ROADWORKS SUMMARY
Station Road, LEWES, BN8 4HG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Station Road, BN8 4HG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Station Road, LEWES, BN8 4HG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Station Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

East Sussex County Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Underhill

East Sussex County Council are carrying out Highway repair and maintenance works on Underhill, Maresfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2023 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 7 Nov 2024 at 14:38.

West Sussex County Council logo
LONG TERM
Between
21 Nov 2023 and 21 Nov 2026
Details
View Map
Share
Follow
Sloop Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Sloop Lane, Scaynes Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2023 and could run through until 21 November 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 21 Nov 2023 at 13:03.

West Sussex County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Sandy Vale

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Sandy Vale, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 23 May 2024 at 13:00.

West Sussex County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Sunnywood Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Sunnywood Drive, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 23 May 2024 at 11:51.

West Sussex County Council logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Vale Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Vale Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 3 Jun 2024 at 08:55.

East Sussex County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Uckfield Bypass

East Sussex County Council are carrying out roadworks on Uckfield Bypass, Uckfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 19:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by East Sussex County Council on 5 Dec 2024 at 10:21.

West Sussex County Council logo
LONG TERM
Between
25 Aug 2024 and 25 Feb 2025
Details
View Map
Share
Follow
Harlands Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Harlands Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2024 and could run through until 25 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 14 Mar 2024 at 15:43.

West Sussex County Council logo
LONG TERM
Between
27 Aug 2024 and 25 Feb 2025
Details
View Map
Share
Follow
Ashenground Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Ashenground Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 25 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 3 Jun 2024 at 12:56.

West Sussex County Council logo
LONG TERM
Between
20 Sep 2024 and 20 Mar 2025
Details
View Map
Share
Follow
Redwood Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Redwood Drive, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 20 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 26 Jul 2024 at 15:30.

West Sussex County Council logo
LONG TERM
Between
20 Sep 2024 and 20 Mar 2025
Details
View Map
Share
Follow
Ash Grove

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Ash Grove, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 20 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 31 Jul 2024 at 16:30.

West Sussex County Council logo
LONG TERM
Between
21 Sep 2024 and 21 Mar 2025
Details
View Map
Share
Follow
Selby Court

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Selby Court, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2024 and could run through until 21 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 26 Jul 2024 at 15:30.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Scaynes Hill Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Scaynes Hill Road, Lindfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 12:14.

South East Water logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Turners Mill Road

South East Water are carrying out Utility asset works on Turners Mill Road, Haywards Heath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 12 Dec 2024 at 14:35.

UK Power Networks South Eastern logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Budletts Lane

UK Power Networks South Eastern were proposing to carry out New service connection on Budletts Lane, Coopers Green, Uckfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Sep 2024 at 09:39.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Bridge Road

UK Power Networks South Eastern are proposing to carry out New service connection on Bridge Road, Haywards Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 15:15.

UK Power Networks South Eastern logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Bridge Road

UK Power Networks South Eastern are proposing to carry out New service connection on Bridge Road, Haywards Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Oct 2024 at 10:40.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Scaynes Hill Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Scaynes Hill Road, Lindfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:51.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Scaynes Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Scaynes Hill Road, Lindfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 12:56.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Scaynes Hill Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Scaynes Hill Road, Lindfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 14:39.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Scaynes Hill Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Scaynes Hill Road, Lindfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2024 at 15:25.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 7 Feb 2025
Details
View Map
Share
Scaynes Hill Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Scaynes Hill Road, Lindfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 16:22.

UK Power Networks South Eastern logo
Finishing
Wednesday
Details
View Map
Share
Follow
Sunte Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Sunte Avenue, Lindfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Oct 2024 at 10:24.

Nexfibre Networks Limited logo
Finishing
Monday
Details
View Map
Share
Follow
Hickmans Lane

Nexfibre Networks Limited are carrying out Utility asset works on Hickmans Lane, Lindfield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 09:19 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 12 Dec 2024 at 09:24.

