ROADWORKS SUMMARY
WC1N 3NX
Introduction
View current and future planned roadworks and road closures for WC1N 3NX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to WC1N 3NX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
26 Jun 2024
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 June 2019 at 07:00 and could run through until 26 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 12 Oct 2023 at 12:48.
23 Mar 2020 and 14 Apr 2024
Transport for London (TfL) are proposing to carry out roadworks on Old Street, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 March 2020 and could run through until 14 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 19 Dec 2023 at 10:44.
30 Nov 2024
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Chelsea Embankment, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2020 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 15 Feb 2024 at 15:50.
Sunday
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Chelsea Embankment, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2020 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 12 Oct 2023 at 09:39.
30 May 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.
These works are categorised as Major.
The works started on 17 July 2020 at 08:00 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 09:28.
30 Aug 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Yeoman Street, London.
These works are categorised as Major.
The works started on 17 July 2020 at 08:00 and could run through until 30 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 4 Nov 2021 at 15:19.
30 Aug 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2020 at 07:00 and could run through until 30 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 8 Nov 2021 at 12:02.
23 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on West Lane, London.
These works are categorised as Major.
The works started on 27 July 2020 at 07:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Nov 2021 at 10:01.
31 Oct 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Coffey Road, London.
These works are categorised as Major.
The works started on 4 August 2020 at 07:00 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 09:29.
Sunday
Thames Water are carrying out Utility asset works on Vesta Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 June 2021 at 09:00 and could run through until 31 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Dec 2023 at 14:47.
22 Aug 2202
Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2021 at 15:30.
6 Dec 2021 and 25 Jul 2024
City Of London Corporation are proposing to carry out Highway improvement works on Blackfriars Bridge, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2021 and could run through until 25 July 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2021 at 16:21.
1 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2022 at 00:00 and could run through until 1 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 23:15.
18 Sep 2022 and 12 Jul 2024
Thames Tideway Tunnel are proposing to carry out Utility repair and maintenance works on Albert Embankment, Prince's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2022 and could run through until 12 July 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Tideway Tunnel on 8 Mar 2021 at 13:32.
5 Sep 2024
Network Rail are carrying out Works for Rail Purposes on Tanner Lane, Westminster, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2022 at 06:30 and could run through until 5 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 3 Oct 2022 at 07:08.
5 Sep 2024
Network Rail are carrying out Works for Rail Purposes on South Wharf Road, Hyde Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 October 2022 at 06:30 and could run through until 5 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Oct 2022 at 07:07.
5 Sep 2024
Network Rail are carrying out Works for Rail Purposes on Junction Place, Hyde Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 October 2022 at 06:30 and could run through until 5 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Oct 2022 at 07:09.
30 Apr 2024
City Of London Corporation are carrying out Highway improvement works on Threadneedle Street, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 October 2022 at 07:00 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:21.
31 Oct 2022 and 30 Apr 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Randall Close, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2022 and could run through until 30 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 26 Oct 2022 at 11:50.
14 Nov 2022 and 5 Apr 2024
Transport for London (TfL) are proposing to carry out roadworks on Farringdon Road, Islington, London.
These works are categorised as Major.
The works will start on or after 14 November 2022 and could run through until 5 April 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 30 Jan 2024 at 19:08.
1 Dec 2022 and 19 Apr 2024
Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2022 and could run through until 19 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2023 at 10:10.
30 Apr 2024
City Of London Corporation are carrying out Highway repair and maintenance works on Lombard Street, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 December 2022 at 08:00 and could run through until 30 April 2024. The works will impact the footway only.
This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:02.
1 May 2024
Network Rail are carrying out Works for Rail Purposes on Kingsbury Road, Islington, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 December 2022 at 17:30 and could run through until 1 May 2024. The works will impact the footway and cycleway.
This roadwork event was last updated by Network Rail on 25 Jan 2024 at 12:42.
19 Dec 2022 and 26 Aug 2024
Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2022 and could run through until 26 August 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 11:17.
31 Dec 2024
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 January 2023 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Jan 2023 at 09:41.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Ellis Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 15:53.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pont Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Cadogan Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Harriet Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.
2 May 2024
Transport for London (TfL) are carrying out roadworks on Stoke Newington High Street, Hackney, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 February 2023 at 08:00 and could run through until 2 May 2024. The works will impact the footway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2024 at 11:37.
30 Apr 2024
City Of London Corporation are carrying out Highway repair and maintenance works on Mansion House Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 February 2023 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:04.
30 Apr 2024
City Of London Corporation are carrying out Highway improvement works on Prince's Street, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 February 2023 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:19.
4 Mar 2023 and 19 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Wood Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2023 and could run through until 19 April 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2024 at 10:34.
27 Mar 2023 and 8 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.
7 May 2024
London Borough Of Southwark are carrying out Highway improvement works on Walworth Square, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 April 2023 at 23:00 and could run through until 7 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 11:58.
Tuesday
Transport for London (TfL) are carrying out Highway improvement works on Holloway Road, Islington, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 May 2023 at 07:00 and could run through until 2 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2024 at 11:41.
31 Dec 2024
Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Cadogan Gardens, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 May 2023 at 07:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 May 2023 at 08:01.
24 May 2024
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on York Road, Wandsworth, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 May 2023 at 07:00 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 15 Jun 2023 at 12:20.
Sunday
Thames Water are carrying out Utility repair and maintenance works on Kitto Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 June 2023 at 13:30 and could run through until 31 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Sep 2023 at 15:25.
4 Jul 2023 and 12 May 2024
London Borough Of Hackney are proposing to carry out Highway improvement works on Lea Bridge Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2023 and could run through until 12 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 3 May 2023 at 10:19.
24 Jul 2024
London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 July 2023 at 23:00 and could run through until 24 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 15 Nov 2023 at 10:50.
12 Jul 2023 and 12 Aug 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Melior Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 July 2023 and could run through until 12 August 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 27 Jul 2023 at 09:21.
31 May 2024
Thames Tideway Tunnel are carrying out Works for road purposes on Cringle Street, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 July 2023 at 08:00 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 14 Mar 2024 at 15:48.
23 Apr 2025
Thames Water are carrying out roadworks on Welsford Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 July 2023 at 14:30 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Jul 2023 at 16:01.
16 May 2024
Thames Water are carrying out Utility repair and maintenance works on Finsbury Park Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 July 2023 at 07:30 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2023 at 14:31.
