ROADWORKS SUMMARY
Hints, TAMWORTH, B78 3DP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for B78 3DP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hints, TAMWORTH, B78 3DP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

HS2 logo
LONG TERM
Between
22 Apr and 31 Dec 2024
Details
View Map
Share
Follow
Bangley Lane

HS2 are proposing to carry out Works for Rail Purposes on Bangley Lane, Carroway Head.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 16 Apr 2024 at 09:37.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
2 Sep 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Link Footway From Moor Lane Strteching 780m

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Link Footway From Moor Lane Strteching 780m, Tamworth.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 2 September 2024 and could run through until 17 February 2025. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Apr 2024 at 09:01.

Staffordshire County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Coton Lane

Staffordshire County Council are carrying out Highway repair and maintenance works on Coton Lane, Tamworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 00:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 13:49.

Birmingham City Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lindridge Road

Birmingham City Council are proposing to carry out Highway improvement works on Lindridge Road, Sutton New Hall, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Birmingham City Council on 4 Sep 2024 at 10:52.

Staffordshire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Walsall Road

Staffordshire County Council are carrying out Highway improvement works on Walsall Road, Little Aston.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 09:41 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:25.

Birmingham City Council logo
LONG TERM
Between
20 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Lindridge Road

Birmingham City Council are proposing to carry out Highway improvement works on Lindridge Road, Sutton New Hall, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 21 Nov 2024 at 10:27.

Cadent Gas logo
Until
24 Dec 2024
Details
View Map
Share
Follow
Church Road

Cadent Gas are carrying out Utility asset works on Church Road, Tamworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 09:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:39.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Upper Gungate

Staffordshire County Council are proposing to carry out Highway improvement works on Upper Gungate, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:54.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lunns Croft

Cadent Gas are proposing to carry out Utility asset works on Lunns Croft, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:13.

Cadent Gas logo
Between
3 and 24 Dec 2024
Details
View Map
Share
Follow
Partridge Croft

Cadent Gas are proposing to carry out Utility asset works on Partridge Croft, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:13.

Cadent Gas logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Follow
St Michael Road

Cadent Gas are proposing to carry out Utility asset works on St Michael Road, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:26.

Cadent Gas logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Follow
Scotch Orchard

Cadent Gas are proposing to carry out Utility asset works on Scotch Orchard, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:26.

Cadent Gas logo
Between
5 and 27 Dec 2024
Details
View Map
Share
Follow
Valley Lane

Cadent Gas are proposing to carry out Utility asset works on Valley Lane, Lichfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 14:26.

Staffordshire County Council logo
Between
8 and 20 Dec 2024
Details
View Map
Share
Follow
Sutton Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Sutton Road, Carroway Head.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:36.

Warwickshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Bodymoor Heath Lane

Warwickshire County Council are proposing to carry out roadworks on Bodymoor Heath Lane, Kingsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Warwickshire County Council on 11 Nov 2024 at 12:10.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Rush Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Rush Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:04.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Sefton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sefton Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:29.

Staffordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Sefton Road

Staffordshire County Council are carrying out Highway improvement works on Sefton Road, Tamworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 09:17 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 09:23.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Gorsy Bank Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gorsy Bank Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:16.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Gorsy Bank Road

Staffordshire County Council are proposing to carry out Highway improvement works on Gorsy Bank Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:33.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Cadogan Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cadogan Road, Dosthill, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:29.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Cadogan Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cadogan Road, Dosthill, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:33.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Cadogan Road

Staffordshire County Council were proposing to carry out Highway improvement works on Cadogan Road, Dosthill, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 17:20.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Hockley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Hockley Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:04.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Hedging Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hedging Lane, Wilnecote, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 09:52.

Network Rail logo
Today
Details
View Map
Share
Hill Hook Road

Network Rail carried out Works for Rail Purposes on Hill Hook Road, Sutton Coldfield.

The road was closed for some or all of the period.

