ROADWORKS SUMMARY
BATH, BA1 0YP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for BA1 0YP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to BATH, BA1 0YP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wiltshire Council logo
LONG TERM
Between
30 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Stoke

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 3 Oct 2024 at 12:54.

Wiltshire Council logo
LONG TERM
Between
30 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Stoke

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 4 Oct 2024 at 12:32.

Wiltshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Turleigh

Wiltshire Council are carrying out Highway repair and maintenance works on Turleigh, Turleigh.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:34 and could run through until 12 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 10:17.

Wiltshire Council logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Henley Lane

Wiltshire Council are carrying out Highway repair and maintenance works on Henley Lane, Box.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 15:56 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 12:12.

Wiltshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Turleigh

Wiltshire Council are proposing to carry out Section 50 on Turleigh, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 23 Oct 2024 at 17:01.

Wiltshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Turleigh

Wiltshire Council are carrying out Section 50 on Turleigh, Turleigh.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 09:00 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 16:39.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
Follow
The Batch

Nexfibre Networks Limited are proposing to carry out Utility asset works on The Batch, Batheaston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 29 Oct 2024 at 17:02.

Nexfibre Networks Limited logo
Finishing
Today
Details
View Map
Share
The Batch

Nexfibre Networks Limited were proposing to carry out Utility asset works on The Batch, Batheaston, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 27 Nov 2024 at 12:29.

Wessex Water logo
Friday
Details
View Map
Share
Rosemount Lane

Wessex Water carried out Utility repair and maintenance works on Rosemount Lane, Lyncombe, Bath.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 11 Dec 2024 and 13 Dec 2024 and were actually completed on 11 Dec 2024 between 09:15 and 16:30. The works impacted the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Dec 2024 at 16:40.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Rosemount Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Rosemount Lane, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 5 Dec 2024 at 09:38.

Wessex Water logo
Between
13 and 23 Dec 2024
Details
View Map
Share
Follow
Church Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 9 Dec 2024 at 08:47.

Wessex Water logo
Between
13 and 23 Dec 2024
Details
View Map
Share
Follow
Church Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 16 Sep 2024 at 07:49.

Wiltshire Council logo
Between
15 and 18 Dec 2024
Details
View Map
Share
Follow
Rode Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Oct 2024 at 12:50.

Wessex Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Tyning Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Tyning Lane, Fairfield Park, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Sep 2024 at 12:37.

Wessex Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Tyning Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Tyning Lane, Fairfield Park, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 26 Sep 2024 at 11:21.

Wiltshire Council logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Rode Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill, Colerne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Nov 2024 at 15:14.

Wessex Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Cheltenham Street

Wessex Water were proposing to carry out New service connection on Cheltenham Street, Westmoreland, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 25 Sep 2024 at 13:39.

Wessex Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Church Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 16 Sep 2024 at 07:49.

Wessex Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Church Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 9 Dec 2024 at 08:47.

Western Power Distribution (South West) logo
Between
5 and 26 Jan 2025
Details
View Map
Share
Follow
Queen Square

Western Power Distribution (South West) are proposing to carry out Utility asset works on Queen Square, City Centre, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 2 Dec 2024 at 16:05.

Western Power Distribution (South West) logo
Between
5 and 26 Jan 2025
Details
View Map
Share
Chapel Row

Western Power Distribution (South West) were proposing to carry out Utility asset works on Chapel Row, City Centre, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2025 and run through until 26 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Nov 2024 at 09:12.

Western Power Distribution (South West) logo
Between
5 and 26 Jan 2025
Details
View Map
Share
Follow
Chapel Row

Western Power Distribution (South West) are proposing to carry out Utility asset works on Chapel Row, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 2 Dec 2024 at 16:06.

Western Power Distribution (South West) logo
Between
5 and 26 Jan 2025
Details
View Map
Share
St Paul's Place

Western Power Distribution (South West) were proposing to carry out Utility asset works on St Paul's Place, Kingsmead, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2025 and run through until 26 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Nov 2024 at 09:14.

Western Power Distribution (South West) logo
Between
5 and 26 Jan 2025
Details
View Map
Share
Queen Square

Western Power Distribution (South West) were proposing to carry out Utility asset works on Queen Square, City Centre, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 January 2025 and run through until 26 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 28 Nov 2024 at 09:14.

Wales And West Utilities logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Snow Hill

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Snow Hill, Walcot, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 12:14.

Wales And West Utilities logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Snow Hill

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Snow Hill, Walcot, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 12:54.

