ROADWORKS SUMMARY
Wellington Hill West, BRISTOL, BS9 4QU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wellington Hill West, BS9 4QU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wellington Hill West, BRISTOL, BS9 4QU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wellington Hill West are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bristol City Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Malago Road

Bristol City Council are carrying out Highway improvement works on Malago Road, Bedminster, Bristol.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2022 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Bristol City Council on 24 Oct 2024 at 11:08.

Bristol City Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Sheene Road

Bristol City Council are carrying out Highway improvement works on Sheene Road, Bedminster, Bristol.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2022 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Bristol City Council on 18 Oct 2024 at 15:59.

Bristol City Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Dalby Avenue

Bristol City Council are carrying out Highway improvement works on Dalby Avenue, Bedminster, Bristol.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2022 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Bristol City Council on 8 Oct 2024 at 09:13.

Bristol City Council logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Hereford Street

Bristol City Council are carrying out Highway improvement works on Hereford Street, Bedminster, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 June 2023 at 09:30 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol City Council on 14 Oct 2024 at 08:09.

Bristol City Council logo
LONG TERM
Between
26 Jun 2023 and 28 Mar 2025
Details
View Map
Share
Follow
Tarnock Avenue

Bristol City Council are proposing to carry out Highway improvement works on Tarnock Avenue, Hengrove, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2023 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 23 Feb 2023 at 13:32.

Bristol City Council logo
LONG TERM
Between
26 Jun 2023 and 28 Mar 2025
Details
View Map
Share
Follow
Bamfield

Bristol City Council are proposing to carry out Highway improvement works on Bamfield, Hengrove, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2023 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 23 Feb 2023 at 13:17.

Bristol City Council logo
LONG TERM
Between
26 Jun 2023 and 28 Mar 2025
Details
View Map
Share
Follow
Creswicke Road

Bristol City Council are proposing to carry out Highway improvement works on Creswicke Road, Knowle, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2023 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 23 Feb 2023 at 13:21.

Bristol City Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Airport Road

Bristol City Council are carrying out Highway improvement works on Airport Road, Hengrove, Bristol.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 08:30 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 14 Aug 2023 at 07:51.

Wales And West Utilities logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Avon Street

Wales And West Utilities are carrying out Utility repair and maintenance works on Avon Street, St Philips, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 08:00 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Sep 2024 at 17:00.

Wales And West Utilities logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Albert Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Albert Road, St Philips, Bristol.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 December 2023 at 08:30 and could run through until 28 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Wales And West Utilities on 19 Sep 2024 at 17:01.

Wales And West Utilities logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Feeder Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Feeder Road, St Philips, Bristol.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 December 2023 at 08:30 and could run through until 28 March 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Wales And West Utilities on 19 Sep 2024 at 17:01.

Nexfibre Networks Limited logo
LONG TERM
Between
23 Jan 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Sorrel Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on Sorrel Place, Stoke Gifford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 23 January 2024 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Nexfibre Networks Limited on 31 Oct 2023 at 14:06.

National Highways logo
LONG TERM
Between
13 Feb 2024 and 12 Feb 2026
Details
View Map
Share
Follow
Badminton Road

National Highways are proposing to carry out Works for road purposes on Badminton Road, Winterbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2024 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 8 Feb 2024 at 07:22.

National Highways logo
LONG TERM
Between
13 Feb 2024 and 12 Feb 2026
Details
View Map
Share
Follow
Badminton Road

National Highways are proposing to carry out Works for road purposes on Badminton Road, Winterbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2024 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 19 Sep 2024 at 07:10.

Bristol City Council logo
LONG TERM
Between
8 Mar 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Woodland Road

Bristol City Council are proposing to carry out Highway improvement works on Woodland Road, Cotham, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 2 Apr 2024 at 10:43.

Bristol City Council logo
LONG TERM
Between
8 Mar 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Perry Road

Bristol City Council are proposing to carry out Highway improvement works on Perry Road, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 28 Dec 2023 at 13:15.

Bristol City Council logo
LONG TERM
Between
8 Mar 2024 and 7 Feb 2025
Details
View Map
Share
Follow
St Michaels Hill

Bristol City Council are proposing to carry out Highway improvement works on St Michaels Hill, Kingsdown, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 28 Dec 2023 at 13:15.

Bristol City Council logo
LONG TERM
Between
8 Mar 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Colston Street

Bristol City Council are proposing to carry out Highway improvement works on Colston Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 28 Dec 2023 at 13:13.

Bristol City Council logo
LONG TERM
Between
28 Mar 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Park Street Avenue

Bristol City Council are proposing to carry out Highway improvement works on Park Street Avenue, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 21 Mar 2024 at 15:06.

Bristol City Council logo
LONG TERM
Between
28 Mar 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Lower Park Row

Bristol City Council are proposing to carry out Highway improvement works on Lower Park Row, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 21 Mar 2024 at 15:07.

Bristol City Council logo
LONG TERM
Between
28 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Lower Church Lane

Bristol City Council are proposing to carry out Highway improvement works on Lower Church Lane, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 21 Mar 2024 at 15:07.