16 May 2024
Thames Water are carrying out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 July 2023 at 08:30 and could run through until 16 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 28 Nov 2023 at 14:29.
2 Jun 2024
London Borough Of Hackney are carrying out Highway improvement works on Lea Bridge Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 July 2023 at 08:05 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 24 Jul 2023 at 08:05.
31 Aug 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2023 at 23:00 and could run through until 31 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Nov 2023 at 16:30.
20 May 2025
London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.
These works are categorised as Major.
The works started on 21 August 2023 at 05:11 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Jan 2024 at 10:37.
24 Apr 2024
London Borough Of Southwark are carrying out Highway improvement works on Albion Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 August 2023 at 23:00 and could run through until 24 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 17 Jan 2024 at 12:32.
29 Aug 2023 and 24 Oct 2024
Transport for London (TfL) are proposing to carry out roadworks on Stamford Street, London.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 29 August 2023 and could run through until 24 October 2024. The works will impact the footway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2023 at 14:31.
6 Sep 2023 and 3 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 14:54.
9 Sep 2023 and 11 Sep 2024
City Of Westminster are proposing to carry out Highway improvement works on Wigmore Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2023 and could run through until 11 September 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 28 Jun 2023 at 05:54.
22 Jun 2024
London Borough Of Southwark are carrying out Highway improvement works on Lower Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2023 at 23:00 and could run through until 22 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 13 Oct 2023 at 05:52.
30 Apr 2024
London Borough Of Camden are carrying out Highway improvement works on Tavistock Square, Bloomsbury, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 September 2023 at 14:00 and could run through until 30 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 29 Sep 2023 at 15:00.
25 Sep 2023 and 31 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jamaica Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2023 and could run through until 31 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 22 May 2023 at 10:12.
30 Sep 2024
London Borough Of Southwark are carrying out Highway improvement works on Bankside, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 30 September 2023 at 23:00 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2023 at 12:22.
14 Apr 2024
Thames Water are carrying out Utility asset works on Crowndale Road, St Pancras And Somers Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 October 2023 at 09:21 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Oct 2023 at 11:20.
29 Jun 2024
London Borough Of Camden are carrying out Highway improvement works on York Way, St Pancras And Somers Town, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 October 2023 at 09:00 and could run through until 29 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 26 Mar 2024 at 07:15.
11 Oct 2025
Transport for London (TfL) are carrying out roadworks on Druid Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.
11 Oct 2025
Transport for London (TfL) are carrying out roadworks on Druid Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 22:46.
Tomorrow
City Of Westminster are carrying out Highway improvement works on Embankment Place, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 October 2023 at 08:00 and could run through until 30 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 30 Jan 2024 at 06:26.
7 Nov 2023 and 10 May 2024
Thames Water are proposing to carry out Utility asset works on St Edmund's Terrace, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2023 and could run through until 10 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Aug 2023 at 15:37.
1 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Pembroke Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 08:00 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2023 at 08:59.
12 Apr 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Pembroke Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 08:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Feb 2024 at 14:18.
5 Apr 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Holland Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 08:00 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 10:47.
14 Apr 2024
Thames Water are carrying out Utility asset works on Eversholt Street, St Pancras And Somers Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 11:45 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2023 at 12:12.
13 Nov 2023 and 14 Apr 2024
Thames Water are proposing to carry out Utility asset works on Eversholt Street, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2023 and could run through until 14 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 11 Aug 2023 at 12:43.
7 May 2024
London Borough Of Southwark are carrying out Highway improvement works on Walworth Square, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 November 2023 at 08:08 and could run through until 7 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 12:05.
Today
London Borough Of Haringey are carrying out Highway improvement works on The Bank, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2023 at 08:00 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 20 Nov 2023 at 09:20.
1 May 2024
Network Rail are carrying out Works for Rail Purposes on St Jude Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:00 and could run through until 1 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Nov 2023 at 08:33.
8 Apr 2024
Thames Water are carrying out Disconnection or alteration of supply on Reverdy Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2023 at 09:30 and could run through until 8 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Nov 2023 at 09:49.
28 Nov 2024
London Borough Of Southwark are carrying out Highway improvement works on Bankside, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 29 November 2023 at 06:11 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Nov 2023 at 06:14.
12 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on Strand, St James's, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 November 2023 at 13:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Mar 2024 at 10:15.
4 Dec 2023 and 3 May 2024
Transport for London (TfL) are proposing to carry out roadworks on Borough High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2023 and could run through until 3 May 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2023 at 12:45.
9 Dec 2023 and 10 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.
5 Apr 2024
Network Rail are carrying out Works for Rail Purposes on Leeke Street, King's Cross, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2023 at 08:00 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Dec 2023 at 09:16.
16 Jul 2024
London Borough Of Southwark are carrying out Highway improvement works on Albion Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 December 2023 at 19:28 and could run through until 16 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 17 Dec 2023 at 19:31.
Today
City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 December 2023 at 08:00 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 18 Dec 2023 at 08:47.
28 May 2024
Thames Water are carrying out Utility repair and maintenance works on Linden Grove, London.
These works are categorised as Major.
The works started on 4 January 2024 at 08:00 and could run through until 28 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Jan 2024 at 14:29.
12 Apr 2024
Thames Water are carrying out Disconnection or alteration of supply on Monnow Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 January 2024 at 10:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jan 2024 at 09:05.
2 Jan and 2 Jul 2024
London Borough Of Lambeth are proposing to carry out Remedial works on Waterloo Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 2 July 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 3 Oct 2023 at 07:51.
2 Jan and 30 Apr 2024
HS2 are proposing to carry out Works for Rail Purposes on Stanhope Street, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by HS2 on 11 Dec 2023 at 13:50.
14 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2024 at 10:00 and could run through until 14 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 13:47.
21 Apr 2024
Thames Water are carrying out Utility asset works on Warwick Way, Warwick, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2024 at 08:45 and could run through until 21 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jan 2024 at 08:59.
21 Apr 2024
Thames Water are carrying out Utility asset works on Denbigh Street, Warwick, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2024 at 08:45 and could run through until 21 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jan 2024 at 08:58.
18 Aug 2024
Thames Water are carrying out Utility asset works on Wilton Road, Warwick, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 January 2024 at 08:45 and could run through until 18 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jan 2024 at 09:00.
15 Apr 2024
Thames Water are carrying out Utility asset works on Grafton Crescent, Kentish Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 January 2024 at 07:30 and could run through until 15 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jan 2024 at 08:56.
