ROADWORKS SUMMARY
Tan Yard, HENFIELD, BN5 9PE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Tan Yard, BN5 9PE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Tan Yard, HENFIELD, BN5 9PE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tan Yard are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
1 Jan 2023 and 30 Dec 2027
Details
View Map
Share
Follow
Edburton Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Edburton Road, Fulking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2023 and could run through until 30 December 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 21 Jul 2023 at 10:35.

West Sussex County Council logo
LONG TERM
Between
18 Mar 2024 and 18 Mar 2026
Details
View Map
Share
Follow
Brighton Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Woodmancote, Henfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 18 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 26 Sep 2023 at 06:24.

West Sussex County Council logo
LONG TERM
Between
19 Jun 2024 and 13 Jun 2025
Details
View Map
Share
Follow
College Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on College Lane, Hurstpierpoint.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 13 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Apr 2024 at 14:30.

Southern Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
London Road

Southern Water are carrying out Utility repair and maintenance works on London Road, Sayers Common.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 13:00 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 20 Nov 2024 at 12:07.

Southern Water logo
Finishing
Monday
Details
View Map
Share
Follow
Reeds Lane

Southern Water are carrying out Utility repair and maintenance works on Reeds Lane, Sayers Common.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 13:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 20 Nov 2024 at 11:39.

West Sussex County Council logo
LONG TERM
Between
19 Nov 2024 and 17 May 2025
Details
View Map
Share
Follow
Swallows Lane

West Sussex County Council are proposing to carry out Works for road purposes on Swallows Lane, Dial Post.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 19 Nov 2024 at 09:23.

Southern Water logo
Between
27 Nov and 9 Dec 2024
Details
View Map
Share
London Road

Southern Water were proposing to carry out Utility repair and maintenance works on London Road, Sayers Common.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 9 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 13 Nov 2024 at 13:20.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Follow
Elm Grove Lane

Virgin Media are proposing to carry out Remedial works on Elm Grove Lane, Steyning.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 1 Oct 2024 at 14:17.

West Sussex County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Horn Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Horn Lane, Woodmancote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:44.

West Sussex County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Horn Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Horn Lane, Woodmancote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 13:06.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Elm Grove Lane

Virgin Media were proposing to carry out Remedial works on Elm Grove Lane, Steyning.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 5 Sep 2024 at 14:07.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Elm Grove Lane

Virgin Media were proposing to carry out Remedial works on Elm Grove Lane, Steyning.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 12 Sep 2024 at 14:57.

Virgin Media logo
Finishing
Friday
Details
View Map
Share
Elm Grove Lane

Virgin Media were proposing to carry out Remedial works on Elm Grove Lane, Steyning.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 08:55.

West Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Station Road, Cowfold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Nov 2024 at 12:14.

West Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Station Road, Cowfold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 10:21.

West Sussex County Council logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Steyning Road

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Steyning Road, Wiston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 9 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Oct 2024 at 09:32.

West Sussex County Council logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Follow
Steyning Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Steyning Road, Wiston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 09:15.

Southern Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Street

Southern Water are proposing to carry out Utility repair and maintenance works on The Street, Bramber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Nov 2024 at 11:22.

Southern Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Street

Southern Water are proposing to carry out Utility repair and maintenance works on The Street, Bramber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 6 Nov 2024 at 08:52.

South East Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Mill Lane

South East Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Sayers Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 7 Oct 2024 at 11:37.

South East Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Mill Lane

South East Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Sayers Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 30 Sep 2024 at 12:20.

Virgin Media logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Castle Lane

Virgin Media are proposing to carry out Remedial works on Castle Lane, Bramber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 1 Oct 2024 at 14:15.

Virgin Media logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Castle Lane

Virgin Media were proposing to carry out Remedial works on Castle Lane, Bramber.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 08:54.

Virgin Media logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Castle Lane

Virgin Media were proposing to carry out Remedial works on Castle Lane, Bramber.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Sep 2024 at 14:05.

Virgin Media logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Castle Lane

Virgin Media were proposing to carry out Remedial works on Castle Lane, Bramber.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 Sep 2024 at 14:54.

West Sussex County Council logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Reeds Lane

West Sussex County Council are proposing to carry out Highway improvement works on Reeds Lane, Sayers Common.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Jul 2024 at 11:55.

West Sussex County Council logo
Between
19 and 21 Dec 2024
Details
View Map
Share
Follow
Steyning Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Steyning Road, Wiston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:09.

Southern Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Castle Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Castle Lane, Bramber.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Water on 19 Nov 2024 at 15:04.

Southern Water logo
Between
7 and 24 Jan 2025
Details
View Map
Share
Castle Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Castle Lane, Bramber.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 24 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Southern Water on 12 Nov 2024 at 09:34.

South East Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Clappers Lane

South East Water are proposing to carry out New service connection on Clappers Lane, Fulking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 14 Oct 2024 at 10:19.

South East Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Clappers Lane

South East Water are proposing to carry out New service connection on Clappers Lane, Fulking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 27 Oct 2024 at 14:39.

West Sussex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Kent Street

West Sussex County Council are proposing to carry out Highway improvement works on Kent Street, Cowfold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Nov 2024 at 07:18.

West Sussex County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Wineham Lane

West Sussex County Council are proposing to carry out Highway improvement works on Wineham Lane, Wineham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 08:39.

South East Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Clappers Lane

South East Water are proposing to carry out New service connection on Clappers Lane, Fulking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 29 Oct 2024 at 10:28.

South East Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Truslers Hill Lane

South East Water are proposing to carry out Utility repair and maintenance works on Truslers Hill Lane, Albourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 27 Nov 2024 at 15:17.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
New Road

Southern Gas Networks are proposing to carry out New service connection on New Road, Upper Beeding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Nov 2024 at 14:11.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
New Road

Southern Gas Networks are proposing to carry out New service connection on New Road, Upper Beeding.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 15:24.


Roadworks Map near to Tan Yard, HENFIELD, BN5 9PE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Tan Yard, HENFIELD, BN5 9PE (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
West Sussex County Council logo
FABIANS WAY 
(0.2 miles)
West Sussex County Council
Utility asset works - Carriageway - No carriageway incursion
Cancelled
(Scheduled: 28 Nov 2024 - 2 Dec 2024)
0.2
Details
Share
2
Southern Water logo
URGENT
  
MANOR CLOSE 
(0.3 miles)
Southern Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 28 Nov 2024 11:47
(Scheduled: 28 Nov 2024 - 2 Dec 2024)
0.3
Details
Share
Follow