Bristol City Council logo
LONG TERM
Between
28 Mar 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Park Row

Bristol City Council are proposing to carry out Highway improvement works on Park Row, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 21 Mar 2024 at 15:07.

Bristol City Council logo
LONG TERM
Between
28 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Upper Maudlin Street

Bristol City Council are proposing to carry out Highway improvement works on Upper Maudlin Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 21 Mar 2024 at 15:06.

Bristol City Council logo
LONG TERM
Between
28 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Lower Maudlin Street

Bristol City Council are proposing to carry out Highway improvement works on Lower Maudlin Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 21 Mar 2024 at 15:06.

Bristol City Council logo
LONG TERM
Between
28 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Marlborough Street

Bristol City Council are proposing to carry out Highway improvement works on Marlborough Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 21 Mar 2024 at 15:04.

Bristol City Council logo
LONG TERM
Between
28 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Whitson Street

Bristol City Council are proposing to carry out Highway improvement works on Whitson Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 21 Mar 2024 at 15:05.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Coniston Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Coniston Road, Patchway.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 13:54.

National Highways logo
LONG TERM
Between
1 Jul 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Cuckoo Lane

National Highways are proposing to carry out Utility asset works on Cuckoo Lane, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 11 Jun 2024 at 06:12.

National Highways logo
LONG TERM
Between
1 Jul 2024 and 14 Mar 2025
Details
View Map
Share
Follow
Cuckoo Lane

National Highways are proposing to carry out Utility asset works on Cuckoo Lane, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 14 March 2025. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 21 Nov 2024 at 11:06.

Bristol City Council logo
LONG TERM
Between
8 Jul 2024 and 30 Apr 2025
Details
View Map
Share
Follow
York Road

Bristol City Council are proposing to carry out Highway repair and maintenance works on York Road, Bedminster, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 5 Sep 2024 at 15:08.

Bristol City Council logo
LONG TERM
Until
6 May 2025
Details
View Map
Share
Follow
Clarke Street

Bristol City Council are carrying out Highway improvement works on Clarke Street, Bedminster, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 08:00 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 22 Oct 2024 at 08:27.

South Gloucestershire Council logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Link Road

South Gloucestershire Council are carrying out Highway improvement works on Link Road, Filton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 07:45 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 08:10.

South Gloucestershire Council logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Southmead Road

South Gloucestershire Council are carrying out Highway improvement works on Southmead Road, Filton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 07:45 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 08:10.

South Gloucestershire Council logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 07:45 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 08:09.

South Gloucestershire Council logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 07:45 and could run through until 24 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by South Gloucestershire Council on 5 Aug 2024 at 08:08.

Bristol City Council logo
LONG TERM
Between
12 Aug 2024 and 17 Jan 2025
Details
View Map
Share
Crow Lane

Bristol City Council were proposing to carry out Statutory Infrastructure Works on Crow Lane, City Centre, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 18 Sep 2024 at 10:11.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Alma Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Alma Road, Clifton, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 12:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Oct 2024 at 11:39.

Bristol City Council logo
LONG TERM
Between
2 Sep 2024 and 11 Apr 2025
Details
View Map
Share
Access To Portway Park And Ride

Bristol City Council were proposing to carry out Highway improvement works on Access To Portway Park And Ride, Shirehampton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 11 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol City Council on 3 Oct 2024 at 16:09.

Bristol City Council logo
LONG TERM
Between
2 Sep 2024 and 30 Aug 2026
Details
View Map
Share
Follow
Crow Lane

Bristol City Council are proposing to carry out Highway improvement works on Crow Lane, Henbury, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 August 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 3 Jul 2024 at 08:42.

Bristol City Council logo
LONG TERM
Between
2 Sep 2024 and 30 Aug 2026
Details
View Map
Share
Follow
Knole Lane

Bristol City Council are proposing to carry out Highway improvement works on Knole Lane, Brentry, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 August 2026. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 3 Jul 2024 at 08:42.

North Somerset Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Pill Road

North Somerset Council are carrying out Section 50 on Pill Road, Abbots Leigh.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by North Somerset Council on 2 Oct 2024 at 14:37.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Footpaths Bradley Road By 1 To Coniston Road By 153

Wales And West Utilities are carrying out Utility repair and maintenance works on Footpaths Bradley Road By 1 To Coniston Road By 153, Patchway.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 13 September 2024 at 14:05 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 29 Oct 2024 at 10:51.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Footpaths Network Bradley Road By 30 To Coniston Road By 155

Wales And West Utilities are carrying out Utility repair and maintenance works on Footpaths Network Bradley Road By 30 To Coniston Road By 155, Patchway.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 13 September 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Oct 2024 at 10:21.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Midland Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Midland Road, Staple Hill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 07:04.

Wales And West Utilities logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Sandy Park Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Sandy Park Road, Brislington, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 12:27.

Bristol Waterworks Company logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Gloucester Road North

Bristol Waterworks Company are carrying out Utility asset works on Gloucester Road North, Filton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 09:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 6 Nov 2024 at 14:07.

