ROADWORKS SUMMARY
Westbury Close, NEW MILTON, BH25 7AZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Westbury Close, BH25 7AZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Westbury Close, NEW MILTON, BH25 7AZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Westbury Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Corbin Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Corbin Road, Pennington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 16:14.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 13 Dec 2024
Details
View Map
Share
Corbin Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Corbin Road, Pennington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 08:11.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Bashley Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
28 Oct and 23 Dec 2024
Details
View Map
Share
Follow
Bashley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 15:39.

Southern Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Lavender Road

Southern Water are proposing to carry out Utility repair and maintenance works on Lavender Road, Hordle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Water on 31 Jul 2024 at 13:48.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Lymington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Wainsford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wainsford Road, Pennington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Sep 2024 at 15:03.

Wessex Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Walkford Road

Wessex Water are carrying out Utility repair and maintenance works on Walkford Road, Christchurch.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:22 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 29 Nov 2024 at 13:14.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Lymington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 16:34.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Lymington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 13:29.

Wessex Internet logo
Finishing
Tuesday
Details
View Map
Share
Follow
Southampton Road

Wessex Internet are carrying out Utility asset works on Southampton Road, Boldre.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 10:30 and could run through until 3 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 27 Nov 2024 at 06:38.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Marryat Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Marryat Road, New Milton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 13:30 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 10:41.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Wainsford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wainsford Road, Pennington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 24 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 08:19.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Smugglers Lane South

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Smugglers Lane South, Christchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 12:14.

Southern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Wainsford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wainsford Road, Pennington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 14:45.

Wessex Internet logo
Between
27 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Whitby Road

Wessex Internet are proposing to carry out Utility asset works on Whitby Road, Milford-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 11 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Internet on 28 Nov 2024 at 08:30.

Wessex Internet logo
Between
27 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Whitby Road

Wessex Internet are proposing to carry out Utility asset works on Whitby Road, Milford-on-sea.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 11 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Internet on 21 Nov 2024 at 10:10.

Wessex Internet logo
Between
27 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Whitby Road

Wessex Internet are proposing to carry out Utility asset works on Whitby Road, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 11 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wessex Internet on 20 Nov 2024 at 13:50.

Hampshire County Council logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Bournemouth Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Bournemouth Road, Holmsley, Burley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the verge only.

This roadwork event was last updated by Hampshire County Council on 25 Oct 2024 at 09:09.

Hampshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beckley Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beckley Road, Beckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 8 Nov 2024 at 14:42.

Hampshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beckley Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beckley Road, Beckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 11 Nov 2024 at 13:32.

Hampshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beckley Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Beckley Road, Beckley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 12 Nov 2024 at 10:52.

Southern Gas Networks logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Ramley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ramley Road, Pennington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Sep 2024 at 15:05.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bashley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:11.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 09:01.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 13:54.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:30.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bashley Common Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Common Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:11.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 09:00.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 13:54.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Bashley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bashley Road, New Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:31.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Wortley Road Car Park

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wortley Road Car Park, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Oct 2024 at 09:27.

Hampshire County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Everton Road

Hampshire County Council are proposing to carry out Section 50 on Everton Road, Hordle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 09:13.

Cityfibre Metro Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Lymington Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lymington Road, Christchurch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 09:50.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lymington Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lymington Road, Christchurch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 11:40.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lymington Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lymington Road, Christchurch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 09:05.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Wortley Road Car Park

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wortley Road Car Park, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 11:41.

Wessex Internet logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Mead End Road

Wessex Internet are proposing to carry out Utility asset works on Lower Mead End Road, Sway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 5 Nov 2024 at 15:29.

Wessex Internet logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Mead End Road

Wessex Internet are proposing to carry out Utility asset works on Lower Mead End Road, Sway.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 7 Nov 2024 at 11:35.

Wessex Internet logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Barnes Lane

Wessex Internet are proposing to carry out Utility asset works on Barnes Lane, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Internet on 20 Nov 2024 at 14:58.

Wessex Internet logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
De La Warr Road

Wessex Internet are proposing to carry out Utility asset works on De La Warr Road, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Internet on 26 Nov 2024 at 13:00.

South West Water logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Dark Lane

South West Water are proposing to carry out Utility repair and maintenance works on Dark Lane, Hinton St Michael.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 23 Oct 2024 at 14:34.

Wessex Internet logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Grebe Close

Wessex Internet are proposing to carry out Utility asset works on Grebe Close, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Internet on 21 Nov 2024 at 10:06.

Wessex Internet logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Grebe Close

Wessex Internet are proposing to carry out Utility asset works on Grebe Close, Milford-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Internet on 20 Nov 2024 at 13:55.


Roadworks Map near to Westbury Close, NEW MILTON, BH25 7AZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 11:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Westbury Close, NEW MILTON, BH25 7AZ (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
BARTON COURT AVENUE 
(0.3 miles)
BT
Utility asset works - Footway - Give and take
Complete
28 Nov 2024 14:00 - 16:10
0.3
Details
Share
2
Cityfibre Metro Networks logo
BECTON LANE 
(0.5 miles)
Cityfibre Metro Networks
Permanent reinstatement - Carriageway - Give and take
Complete
29 Nov 2024 07:31 - 11:15
0.5
Details
Share
3
Cityfibre Metro Networks logo
GROVE ROAD 
(0.5 miles)
Cityfibre Metro Networks
Permanent reinstatement - Carriageway - Give and take
Complete
29 Nov 2024 07:31 - 11:15
0.5
Details
Share
4
Scottish Hydro Electric Power Dis logo
MOORE CLOSE 
(0.6 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 2 Dec 2024
0.6
Details
Share
Follow
5
Southern Gas Networks logo
EMERGENCY
  
OLD MILTON ROAD 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Road closure
Complete
25 Nov 2024 08:00 - 29 Nov 2024 15:00
0.6
Details
Share
6
Hampshire County Council logo
ASHLEY ROAD 
(0.6 miles)
Hampshire County Council
Highway improvement works - Footway - Give and take
Planned
Scheduled: 25 Nov 2024 - 6 Dec 2024
0.6
Details
Share
Follow
7
Hampshire County Council logo
ASHLEY ROAD 
(0.6 miles)
Hampshire County Council
Highway improvement works - Footway - Give and take
Planned
Scheduled: 26 Nov 2024 - 6 Dec 2024
0.6
Details
Share
Follow
8
Nexfibre Networks Limited logo
SEA ROAD 
(0.8 miles)
Nexfibre Networks Limited
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 28 Nov 2024 - 2 Dec 2024
0.8
Details
Share
Follow
9
Nexfibre Networks Limited logo
CLIFFE ROAD 
(0.8 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 2 Dec 2024
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.