The works were originally planned between 9 Dec 2024 and 13 Dec 2024 and were actually completed between 9 Dec 2024 (23:30) and 13 Dec 2024 (06:00). The works impacted the carriageway only.

This roadwork event was last updated by Network Rail on 13 Dec 2024 at 08:37.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Goldcrest

Staffordshire County Council are proposing to carry out Highway improvement works on Goldcrest, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 09:52.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Goldcrest

Staffordshire County Council were proposing to carry out Highway improvement works on Goldcrest, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Nov 2024 at 15:14.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Manta Road

Staffordshire County Council are proposing to carry out Highway improvement works on Manta Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 09:52.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Forge Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Forge Lane, Mill Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:58.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Brent

Staffordshire County Council are proposing to carry out Highway improvement works on Brent, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:29.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Glascote Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Lane, Belgrave, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 14:51.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Fossdale Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fossdale Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:18.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Glascote Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Glascote Lane, Wilnecote, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 16:17.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Glascote Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Lane, Wilnecote, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:18.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Cycleway From Wilnecote Lane To Cycleway At Rear Of 30 Rothay

Staffordshire County Council are proposing to carry out Highway improvement works on Cycleway From Wilnecote Lane To Cycleway At Rear Of 30 Rothay, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 10:16.

Staffordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Cycleway From Wilnecote Lane To Cycleway At Rear Of 30 Rothay

Staffordshire County Council are carrying out Highway improvement works on Cycleway From Wilnecote Lane To Cycleway At Rear Of 30 Rothay, Tamworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 09:17 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 09:29.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Willowbank

Staffordshire County Council were proposing to carry out Highway improvement works on Willowbank, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 16:54.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Collett

Staffordshire County Council were proposing to carry out Highway improvement works on Collett, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 18:56.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Felspar Road

Staffordshire County Council are proposing to carry out Highway improvement works on Felspar Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:31.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
St Georges Way

Staffordshire County Council are proposing to carry out Highway improvement works on St Georges Way, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:18.

Staffordshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Market Street

Staffordshire County Council are proposing to carry out Highway improvement works on Market Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the verge only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:58.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 09:52.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Church Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Church Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:53.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Bridgewater Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bridgewater Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:01.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Dunstall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Dunstall Road, Hopwas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:03.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Borman

Staffordshire County Council are proposing to carry out Highway improvement works on Borman, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:41.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Ashcroft Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ashcroft Lane, Shenstone, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:44.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Coton Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Coton Lane, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Sep 2024 at 11:06.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Ashcroft Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Ashcroft Lane, Wall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:44.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Tamworth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 09:35.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Quarry Hills Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Quarry Hills Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2024 at 10:41.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Abbotsford Road

Staffordshire County Council are proposing to carry out Highway improvement works on Abbotsford Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 11:54.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Huddlesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:41.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Europa Way

Staffordshire County Council are proposing to carry out Highway improvement works on Europa Way, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 11:54.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Whittington Hurst, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 14:41.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Stockford Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Stockford Lane, Hilliards Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 13:38.

South Staffordshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Four Oaks Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Four Oaks Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 18 Oct 2024 at 14:47.

Staffordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Coronation Avenue

Staffordshire County Council are carrying out Highway improvement works on Coronation Avenue, Fazeley.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 13 December 2024 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 12:36.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Tamworth Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Tamworth Road, Dosthill, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Sep 2024 at 14:42.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Tamworth Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Tamworth Road, Dosthill, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 09:03.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Dosthill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Dosthill Road, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Sep 2024 at 14:42.