Bristol City Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Bamfield

Bristol City Council are carrying out Highway improvement works on Bamfield, Hengrove, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:30 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 25 Oct 2024 at 15:46.

Bristol City Council logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Falcondale Road

Bristol City Council were proposing to carry out Statutory Infrastructure Works on Falcondale Road, Westbury On Trym, Bristol.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 27 Sep 2024 at 10:43.

Bristol City Council logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Falcondale Road

Bristol City Council are carrying out Statutory Infrastructure Works on Falcondale Road, Westbury On Trym, Bristol.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:30 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Oct 2024 at 11:12.

Bristol City Council logo
LONG TERM
Between
1 Oct 2024 and 1 Oct 2025
Details
View Map
Share
Follow
York Road

Bristol City Council are proposing to carry out Works for road purposes on York Road, Bedminster, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 1 Aug 2024 at 15:29.

South Gloucestershire Council logo
LONG TERM
Between
7 Oct 2024 and 7 Oct 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 21 Feb 2024 at 15:46.

South Gloucestershire Council logo
LONG TERM
Between
7 Oct 2024 and 7 Oct 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Gloucestershire Council on 21 Feb 2024 at 15:47.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Temple Street

Bristol City Council are proposing to carry out Highway improvement works on Temple Street, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Mitchell Lane

Bristol City Council are proposing to carry out Highway improvement works on Mitchell Lane, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Church Lane

Bristol City Council are proposing to carry out Highway improvement works on Church Lane, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
St Thomas Street East

Bristol City Council are proposing to carry out Highway repair and maintenance works on St Thomas Street East, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:22.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
St Thomas Street

Bristol City Council are proposing to carry out Highway improvement works on St Thomas Street, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Counterslip

Bristol City Council are proposing to carry out Highway improvement works on Counterslip, Redcliff, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:22.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Redcliff Street

Bristol City Council are proposing to carry out Highway improvement works on Redcliff Street, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:21.

Bristol City Council logo
LONG TERM
Between
21 Oct 2024 and 16 Jan 2026
Details
View Map
Share
Follow
Victoria Street

Bristol City Council are proposing to carry out Highway improvement works on Victoria Street, Redcliff, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bristol City Council on 18 Mar 2024 at 09:16.

Western Power Distribution (South West) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Station Road

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Station Road, Filton.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 11:30 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:36.

Western Power Distribution (South West) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Great Stoke Way Roundabout A4174

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Great Stoke Way Roundabout A4174, Stoke Gifford.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 11:30 and could run through until 20 December 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:37.

Western Power Distribution (South West) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Great Stoke Way South

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Great Stoke Way South, Stoke Gifford.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 11:30 and could run through until 20 December 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:34.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Morley Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Morley Road, Staple Hill.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 13:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 09:58.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Soundwell Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Soundwell Road, Soundwell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 12:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 13:51.

Bristol City Council logo
LONG TERM
Until
3 Jan 2025
Details
View Map
Share
Follow
Clarke Street

Bristol City Council are carrying out Highway improvement works on Clarke Street, Bedminster, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 28 Oct 2024 at 12:29.

Wales And West Utilities logo
LONG TERM
Between
28 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Bath Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Bath Road, Totterdown, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 18 Sep 2024 at 14:47.

Bristol City Council logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Crow Lane

Bristol City Council are carrying out Highway improvement works on Crow Lane, City Centre, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 28 Oct 2024 at 09:36.

Bristol City Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Queen Charlotte Street

Bristol City Council are carrying out Highway improvement works on Queen Charlotte Street, City Centre, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 28 Oct 2024 at 09:36.

Bristol City Council logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Air Balloon Road

Bristol City Council are carrying out Highway improvement works on Air Balloon Road, St George, Bristol.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 22 Nov 2024 at 11:53.

Bristol City Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Stapleton Road

Bristol City Council are proposing to carry out Highway improvement works on Stapleton Road, Easton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 13 Nov 2024 at 12:57.

Bristol Waterworks Company logo
LONG TERM
Between
28 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Muller Road

Bristol Waterworks Company are proposing to carry out Diversionary works on Muller Road, Horfield, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 20 Aug 2024 at 09:28.

Bristol Waterworks Company logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Muller Road

Bristol Waterworks Company were proposing to carry out Diversionary works on Muller Road, Horfield, Bristol.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 16 Oct 2024 at 16:04.

Bristol Waterworks Company logo
LONG TERM
Between
28 Oct and 13 Dec 2024
Details
View Map
Share
Ralph Road

Bristol Waterworks Company were proposing to carry out Diversionary works on Ralph Road, Bishopston, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 16 Oct 2024 at 16:04.

South Gloucestershire Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Foot And Cyclepath Mod Perimeter

South Gloucestershire Council are carrying out Highway improvement works on Foot And Cyclepath Mod Perimeter, Stoke Gifford.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 28 October 2024 at 07:45 and could run through until 20 December 2024. The works will impact the cycleway and footpath.

This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 09:12.

South Gloucestershire Council logo
LONG TERM
Between
30 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Douglas Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Douglas Road, Kingswood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 Aug 2024 at 09:43.

