ROADWORKS SUMMARY
North Street, POOLE, BH15 1NX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for North Street, BH15 1NX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to North Street, POOLE, BH15 1NX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for North Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
26 Aug 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Dolbery Road North

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Dolbery Road North, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 21 Jun 2024 at 12:59.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
26 Aug 2024 and 28 May 2025
Details
View Map
Share
Follow
Parkstone Heights

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Parkstone Heights, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 11:51.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Hunt Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hunt Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:32.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Kinson Pottery Industrial Estate Service Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Kinson Pottery Industrial Estate Service Road, Newtown, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 11:51.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Dale Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Dale Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:30.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Haymoor Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Haymoor Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 24 Jun 2024 at 15:05.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Hilton Close

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hilton Close, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:36.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Balston Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Balston Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:29.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Foxholes Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Foxholes Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:30.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Dorchester Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Dorchester Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:38.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Pound Lane

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Pound Lane, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 11:51.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Walton Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Walton Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:30.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Sea View Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Sea View Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:26.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Bond Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Bond Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:33.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Lacey Crescent

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Lacey Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:33.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 28 May 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:00.

Wessex Water logo
LONG TERM
Between
2 Sep 2024 and 25 Mar 2025
Details
View Map
Share
French Road

Wessex Water were proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 25 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 20 Aug 2024 at 10:40.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Belben Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Belben Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:37.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Loewy Crescent

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Loewy Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:37.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Canford Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Canford Way, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:37.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Portelet Close

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Portelet Close, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:38.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Bedford Road South

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Bedford Road South, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 23 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 23 Aug 2024 at 12:03.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Alderney Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Alderney Avenue, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:38.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Ringwood Road To Alderney Hospital Access Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road To Alderney Hospital Access Road, Alderney, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:38.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Broom Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Broom Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:10.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:15.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Canford Cliffs Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Canford Cliffs Road, Poole.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2024 at 12:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:19.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Sea View Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Sea View Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 17 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 13:11.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Sea View Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Sea View Road, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 07:30 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 17 Sep 2024 at 16:22.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Madeira Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Works for Rail Purposes on Madeira Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 31 Jul 2024 at 16:28.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Madeira Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Madeira Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 31 Jul 2024 at 16:46.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dorchester Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Dorchester Road, Poole.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 15 Nov 2024 at 10:03.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 07:30 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 29 Oct 2024 at 16:37.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep 2024 and 12 Jun 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 12 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 13:59.

Dorset Council logo
LONG TERM
Between
16 Sep and 19 Dec 2024
Details
View Map
Share
Follow
Poole Road

Dorset Council are proposing to carry out Highway improvement works on Poole Road, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dorset Council on 22 Jul 2024 at 13:46.

Dorset Council logo
LONG TERM
Between
16 Sep and 19 Dec 2024
Details
View Map
Share
Follow
Poole Road

Dorset Council are proposing to carry out Highway improvement works on Poole Road, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dorset Council on 12 Sep 2024 at 14:10.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
23 Sep and 13 Dec 2024
Details
View Map
Share
Branksome Wood Road

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Branksome Wood Road, Bournemouth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 Sep 2024 at 08:42.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
30 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Queens Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Queens Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 11:30.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Kinson Pottery Industrial Estate Service Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kinson Pottery Industrial Estate Service Road, Newtown, Poole.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 15:24.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wimborne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wimborne Road, Corfe Mullen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 11:00.

Southern Gas Networks logo
LONG TERM
Until
6 Feb 2025
Details
View Map
Share
Follow
Queens Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Queens Road, Bournemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 15:50 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 15:56.

Southern Gas Networks logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Banks Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Banks Road, Poole.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:18 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:33.

Southern Gas Networks logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Panorama Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Panorama Road, Poole.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:13 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:30.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Victoria Avenue, Bournemouth.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:35 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 14:37.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
11 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Queens Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Queens Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 11:20.

Wessex Water logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Herbert Avenue

Wessex Water are carrying out Utility repair and maintenance works on Herbert Avenue, Poole.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 09:30 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 18 Nov 2024 at 13:37.

Wessex Water logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Ringwood Road

Wessex Water are carrying out Utility repair and maintenance works on Ringwood Road, Poole.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 09:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 25 Nov 2024 at 08:32.

Scottish Hydro Electric Power Dis logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Meyrick Park Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Meyrick Park Crescent, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2024 at 13:25.