5 Aug 2024
City Of London Corporation are carrying out Highway improvement works on Leadenhall Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 January 2024 at 08:00 and could run through until 5 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 5 Jan 2024 at 08:00.
5 Aug 2024
City Of London Corporation are carrying out Highway improvement works on Goring Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 January 2024 at 08:00 and could run through until 5 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 5 Jan 2024 at 08:00.
8 Jan and 29 Apr 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 Dec 2023 at 10:45.
30 Oct 2024
London Borough Of Camden are carrying out Highway repair and maintenance works on Chalk Farm Road, Camden Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 12:30 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 16:23.
8 Jan and 5 Apr 2024
London Borough Of Haringey are proposing to carry out Highway improvement works on Remington Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 5 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Haringey on 20 Dec 2023 at 12:44.
12 Apr 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Quebec Way, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 January 2024 at 08:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2024 at 08:34.
Tomorrow
City Of Westminster are carrying out Highway repair and maintenance works on John Adam Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 January 2024 at 12:00 and could run through until 30 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 30 Jan 2024 at 06:24.
14 Apr 2024
Thames Water are carrying out Utility asset works on Warren Street, Bloomsbury, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:00 and could run through until 14 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 14:43.
24 Sep 2024
City Of Westminster are carrying out Highway repair and maintenance works on Fernhead Road, Harrow Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 12:30 and could run through until 24 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 15 Jan 2024 at 14:17.
31 Dec 2024
London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 16 Feb 2024 at 10:14.
18 Apr 2024
London Borough Of Hackney are carrying out Highway improvement works on Wayland Avenue, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:17 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:38.
18 Apr 2024
London Borough Of Hackney are carrying out Highway improvement works on Sigdon Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:17 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:45.
18 Apr 2024
London Borough Of Hackney are carrying out Highway improvement works on Sandringham Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 14:44 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:27.
15 Jan and 22 Apr 2024
London Borough Of Haringey are proposing to carry out Highway improvement works on Highgate High Street, Hornsey, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Haringey on 21 Dec 2023 at 12:50.
15 Jan and 22 Apr 2024
London Borough Of Haringey are proposing to carry out Highway improvement works on Southwood Lane, Hornsey, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Haringey on 21 Dec 2023 at 12:50.
23 Sep 2024
Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 January 2024 at 08:30 and could run through until 23 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Jan 2024 at 10:27.
7 May 2024
Thames Water are carrying out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 January 2024 at 08:30 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jan 2024 at 10:14.
19 Jun 2024
Thames Water are carrying out Utility asset works on Hobart Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 January 2024 at 08:30 and could run through until 19 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jan 2024 at 10:28.
17 Jan 2024 and 14 Jan 2026
Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.
14 Apr 2024
Thames Water are carrying out Utility asset works on Thorparch Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 09:00 and could run through until 14 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:38.
22 Jan and 10 May 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 14:19.
Sunday
Transport for London (TfL) are carrying out Highway improvement works on Bishopsgate, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2024 at 10:35.
13 May 2024
Thames Water are carrying out Utility asset works on Mill Lane, Fortune Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 10:00 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 07:19.
24 Jan and 30 Oct 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porters Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 15 Dec 2023 at 16:25.
Monday
Transport for London (TfL) are carrying out Highway improvement works on Holland Gardens, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2024 at 08:00 and could run through until 1 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Mar 2024 at 16:54.
12 Apr 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Earl's Court Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 January 2024 at 08:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Feb 2024 at 14:17.
5 Apr 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Camden Road, Cantelowes, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 January 2024 at 08:00 and could run through until 5 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 10:05.
3 Jul 2024
London Borough Of Southwark are carrying out Highway improvement works on Thurlow Street, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 January 2024 at 14:18 and could run through until 3 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Jan 2024 at 14:21.
Today
Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2024 and could run through until 29 March 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2024 at 14:57.
Today
Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2024 and could run through until 29 March 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 10:34.
5 Feb and 8 Apr 2024
Thames Water are proposing to carry out Utility asset works on Draycott Avenue, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 10 Jan 2024 at 15:48.
5 Feb and 7 Apr 2024
Thames Water are proposing to carry out Utility asset works on Ixworth Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2024 and could run through until 7 April 2024. The works will impact the carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 23 Jan 2024 at 16:02.
5 Feb and 12 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Bevington Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2024 and could run through until 12 June 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 3 Oct 2023 at 08:59.
5 Aug 2024
London Borough Of Islington are carrying out Highway improvement works on Clerkenwell Green, Islington, London.
These works are categorised as Major.
The works started on 5 February 2024 at 11:30 and could run through until 5 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 5 Feb 2024 at 11:40.
Today
Thames Water are carrying out Utility repair and maintenance works on Finborough Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 February 2024 at 08:40 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:04.
26 Apr 2024
Thames Water are carrying out Disconnection or alteration of supply on Linsey Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 10:00 and could run through until 26 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Feb 2024 at 10:56.
25 Apr 2024
Thames Water are carrying out Disconnection or alteration of supply on Collett Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 12:30 and could run through until 25 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Feb 2024 at 08:08.
Monday
Thames Water are carrying out Disconnection or alteration of supply on Farncombe Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 11:00 and could run through until 1 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 10:04.
24 Apr 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 21:00 and could run through until 24 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2024 at 09:44.
24 Apr 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge Road, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 21:00 and could run through until 24 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2024 at 09:43.
12 Feb and 8 Apr 2024
London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Wapping Dock Stairs, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2024 and could run through until 8 April 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Tower Hamlets on 25 Jan 2024 at 13:35.
8 Apr 2024
London Borough Of Tower Hamlets are carrying out Highway repair and maintenance works on Wapping Dock Stairs, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 8 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 16 Feb 2024 at 12:51.
31 Jul 2024
London Borough Of Hackney are carrying out Highway improvement works on Queensbridge Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 08:14 and could run through until 31 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 08:14.
13 Apr 2024
Thames Water are carrying out Utility asset works on Ixworth Place, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 08:00 and could run through until 13 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Feb 2024 at 14:32.
14 Apr 2024
Thames Water are carrying out Utility asset works on Draycott Avenue, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 08:00 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Feb 2024 at 14:35.
10 Jun 2024
UK Power Networks Eastern & London are carrying out New service connection on Willesden Lane, Kilburn, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 February 2024 at 09:35 and could run through until 10 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2024 at 09:40.