South Gloucestershire Council logo
LONG TERM
Between
30 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Pillingers Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Pillingers Road, Kingswood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 Aug 2024 at 09:41.

South Gloucestershire Council logo
LONG TERM
Between
30 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Forest Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Forest Road, Kingswood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 Aug 2024 at 09:35.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 14:36.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gloucester Road North

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road North, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:40.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gipsy Patch Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:30.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 13:24.

South Gloucestershire Council logo
LONG TERM
Between
31 Oct 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 8 Aug 2024 at 11:54.

South Gloucestershire Council logo
LONG TERM
Between
1 Nov 2024 and 3 Nov 2025
Details
View Map
Share
Follow
Gipsy Patch Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Gipsy Patch Lane, Little Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 9 Aug 2024 at 13:55.

South Gloucestershire Council logo
LONG TERM
Between
1 Nov 2024 and 3 Nov 2025
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 9 Aug 2024 at 13:48.

Bristol Waterworks Company logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Ralph Road

Bristol Waterworks Company are proposing to carry out Diversionary works on Ralph Road, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 20 Aug 2024 at 09:28.

South Gloucestershire Council logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Filton Road

South Gloucestershire Council are carrying out Highway improvement works on Filton Road, Stoke Gifford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:45 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:30.

South Gloucestershire Council logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Harry Stoke Road

South Gloucestershire Council are carrying out Highway improvement works on Harry Stoke Road, Stoke Gifford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:45 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:30.

South Gloucestershire Council logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Filton Lane

South Gloucestershire Council are carrying out Highway improvement works on Filton Lane, Stoke Gifford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:45 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:29.

South Gloucestershire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

South Gloucestershire Council are carrying out Highway improvement works on Station Road, Filton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 07:45 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:30.

South Gloucestershire Council logo
Finishing
Friday
Details
View Map
Share
New Road

South Gloucestershire Council were proposing to carry out Highway improvement works on New Road, Stoke Gifford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 4 Nov 2024 at 08:55.

Wales And West Utilities logo
Finishing
Friday
Details
View Map
Share
Follow
Bradley Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Bradley Road, Patchway.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 10:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Nov 2024 at 13:57.

Western Power Distribution (South West) logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Oakfield Road

Western Power Distribution (South West) are carrying out Utility repair and maintenance works on Oakfield Road, Clifton, Bristol.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 08:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 8 Nov 2024 at 14:35.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Bath Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Bath Road, Totterdown, Bristol.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 12:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 13 Nov 2024 at 16:17.

Bristol City Council logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Temple Way

Bristol City Council are proposing to carry out Works for road purposes on Temple Way, Redcliff, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Oct 2024 at 13:11.

Bristol City Council logo
LONG TERM
Between
11 Nov 2024 and 3 Jan 2025
Details
View Map
Share
King Street

Bristol City Council were proposing to carry out Statutory Infrastructure Works on King Street, City Centre, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 3 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 18 Sep 2024 at 10:12.

Bristol City Council logo
Finishing
Friday
Details
View Map
Share
Cranbrook Road

Bristol City Council were proposing to carry out Highway improvement works on Cranbrook Road, Redland, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 17 Oct 2024 at 11:33.

Bristol City Council logo
LONG TERM
Between
11 Nov 2024 and 31 Dec 2026
Details
View Map
Share
Follow
Passage Road

Bristol City Council are proposing to carry out Highway improvement works on Passage Road, Henbury, Bristol.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 31 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Bristol City Council on 4 Oct 2024 at 14:25.

Bristol City Council logo
LONG TERM
Between
13 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Stapleton Road

Bristol City Council are proposing to carry out Highway improvement works on Stapleton Road, Easton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 13 Nov 2024 at 14:43.

Bristol City Council logo
LONG TERM
Between
13 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Warwick Road

Bristol City Council are proposing to carry out Highway improvement works on Warwick Road, Easton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 13 Nov 2024 at 12:57.

Bristol City Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Warwick Road

Bristol City Council are carrying out Highway improvement works on Warwick Road, Easton, Bristol.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 18 Nov 2024 at 15:14.

Bristol City Council logo
Between
14 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Canford Lane

Bristol City Council are proposing to carry out Highway improvement works on Canford Lane, Westbury On Trym, Bristol.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 27 Sep 2024 at 10:45.

Western Power Distribution (South West) logo
LONG TERM
Between
18 Nov 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Feeder Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Feeder Road, St Philips, Bristol.

These works are categorised as Major.

The works will start on or after 18 November 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 14 Nov 2024 at 14:46.

Western Power Distribution (South West) logo
LONG TERM
Until
8 Jan 2025
Details
View Map
Share
Follow
Feeder Road

Western Power Distribution (South West) are carrying out Utility asset works on Feeder Road, St Philips, Bristol.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 13:00 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Nov 2024 at 11:54.

Bristol Waterworks Company logo
Finishing
Friday
Details
View Map
Share
Follow
Rodway Road

Bristol Waterworks Company are carrying out Utility repair and maintenance works on Rodway Road, Patchway.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 18:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 21 Nov 2024 at 14:41.