UK Power Networks South Eastern logo
Between
19 and 20 Dec 2024
Details
View Map
Share
Follow
Maple Close To Valebridge Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Maple Close To Valebridge Road, Burgess Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 10:29.

UK Power Networks South Eastern logo
Between
19 and 20 Dec 2024
Details
View Map
Share
Follow
Maple Close To Valebridge Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Maple Close To Valebridge Road, Burgess Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Dec 2024 at 13:51.

Murphy Power Distribution logo
Between
20 and 24 Dec 2024
Details
View Map
Share
Follow
Allington Road

Murphy Power Distribution are proposing to carry out New service connection on Allington Road, Newick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 23 Sep 2024 at 08:09.

Murphy Power Distribution logo
Between
21 and 24 Dec 2024
Details
View Map
Share
Follow
Allington Road

Murphy Power Distribution are proposing to carry out New service connection on Allington Road, Newick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 7 Oct 2024 at 11:31.

Murphy Power Distribution logo
Between
21 and 24 Dec 2024
Details
View Map
Share
Follow
Allington Road

Murphy Power Distribution are proposing to carry out New service connection on Allington Road, Newick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 1 Oct 2024 at 12:18.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Kings Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Way, Burgess Hill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 08:58.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Kings Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Way, Burgess Hill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 12:39.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Kings Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Way, Burgess Hill.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 10:47.

South East Water logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Turners Mill Road

South East Water are proposing to carry out New service connection on Turners Mill Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 3 Sep 2024 at 11:24.

South East Water logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Turners Mill Road

South East Water are proposing to carry out New service connection on Turners Mill Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 24 Sep 2024 at 10:48.

South East Water logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Turners Mill Road

South East Water were proposing to carry out New service connection on Turners Mill Road, Haywards Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South East Water on 4 Oct 2024 at 14:11.

South East Water logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Turners Mill Road

South East Water are proposing to carry out New service connection on Turners Mill Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 8 Oct 2024 at 11:56.

UK Power Networks South Eastern logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Sunte Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Sunte Avenue, Lindfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 11:18.

South East Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Church Street

South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 29 Nov 2024 at 12:54.

South East Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Church Street

South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 6 Nov 2024 at 13:39.

South East Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Church Street

South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 1 Nov 2024 at 12:54.

South East Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Church Street

South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 11 Oct 2024 at 16:31.

South East Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Church Street

South East Water are proposing to carry out Utility repair and maintenance works on Church Street, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 1 Oct 2024 at 11:26.

West Sussex County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Bannister Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Bannister Way, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Nov 2024 at 10:15.

West Sussex County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Bannister Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Bannister Way, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:06.

West Sussex County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Market Place

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Market Place, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 26 Nov 2024 at 09:22.

West Sussex County Council logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Market Place

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Market Place, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:03.

West Sussex County Council logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Market Place

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Market Place, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Nov 2024 at 11:20.

West Sussex County Council logo
Between
9 and 11 Jan 2025
Details
View Map
Share
Follow
Bannister Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Bannister Way, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Nov 2024 at 11:22.

East Sussex County Council logo
LONG TERM
Between
9 Jan and 9 Oct 2025
Details
View Map
Share
Follow
Station Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Station Road, Plumpton Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 1 Oct 2024 at 15:36.

East Sussex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Spithurst Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Spithurst Road, Barcombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Oct 2024 at 12:34.

East Sussex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
School Hill

East Sussex County Council are proposing to carry out Highway repair and maintenance works on School Hill, Barcombe Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 22 Oct 2024 at 12:27.

West Sussex County Council logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Market Place

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Market Place, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 11:46.

West Sussex County Council logo
Between
14 and 18 Jan 2025
Details
View Map
Share
Follow
Bannister Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Bannister Way, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 12:44.