Wiltshire Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Road From 216 Blackberry Lane South To Junction At Winsley Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Road From 216 Blackberry Lane South To Junction At Winsley Hill, Conkwell, Limpley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Nov 2024 at 13:31.

Wiltshire Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Road From 216 Blackberry Lane South To Junction At Winsley Hill

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Road From 216 Blackberry Lane South To Junction At Winsley Hill, Conkwell, Limpley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 1 Nov 2024 at 16:22.

Wessex Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Princes Street

Wessex Water are proposing to carry out New service connection on Princes Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 7 Oct 2024 at 12:15.

Wessex Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Princes Street

Wessex Water are proposing to carry out New service connection on Princes Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 21 Oct 2024 at 12:22.

Gigaclear logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Winsley

Gigaclear were proposing to carry out Utility asset works on Winsley, Winsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 9 Dec 2024 at 13:15.

Wessex Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Westmoreland Street

Wessex Water were proposing to carry out New service connection on Westmoreland Street, Westmoreland, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 15 Oct 2024 at 10:02.

Network Rail logo
Between
25 Jan and 9 Feb 2025
Details
View Map
Share
A4 From J A363 Roundabout To J A46 W

Network Rail were proposing to carry out Works for Rail Purposes on A4 From J A363 Roundabout To J A46 W, Bath And North East Somerset.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 9 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 13:45.

Network Rail logo
Between
25 Jan and 9 Feb 2025
Details
View Map
Share
Follow
A4 From J A363 Roundabout To J A46 W

Network Rail are proposing to carry out Works for Rail Purposes on A4 From J A363 Roundabout To J A46 W, Bath And North East Somerset.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 2 Dec 2024 at 16:30.

Network Rail logo
Between
25 Jan and 9 Feb 2025
Details
View Map
Share
Follow
A4 From J A363 Roundabout To J A46 W

Network Rail are proposing to carry out Works for Rail Purposes on A4 From J A363 Roundabout To J A46 W, Bath And North East Somerset.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Dec 2024 at 13:33.

Western Power Distribution (South West) logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Queen Square

Western Power Distribution (South West) are proposing to carry out Utility asset works on Queen Square, City Centre, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Dec 2024 at 18:42.

Wiltshire Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Belcombe Road

Wiltshire Council are proposing to carry out roadworks on Belcombe Road, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Nov 2024 at 16:38.

Bath And North East Somerset Council logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Widcombe Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 07:36.

Western Power Distribution (South West) logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Rossiter Road

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Rossiter Road, Widcombe, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Nov 2024 at 14:53.

Western Power Distribution (South West) logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Rossiter Road

Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Rossiter Road, Widcombe, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 25 Nov 2024 at 11:21.

Wales And West Utilities logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
New King Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New King Street, Kingsmead, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 21 Nov 2024 at 10:25.

Western Power Distribution (South West) logo
Between
28 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Cul-de-sac At Rear Of 90 To 108 Frome Road

Western Power Distribution (South West) are proposing to carry out New service connection on Cul-de-sac At Rear Of 90 To 108 Frome Road, Odd Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 29 Oct 2024 at 08:25.

Western Power Distribution (South West) logo
Between
28 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Cul-de-sac At Rear Of 90 To 108 Frome Road

Western Power Distribution (South West) are proposing to carry out New service connection on Cul-de-sac At Rear Of 90 To 108 Frome Road, Odd Down, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 14:59.

Western Power Distribution (South West) logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Follow
Cedric Road

Western Power Distribution (South West) are proposing to carry out New service connection on Cedric Road, Lower Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 8 Nov 2024 at 17:18.

Western Power Distribution (South West) logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Follow
Cedric Road

Western Power Distribution (South West) are proposing to carry out New service connection on Cedric Road, Lower Weston, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 29 Oct 2024 at 12:47.

Western Power Distribution (South West) logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Barton Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Barton Street, City Centre, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Dec 2024 at 18:47.

Wales And West Utilities logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Morford Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morford Street, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 25 Oct 2024 at 14:37.

Wales And West Utilities logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Morford Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morford Street, Lansdown, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 07:42.

BT logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

BT are proposing to carry out Utility asset works on Salisbury Road, Larkhall, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Nov 2024 at 15:11.

Wales And West Utilities logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lyncombe Vale Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lyncombe Vale Road, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 9 Dec 2024 at 11:18.

Western Power Distribution (South West) logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Sawclose

Western Power Distribution (South West) are proposing to carry out Utility asset works on Sawclose, City Centre, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Dec 2024 at 15:06.