Bristol Waterworks Company logo
Finishing
Friday
Details
View Map
Share
Follow
Durban Road

Bristol Waterworks Company are carrying out Utility repair and maintenance works on Durban Road, Patchway.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 18:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bristol Waterworks Company on 22 Nov 2024 at 15:38.

Wales And West Utilities logo
Between
18 and 30 Nov 2024
Details
View Map
Share
Follow
Windermere Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Windermere Road, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Aug 2024 at 14:12.

South Gloucestershire Council logo
Until
3 Dec 2024
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are carrying out Highway improvement works on Gloucester Road, Almondsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 18 Nov 2024 at 10:15.

South Gloucestershire Council logo
Until
17 Dec 2024
Details
View Map
Share
Follow
Emma-chris Way

South Gloucestershire Council are carrying out Highway improvement works on Emma-chris Way, Filton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:30 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 19 Nov 2024 at 10:01.

South Gloucestershire Council logo
Until
17 Dec 2024
Details
View Map
Share
Follow
Station Road

South Gloucestershire Council are carrying out Highway improvement works on Station Road, Filton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:30 and could run through until 17 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 19 Nov 2024 at 10:00.

Wales And West Utilities logo
LONG TERM
Between
25 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Follow
College Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on College Road, Clifton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Jul 2024 at 16:11.

Wales And West Utilities logo
Finishing
Thursday
Details
View Map
Share
Clevedon Terrace

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Clevedon Terrace, Cotham, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Aug 2024 at 12:35.

Bristol City Council logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Canford Lane

Bristol City Council are proposing to carry out Highway improvement works on Canford Lane, Westbury On Trym, Bristol.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 22 Nov 2024 at 08:54.

National Highways logo
Finishing
Wednesday
Details
View Map
Share
Follow
Badminton Road

National Highways are proposing to carry out Works for road purposes on Badminton Road, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 19 Nov 2024 at 13:50.

South Gloucestershire Council logo
Between
25 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Bristol Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Bristol Road, Hambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 14:36.

South Gloucestershire Council logo
Between
25 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Whiteshill

South Gloucestershire Council are proposing to carry out Highway improvement works on Whiteshill, Hambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 14:36.

South Gloucestershire Council logo
Between
25 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Bristol Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Bristol Road, Winterbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 14:36.

South Gloucestershire Council logo
Between
26 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Gloucester Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Almondsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 3 Sep 2024 at 11:10.

National Highways logo
Finishing
Friday
Details
View Map
Share
Follow
Badminton Road

National Highways are proposing to carry out Utility asset works on Badminton Road, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by National Highways on 14 Nov 2024 at 07:47.

National Highways logo
Finishing
Friday
Details
View Map
Share
Follow
Badminton Road

National Highways are proposing to carry out Utility asset works on Badminton Road, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by National Highways on 20 Nov 2024 at 14:24.

Wales And West Utilities logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Sandhurst Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Sandhurst Road, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 31 Jul 2024 at 11:28.

Wales And West Utilities logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Acacia Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Acacia Road, Staple Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Jul 2024 at 09:25.

National Highways logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

National Highways are proposing to carry out Statutory Infrastructure Works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Nov 2024 at 14:34.

National Highways logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

National Highways are proposing to carry out Statutory Infrastructure Works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Nov 2024 at 14:25.

Wessex Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Mackie Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Mackie Road, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 15 Aug 2024 at 09:06.

Wessex Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Mackie Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Mackie Road, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 15 Aug 2024 at 09:30.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Dec 2024 and 11 Mar 2025
Details
View Map
Share
Follow
Avonmouth Way

Western Power Distribution (South West) are proposing to carry out Utility asset works on Avonmouth Way, Avonmouth, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 10:04.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Dec 2024 and 11 Mar 2025
Details
View Map
Share
Follow
Avonmouth Way

Western Power Distribution (South West) are proposing to carry out Utility asset works on Avonmouth Way, Avonmouth, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Nov 2024 at 13:44.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Third Way

Western Power Distribution (South West) are proposing to carry out Utility asset works on Third Way, Avonmouth, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 10:04.

Western Power Distribution (South West) logo
LONG TERM
Between
3 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Third Way

Western Power Distribution (South West) are proposing to carry out Utility asset works on Third Way, Avonmouth, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Nov 2024 at 13:44.

National Highways logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

National Highways are proposing to carry out Statutory Infrastructure Works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Nov 2024 at 14:34.

National Highways logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

National Highways are proposing to carry out Statutory Infrastructure Works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 20 Nov 2024 at 14:25.

Wales And West Utilities logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Kings Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Kings Road, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Nov 2024 at 15:17.

Bristol Waterworks Company logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Cleeve Wood Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Cleeve Wood Road, Downend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 11 Sep 2024 at 09:00.

South Gloucestershire Council logo
Between
25 and 28 Dec 2024
Details
View Map
Share
Follow
Blackhorse Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Blackhorse Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 December 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Gloucestershire Council on 3 Oct 2024 at 10:22.

