ROADWORKS SUMMARY
Industrial Street, BOLTON, BL5 2LD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Industrial Street, BL5 2LD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Industrial Street, BOLTON, BL5 2LD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Industrial Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bolton Metropolitan Borough Council logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Manchester Road

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Manchester Road, Bolton.

These works are categorised as Major.

The works started on 20 September 2022 at 09:30 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 10 Oct 2024 at 10:27.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
St Helens Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on St Helens Road, Leigh.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:00 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Oct 2024 at 09:03.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Ridgway Gates

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Ridgway Gates, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:24.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Ridgway Gates

Bolton Metropolitan Borough Council are carrying out Section 50 on Ridgway Gates, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:28.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
30 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Brook Street

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Brook Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:22.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Brook Street

Bolton Metropolitan Borough Council are carrying out Section 50 on Brook Street, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 4 Oct 2024 at 11:28.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct 2024 and 1 Apr 2025
Details
View Map
Share
East Lancashire Road

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on East Lancashire Road, Worsley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2024 and run through until 1 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Dec 2024 at 09:39.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Oct 2024 and 1 Apr 2025
Details
View Map
Share
Mosley Common Road

Wigan Metropolitan Borough Council were proposing to carry out Highway improvement works on Mosley Common Road, Worsley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2024 and run through until 1 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Dec 2024 at 09:38.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Bromwich Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Bromwich Street, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 17:00 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 6 Dec 2024 at 11:11.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Wardle Street

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Wardle Street, Bolton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 17:00 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 3 Dec 2024 at 09:34.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Kirkwall Drive

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Kirkwall Drive, Bolton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 17:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 3 Dec 2024 at 09:32.

Cadent Gas logo
LONG TERM
Between
14 Oct 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:50.

Cadent Gas logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Millers Lane

Cadent Gas are proposing to carry out Utility asset works on Millers Lane, Platt Bridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 14:23.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Deansgate

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Deansgate, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 25 Oct 2024 at 13:37.

Electricity North West (NorWeb) logo
Today
Details
View Map
Share
Smiths Lane

Electricity North West (NorWeb) carried out New service connection on Smiths Lane, Hindley Green.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 14 Nov 2024 and 11 Dec 2024 and were actually completed between 14 Nov 2024 (16:45) and 11 Dec 2024 (11:43). The works impacted the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Dec 2024 at 11:59.

Electricity North West (NorWeb) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 09:48.

Electricity North West (NorWeb) logo
LONG TERM
Between
15 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Bickershaw Lane

Electricity North West (NorWeb) were proposing to carry out New service connection on Bickershaw Lane, Bickershaw.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 November 2024 and run through until 28 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Aug 2024 at 09:14.

Electricity North West (NorWeb) logo
LONG TERM
Between
15 Nov 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Bickershaw Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Bickershaw Lane, Bickershaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 09:48.

Cadent Gas logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Tennyson Street

Cadent Gas are carrying out Utility asset works on Tennyson Street, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 14:50 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 11:34.

Bolton Metropolitan Borough Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Deansgate

Bolton Metropolitan Borough Council are carrying out Section 50 on Deansgate, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 18 Nov 2024 at 15:35.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Morris Fold Drive

Cadent Gas are proposing to carry out Utility asset works on Morris Fold Drive, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:20.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Overdene Close

Cadent Gas are proposing to carry out Utility asset works on Overdene Close, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Regent Road

Cadent Gas are proposing to carry out Utility asset works on Regent Road, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:19.

Electricity North West (NorWeb) logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Richmond Road

Electricity North West (NorWeb) are carrying out New service connection on Richmond Road, Hindley Green.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 09:28 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Dec 2024 at 13:30.

Electricity North West (NorWeb) logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are carrying out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 09:28 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Dec 2024 at 13:29.

Electricity North West (NorWeb) logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are carrying out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 09:28 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Dec 2024 at 13:30.

Cadent Gas logo
Until
24 Dec 2024
Details
View Map
Share
Follow
The Cheethams

Cadent Gas are carrying out Utility asset works on The Cheethams, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 09:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:17.

Cadent Gas logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Blackrod Footpath 24

Cadent Gas were proposing to carry out Utility asset works on Blackrod Footpath 24, Blackrod.

These works were categorised as Major.

The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 14:01.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hamilton Street

Cadent Gas are proposing to carry out Utility repair and maintenance works on Hamilton Street, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 09:59.

Wigan Metropolitan Borough Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Alder Street

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Alder Street, Atherton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:00 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Dec 2024 at 09:23.