Western Power Distribution (East Midlands) logo
LONG TERM
Between
16 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Dosthill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Dosthill Road, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 15 Oct 2024 at 09:03.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Belsize

Staffordshire County Council are proposing to carry out Highway improvement works on Belsize, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:07.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Belsize

Staffordshire County Council are proposing to carry out Highway improvement works on Belsize, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:00.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brockhurst Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Brockhurst Lane, Hints.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:27.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Little Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 12:15.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Dumolos Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dumolos Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:21.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Dumolos Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dumolos Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Kettlebrook Road

Staffordshire County Council are proposing to carry out Highway improvement works on Kettlebrook Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:07.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Kettlebrook Road

Staffordshire County Council are proposing to carry out Highway improvement works on Kettlebrook Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 11:34.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
John Street

Staffordshire County Council are proposing to carry out Highway improvement works on John Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:39.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
John Street

Staffordshire County Council are proposing to carry out Highway improvement works on John Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 11:34.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Weeford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 14:34.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Weeford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 15:04.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Church Street

Staffordshire County Council are proposing to carry out Highway improvement works on Church Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:07.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Church Street

Staffordshire County Council are proposing to carry out Highway improvement works on Church Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:00.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Wardle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Wardle Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:33.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Wardle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Wardle Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Halford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Halford Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:33.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Halford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Halford Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Holly Hill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Holly Hill Road, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:28.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Spinning School Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Spinning School Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:33.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Spinning School Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Spinning School Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Borman

Staffordshire County Council are proposing to carry out Highway improvement works on Borman, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 08:23.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Church Road

Staffordshire County Council are proposing to carry out Highway improvement works on Church Road, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:28.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Buckingham Road

Staffordshire County Council are proposing to carry out Highway improvement works on Buckingham Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:33.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Buckingham Road

Staffordshire County Council are proposing to carry out Highway improvement works on Buckingham Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Masefield Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Masefield Drive, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:07.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Masefield Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Masefield Drive, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 11:34.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Thackeray Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Thackeray Drive, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 10:40.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Borough Road

Staffordshire County Council are proposing to carry out Highway improvement works on Borough Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:54.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Borough Road

Staffordshire County Council are proposing to carry out Highway improvement works on Borough Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Fontenaye Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fontenaye Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 15:21.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Fontenaye Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fontenaye Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Chestnut Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Chestnut Avenue, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:54.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Chestnut Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Chestnut Avenue, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:00.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Clifton Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Clifton Avenue, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 10:27.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Main Road

Staffordshire County Council are proposing to carry out Highway improvement works on Main Road, Wigginton, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:54.

Cadent Gas logo
Between
17 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Cadogan Road

Cadent Gas are proposing to carry out Utility asset works on Cadogan Road, Dosthill, Tamworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:55.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Leyland Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leyland Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:40.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Portleys Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Portleys Lane, Drayton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 13:20.

Cadent Gas logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Sutton Coldfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:32.

Cadent Gas logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Hillwood Road

Cadent Gas are proposing to carry out Utility asset works on Hillwood Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 13:27.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Whitehouse Common Road

Cadent Gas are proposing to carry out Utility asset works on Whitehouse Common Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 10:49.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Withy Hill Road

Cadent Gas are proposing to carry out Utility asset works on Withy Hill Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:33.

Severn Trent Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Slade Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Slade Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 16 Oct 2024 at 16:28.

Severn Trent Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Slade Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Slade Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 12:50.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Worcester Lane

Cadent Gas are proposing to carry out Utility asset works on Worcester Lane, Sutton Coldfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 13:13.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Hillwood Road

Cadent Gas are proposing to carry out Utility asset works on Hillwood Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 12:39.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Forties

Staffordshire County Council are proposing to carry out Highway improvement works on Forties, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 10:01.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Little Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 15:17.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Weeford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 15:17.

South Staffordshire Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Wigginton Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Wigginton Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 21 Oct 2024 at 11:40.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Wall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wall Lane, Wall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 10:56.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Fisherwick Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fisherwick Road, Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 10:22.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Huddlesford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 09:16.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Broad Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Broad Lane, Whittington Hurst, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Oct 2024 at 11:01.

BT logo
Between
7 and 8 Jan 2025
Details
View Map
Share
Follow
Roman Road

BT are proposing to carry out Utility asset works on Roman Road, Little Aston.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 29 Nov 2024 at 09:43.

South Staffordshire Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Coppice Lane

South Staffordshire Water are proposing to carry out New service connection on Coppice Lane, Middleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 4 Oct 2024 at 09:22.