South Gloucestershire Council logo
Between
31 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Collins Drive

South Gloucestershire Council are proposing to carry out Highway improvement works on Collins Drive, Severn Beach.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 8 Oct 2024 at 08:53.

Bristol City Council logo
LONG TERM
Between
2 Jan 2025 and 31 Dec 2026
Details
View Map
Share
Follow
Westacre Close

Bristol City Council are proposing to carry out Highway improvement works on Westacre Close, Henbury, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 4 Oct 2024 at 14:43.

Bristol City Council logo
LONG TERM
Between
2 Jan 2025 and 31 Dec 2026
Details
View Map
Share
Follow
Brentry Lane

Bristol City Council are proposing to carry out Highway improvement works on Brentry Lane, Brentry, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol City Council on 7 Oct 2024 at 11:43.

Bristol City Council logo
LONG TERM
Between
2 Jan 2025 and 31 Dec 2026
Details
View Map
Share
Follow
Dragons Well Road

Bristol City Council are proposing to carry out Highway improvement works on Dragons Well Road, Henbury, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 4 Oct 2024 at 14:43.

Bristol City Council logo
LONG TERM
Between
2 Jan 2025 and 31 Dec 2026
Details
View Map
Share
Crow Lane

Bristol City Council were proposing to carry out Highway improvement works on Crow Lane, Henbury, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 December 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 15 Oct 2024 at 15:08.

Bristol City Council logo
LONG TERM
Between
2 Jan 2025 and 31 Dec 2026
Details
View Map
Share
Knole Lane

Bristol City Council were proposing to carry out Highway improvement works on Knole Lane, Brentry, Bristol.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 December 2026. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Bristol City Council on 15 Oct 2024 at 15:08.

Bristol City Council logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Princess Victoria Street

Bristol City Council were proposing to carry out Highway improvement works on Princess Victoria Street, Clifton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 23 Oct 2024 at 12:22.

Wales And West Utilities logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Pillingers Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pillingers Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Jul 2024 at 11:19.

Bristol City Council logo
LONG TERM
Between
6 Jan and 23 May 2025
Details
View Map
Share
Whiteladies Road

Bristol City Council were proposing to carry out Highway improvement works on Whiteladies Road, Clifton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 1 Oct 2024 at 11:14.

Wales And West Utilities logo
LONG TERM
Between
6 Jan and 18 Mar 2025
Details
View Map
Share
Follow
College Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on College Road, Clifton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 29 Oct 2024 at 11:36.

Wales And West Utilities logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Leigh Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Leigh Road, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Oct 2024 at 13:09.

Bristol City Council logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Overton Road

Bristol City Council were proposing to carry out Highway improvement works on Overton Road, Montpelier, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 23 Oct 2024 at 12:34.

Wales And West Utilities logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Morley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morley Road, Staple Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Jun 2024 at 09:01.

Bristol City Council logo
LONG TERM
Between
6 Jan and 31 Oct 2025
Details
View Map
Share
Follow
Portway

Bristol City Council are proposing to carry out Highway improvement works on Portway, Shirehampton, Bristol.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bristol City Council on 4 Oct 2024 at 07:26.

Bristol City Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Westbury Hill

Bristol City Council are proposing to carry out Highway repair and maintenance works on Westbury Hill, Westbury On Trym, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 17 Oct 2024 at 15:47.

Bristol City Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
High Street

Bristol City Council are proposing to carry out Utility repair and maintenance works on High Street, Westbury On Trym, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 17 Oct 2024 at 15:47.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Bromley Heath Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Bromley Heath Roundabout, Downend.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:37.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Filton Road Avon Ring Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road Avon Ring Road, Hambrook.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:37.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Avon Ring Road Bromley Heath Roundabout To Badminton Road Roundabout, Downend.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:38.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Wick Wick Roundabout

South Gloucestershire Council are proposing to carry out Highway improvement works on Wick Wick Roundabout, Downend.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:39.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
A4174 M32 Junction 1 Interchange

South Gloucestershire Council are proposing to carry out Highway improvement works on A4174 M32 Junction 1 Interchange, Hambrook.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:36.

South Gloucestershire Council logo
LONG TERM
Between
6 Jan and 12 Dec 2025
Details
View Map
Share
Follow
Filton Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Filton Road, Stoke Gifford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 22 Jul 2024 at 13:36.

South Gloucestershire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Great Stoke Way Roundabout A4174

South Gloucestershire Council are proposing to carry out Highway improvement works on Great Stoke Way Roundabout A4174, Stoke Gifford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 14 Oct 2024 at 13:42.

South Gloucestershire Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Emma-chris Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Emma-chris Way, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 14 Oct 2024 at 13:41.

South Gloucestershire Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Station Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Station Road, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 14 Oct 2024 at 13:44.

South Gloucestershire Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Station Road, Filton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 14 Oct 2024 at 13:42.

South Gloucestershire Council logo
Between
7 Jan and 3 Feb 2025
Details
View Map
Share
Follow
New Road

South Gloucestershire Council are proposing to carry out Highway improvement works on New Road, Stoke Gifford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 15 Oct 2024 at 13:08.