United Utilities Water (formerly North West Water) logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Bolton Restricted Byway 346

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Bolton Restricted Byway 346, Bolton.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 9 December 2024 at 10:47 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Dec 2024 at 16:30.

United Utilities Water (formerly North West Water) logo
Finishing
Today
Details
View Map
Share
Follow
Back Hughes Street

United Utilities Water (formerly North West Water) are carrying out Disconnection or alteration of supply on Back Hughes Street, Bolton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 12:33 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 12:56.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 11:00.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:59.

United Utilities Water (formerly North West Water) logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Glebe Street Back Service Road East 82 - 144

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Street Back Service Road East 82 - 144, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Nov 2024 at 12:10.

United Utilities Water (formerly North West Water) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Back Bertrand Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Bertrand Road, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Nov 2024 at 15:47.

Cadent Gas logo
LONG TERM
Between
19 Dec 2024 and 10 Feb 2025
Details
View Map
Share
Follow
St Helens Road

Cadent Gas are proposing to carry out Utility asset works on St Helens Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:57.

Electricity North West (NorWeb) logo
Between
27 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Liscard Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Liscard Street, Atherton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Oct 2024 at 09:25.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
The Cheethams

Cadent Gas are proposing to carry out Utility asset works on The Cheethams, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:51.

Cadent Gas logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Follow
Gaskell Street

Cadent Gas are proposing to carry out Utility asset works on Gaskell Street, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:56.

Cadent Gas logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Follow
Gaskell Street

Cadent Gas are proposing to carry out Utility asset works on Gaskell Street, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 08:22.

Cadent Gas logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Gaskell Street

Cadent Gas were proposing to carry out Utility asset works on Gaskell Street, Bolton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 09:12.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Slag Lane

Cadent Gas were proposing to carry out Utility asset works on Slag Lane, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:01.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Glebe Street Back Service Road East 82 - 144

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Street Back Service Road East 82 - 144, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 10:15.

Electricity North West (NorWeb) logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Dec 2024 at 15:56.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Back Morris Green Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Morris Green Lane, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Oct 2024 at 11:45.

Cadent Gas logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Parkfield Road

Cadent Gas are proposing to carry out Utility asset works on Parkfield Road, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 08:55.

Cadent Gas logo
Between
6 and 14 Jan 2025
Details
View Map
Share
Follow
Parkfield Road

Cadent Gas are proposing to carry out Utility asset works on Parkfield Road, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 11:27.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Overdene Close

Cadent Gas are proposing to carry out Utility asset works on Overdene Close, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:00.

Cadent Gas logo
Between
6 and 29 Jan 2025
Details
View Map
Share
Follow
Regent Road

Cadent Gas are proposing to carry out Utility asset works on Regent Road, Lostock, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 14:01.

Bolton Metropolitan Borough Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Lower Bridgeman Street

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Lower Bridgeman Street, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 2 Dec 2024 at 11:28.

Bolton Metropolitan Borough Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Lower Bridgeman Street

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Lower Bridgeman Street, Bolton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 Dec 2024 at 16:30.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Back Bertrand Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Bertrand Road, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 08:34.

United Utilities Water (formerly North West Water) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
White Lion Brow

United Utilities Water (formerly North West Water) are proposing to carry out Statutory Infrastructure Works on White Lion Brow, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 4 Dec 2024 at 14:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:48.

Bolton Metropolitan Borough Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Back Olga Street

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Back Olga Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 5 Dec 2024 at 12:49.

Bolton Metropolitan Borough Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Back Olga Street

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Back Olga Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 5 Dec 2024 at 12:50.

Bolton Metropolitan Borough Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Back Halliwell Road South

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Back Halliwell Road South, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 5 Dec 2024 at 12:52.

Bolton Metropolitan Borough Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Back Halliwell Road South

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Back Halliwell Road South, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 5 Dec 2024 at 12:52.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Chorley Road

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Chorley Road, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 Dec 2024 at 15:31.

Bolton Metropolitan Borough Council logo
LONG TERM
Between
7 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Chorley Road

Bolton Metropolitan Borough Council are proposing to carry out Section 50 on Chorley Road, Westhoughton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 9 Dec 2024 at 15:31.

Cadent Gas logo
Between
13 and 29 Jan 2025
Details
View Map
Share
The Grove

Cadent Gas were proposing to carry out Utility asset works on The Grove, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:02.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 23 Mar 2025
Details
View Map
Share
Follow
Leigh Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Leigh Road, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Dec 2024 at 10:29.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hamilton Street

Cadent Gas are proposing to carry out Utility repair and maintenance works on Hamilton Street, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 09:50.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hamilton Street

Cadent Gas are proposing to carry out Utility repair and maintenance works on Hamilton Street, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 11:38.

