ROADWORKS SUMMARY
Penrith Road, KESWICK, CA12 4HB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Penrith Road, CA12 4HB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Penrith Road, KESWICK, CA12 4HB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Penrith Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Electricity North West (NorWeb) logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Brundholme Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Brundholme Road, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 1 Aug 2024 at 08:58.

Electricity North West (NorWeb) logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Briar Rigg

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Briar Rigg, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Aug 2024 at 10:59.

Electricity North West (NorWeb) logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Briar Rigg

Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Briar Rigg, Keswick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Aug 2024 at 11:33.

Electricity North West (NorWeb) logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Briar Rigg

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Briar Rigg, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Aug 2024 at 08:27.

Electricity North West (NorWeb) logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Briar Rigg

Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Briar Rigg, Keswick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Aug 2024 at 08:26.

Electricity North West (NorWeb) logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Briar Rigg

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Briar Rigg, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Jul 2024 at 11:46.

Electricity North West (NorWeb) logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Brundholme Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Brundholme Road, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity North West (NorWeb) on 1 Aug 2024 at 08:56.

Electricity North West (NorWeb) logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Brundholme Road

Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Brundholme Road, Keswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:45 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Oct 2024 at 10:32.

Electricity North West (NorWeb) logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Briar Rigg

Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Briar Rigg, Keswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 14:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Oct 2024 at 14:12.

Electricity North West (NorWeb) logo
LONG TERM
Between
21 Oct and 31 Dec 2024
Details
View Map
Share
Briar Rigg

Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Briar Rigg, Keswick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Aug 2024 at 07:44.

Electricity North West (NorWeb) logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Brundholme Road

Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Brundholme Road, Keswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 14:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Oct 2024 at 14:12.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Brackenrigg Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brackenrigg Drive, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Jun 2024 at 09:49.

Northern Gas Networks logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Brackenrigg Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Brackenrigg Drive, Keswick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Nov 2024 at 08:24.

Electricity North West (NorWeb) logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brundholme Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Brundholme Road, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Nov 2024 at 13:55.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Brundholme Road

BT were proposing to carry out Utility asset works on Brundholme Road, Keswick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 17 Sep 2024 at 07:49.

Electricity North West (NorWeb) logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brundholme Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Brundholme Road, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Nov 2024 at 13:56.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Brundholme Road

BT were proposing to carry out Utility asset works on Brundholme Road, Keswick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 22 Nov 2024 at 15:14.

Northern Gas Networks logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Portinscale To Junction With B5289 High Hill To A66t At Derwent Bridge

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Portinscale To Junction With B5289 High Hill To A66t At Derwent Bridge, Portinscale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 23 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 13:49.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Portinscale To Junction With B5289 High Hill To A66t At Derwent Bridge

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Portinscale To Junction With B5289 High Hill To A66t At Derwent Bridge, Portinscale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 08:43.

Electricity North West (NorWeb) logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Briar Rigg

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Briar Rigg, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Nov 2024 at 13:56.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Portinscale To Junction With B5289 High Hill To A66t At Derwent Bridge

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Portinscale To Junction With B5289 High Hill To A66t At Derwent Bridge, Portinscale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 10:24.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Portinscale Village

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Portinscale Village, Portinscale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 14:17.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Portinscale Village

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Portinscale Village, Portinscale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 08:41.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Portinscale Village

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Portinscale Village, Portinscale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Oct 2024 at 13:09.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Portinscale Village

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Portinscale Village, Portinscale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 10:25.

Electricity North West (NorWeb) logo
Between
9 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Briar Rigg

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Briar Rigg, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 11:31.

Electricity North West (NorWeb) logo
Between
9 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Brundholme Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Brundholme Road, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 11:29.

Electricity North West (NorWeb) logo
Between
9 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Brundholme Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Brundholme Road, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 11:30.

Northern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Portinscale Village

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Portinscale Village, Portinscale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Nov 2024 at 09:55.

Cumberland Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Keswick To Junction With Threlkeld Bridge At Boundary To A66t Near Keswick

Cumberland Council are proposing to carry out Highway repair and maintenance works on Keswick To Junction With Threlkeld Bridge At Boundary To A66t Near Keswick, Keswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 4 Nov 2024 at 13:21.


Roadworks Map near to Penrith Road, KESWICK, CA12 4HB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Penrith Road, KESWICK, CA12 4HB (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Gas Networks logo
MAJOR
  
BRACKENRIGG DRIVE 
(0.0 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 18 Nov 2024 - 2 Dec 2024
0.0
Details
Share
Follow
2
Northern Gas Networks logo
MAJOR
  
BRACKENRIGG DRIVE 
(0.0 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
In Progress
Since: 25 Nov 2024 08:00
(Scheduled: 25 Nov 2024 - 9 Dec 2024)
0.0
Details
Share
Follow
3
Fibrus Networks logo
SKIDDAW STREET 
(0.2 miles)
Fibrus Networks
Remedial works - Footway - Some carriageway incursion
Complete
29 Nov 2024 09:52 - 11:35
0.2
Details
Share
4
BT logo
AMBLESIDE ROAD 
(0.3 miles)
BT
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 1 Dec 2024
0.3
Details
Share
Follow
5
Electricity North West (NorWeb) logo
MAJOR
  
BRUNDHOLME ROAD 
(0.3 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 14 Oct 2024 - 20 Dec 2024
0.3
Details
Share
Follow
6
Electricity North West (NorWeb) logo
MAJOR
  
BRUNDHOLME ROAD 
(0.3 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 23 Oct 2024 14:00
(Scheduled: 21 Oct 2024 - 24 Dec 2024)
0.3
Details
Share
Follow
7
Northern Gas Networks logo
MAJOR
  
LATRIGG CLOSE 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Some carriageway incursion
In Progress
Since: 18 Nov 2024 08:00
(Scheduled: 18 Nov 2024 - 4 Dec 2024)
0.3
Details
Share
Follow
8
Electricity North West (NorWeb) logo
MAJOR
  
BRIAR RIGG 
(0.3 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 14 Oct 2024 - 20 Dec 2024)
0.3
Details
Share
9
Electricity North West (NorWeb) logo
MAJOR
  
BRIAR RIGG 
(0.3 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 14 Oct 2024 - 20 Dec 2024
0.3
Details
Share
Follow
10
Electricity North West (NorWeb) logo
MAJOR
  
BRIAR RIGG 
(0.3 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 21 Oct 2024 - 31 Dec 2024)
0.3
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.