1 May 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Winnington Road, East Finchley, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 08:00 and could run through until 1 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Feb 2024 at 12:01.
15 Feb 2024 and 12 Jul 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.
17 Feb and 22 Apr 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Marine Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2024 and could run through until 22 April 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 7 Nov 2023 at 10:02.
Tuesday
Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 09:30 and could run through until 2 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2024 at 15:34.
19 Feb and 10 Jun 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porters Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 18:55.
18 Apr 2024
London Borough Of Hackney are carrying out Highway improvement works on Buckland Street, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 09:30 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 25 Mar 2024 at 12:48.
18 Apr 2024
London Borough Of Hackney are carrying out Highway improvement works on Pitfield Street, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 08:00 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 25 Mar 2024 at 12:54.
11 Apr 2024
Thames Water are carrying out Utility asset works on Colebrooke Row, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 08:00 and could run through until 11 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 14:40.
19 Feb and 15 Apr 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2024 and could run through until 15 April 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2024 at 10:22.
16 Apr 2024
London Borough Of Islington are carrying out Highway improvement works on Caledonian Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 08:00 and could run through until 16 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 12 Mar 2024 at 09:13.
17 Apr 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 February 2024 at 17:00 and could run through until 17 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 18:00.
Sunday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 February 2024 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2024 at 09:05.
Sunday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Hyde Park Corner, West End, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 February 2024 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2024 at 09:13.
Sunday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Park Lane, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 February 2024 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2024 at 09:13.
22 Feb and 30 Nov 2024
Thames Tideway Tunnel are proposing to carry out Highway improvement works on Chelsea Embankment, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Tideway Tunnel on 30 Jan 2024 at 09:17.
5 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on Rockingham Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 07:01 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:43.
26 Feb and 5 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Newington Causeway, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 19 Dec 2023 at 20:32.
5 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on Newington Causeway, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 07:01 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:42.
Today
City Of London Corporation are carrying out Highway improvement works on Blackfriars Bridge, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:00 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 26 Feb 2024 at 08:00.
Today
City Of London Corporation are carrying out Highway repair and maintenance works on New Bridge Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:00 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 26 Feb 2024 at 08:00.
22 Nov 2024
City Of Westminster are carrying out Highway improvement works on Mortimer Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 February 2024 at 12:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 4 Mar 2024 at 12:01.
19 Apr 2024
London Borough Of Islington are carrying out Highway improvement works on Northchurch Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:00 and could run through until 19 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 26 Feb 2024 at 08:36.
19 Apr 2024
London Borough Of Hackney are carrying out Highway improvement works on Southgate Road, Hackney, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:40 and could run through until 19 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 26 Feb 2024 at 08:40.
Today
Transport for London (TfL) are carrying out Highway improvement works on Camden Park Road, Cantelowes, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:01 and could run through until 29 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:39.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Cantelowes, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2024 and could run through until 29 March 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2023 at 13:32.
Today
Transport for London (TfL) are carrying out Highway improvement works on Torriano Avenue, Kentish Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:01 and could run through until 29 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:39.
Tomorrow
UK Power Networks Eastern & London are carrying out Utility asset works on St Pancras Way, St Pancras And Somers Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 February 2024 at 08:29 and could run through until 30 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 11:59.
Thursday
Cadent Gas are carrying out Utility repair and maintenance works on Highgate West Hill, Highgate, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 February 2024 at 11:09 and could run through until 4 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 15:55.
1 Mar 2024 and 2 Jan 2026
Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 2 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2024 at 11:51.
5 Aug 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 13:00 and could run through until 5 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 13:43.
1 Mar and 1 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bow Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2023 at 11:05.
1 May 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 March 2024 at 08:00 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2024 at 12:58.
1 Mar and 1 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2023 at 11:31.
1 Mar and 1 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2023 at 11:39.
1 May 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 March 2024 at 08:00 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2024 at 12:57.
31 May 2024
Network Rail are carrying out Works for Rail Purposes on Sheepcote Lane, Battersea, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:33 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Mar 2024 at 08:24.
Tomorrow
London Borough Of Southwark are carrying out Highway repair and maintenance works on Benhill Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 30 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Mar 2024 at 09:11.
Tomorrow
London Borough Of Southwark are carrying out Highway repair and maintenance works on Elmington Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 30 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Mar 2024 at 09:10.
Tomorrow
London Borough Of Southwark are carrying out Highway improvement works on Benhill Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 30 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Mar 2024 at 09:09.
Tuesday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Shorncliffe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Dec 2023 at 15:59.
4 Mar and 16 Apr 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Neathouse Place, Warwick, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 16 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Jan 2024 at 16:30.
14 Jun 2024
Thames Water are carrying out Disconnection or alteration of supply on Wilson Grove, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 March 2024 at 10:00 and could run through until 14 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Mar 2024 at 11:17.
4 Mar and 23 Apr 2024
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Poplar High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 23 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 15 Jan 2024 at 11:11.
6 Apr 2024
UK Power Networks Eastern & London are carrying out Utility asset works on Hosier Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 6 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 14:56.
4 May 2024
Thames Water are carrying out Utility asset works on Mile End Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 10:00 and could run through until 4 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Mar 2024 at 10:05.
17 Apr 2024
London Borough Of Hackney are carrying out Highway improvement works on Gore Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 March 2024 at 14:17 and could run through until 17 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 18 Mar 2024 at 13:03.
31 Dec 2024
Network Rail are carrying out Works for Rail Purposes on Bodney Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Mar 2024 at 09:23.
31 Dec 2024
Network Rail are carrying out Works for Rail Purposes on Downs Park Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 10:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Mar 2024 at 10:47.
5 Mar and 26 Apr 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2024 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 5 Mar 2024 at 08:05.
12 Apr 2024
London Borough Of Camden are carrying out Highway repair and maintenance works on Goldhurst Terrace, Swiss Cottage, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 March 2024 at 10:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 13:25.
11 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on King Henry's Road, Swiss Cottage, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 March 2024 at 09:00 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Mar 2024 at 12:41.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 March 2024 at 15:04 and could run through until 2 April 2024. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Southern Gas Networks on 27 Mar 2024 at 12:38.
26 Apr 2024
City Of Westminster are carrying out Highway repair and maintenance works on Sackville Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 March 2024 at 09:30 and could run through until 26 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 7 Mar 2024 at 10:15.