Cadent Gas logo
LONG TERM
Between
13 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:59.

Network Rail logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 10:55.

Network Rail logo
Between
15 and 18 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:46.

United Utilities Water (formerly North West Water) logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Back Campbell Street North

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Campbell Street North, Farnworth, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Oct 2024 at 09:31.

Electricity North West (NorWeb) logo
Between
15 and 28 Jan 2025
Details
View Map
Share
Follow
Coronation Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Coronation Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 11 Dec 2024 at 10:22.

United Utilities Water (formerly North West Water) logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Back Hughes Street

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Hughes Street, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Oct 2024 at 14:04.

Wigan Metropolitan Borough Council logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
St Helens Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on St Helens Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Dec 2024 at 16:00.

United Utilities Water (formerly North West Water) logo
Between
19 and 21 Jan 2025
Details
View Map
Share
Follow
St Georges Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on St Georges Road, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Nov 2024 at 14:08.

Electricity North West (NorWeb) logo
LONG TERM
Between
20 Jan and 30 Mar 2025
Details
View Map
Share
Follow
Leigh Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Leigh Road, Hindley Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Dec 2024 at 10:29.

United Utilities Water (formerly North West Water) logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Platt Street

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Platt Street, Platt Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2024 at 14:46.

Wigan Metropolitan Borough Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wigan Road, Atherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 9 Dec 2024 at 12:05.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Sep 2024 at 13:21.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Oct 2024 at 09:43.

United Utilities Water (formerly North West Water) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Back Hulton Lane West

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Hulton Lane West, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Nov 2024 at 14:54.

Cadent Gas logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:57.

Network Rail logo
Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:46.

Network Rail logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wallgate

Network Rail are proposing to carry out Works for Rail Purposes on Wallgate, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 10:55.

Electricity North West (NorWeb) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Bretherton Row

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Bretherton Row, Wigan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 6 Nov 2024 at 15:39.

Cadent Gas logo
Between
27 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Crown Lane

Cadent Gas are proposing to carry out Utility asset works on Crown Lane, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 08:50.

Cadent Gas logo
Between
27 Jan and 12 Feb 2025
Details
View Map
Share
Follow
James Street

Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:02.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Millgate

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Millgate, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:25.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Scholes

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Scholes, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:25.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
School Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on School Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 3 Oct 2024 at 13:26.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
1 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Warrington Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Warrington Lane, Wigan.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 1 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 6 Sep 2024 at 11:03.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Beaumaris Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Beaumaris Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are proposing to carry out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Electricity North West (NorWeb) logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Pendennis Crescent

Electricity North West (NorWeb) are proposing to carry out New service connection on Pendennis Crescent, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Back St Georges Road Central

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Back St Georges Road Central, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 7 Nov 2024 at 07:42.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:48.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 15:34.

Cadent Gas logo
Between
10 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Taylors Lane

Cadent Gas are proposing to carry out Utility asset works on Taylors Lane, Ince.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:51.

Cadent Gas logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Warrington Road

Cadent Gas are proposing to carry out Utility asset works on Warrington Road, Ince.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:50.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
James Street

Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 11:15.

United Utilities Water (formerly North West Water) logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Back Higher Swan Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Back Higher Swan Lane, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Nov 2024 at 15:46.

Electricity North West (NorWeb) logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
Edale Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Edale Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Nov 2024 at 10:52.

Electricity North West (NorWeb) logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Atherton Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Atherton Road, Hindley Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Dec 2024 at 17:01.

United Utilities Water (formerly North West Water) logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Back St Helens Road South

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back St Helens Road South, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Dec 2024 at 08:48.

Electricity North West (NorWeb) logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Smiths Lane

Electricity North West (NorWeb) are proposing to carry out New service connection on Smiths Lane, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 10:55.

Electricity North West (NorWeb) logo
LONG TERM
Between
27 Feb and 12 May 2025
Details
View Map
Share
Follow
Leigh Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Leigh Road, Hindley Green.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 10:53.

Electricity North West (NorWeb) logo
LONG TERM
Between
27 Feb and 12 May 2025
Details
View Map
Share
Follow
Leigh Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Leigh Road, Hindley Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 10:54.

Electricity North West (NorWeb) logo
Between
27 Feb and 19 Mar 2025
Details
View Map
Share
Follow
Atherton Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Atherton Road, Hindley Green.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Dec 2024 at 10:55.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
King Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on King Street, Leigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Sep 2024 at 11:22.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Street

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Leigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Sep 2024 at 11:21.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Place

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Place, Leigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Sep 2024 at 11:20.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
2 Mar 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Leigh Road

Wigan Metropolitan Borough Council are proposing to carry out Highway improvement works on Leigh Road, Leigh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 31 March 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 16 Sep 2024 at 11:23.