South Staffordshire Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Coppice Lane

South Staffordshire Water are proposing to carry out New service connection on Coppice Lane, Middleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 22 Oct 2024 at 12:01.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Glascote Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Lane, Belgrave, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 14:50.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brook End

Staffordshire County Council are proposing to carry out Highway improvement works on Brook End, Fazeley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 11:35.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Glascote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Road, Stonydelph, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 15:59.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Neville Street

Staffordshire County Council are proposing to carry out Highway improvement works on Neville Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 16:25.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Argyle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Argyle Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:41.

Staffordshire County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Plantation Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Plantation Lane, Hopwas.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 09:48.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Rene Road

Staffordshire County Council are proposing to carry out Highway improvement works on Rene Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:41.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Florendine Street

Staffordshire County Council are proposing to carry out Highway improvement works on Florendine Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:28.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Borman

Staffordshire County Council are proposing to carry out Highway improvement works on Borman, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Oct 2024 at 09:49.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Marsh Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Marsh Lane, Darnford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 16:15.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Marsh Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Marsh Lane, Darnford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 09:13.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Ivanhoe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Oct 2024 at 16:12.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
St John Street

Staffordshire County Council are proposing to carry out Highway improvement works on St John Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Oct 2024 at 12:54.

South Staffordshire Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Walsh Drive

South Staffordshire Water are proposing to carry out Remedial works on Walsh Drive, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 10 Oct 2024 at 14:33.

South Staffordshire Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Ashcroft Lane

South Staffordshire Water are proposing to carry out Remedial works on Ashcroft Lane, Shenstone, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 8 Oct 2024 at 11:40.

Staffordshire County Council logo
Between
15 and 24 Jan 2025
Details
View Map
Share
Follow
Bird Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bird Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 10:12.

Staffordshire County Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Lichfield Street

Staffordshire County Council are proposing to carry out Highway improvement works on Lichfield Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 16:10.

Staffordshire County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Lichfield Street

Staffordshire County Council are proposing to carry out Highway improvement works on Lichfield Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 12:34.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Cappers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Dec 2024 at 11:39.

South Staffordshire Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Market Street

South Staffordshire Water were proposing to carry out New service connection on Market Street, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 28 Oct 2024 at 11:54.

Cadent Gas logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Whitehouse Common Road

Cadent Gas are proposing to carry out Utility asset works on Whitehouse Common Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:44.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Withy Hill Road

Cadent Gas are proposing to carry out Utility asset works on Withy Hill Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:46.

Staffordshire County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Blake Street

Staffordshire County Council are proposing to carry out Highway improvement works on Blake Street, Little Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 14:27.

Staffordshire County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Blake Street

Staffordshire County Council are proposing to carry out Highway improvement works on Blake Street, Little Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 14:42.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mariner

Staffordshire County Council are proposing to carry out Highway improvement works on Mariner, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 13:27.

South Staffordshire Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Quarry Hills Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Quarry Hills Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 10 Oct 2024 at 10:07.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Sturgeons Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sturgeons Hill, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 16:30.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Sturgeons Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sturgeons Hill, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 17:15.

South Staffordshire Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Wade Street

South Staffordshire Water were proposing to carry out New service connection on Wade Street, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 24 Oct 2024 at 10:12.

Staffordshire County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Tamworth Street

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 10:08.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Little Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 14:23.

Western Power Distribution (East Midlands) logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Riley

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Riley, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 10:47.

Western Power Distribution (East Midlands) logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Riley

Western Power Distribution (East Midlands) were proposing to carry out New service connection on Riley, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 9 Dec 2024 at 12:43.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Glascote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Road, Glascote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 15:13.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Weeford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 14:23.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 16 May 2025
Details
View Map
Share
Follow
Friary Road

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 10:03.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Friary Road

Staffordshire County Council were proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 15:11.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 16 May 2025
Details
View Map
Share
Follow
Friary Island

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Island, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 10:01.