Monday
Thames Water are carrying out Utility repair and maintenance works on Glenarm Road, Hackney, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 March 2024 at 09:40 and could run through until 1 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 14:02.
29 Sep 2024
Thames Water are carrying out Utility asset works on Shakespeare Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2024 at 09:20 and could run through until 29 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2024 at 09:24.
6 Apr 2024
London Borough Of Southwark are carrying out Highway repair and maintenance works on Marmont Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 08:00 and could run through until 6 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 11 Mar 2024 at 09:29.
4 May 2024
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Hollywood Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 08:00 and could run through until 4 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 11 Mar 2024 at 08:32.
29 Aug 2024
Thames Water are carrying out Disconnection or alteration of supply on Lynton Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 14:00 and could run through until 29 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:02.
11 Mar and 27 May 2024
Thames Water are proposing to carry out Utility asset works on Wilton Road, Warwick, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Jul 2023 at 12:08.
11 Mar and 2 May 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Utility asset works on Cadogan Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2024 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 8 Mar 2024 at 15:08.
11 Mar and 22 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Dockley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Mar 2024 at 09:37.
11 Mar and 8 Apr 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Marigold Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2024 and could run through until 8 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Mar 2024 at 12:43.
Wednesday
UK Power Networks Eastern & London are proposing to carry out New service connection on Cranleigh Street, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2024 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2024 at 20:42.
Today
London Borough Of Barnet are carrying out Highway improvement works on West Heath Road, Hampstead, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 09:15 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Mar 2024 at 11:57.
Today
Murphy Power Distribution are proposing to carry out Utility asset works on Magdala Avenue, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2024 and could run through until 29 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 11 Dec 2023 at 07:59.
10 May 2024
Thames Water are carrying out Disconnection or alteration of supply on Macks Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2024 at 09:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 08:57.
9 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on Holly Hill, Hampstead Town, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2024 at 11:30 and could run through until 9 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 10:24.
5 Apr 2024
UK Power Networks Eastern & London are carrying out New service connection on Eversholt Street, St Pancras And Somers Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 March 2024 at 08:00 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2024 at 09:29.
6 May 2024
London Borough Of Camden are carrying out Highway improvement works on Clarkson Row, Regent's Park, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 March 2024 at 08:00 and could run through until 6 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 17:40.
Cadent Gas carried out Utility repair and maintenance works on Camden Street, Camden Town, London.
A lane was closed for some or all of the period.
The works were originally planned between 15 Mar 2024 and 29 Mar 2024 and were actually completed between 15 Mar 2024 (15:57) and 29 Mar 2024 (09:07). The works impacted the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Mar 2024 at 09:31.
10 May 2024
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Northcote Road, Battersea, London.
These works are categorised as Major.
The works started on 18 March 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 19 Mar 2024 at 10:31.
7 May 2024
Transport for London (TfL) are carrying out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2024 at 08:53.
7 May 2024
Transport for London (TfL) are carrying out Highway improvement works on Neathouse Place, Warwick, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2024 at 08:54.
14 Apr 2024
London Borough Of Camden are carrying out Highway improvement works on Theobald's Road, Holborn And Covent Garden, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 10:00 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 18 Mar 2024 at 10:25.
14 Apr 2024
London Borough Of Camden are carrying out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 10:00 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 18 Mar 2024 at 10:26.
14 Apr 2024
London Borough Of Camden are carrying out Highway improvement works on Theobald's Road, Holborn And Covent Garden, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 10:00 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 18 Mar 2024 at 10:24.
14 Apr 2024
London Borough Of Camden are carrying out Highway improvement works on Rosebery Avenue, Holborn And Covent Garden, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 10:00 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 18 Mar 2024 at 10:26.
12 Apr 2024
UK Power Networks Eastern & London are carrying out Utility asset works on Old Nichol Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 15:00 and could run through until 12 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2024 at 15:20.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Frampton Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2024 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Feb 2024 at 08:29.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Lisson Grove, Church Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2024 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Feb 2024 at 08:28.
5 Apr 2024
City Of Westminster are carrying out Highway repair and maintenance works on St John's Terrace, Queen's Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 10:00 and could run through until 5 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 18 Mar 2024 at 10:43.
Tomorrow
London Borough Of Islington are carrying out Highway improvement works on Geary Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 30 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 18 Mar 2024 at 08:36.
12 Apr 2024
London Borough Of Islington are carrying out Highway improvement works on Biddestone Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 12 April 2024. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Islington on 18 Mar 2024 at 08:35.
15 Apr 2024
London Borough Of Southwark are carrying out Highway improvement works on Rowcross Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 March 2024 at 09:00 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 14:25.
Monday
London Borough Of Southwark are carrying out Highway repair and maintenance works on Rolls Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 March 2024 at 09:00 and could run through until 1 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2024 at 10:07.
Wednesday
City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 March 2024 at 12:00 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 20 Mar 2024 at 15:42.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Warwick Avenue, Little Venice, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 March 2024 at 18:00 and could run through until 3 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 12:08.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Blomfield Road, Little Venice, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 March 2024 at 15:00 and could run through until 3 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 12:08.
12 Apr 2024
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Stamford Street, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 March 2024 at 06:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 14:17.
12 Apr 2024
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Hatfields, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 March 2024 at 07:15 and could run through until 12 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 14:41.
21 Mar and 19 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Old Jamaica Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2024 and could run through until 19 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2023 at 07:43.
Today
Thames Water are carrying out Utility repair and maintenance works on Lisson Grove, Church Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 March 2024 at 23:55 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 16:04.
10 Apr 2024
UK Power Networks Eastern & London are carrying out New service connection on Eversholt Street, St Pancras And Somers Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 March 2024 at 08:15 and could run through until 10 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Mar 2024 at 10:15.
5 Apr 2024
City Of London Corporation are carrying out Highway repair and maintenance works on Minories, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 March 2024 at 08:00 and could run through until 5 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 23 Mar 2024 at 08:53.
Today
Thames Water are carrying out Utility repair and maintenance works on Garrick Street, St James's, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 March 2024 at 21:00 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 09:35.
Transport for London (TfL) carried out Highway improvement works on Lower Clapton Road, Hackney, London.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 24 Mar 2024 and 29 Mar 2024 and were actually completed between 24 Mar 2024 (21:00) and 29 Mar 2024 (05:00). The works impacted the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Mar 2024 at 10:26.
