry How Road

Cumberland Council are proposing to carry out Highway improvement works on Strawberry How Road, Cockermouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 23 Aug 2024 at 09:34.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Ellenborough Road A594 At Maryport

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ellenborough Road A594 At Maryport, Maryport.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2024 at 15:17.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Mealpot Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mealpot Road, Maryport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 07:58.

ESP Electricity logo
Between
20 Nov and 11 Dec 2024
Details
View Map
Share
Central Way

ESP Electricity were proposing to carry out Utility asset works on Central Way, Workington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 27 Aug 2024 at 13:48.

Murphy Power Distribution logo
Between
20 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out Utility asset works on Central Way, Workington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 16 Sep 2024 at 07:24.

Northern Gas Networks logo
LONG TERM
Until
9 Jan 2025
Details
View Map
Share
Follow
High Seaton Village

Northern Gas Networks are carrying out Utility repair and maintenance works on High Seaton Village, Seaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 08:00 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 08:33.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
High Seaton Village

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Seaton Village, Seaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 13:44.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
High Seaton Village

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Seaton Village, Seaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Nov 2024 at 11:40.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
High Seaton Village

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on High Seaton Village, Seaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 14:44.

Fibrus Networks logo
Finishing
Today
Details
View Map
Share
Follow
Row Brow To Junction With A594 Dearham To Dovenby Near Woodside Farm

Fibrus Networks are proposing to carry out Utility asset works on Row Brow To Junction With A594 Dearham To Dovenby Near Woodside Farm, Dearham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 November 2024. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 1 Nov 2024 at 08:00.

Fibrus Networks logo
Finishing
Today
Details
View Map
Share
Follow
Row Brow To Junction With A594 Dearham To Dovenby Near Woodside Farm

Fibrus Networks are carrying out Utility asset works on Row Brow To Junction With A594 Dearham To Dovenby Near Woodside Farm, Dearham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 08:05 and could run through until 30 November 2024. The works will impact the verge only.

This roadwork event was last updated by Fibrus Networks on 26 Nov 2024 at 08:05.

Fibrus Networks logo
Finishing
Wednesday
Details
View Map
Share
Lowca Lane

Fibrus Networks were proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 November 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Fibrus Networks on 2 Oct 2024 at 16:45.

Fibrus Networks logo
Finishing
Monday
Details
View Map
Share
Lowca Lane

Fibrus Networks were proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Fibrus Networks on 20 Sep 2024 at 11:48.

Fibrus Networks logo
Finishing
Today
Details
View Map
Share
Follow
Great Broughton To Papcastle

Fibrus Networks are proposing to carry out Utility asset works on Great Broughton To Papcastle, Great Broughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 6 Nov 2024 at 12:33.

Fibrus Networks logo
Finishing
Today
Details
View Map
Share
Follow
Great Broughton To Papcastle

Fibrus Networks are proposing to carry out Utility asset works on Great Broughton To Papcastle, Great Broughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 13 Nov 2024 at 13:07.

Northern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Lowca Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Nov 2024 at 07:17.

Northern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Lowca Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 10:15.

Northern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Newlands Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Newlands Lane, Workington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2024 at 07:54.

Northern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Meadow Edge

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Meadow Edge, Barepot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 10:16.

Electricity North West (NorWeb) logo
Between
9 and 18 Dec 2024
Details
View Map
Share
Follow
John Street

Electricity North West (NorWeb) are proposing to carry out New service connection on John Street, Workington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 14:47.

Electricity North West (NorWeb) logo
Between
9 and 18 Dec 2024
Details
View Map
Share
Follow
John Street

Electricity North West (NorWeb) are proposing to carry out New service connection on John Street, Workington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 1 Nov 2024 at 09:12.

Electricity North West (NorWeb) logo
Between
9 and 18 Dec 2024
Details
View Map
Share
Follow
Roper Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Roper Street, Workington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 14:47.

Fibrus Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Croftfield Road

Fibrus Networks are proposing to carry out Utility asset works on Croftfield Road, Seaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 22 Nov 2024 at 09:58.

Electricity North West (NorWeb) logo
Between
9 and 18 Dec 2024
Details
View Map
Share
Follow
Roper Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Roper Street, Workington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 1 Nov 2024 at 09:14.

Electricity North West (NorWeb) logo
Between
11 and 20 Dec 2024
Details
View Map
Share
John Street

Electricity North West (NorWeb) were proposing to carry out New service connection on John Street, Workington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Sep 2024 at 13:38.