Scottish Hydro Electric Power Dis logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Meyrick Park Crescent

Scottish Hydro Electric Power Dis are carrying out New service connection on Meyrick Park Crescent, Bournemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:04 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 08:24.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
18 Feb 2025
Details
View Map
Share
Follow
Leven Avenue

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Leven Avenue, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 14:00 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Nov 2024 at 07:46.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Banks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banks Road, Poole.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 15:39.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
18 Nov 2024 and 18 Feb 2025
Details
View Map
Share
Follow
Leven Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Leven Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 15 Nov 2024 at 16:13.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Queens Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Queens Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 14:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Nov 2024 at 07:46.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 May 2024 at 13:36.

South West Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Waterloo Road

South West Water are carrying out Utility repair and maintenance works on Waterloo Road, Bournemouth.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 12:09 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South West Water on 27 Nov 2024 at 14:55.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Banks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banks Road, Poole.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:11.

Scottish Hydro Electric Power Dis logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Alumhurst Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Alumhurst Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Nov 2024 at 09:29.

Scottish Hydro Electric Power Dis logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Alumhurst Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Alumhurst Road, Bournemouth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 13:44.

Scottish Hydro Electric Power Dis logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Alumhurst Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Alumhurst Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Nov 2024 at 10:21.

Bournemouth, Christchurch And Poole Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Abbotsbury Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Section 50 on Abbotsbury Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 17:17.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Cranbrook Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cranbrook Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:01.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
St Augustin's Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Augustin's Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:43.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Cranbrook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranbrook Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 09:04.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
St Augustin's Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Augustin's Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Wayne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wayne Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 May 2024 at 13:34.

Southern Gas Networks logo
Between
8 and 31 Jan 2025
Details
View Map
Share
Follow
Poole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Poole Road, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 10:48.

Dorset Council logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Poole Road

Dorset Council are proposing to carry out Highway improvement works on Poole Road, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 17 Sep 2024 at 09:20.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Dorset Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Dorset Way, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 16 Sep 2024 at 11:11.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
30 Jan and 23 Apr 2025
Details
View Map
Share
Alumhurst Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Alumhurst Road, Bournemouth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:25.

Bournemouth, Christchurch And Poole Council logo
Between
30 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 2 Sep 2024 at 09:41.

Bournemouth, Christchurch And Poole Council logo
Between
30 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 11 Sep 2024 at 15:29.

Bournemouth, Christchurch And Poole Council logo
Between
30 Jan and 19 Feb 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 11 Sep 2024 at 16:15.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Gervis Place

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gervis Place, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 25 Jul 2024 at 13:08.

South West Water logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Mossley Avenue

South West Water were proposing to carry out Utility repair and maintenance works on Mossley Avenue, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 24 Oct 2024 at 11:14.

Scottish Hydro Electric Power Dis logo
Between
8 and 15 Feb 2025
Details
View Map
Share
Follow
Kinson Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Kinson Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 14:21.

Scottish Hydro Electric Power Dis logo
Between
8 and 15 Feb 2025
Details
View Map
Share
Follow
Acres Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Acres Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 14:20.

South West Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mossley Avenue

South West Water are proposing to carry out Utility repair and maintenance works on Mossley Avenue, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 28 Oct 2024 at 07:58.


Roadworks Map near to North Street, POOLE, BH15 1NX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to North Street, POOLE, BH15 1NX (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Water logo
URGENT
  
DEAR HAY LANE 
(0.1 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
28 Nov 2024 17:00 - 20:00
0.1
Details
Share
2
Southern Gas Networks logo
EMERGENCY
  
GEORGE ROUNDABOUT, POOLE TOWN 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 28 Nov 2024 22:35
(Scheduled: 28 Nov 2024 - 6 Dec 2024)
0.2
Details
Share
Follow
3
BT logo
BALLARD ROAD 
(0.3 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 30 Nov 2024 - 2 Dec 2024
0.3
Details
Share
Follow
4
Southern Gas Networks logo
EMERGENCY
  
SELDOWN ROAD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 18 Nov 2024 14:30
(Scheduled: 18 Nov 2024 - 2 Dec 2024)
0.4
Details
Share
Follow
5
Scottish Hydro Electric Power Dis logo
URGENT
  
FOOTPATH FROM COLBOURNE CLOSE ADJACENT 15-17 TO TAVERNER CLOSE ADJACENT 42-56, POOLE TOWN 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footpath - No carriageway incursion
In Progress
Since: 28 Nov 2024 18:07
(Scheduled: 28 Nov 2024 - 5 Dec 2024)
0.5
Details
Share
Follow
6
Southern Gas Networks logo
EMERGENCY
  
ASHMORE AVENUE 
(1.0 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 28 Nov 2024 09:38
(Scheduled: 28 Nov 2024 - 5 Dec 2024)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.