20 Apr 2024
London Borough Of Southwark are carrying out Highway repair and maintenance works on Dalwood Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 08:00 and could run through until 20 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 09:12.
Thursday
Cadent Gas are carrying out Utility repair and maintenance works on Battersea Park Road, Battersea, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 12:12 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 10:26.
25 Mar and 29 Apr 2024
Thames Water are proposing to carry out Utility asset works on Surrey Canal Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Feb 2024 at 13:40.
12 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on West Cromwell Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 08:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 08:03.
Monday
Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2024 and could run through until 1 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Dec 2023 at 09:15.
5 Apr 2024
Cadent Gas are carrying out Utility repair and maintenance works on Berkeley Square, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 13:00 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 16:00.
Monday
Thames Water are carrying out Utility repair and maintenance works on Poland Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 09:31 and could run through until 1 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 16:30.
15 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on New Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 09:30 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:41.
11 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on Newark Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 09:00 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:46.
Sunday
Thames Water are carrying out New service connection on Norman Grove, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 08:50 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 09:43.
25 Mar and 19 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2024 and could run through until 19 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2024 at 15:48.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Lavender Hill, Battersea, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 08:18 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 11:56.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Shirley Grove, Battersea, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 08:18 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 15:12.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Lillie Road, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 11:54 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 14:03.
Tuesday
Thames Water are carrying out roadworks on Humbolt Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 11:54 and could run through until 2 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 16:54.
26 Mar and 2 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Ambrose Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2024 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Aug 2023 at 07:22.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Druid Street, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 11:05 and could run through until 30 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 14:39.
Tuesday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Old Compton Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 12:00 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2024 at 16:10.
Tomorrow
Thames Water are carrying out New service connection on Dean's Mews, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 09:43 and could run through until 30 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 10:25.
14 Apr 2024
Thames Water are carrying out Utility asset works on Cleveland Street, Bloomsbury, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 08:00 and could run through until 14 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 09:22.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Samford Street, Church Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 06:54 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 08:02.
26 Mar and 30 Aug 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Tavistock Place, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2024 and could run through until 30 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 16:26.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Purves Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 08:38 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 22:21.
26 Mar and 5 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2024 and could run through until 5 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Mar 2024 at 10:20.
Thames Water carried out Utility repair and maintenance works on Lanesborough Place, Knightsbridge & Belgravia, London.
The road was closed for some or all of the period.
The works were originally planned between 27 Mar 2024 and 3 Apr 2024 and were actually completed between 27 Mar 2024 (11:01) and 29 Mar 2024 (10:44). The works impacted the carriageway only.
This roadwork event was last updated by Thames Water on 29 Mar 2024 at 11:43.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Carlos Place, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 08:14 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 15:34.
11 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on Commercial Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 22:00 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:28.
8 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on Hanbury Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 22:00 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:37.
8 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on Folgate Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 22:00 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:36.
8 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on Jerome Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 22:00 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:37.
8 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on Wheler Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 22:00 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:36.
Wednesday
Transport for London (TfL) are carrying out Highway improvement works on Fleur De Lis Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 22:00 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:35.
Wednesday
Transport for London (TfL) are carrying out Highway improvement works on Elder Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 22:00 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:35.
Wednesday
Transport for London (TfL) are carrying out Highway improvement works on Quaker Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 22:00 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:34.
27 Mar and 12 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2024 and could run through until 12 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 14:56.
Tomorrow
BT are proposing to carry out Utility repair and maintenance works on Cadogan Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2024 and could run through until 30 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Jan 2024 at 12:06.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Laud Street, Vauxhall, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 08:26 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 09:01.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Vincent Square, Vincent Square, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 14:24 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 15:29.
Thursday
Thames Water are carrying out roadworks on Upper James Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 07:54 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 08:45.
17 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on Somerfield Road, Hackney, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 10:00 and could run through until 17 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 10:12.
19 Apr 2024
London Borough Of Haringey are carrying out Highway improvement works on Wakefield Road, Tottenham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 09:41 and could run through until 19 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 28 Mar 2024 at 09:42.
Sunday
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2024 and could run through until 31 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2024 at 11:40.
Sunday
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2024 and could run through until 31 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 17:08.
Sunday
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2024 and could run through until 31 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2024 at 11:43.
30 Mar and 13 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 March 2024 and could run through until 13 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 11:16.
30 Mar and 26 Apr 2024
Thames Water are proposing to carry out Statutory Infrastructure Works on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 March 2024 and could run through until 26 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Feb 2024 at 17:28.
31 Mar and 14 Apr 2024
Cadent Gas are proposing to carry out Remedial works on Elizabeth Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Jan 2024 at 10:23.
31 Mar and 29 Aug 2024
London Borough Of Hackney are proposing to carry out Highway improvement works on Marvin Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 6 Dec 2023 at 10:05.
31 Mar and 28 Apr 2024
Transport for London (TfL) are proposing to carry out roadworks on Seven Sisters Road, Hackney, London.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 31 March 2024 and could run through until 28 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 11:12.
1 and 14 Apr 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Albany Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 14 April 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 11:59.
1 and 15 Apr 2024
Thames Water are proposing to carry out Utility asset works on Buckingham Palace Road, Warwick, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 18:42.
1 Apr and 13 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Keetons Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:13.
1 Apr and 1 Jul 2024
Thames Water are proposing to carry out Utility asset works on Netherwood Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2024 at 11:48.
Wednesday
London Borough Of Southwark are proposing to carry out Highway improvement works on Wardens Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 10:24.
Wednesday
London Borough Of Southwark are proposing to carry out Highway improvement works on Wardens Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 27 Mar 2024 at 05:58.
Wednesday
London Borough Of Southwark are proposing to carry out Highway improvement works on Bank End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Jan 2024 at 12:18.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Kensington Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 12:35.
1 and 20 Apr 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Commercial Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Mar 2024 at 10:16.
1 and 9 Apr 2024
Cadent Gas are proposing to carry out Utility asset works on Greek Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 13:47.
1 and 21 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Westbourne Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 21 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Mar 2024 at 09:48.
1 Apr and 14 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Praed Street, Hyde Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 14 May 2024. The works will impact the footway only.
This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 11:30.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Colville Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Mar 2024 at 16:19.
Thursday
Thames Water are proposing to carry out New service connection on Furnival Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 4 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Mar 2024 at 14:27.
1 and 29 Apr 2024
Eunetworks are proposing to carry out Utility asset works on Goodge Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Eunetworks on 26 Mar 2024 at 07:29.