Staffordshire County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Cappers Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 15:11.

South Staffordshire Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Lingard Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Lingard Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 27 Nov 2024 at 11:58.

South Staffordshire Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lichfield Road

South Staffordshire Water are proposing to carry out New service connection on Lichfield Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 9 Dec 2024 at 12:55.

Western Power Distribution (West Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Streetly Crescent

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Streetly Crescent, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 13:29.

Western Power Distribution (West Midlands) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Streetly Crescent

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Streetly Crescent, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Dec 2024 at 12:36.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 09:05.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Church Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:49.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
St John Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on St John Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:49.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Corporation Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Corporation Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:50.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Orchard Street

Staffordshire County Council are proposing to carry out Highway improvement works on Orchard Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 12:48.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Lower Gungate

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Lower Gungate, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:50.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Hospital Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Hospital Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:50.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Albert Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Albert Road, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:49.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Upper Gungate

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Upper Gungate, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:50.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Aldergate

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Aldergate, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:49.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Offa Drive

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Offa Drive, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:50.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Salters Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Salters Lane, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:50.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
Croft Street

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Croft Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 13:50.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Pinfold Hill

Cadent Gas are proposing to carry out New service connection on Pinfold Hill, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 09:59.

South Staffordshire Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Back Lane

South Staffordshire Water are proposing to carry out New service connection on Back Lane, Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 11 Dec 2024 at 11:24.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Friary Road

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Road, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 15:58.

Staffordshire County Council logo
LONG TERM
Between
10 Feb and 23 May 2025
Details
View Map
Share
Follow
Friary Island

Staffordshire County Council are proposing to carry out Highway improvement works on Friary Island, Lichfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 15:45.

South Staffordshire Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Four Oaks Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Four Oaks Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 6 Dec 2024 at 14:36.

Western Power Distribution (West Midlands) logo
Between
14 and 28 Feb 2025
Details
View Map
Share
Follow
Park View Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park View Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 4 Dec 2024 at 13:25.

Western Power Distribution (West Midlands) logo
Between
14 and 28 Feb 2025
Details
View Map
Share
Follow
Park View Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Park View Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Dec 2024 at 12:36.

National Highways logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
A38 Weeford To Bassetts Pole

National Highways are proposing to carry out Highway repair and maintenance works on A38 Weeford To Bassetts Pole, Weeford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Dec 2024 at 11:28.

Cadent Gas logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Drayton Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Drayton Lane, Drayton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 09:05.

Cadent Gas logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Drayton Lane

Cadent Gas are proposing to carry out New service connection on Drayton Lane, Drayton Bassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:10.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Glascote Road

Staffordshire County Council are proposing to carry out Highway improvement works on Glascote Road, Glascote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:52.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Orchard Street

Staffordshire County Council were proposing to carry out Highway improvement works on Orchard Street, Tamworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 15:38.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mariner

Staffordshire County Council are proposing to carry out Highway improvement works on Mariner, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 09:48.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Ivanhoe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:24.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Cappers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cappers Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 10:28.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Fisherwick Road

Staffordshire County Council are proposing to carry out Highway improvement works on Fisherwick Road, Fisherwick, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 13:11.

South Staffordshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Wissage Lane

South Staffordshire Water are proposing to carry out New service connection on Wissage Lane, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 09:44.

South Staffordshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Scotch Orchard

South Staffordshire Water are proposing to carry out New service connection on Scotch Orchard, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 14 Oct 2024 at 09:44.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Florendine Street

Staffordshire County Council are proposing to carry out Highway improvement works on Florendine Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:24.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Orchard Street

Staffordshire County Council are proposing to carry out Highway improvement works on Orchard Street, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 10:55.

Network Rail logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Ivanhoe Road

Network Rail are proposing to carry out Works for Rail Purposes on Ivanhoe Road, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 08:50.

Staffordshire County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Tamworth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Road, Amington, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 16:59.

Staffordshire County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Tamworth Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tamworth Road, Amington, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 09:57.