Electricity North West (NorWeb) logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Richmond Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Richmond Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 11:05.

Electricity North West (NorWeb) logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Richmond Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Richmond Road, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 29 Oct 2024 at 13:07.

Electricity North West (NorWeb) logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Coronation Street

Electricity North West (NorWeb) were proposing to carry out New service connection on Coronation Street, Bolton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Dec 2024 at 13:23.

Cadent Gas logo
Between
3 and 26 Mar 2025
Details
View Map
Share
Vicarage Road

Cadent Gas were proposing to carry out Utility asset works on Vicarage Road, Blackrod, Bolton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 26 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:28.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Mar and 7 Apr 2025
Details
View Map
Share
Thomas Street

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Thomas Street, Hindley Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 11:00.

Electricity North West (NorWeb) logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
Thomas Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Thomas Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 11:03.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Mar and 7 Apr 2025
Details
View Map
Share
East Street

Electricity North West (NorWeb) were proposing to carry out Diversionary works on East Street, Hindley Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 11:08.

Electricity North West (NorWeb) logo
Between
4 and 10 Mar 2025
Details
View Map
Share
Follow
East Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on East Street, Hindley Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 11:10.

Salford City Council logo
Between
8 and 24 Mar 2025
Details
View Map
Share
Follow
Manchester Road East

Salford City Council are proposing to carry out Highway repair and maintenance works on Manchester Road East, Worsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Dec 2024 at 16:05.

Salford City Council logo
Between
8 and 24 Mar 2025
Details
View Map
Share
Follow
Manchester Road West

Salford City Council are proposing to carry out Utility repair and maintenance works on Manchester Road West, Worsley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Salford City Council on 11 Dec 2024 at 15:58.


Roadworks Map near to Industrial Street, BOLTON, BL5 2LD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Industrial Street, BOLTON, BL5 2LD (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Bolton Metropolitan Borough Council logo
LEIGH ROAD, WESTHOUGHTON 
(0.1 miles)
Bolton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 11 Dec 2024 09:30
(Scheduled: 11 Dec 2024)
0.1
Details
Share
Follow
2
Electricity North West (NorWeb) logo
URGENT
  
PARK ROAD, WESTHOUGHTON 
(0.4 miles)
Electricity North West (NorWeb)
Utility repair and maintenance works - Footway - Two-way signals
In Progress
Since: 10 Dec 2024 08:38
(Scheduled: 10 Dec 2024 - 16 Dec 2024)
0.4
Details
Share
Follow
3
BRSK logo
THE PEWFIST, WESTHOUGHTON 
(0.4 miles)
BRSK
Utility repair and maintenance works - Footway, Verge - Give and take
In Progress
Since: 10 Dec 2024 12:30
(Scheduled: 9 Dec 2024 - 12 Dec 2024)
0.4
Details
Share
Follow
4
Cadent Gas logo
URGENT
  
THE PEWFIST, WESTHOUGHTON 
(0.5 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 9 Dec 2024 14:00
(Scheduled: 9 Dec 2024 - 11 Dec 2024)
0.5
Details
Share
Follow
5
Cadent Gas logo
URGENT
  
THE PEWFIST, WESTHOUGHTON 
(0.5 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 9 Dec 2024 12:45
(Scheduled: 9 Dec 2024 - 11 Dec 2024)
0.5
Details
Share
Follow
6
BT logo
THE PEWFIST 
(0.5 miles)
BT
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 10 Dec 2024 15:30
(Scheduled: 9 Dec 2024 - 13 Dec 2024)
0.5
Details
Share
Follow
7
G2 Energy IDNO logo
PAVILION SQUARE, WESTHOUGHTON 
(0.5 miles)
G2 Energy IDNO
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 9 Dec 2024 - 14 Dec 2024)
0.5
Details
Share
8
BT logo
GREEN MEADOWS, WESTHOUGHTON 
(0.7 miles)
BT
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 12 Dec 2024 - 16 Dec 2024
0.7
Details
Share
Follow
9
BT logo
GREEN MEADOWS, WESTHOUGHTON 
(0.7 miles)
BT
Remedial works - Footway - Give and take
Planned
Scheduled: 12 Dec 2024 - 13 Dec 2024
0.7
Details
Share
Follow
10
United Utilities Water (formerly North West Water) logo
BOLTON ROAD, WESTHOUGHTON 
(0.8 miles)
United Utilities Water (formerly North West Water)
Remedial works - Footway - No carriageway incursion
Complete
10 Dec 2024 14:00 - 11 Dec 2024 13:55
0.8
Details
Share