Wednesday
BT are proposing to carry out Utility asset works on Cygnet Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 5 Mar 2024 at 13:11.
Wednesday
BT are proposing to carry out Utility asset works on Bacon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 5 Mar 2024 at 13:13.
1 and 14 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Bisson Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Feb 2024 at 17:38.
Thursday
Thames Water are proposing to carry out New service connection on Bayford Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 4 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:59.
1 Apr and 2 Aug 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Camden Mews, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 2 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 11 Mar 2024 at 16:05.
Wednesday
Virgin Media are proposing to carry out Utility asset works on Swan Yard, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 21 Dec 2023 at 08:10.
1 and 17 Apr 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Hungerford Road, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 17 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 28 Mar 2024 at 13:50.
1 and 7 Apr 2024
Thames Water are proposing to carry out New service connection on Carleton Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 7 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 10:58.
2 and 10 Apr 2024
Thames Water are proposing to carry out New service connection on Wakehurst Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 10 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jan 2024 at 15:15.
2 Apr and 18 May 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Windsor Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 18:13.
2 and 27 Apr 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southampton Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 27 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 18 Dec 2023 at 14:49.
2 and 20 Apr 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Fenham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.
2 and 5 Apr 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Lupus Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 29 Feb 2024 at 09:38.
2 and 20 Apr 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Brandon Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 18:13.
2 Apr and 31 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrington Gardens, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Mar 2024 at 11:48.
2 Apr and 31 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Stanhope Gardens, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Mar 2024 at 11:48.
2 Apr and 31 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Gloucester Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Mar 2024 at 11:48.
2 and 12 Apr 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Pelham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 15:47.
2 and 20 Apr 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 27 Mar 2024 at 09:07.
2 and 9 Apr 2024
London Borough Of Hammersmith & Fulham are proposing to carry out Remedial works on Blythe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Feb 2024 at 15:02.
2 and 28 Apr 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fair Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 28 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Mar 2024 at 11:14.
2 and 5 Apr 2024
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Chandler Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 14 Feb 2024 at 13:55.
2 and 5 Apr 2024
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Wapping Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 14 Feb 2024 at 13:55.
2 and 8 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on St Katharines Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 11:37.
2 and 15 Apr 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Chilworth Mews, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 15 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 25 Mar 2024 at 15:19.
2 and 13 Apr 2024
Boldyn Networks are proposing to carry out Utility asset works on Commercial Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 13 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Boldyn Networks on 20 Feb 2024 at 15:14.
2 and 19 Apr 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Penfold Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 19 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2024 at 09:18.
2 Apr and 14 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Mar 2024 at 10:30.
2 Apr and 5 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Lever Street, Islington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2024 at 12:18.
2 and 13 Apr 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 13 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2024 at 13:13.
2 and 6 Apr 2024
Thames Water are proposing to carry out roadworks on Killick Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 6 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Jan 2024 at 08:07.
2 and 12 Apr 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Hargrave Park, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 9 Feb 2024 at 13:49.
2 and 15 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 09:51.
3 and 7 Apr 2024
Thames Water are proposing to carry out New service connection on The Cut, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2024 and could run through until 7 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Feb 2024 at 09:08.
3 Apr and 29 May 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Feb 2024 at 13:42.
3 Apr and 29 May 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lochnagar Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2024 at 09:04.
3 and 8 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Whites Row, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:30.
3 and 8 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Fashion Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:30.
3 and 8 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Brushfield Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:29.
3 and 8 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Fournier Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:20.
3 and 8 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lamb Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:18.
4 and 6 Apr 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Cowcross Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2024 and could run through until 6 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Mar 2024 at 00:10.
4 and 7 Apr 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2024 and could run through until 7 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 10:20.
4 and 11 Apr 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Paul Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 11:52.
5 and 7 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2024 and could run through until 7 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:29.
5 and 7 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2024 and could run through until 7 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 13:02.
5 and 26 Apr 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Drummond Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 07:57.
5 and 8 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 13:13.
5 and 8 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:34.
5 and 8 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:35.
5 and 17 Apr 2024
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Newbury Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2024 and could run through until 17 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 14:01.
7 and 11 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Webbs Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jan 2024 at 08:03.
7 and 10 Apr 2024
Thames Water are proposing to carry out New service connection on Grandison Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 10 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Mar 2024 at 13:00.
7 and 9 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Moore Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:19.
7 and 12 Apr 2024
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Normand Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 26 Mar 2024 at 09:22.
7 Apr and 24 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Canada Water Walkway, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 16:30.
7 Apr 2024
Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 7 April 2024 and are due to last for only one day. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 15:08.
7 and 11 Apr 2024
Vodafone are proposing to carry out Utility asset works on Rivington Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 26 Mar 2024 at 10:15.
7 and 9 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Ladbroke Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 16:50.
7 and 11 Apr 2024
Thames Water are proposing to carry out New service connection on Rosebank Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Jan 2024 at 11:55.
7 and 9 Apr 2024
BT are proposing to carry out Utility asset works on Halliford Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Mar 2024 at 08:27.
7 and 10 Apr 2024
BT are proposing to carry out Utility repair and maintenance works on Kenworthy Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 10 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 15 Jan 2024 at 10:21.
7 and 15 Apr 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Penn Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 15 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 20 Mar 2024 at 11:03.
7 and 9 Apr 2024
BT are proposing to carry out Utility asset works on Elwood Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 Mar 2024 at 11:38.
7 and 11 Apr 2024
Thames Water are proposing to carry out New service connection on Lancell Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Feb 2024 at 09:37.
7 and 11 Apr 2024
Thames Water are proposing to carry out New service connection on Tollington Way, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jan 2024 at 08:25.
7 and 11 Apr 2024
Thames Water are proposing to carry out roadworks on Cornwallis Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Jan 2024 at 15:23.
8 Apr and 31 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 11:46.
8 and 12 Apr 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Smith Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Feb 2024 at 16:26.
8 Apr and 18 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Alexis Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:22.
8 and 10 Apr 2024
Thames Water are proposing to carry out New service connection on Earl's Court Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 10 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Feb 2024 at 12:26.
8 Apr and 14 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Enid Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:16.
8 and 21 Apr 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Redcross Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 21 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2024 at 17:34.
8 and 10 Apr 2024
City Of Westminster are proposing to carry out Highway improvement works on Trebeck Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 10 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 12 Mar 2024 at 15:14.