Bristol Waterworks Company logo
Between
8 and 10 Jan 2025
Details
View Map
Share
The Stream

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on The Stream, Hambrook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 1 Nov 2024 at 11:31.

Wales And West Utilities logo
LONG TERM
Between
13 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Harrow Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Harrow Road, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Jul 2024 at 14:54.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
St Nicholas Street

BT are proposing to carry out Utility asset works on St Nicholas Street, City Centre, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Oct 2024 at 09:33.

Bristol City Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Nags Head Hill

Bristol City Council are proposing to carry out Works for road purposes on Nags Head Hill, St George, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 11 Nov 2024 at 10:40.

Bristol City Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Kingsway

Bristol City Council are proposing to carry out Works for road purposes on Kingsway, St George, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 11 Nov 2024 at 10:41.

Bristol City Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Rossiters Lane

Bristol City Council are proposing to carry out Works for road purposes on Rossiters Lane, St George, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 11 Nov 2024 at 09:18.

Bristol City Council logo
LONG TERM
Between
13 Jan and 16 May 2025
Details
View Map
Share
Follow
Princess Victoria Street

Bristol City Council are proposing to carry out Highway improvement works on Princess Victoria Street, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 28 Oct 2024 at 09:29.

Wales And West Utilities logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Downend Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Downend Road, Kingswood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:15.

Wales And West Utilities logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Gilbert Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Gilbert Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 Oct 2024 at 16:09.

Wales And West Utilities logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Gilbert Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Gilbert Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Oct 2024 at 07:21.

Wales And West Utilities logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whatley Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Whatley Road, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 7 Nov 2024 at 15:35.

South Gloucestershire Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Mangotsfield Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Mangotsfield Road, Mangotsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 8 Nov 2024 at 07:42.

Bristol Waterworks Company logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Cooks Close

Bristol Waterworks Company are proposing to carry out New service connection on Cooks Close, Bradley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 16 Oct 2024 at 13:01.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Flowers Hill

Western Power Distribution (South West) are proposing to carry out Utility asset works on Flowers Hill, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Nov 2024 at 09:15.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Flowers Hill

Western Power Distribution (South West) are proposing to carry out Utility asset works on Flowers Hill, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Nov 2024 at 10:09.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bonville Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bonville Road, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Nov 2024 at 09:16.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bonville Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bonville Road, Brislington, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Nov 2024 at 10:09.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bath Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bath Road, Brislington, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Nov 2024 at 09:17.

Western Power Distribution (South West) logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bath Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bath Road, Brislington, Bristol.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Nov 2024 at 10:09.

Bristol City Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Redcliffe Way

Bristol City Council are proposing to carry out Highway repair and maintenance works on Redcliffe Way, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 28 Oct 2024 at 10:23.

South Gloucestershire Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Bristol Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Bristol Road, Hambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 12:15.

South Gloucestershire Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Whiteshill

South Gloucestershire Council are proposing to carry out Highway improvement works on Whiteshill, Hambrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 12:15.

South Gloucestershire Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Bristol Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Bristol Road, Winterbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Gloucestershire Council on 28 Oct 2024 at 12:15.

South Gloucestershire Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Highwood Lane

South Gloucestershire Council are proposing to carry out Highway improvement works on Highwood Lane, Patchway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 24 Oct 2024 at 16:08.

Western Power Distribution (South West) logo
LONG TERM
Between
23 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Kings Weston Lane

Western Power Distribution (South West) are proposing to carry out Utility asset works on Kings Weston Lane, Avonmouth, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 4 Nov 2024 at 14:30.

Western Power Distribution (South West) logo
LONG TERM
Between
27 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Broomhill Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Broomhill Road, Brislington, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Oct 2024 at 12:01.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Lansdown Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lansdown Road, Clifton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 26 Jul 2024 at 16:10.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Lansdown Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lansdown Road, Clifton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 15 Oct 2024 at 11:29.

Western Power Distribution (South West) logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bannerman Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bannerman Road, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 15 Oct 2024 at 12:56.

Western Power Distribution (South West) logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bannerman Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bannerman Road, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 23 Oct 2024 at 13:25.

Western Power Distribution (South West) logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Bannerman Road

Western Power Distribution (South West) were proposing to carry out Utility asset works on Bannerman Road, Easton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 30 Oct 2024 at 11:14.

Western Power Distribution (South West) logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Bannerman Road

Western Power Distribution (South West) were proposing to carry out Utility asset works on Bannerman Road, Easton, Bristol.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Nov 2024 at 11:26.

Western Power Distribution (South West) logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bannerman Road

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bannerman Road, Easton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 21 Nov 2024 at 12:53.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Kings Drive

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Kings Drive, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Sep 2024 at 13:04.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Kings Drive

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Kings Drive, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 8 Nov 2024 at 14:52.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Kings Drive

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Kings Drive, Bishopston, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Nov 2024 at 08:57.

South Gloucestershire Council logo
Between
30 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Mangotsfield Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Mangotsfield Road, Mangotsfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 26 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 7 Nov 2024 at 15:45.

Bristol City Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Gores Marsh Road

Bristol City Council are proposing to carry out Highway improvement works on Gores Marsh Road, Ashton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 3 Sep 2024 at 12:35.