Electricity North West (NorWeb) logo
Between
11 and 20 Dec 2024
Details
View Map
Share
Roper Street

Electricity North West (NorWeb) were proposing to carry out New service connection on Roper Street, Workington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Sep 2024 at 13:39.

Northern Gas Networks logo
LONG TERM
Between
23 Dec 2024 and 7 Feb 2025
Details
View Map
Share
High Seaton Village

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on High Seaton Village, Seaton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Sep 2024 at 14:02.

Northern Gas Networks logo
LONG TERM
Between
30 Dec 2024 and 21 Feb 2025
Details
View Map
Share
Lowca Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 21 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 15:35.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Ellenborough Road A594 At Maryport

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ellenborough Road A594 At Maryport, Maryport.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:30.

Cumberland Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Bridge Street

Cumberland Council are proposing to carry out Highway improvement works on Bridge Street, Workington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 10 Jun 2024 at 12:40.

Cumberland Council logo
LONG TERM
Between
6 Jan and 30 May 2025
Details
View Map
Share
Murray Road

Cumberland Council were proposing to carry out Highway improvement works on Murray Road, Workington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 2 Oct 2024 at 14:36.

Cumberland Council logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Murray Road

Cumberland Council are proposing to carry out Highway improvement works on Murray Road, Workington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 7 Nov 2024 at 09:44.

Cumberland Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Ramsay Brow

Cumberland Council are proposing to carry out Highway improvement works on Ramsay Brow, Workington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 23 May 2024 at 13:25.

Cumberland Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Ramsay Brow

Cumberland Council are proposing to carry out Highway improvement works on Ramsay Brow, Workington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 3 Jun 2024 at 06:47.

Cumberland Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Bridge Street

Cumberland Council are proposing to carry out Highway improvement works on Bridge Street, Workington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 23 May 2024 at 13:25.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Mealpot Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mealpot Road, Maryport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:18.

Cumberland Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Bridge Street

Cumberland Council are proposing to carry out Highway improvement works on Bridge Street, Workington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 10 Jun 2024 at 12:40.

Cumberland Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Hall Park View

Cumberland Council are proposing to carry out Highway improvement works on Hall Park View, Workington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 10 Jun 2024 at 12:39.

Cumberland Council logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Hall Brow

Cumberland Council are proposing to carry out Highway improvement works on Hall Brow, Workington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 10 Jun 2024 at 12:39.

Cumberland Council logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Central Road

Cumberland Council are proposing to carry out Highway repair and maintenance works on Central Road, Dearham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 13 Sep 2024 at 10:15.

United Utilities Water (formerly North West Water) logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Crosby Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Crosby Street, Maryport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Oct 2024 at 11:07.

Cumberland Council logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Ashfield Gardens

Cumberland Council are proposing to carry out Highway repair and maintenance works on Ashfield Gardens, Workington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 12 Sep 2024 at 13:11.

Cumberland Council logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Kirkgate

Cumberland Council are proposing to carry out Works for road purposes on Kirkgate, Cockermouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 24 Oct 2024 at 10:59.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Lowca Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 14:44.

Cumberland Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Riverside

Cumberland Council are proposing to carry out Highway repair and maintenance works on Riverside, Great Clifton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 16 Oct 2024 at 14:49.

Fibrus Networks logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Lowca Lane

Fibrus Networks are proposing to carry out Utility repair and maintenance works on Lowca Lane, Seaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Fibrus Networks on 15 Oct 2024 at 17:50.

Cumberland Council logo
Between
17 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Sullart Street

Cumberland Council are proposing to carry out Section 58 on Sullart Street, Cockermouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Nov 2024 at 16:02.

Cumberland Council logo
Between
17 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Gallowbarrow

Cumberland Council are proposing to carry out Section 58 on Gallowbarrow, Cockermouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Nov 2024 at 15:55.

Electricity North West (NorWeb) logo
Between
24 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Kirkgate

Electricity North West (NorWeb) are proposing to carry out New service connection on Kirkgate, Cockermouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Nov 2024 at 11:28.


Roadworks Map near to Wyndham Close, CA15 7FD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wyndham Close, CA15 7FD (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cumberland Council logo
BROUGHTON MOOR CROSS ROAD TOWARDS GREAT BROUGHTON 
(0.0 miles)
Cumberland Council
Highway repair and maintenance works - Footway, Carriageway - Two-way signals
Planned
Scheduled: 26 Nov 2024 - 9 Dec 2024
0.0
Details
Share
Follow