Severn Trent Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Anchorage Road

Severn Trent Water are proposing to carry out Remedial works on Anchorage Road, Sutton Trinity, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 09:51.

Western Power Distribution (East Midlands) logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Tamworth Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Tamworth Road, Dosthill, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 15:55.

Staffordshire County Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Forties

Staffordshire County Council are proposing to carry out Highway improvement works on Forties, Tamworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 08:35.

Western Power Distribution (East Midlands) logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Dosthill Road

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Dosthill Road, Tamworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 26 Nov 2024 at 15:55.

BT logo
Between
6 and 7 Mar 2025
Details
View Map
Share
Follow
Roman Road

BT are proposing to carry out Utility asset works on Roman Road, Little Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Dec 2024 at 08:59.

South Staffordshire Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Holly Lane

South Staffordshire Water are proposing to carry out New service connection on Holly Lane, Sutton New Hall, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Staffordshire Water on 28 Nov 2024 at 15:07.

Cadent Gas logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Pinfold Hill

Cadent Gas are proposing to carry out New service connection on Pinfold Hill, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:00.

Staffordshire County Council logo
Between
12 and 21 Mar 2025
Details
View Map
Share
Follow
Bird Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bird Street, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Dec 2024 at 09:13.


Roadworks Map near to Hints, TAMWORTH, B78 3DP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Dec 2024 12:41
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hints, TAMWORTH, B78 3DP (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
HS2 logo
BROCKHURST LANE 
(0.3 miles)
HS2
Works for Rail Purposes - Footway - No carriageway incursion
Planned
Scheduled: 20 Sep 2021 - 31 Dec 2024
0.3
Details
Share
Follow
2
HS2 logo
BROCKHURST LANE 
(0.3 miles)
HS2
Works for Rail Purposes - Footway - No carriageway incursion
Planned
Scheduled: 20 Sep 2021 - 31 Dec 2024
0.3
Details
Share
Follow
3
HS2 logo
BROCKHURST LANE 
(0.5 miles)
HS2
Works for Rail Purposes - Footway - No carriageway incursion
Planned
Scheduled: 20 Sep 2021 - 31 Dec 2024
0.5
Details
Share
Follow
4
HS2 logo
BANGLEY LANE 
(0.7 miles)
HS2
Works for Rail Purposes - Footway - No carriageway incursion
Planned
Scheduled: 2 Aug 2021 - 31 Dec 2024
0.7
Details
Share
Follow
5
HS2 logo
WATLING STREET 
(0.7 miles)
HS2
Works for Rail Purposes - Footway - No carriageway incursion
Planned
Scheduled: 13 Mar 2023 - 31 Dec 2025
0.7
Details
Share
Follow
6
HS2 logo
WATLING STREET 
(0.7 miles)
HS2
Works for Rail Purposes - Footway - No carriageway incursion
Planned
Scheduled: 20 Sep 2021 - 31 Dec 2024
0.7
Details
Share
Follow
7
HS2 logo
WATLING STREET 
(0.8 miles)
HS2
Works for Rail Purposes - Footway - No carriageway incursion
Planned
Scheduled: 20 Sep 2021 - 31 Dec 2024
0.8
Details
Share
Follow
8
HS2 logo
BANGLEY LANE 
(0.8 miles)
HS2
Works for Rail Purposes - Carriageway - Multi-way signals
Planned
Scheduled: 22 Apr 2024 - 31 Dec 2024
0.8
Details
Share
Follow
9
HS2 logo
WATLING STREET 
(0.9 miles)
HS2
Works for Rail Purposes - Verge - No carriageway incursion
Planned
Scheduled: 23 Nov 2021 - 31 Dec 2024
0.9
Details
Share
Follow
10
HS2 logo
WATLING STREET 
(0.9 miles)
HS2
Works for Rail Purposes - Footway - No carriageway incursion
Planned
Scheduled: 9 Aug 2021 - 31 Dec 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.