West Sussex County Council logo
Between
14 and 18 Jan 2025
Details
View Map
Share
Follow
Market Place

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Market Place, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 12:41.

UK Power Networks South Eastern logo
Between
16 and 29 Jan 2025
Details
View Map
Share
Follow
Ketches Lane

UK Power Networks South Eastern are proposing to carry out Utility asset works on Ketches Lane, Sheffield Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Oct 2024 at 15:56.

UK Power Networks South Eastern logo
Between
16 and 29 Jan 2025
Details
View Map
Share
Follow
Ketches Lane

UK Power Networks South Eastern are proposing to carry out Utility asset works on Ketches Lane, Sheffield Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Oct 2024 at 09:55.

Southern Gas Networks logo
LONG TERM
Between
16 Jan and 6 Jun 2025
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 14:47.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Muster Green South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Muster Green South, Haywards Heath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 13:46.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Muster Green South

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Muster Green South, Haywards Heath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 09:11.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 2 May 2025
Details
View Map
Share
Follow
The Broadway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Broadway, Haywards Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 15:09.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 11 Mar 2025
Details
View Map
Share
Bridge Road

UK Power Networks South Eastern were proposing to carry out New service connection on Bridge Road, Haywards Heath.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Nov 2024 at 10:33.

Network Rail logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Spatham Lane

Network Rail are proposing to carry out Works for Rail Purposes on Spatham Lane, Westmeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Aug 2024 at 12:33.

Network Rail logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Spatham Lane

Network Rail are proposing to carry out Works for Rail Purposes on Spatham Lane, Westmeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 9 Dec 2024 at 11:11.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Station Road

BT are proposing to carry out Utility asset works on Station Road, Plumpton Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 29 Oct 2024 at 09:42.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on High Street, Lindfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 12:25.

East Sussex County Council logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Streat Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Streat Lane, Streat.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 26 Nov 2024 at 13:28.

East Sussex County Council logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Streat Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Streat Lane, Streat.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 28 Oct 2024 at 11:38.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Birchwood Grove Road

BT are proposing to carry out Utility repair and maintenance works on Birchwood Grove Road, West Sussex, Burgess Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 3 Sep 2024 at 14:39.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Follow
Scaynes Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Scaynes Hill Road, Lindfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 11:09.

West Sussex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Junction Road

West Sussex County Council are proposing to carry out Highway improvement works on Junction Road, Burgess Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 10:59.

West Sussex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Adur Road

West Sussex County Council are proposing to carry out Highway improvement works on Adur Road, Burgess Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 11:13.

West Sussex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Gordon Road

West Sussex County Council are proposing to carry out Highway improvement works on Gordon Road, Burgess Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 11:09.

West Sussex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Leylands Road

West Sussex County Council are proposing to carry out Highway improvement works on Leylands Road, Burgess Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 10:57.

East Sussex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Church Street

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Church Street, Fletching.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 26 Nov 2024 at 12:29.

West Sussex County Council logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Valebridge Road

West Sussex County Council are proposing to carry out Highway improvement works on Valebridge Road, Burgess Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 11:06.

South East Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Southview Drive

South East Water were proposing to carry out New service connection on Southview Drive, Uckfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South East Water on 26 Nov 2024 at 11:53.

South East Water logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Streat Lane

South East Water are proposing to carry out New service connection on Streat Lane, Streat.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 4 Nov 2024 at 13:51.

East Sussex County Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Snatts Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Snatts Road, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 27 Nov 2024 at 15:39.

East Sussex County Council logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Follow
Snatts Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Snatts Road, Uckfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 12 Nov 2024 at 15:10.


Roadworks Map near to Station Road, LEWES, BN8 4HG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Dec 2024 02:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Station Road, LEWES, BN8 4HG (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
East Sussex County Council logo
EAST GRINSTEAD ROAD 
(0.9 miles)
East Sussex County Council
Highway repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 13 Dec 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.