Wales And West Utilities logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Fir Tree Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Fir Tree Lane, St George, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 8 Nov 2024 at 13:30.

Wales And West Utilities logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Fir Tree Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Fir Tree Lane, St George, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 11 Nov 2024 at 14:25.

Western Power Distribution (South West) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Bouverie Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bouverie Street, Easton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 15 Oct 2024 at 12:55.

Western Power Distribution (South West) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Bouverie Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bouverie Street, Easton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 22 Oct 2024 at 14:25.

Western Power Distribution (South West) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Bouverie Street

Western Power Distribution (South West) were proposing to carry out Utility asset works on Bouverie Street, Easton, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 30 Oct 2024 at 11:29.

Western Power Distribution (South West) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Bouverie Street

Western Power Distribution (South West) were proposing to carry out Utility asset works on Bouverie Street, Easton, Bristol.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 13 Nov 2024 at 11:05.

Western Power Distribution (South West) logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Bouverie Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Bouverie Street, Easton, Bristol.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 19 Nov 2024 at 12:49.

Bristol City Council logo
LONG TERM
Between
3 Feb and 20 Jun 2025
Details
View Map
Share
Follow
Overton Road

Bristol City Council are proposing to carry out Highway improvement works on Overton Road, Montpelier, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 24 Oct 2024 at 12:56.

BT logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Phippen Street

BT are proposing to carry out Utility asset works on Phippen Street, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Nov 2024 at 10:40.

BT logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Phippen Street

BT are proposing to carry out Utility asset works on Phippen Street, Redcliff, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Nov 2024 at 09:01.

Wessex Water logo
LONG TERM
Between
10 Feb and 10 Apr 2025
Details
View Map
Share
Follow
Broomhill Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Broomhill Road, Brislington, Bristol.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 15 Nov 2024 at 12:01.

Network Rail logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Cheltenham Road

Network Rail are proposing to carry out Works for Rail Purposes on Cheltenham Road, Montpelier, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Nov 2024 at 15:30.

Wessex Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Broad Walk

Wessex Water are proposing to carry out Utility asset works on Broad Walk, Knowle, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Nov 2024 at 12:03.

Bristol City Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Duckmoor Road

Bristol City Council are proposing to carry out Highway improvement works on Duckmoor Road, Ashton, Bristol.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bristol City Council on 3 Sep 2024 at 10:47.

Wales And West Utilities logo
LONG TERM
Between
17 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Counterpool Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Counterpool Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Jul 2024 at 11:16.

Wales And West Utilities logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Gilbert Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Gilbert Road, Kingswood.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:15.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Follow
Winterbourne Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Winterbourne Road, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:18.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 14 Nov 2025
Details
View Map
Share
Follow
Baileys Court Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Baileys Court Road, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:17.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 14 Nov 2025
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:12.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 14 Nov 2025
Details
View Map
Share
Follow
Webbs Wood Road

South Gloucestershire Council are proposing to carry out Highway improvement works on Webbs Wood Road, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:14.

South Gloucestershire Council logo
LONG TERM
Between
17 Feb and 14 Nov 2025
Details
View Map
Share
Follow
Bradley Stoke Way

South Gloucestershire Council are proposing to carry out Highway improvement works on Bradley Stoke Way, Bradley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Gloucestershire Council on 23 Jul 2024 at 09:13.


Roadworks Map near to Wellington Hill West, BRISTOL, BS9 4QU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 16:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wellington Hill West, BRISTOL, BS9 4QU (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Bristol Waterworks Company logo
BISHOPTHORPE ROAD, HORFIELD 
(0.2 miles)
Bristol Waterworks Company
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
21 Nov 2024 08:32 - 12:44
0.2
Details
Share
2
Bristol Waterworks Company logo
WOODCHESTER ROAD, SOUTHMEAD 
(0.2 miles)
Bristol Waterworks Company
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.2
Details
Share
Follow
3
Wales And West Utilities logo
MAJOR
  
BISHOPTHORPE ROAD, HORFIELD 
(0.2 miles)
Wales And West Utilities
Utility repair and maintenance works - Footway, Footpath - No carriageway incursion
Cancelled
(Scheduled: 21 Oct 2024 - 6 Dec 2024)
0.2
Details
Share
4
Bristol Waterworks Company logo
GLOUCESTER ROAD, HORFIELD 
(0.6 miles)
Bristol Waterworks Company
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
21 Nov 2024 10:12 - 12:47
0.6
Details
Share
5
BT logo
FELSTEAD ROAD, SOUTHMEAD 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
21 Nov 2024 09:58 - 13:59
0.8
Details
Share
6
Bristol Waterworks Company logo
GOSFORTH ROAD, SOUTHMEAD 
(0.9 miles)
Bristol Waterworks Company
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 21 Nov 2024 09:30
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.9
Details
Share
Follow
7
Netomnia logo
FALMOUTH ROAD, BISHOPSTON 
(0.9 miles)
Netomnia
Utility asset works - Footway - Give and take
Complete
21 Nov 2024 11:05 - 12:56
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.