ROADWORKS SUMMARY
The Strand, BOLTON, BL6 6DB
Introduction
View current and future planned roadworks and road closures for The Strand, BL6 6DB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to The Strand, BOLTON, BL6 6DB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Strand are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Oct 2025
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Manchester Road, Bolton.
These works are categorised as Major.
The works started on 20 September 2022 at 09:30 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 10 Oct 2024 at 10:27.
16 Sep 2024 and 31 Jan 2025
Blackburn With Darwen Borough Council are proposing to carry out Highway repair and maintenance works on Belmont Road, Belmont.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Blackburn With Darwen Borough Council on 24 Sep 2024 at 12:05.
31 Jan 2025
Bolton Metropolitan Borough Council are carrying out Section 50 on Brook Street, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:28.
30 Sep 2024 and 31 Jan 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Brook Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:22.
31 Jan 2025
Bolton Metropolitan Borough Council are carrying out Section 50 on Ridgway Gates, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:28.
30 Sep 2024 and 31 Jan 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Ridgway Gates, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:24.
14 Oct 2024 and 15 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:50.
11 Nov and 20 Dec 2024
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Deansgate, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 25 Oct 2024 at 13:37.
Monday
Cadent Gas are carrying out Utility asset works on Belmont Road, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 08:15 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:19.
19 Dec 2024
Cadent Gas are carrying out Utility asset works on Tennyson Street, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 14:50 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 11:34.
20 Dec 2024
Bolton Metropolitan Borough Council are carrying out Section 50 on Deansgate, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 18 Nov 2024 at 15:35.
Friday
Cadent Gas are proposing to carry out Utility asset works on Morris Fold Drive, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:20.
Friday
Cadent Gas are proposing to carry out Utility asset works on Regent Road, Lostock, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.
Friday
Cadent Gas are proposing to carry out Utility asset works on Overdene Close, Lostock, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.
Tuesday
Cadent Gas are carrying out Utility asset works on Crundale Road, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 08:55 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:15.
24 Dec 2024
Cadent Gas are carrying out Utility asset works on The Cheethams, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 09:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:17.
2 and 22 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Blackrod Footpath 24, Blackrod.
These works were categorised as Major.
The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 14:01.
30 May 2025
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Moor Road, Anglezarke.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:45 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Dec 2024 at 09:09.
Today
United Utilities Water (formerly North West Water) are carrying out Disconnection or alteration of supply on Back Hughes Street, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 12:33 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 12:56.
Today
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Walley Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Sep 2024 at 12:08.
Today
United Utilities Water (formerly North West Water) are carrying out Disconnection or alteration of supply on Walley Street, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 08:18 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 08:42.
20 Dec 2024
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Bolton Restricted Byway 346, Bolton.
There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works started on 9 December 2024 at 10:47 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Dec 2024 at 16:30.
Monday
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Jolly Tar Lane, Coppull.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 12:49 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Dec 2024 at 16:05.
18 and 20 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Bertrand Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Nov 2024 at 15:47.
2 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on The Cheethams, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:51.
3 and 17 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Gaskell Street, Bolton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:12.
3 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Gaskell Street, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 08:22.
3 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Gaskell Street, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:56.
6 and 8 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Morris Green Lane, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Oct 2024 at 11:45.
6 and 24 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Statutory Infrastructure Works on White Lion Brow, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Dec 2024 at 14:30.
6 and 22 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fairfields, Egerton, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:39.
6 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:48.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Overdene Close, Lostock, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:00.
6 and 29 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Regent Road, Lostock, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:01.
6 and 8 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Bertrand Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 08:34.
6 and 24 Jan 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Lower Bridgeman Street, Bolton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 Dec 2024 at 16:30.
6 and 17 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Fairfields, Egerton, Bolton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:30.
6 and 18 Jan 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Back Halliwell Road South, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 5 Dec 2024 at 12:52.
6 and 24 Jan 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Lower Bridgeman Street, Bolton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 2 Dec 2024 at 11:28.
6 and 18 Jan 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Back Olga Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 5 Dec 2024 at 12:49.
6 and 18 Jan 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Back Olga Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 5 Dec 2024 at 12:50.
6 and 18 Jan 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Back Halliwell Road South, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 5 Dec 2024 at 12:52.
7 Jan and 17 Feb 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Chorley Road, Westhoughton, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 Dec 2024 at 15:31.
7 Jan and 17 Feb 2025
Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Chorley Road, Westhoughton, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 Dec 2024 at 15:31.
13 Jan and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:59.
15 and 17 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Hughes Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Oct 2024 at 14:04.
15 and 28 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Coronation Street, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Dec 2024 at 10:22.
19 and 21 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on St Georges Road, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Nov 2024 at 14:08.
21 and 23 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Hulton Lane West, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Nov 2024 at 14:54.
25 Jan and 25 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Moor Road, Anglezarke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Oct 2024 at 12:56.
27 Jan and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Crown Lane, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 08:50.
27 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:02.
3 and 5 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Back St Georges Road Central, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Nov 2024 at 07:42.
17 and 21 Feb 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Babylon Lane, Adlington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 11:07.
17 and 21 Feb 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Babylon Lane, Adlington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 13:40.
17 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 11:15.
19 and 21 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Back Higher Swan Lane, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Nov 2024 at 15:46.
24 and 26 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back St Helens Road South, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Dec 2024 at 08:48.
3 and 26 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Vicarage Road, Blackrod, Bolton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 26 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:28.
3 and 14 Mar 2025
Electricity North West (NorWeb) were proposing to carry out New service connection on Coronation Street, Bolton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Dec 2024 at 13:23.
10 and 14 Mar 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Lords Stile Lane, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 16:27.
Roadworks Map near to The Strand, BOLTON, BL6 6DB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to The Strand, BOLTON, BL6 6DB (8 Events)
(Scheduled Dates)
(miles)
(Scheduled: 9 Dec 2024 - 11 Dec 2024)
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.