Western Power Distribution (South West) logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Upper Borough Walls

Western Power Distribution (South West) are proposing to carry out Utility asset works on Upper Borough Walls, City Centre, Bath.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Dec 2024 at 15:06.

Wales And West Utilities logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Edward Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Sep 2024 at 07:47.

Western Power Distribution (South West) logo
Between
26 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Russell Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Russell Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 18 Oct 2024 at 09:29.

Western Power Distribution (South West) logo
Between
26 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Russell Street

Western Power Distribution (South West) are proposing to carry out Utility asset works on Russell Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (South West) on 25 Sep 2024 at 11:20.

Gigaclear logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Newtown

Gigaclear are proposing to carry out Utility asset works on Newtown, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 20 Nov 2024 at 08:28.

Bath And North East Somerset Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 6 Dec 2024 at 10:13.

Bath And North East Somerset Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 10 Dec 2024 at 07:44.

Bristol Waterworks Company logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Ashwicke Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Ashwicke Road, Marshfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 29 Nov 2024 at 10:48.

Bristol Waterworks Company logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Ashwicke Road

Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Ashwicke Road, Marshfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 10 Dec 2024 at 09:49.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Edward Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 12:09.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Edward Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:45.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Edward Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 5 Sep 2024 at 19:03.

Bath And North East Somerset Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Milsom Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Milsom Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 13:55.

Bath And North East Somerset Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Milsom Street

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Milsom Street, City Centre, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 07:38.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Pulteney Mews

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pulteney Mews, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 12:09.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Pulteney Mews

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pulteney Mews, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:46.

Wales And West Utilities logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Pulteney Mews

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pulteney Mews, Bathwick, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Sep 2024 at 07:49.

Wales And West Utilities logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Cottles Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cottles Lane, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 28 Nov 2024 at 16:10.

Wales And West Utilities logo
LONG TERM
Between
10 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Lyncombe Vale

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lyncombe Vale, Lyncombe, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 9 Dec 2024 at 11:19.


Roadworks Map near to BATH, BA1 0YP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 23:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to BATH, BA1 0YP (30 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Bath And North East Somerset Council logo
SPRING GARDENS ROAD, WIDCOMBE 
(0.1 miles)
Bath And North East Somerset Council
Highway improvement works - Footway, Carriageway - Road closure
In Progress
Since: 10 Dec 2024 08:00
(Scheduled: 10 Dec 2024 - 12 Dec 2024)
0.1
Details
Share
Follow
2
Wessex Water logo
SOUTHCOT PLACE, LYNCOMBE 
(0.2 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
9 Dec 2024 13:45 - 16:05
0.2
Details
Share
3
Wessex Water logo
WIDCOMBE HILL, WIDCOMBE 
(0.2 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
11 Dec 2024 11:55 - 16:00
0.2
Details
Share
4
Wessex Water logo
WELLS ROAD, LYNCOMBE 
(0.3 miles)
Wessex Water
Utility repair and maintenance works - Verge - No carriageway incursion
Planned
Scheduled: 12 Dec 2024 - 16 Dec 2024
0.3
Details
Share
Follow
5
Wessex Water logo
MILK STREET, CITY CENTRE 
(0.4 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 12 Dec 2024 - 16 Dec 2024
0.4
Details
Share
Follow
6
Bath And North East Somerset Council logo
SYDNEY BUILDINGS, BATHWICK 
(0.4 miles)
Bath And North East Somerset Council
Highway improvement works - Carriageway, Verge - Some carriageway incursion
Cancelled
(Scheduled: 11 Dec 2024 - 13 Dec 2024)
0.4
Details
Share
7
Wessex Water logo
MAJOR
  
ROSEMOUNT LANE, LYNCOMBE 
(0.4 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 11 Dec 2024 - 13 Dec 2024
0.4
Details
Share
Follow
8
Wessex Water logo
MAJOR
  
ROSEMOUNT LANE, LYNCOMBE 
(0.4 miles)
Wessex Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
11 Dec 2024 09:15 - 16:30
0.4
Details
Share
9
Bath And North East Somerset Council logo
JAMES STREET WEST, CITY CENTRE 
(0.5 miles)
Bath And North East Somerset Council
Highway repair and maintenance works - Footway, Carriageway - Lane closure
Planned
Scheduled: 11 Dec 2024
0.5
Details
Share
Follow
10
BT logo
ST PAUL'S PLACE, KINGSMEAD 
(0.5 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 11 Dec 2024 - 13 Dec 2024)
0.5
Details
Share
  • ...