8 Apr and 31 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Tudor Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 31 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 08:23.
8 and 29 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Westbourne Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jan 2024 at 08:55.
8 and 11 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Pomell Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:38.
8 Apr and 3 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Chilworth Street, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 20 Feb 2024 at 08:24.
8 and 11 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Wentworth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:38.
8 and 11 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Thrawl Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 17:26.
8 and 11 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lolesworth Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:31.
8 and 26 Apr 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Foscote Mews, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2024 at 10:20.
8 and 10 Apr 2024
Vodafone are proposing to carry out Utility asset works on Luke Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 10 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 26 Mar 2024 at 12:59.
8 and 16 Apr 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Lorenzo Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 16 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Jan 2024 at 07:30.
8 Apr and 28 Jun 2024
HS2 are proposing to carry out Works for Rail Purposes on Park Village East, Regent's Park, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 28 Mar 2024 at 13:23.
8 Apr and 24 Sep 2024
London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 24 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 16 Jan 2024 at 09:35.
8 and 11 Apr 2024
G. Network Communications are proposing to carry out Remedial works on Florence Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 27 Feb 2024 at 13:58.
8 and 12 Apr 2024
Thames Water are proposing to carry out New service connection on Canonbury Place, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 12 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Feb 2024 at 11:06.
9 and 11 Apr 2024
Eunetworks are proposing to carry out Utility asset works on Cutler Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Eunetworks on 13 Mar 2024 at 14:22.
9 Apr and 25 Sep 2024
London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 11:55.
9 Apr and 25 Sep 2024
London Borough Of Hackney are proposing to carry out Highway improvement works on Laburnum Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 14:09.
9 Apr and 25 Sep 2024
London Borough Of Hackney are proposing to carry out Highway improvement works on Albion Drive, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 10:55.
9 and 30 Apr 2024
Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2024 and could run through until 30 April 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Network Rail on 26 Mar 2024 at 14:21.
10 and 12 Apr 2024
City Of Westminster are proposing to carry out Highway improvement works on Shepherd Market, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 10:51.
10 and 30 Apr 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on St George Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 31 Jan 2024 at 14:19.
10 and 12 Apr 2024
G. Network Communications are proposing to carry out Remedial works on Charlotte Terrace, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 25 Mar 2024 at 10:10.
11 Apr and 10 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Moat Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Feb 2024 at 16:30.
11 Apr and 10 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Jan 2024 at 14:57.
11 Apr and 10 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on New Mill Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Feb 2024 at 16:30.
11 Apr and 10 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Ponton Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Jan 2024 at 15:15.
12 Apr and 30 Aug 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Galleywall Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 16:30.
12 and 15 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 12:10.
12 and 15 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:39.
12 and 15 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 12:12.
12 Apr and 11 May 2024
Thames Water are proposing to carry out New service connection on Kentish Town Road, Camden Town, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Feb 2024 at 16:30.
13 and 15 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Feb 2024 at 15:06.
13 and 20 Apr 2024
London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Brushfield Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Mar 2024 at 16:26.
13 Apr and 12 May 2024
Thames Water are proposing to carry out roadworks on Gaisford Street, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Feb 2024 at 13:16.
14 Apr and 17 May 2024
Thames Water are proposing to carry out Utility asset works on Crimsworth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:42.
14 and 18 Apr 2024
Thames Water are proposing to carry out New service connection on Old Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Jan 2024 at 16:14.
14 and 18 Apr 2024
Thames Water are proposing to carry out New service connection on Chichester Street, Tachbrook, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Mar 2024 at 09:04.
14 and 22 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 13:51.
14 and 22 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:04.
14 and 22 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Canada Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:03.
14 and 22 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Lower Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:10.
14 Apr and 3 May 2024
Thames Water are proposing to carry out Utility asset works on Sulgrave Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:04.
14 and 22 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Quebec Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 13:51.
14 and 22 Apr 2024
London Borough Of Southwark are proposing to carry out Remedial works on Rotherhithe Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:03.
14 and 22 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Salter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 13:57.
14 and 22 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Brunel Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:04.
14 and 17 Apr 2024
Thames Water are proposing to carry out New service connection on The Cut, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 17 April 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Thames Water on 19 Mar 2024 at 15:45.
14 and 16 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Great Suffolk Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.
14 Apr and 20 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Park Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 07:18.
14 and 16 Apr 2024
Vodafone are proposing to carry out Utility asset works on Berkeley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 8 Mar 2024 at 12:56.
14 and 18 Apr 2024
Thames Water are proposing to carry out roadworks on South Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Jan 2024 at 11:45.
14 and 16 Apr 2024
Vodafone are proposing to carry out Utility asset works on Strand, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 22 Jan 2024 at 07:52.
14 and 18 Apr 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Mincing Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 08:24.
14 and 18 Apr 2024
Cadent Gas are proposing to carry out New service connection on Hessel Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 00:10.
14 and 18 Apr 2024
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Carr Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 26 Feb 2024 at 10:06.
14 and 18 Apr 2024
Cadent Gas are proposing to carry out New service connection on Chapel Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 00:10.
14 and 16 Apr 2024
Virgin Media are proposing to carry out Utility asset works on Hanley Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 3 Jan 2024 at 11:03.
14 Apr and 10 May 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.
These works are categorised as Major.
The works will start on or after 14 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 28 Mar 2024 at 10:35.
15 Apr 2024 and 2 May 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Wiltshire Road, Brixton North, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 12:24.
15 Apr 2024 and 7 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Western Road, Brixton North, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 12:27.
15 and 17 Apr 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Benhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 17 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 16:05.
15 Apr 2024 and 23 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Monnow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Mar 2023 at 13:34.
15 and 19 Apr 2024
Vodafone are proposing to carry out Utility asset works on Thermopylae Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 27 Mar 2024 at 14:03.
15 and 17 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Ewer Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 17 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:02.
15 Apr and 11 May 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fenchurch Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 08:15.
15 and 19 Apr 2024
City Of London Telecomms are proposing to carry out Utility asset works on Upper John Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 6 Feb 2024 at 14:01.
15 Apr and 10 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Denmark Street, Holborn And Covent Garden, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 14:17.
15 Apr and 10 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Charing Cross Road, Holborn And Covent Garden, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 14:18.
15 and 21 Apr 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Blomfield Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 21 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Jan 2024 at 16:47.
15 and 26 Apr 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Devonshire Close, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 17:46.
15 and 19 Apr 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Cosway Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Jan 2024 at 10:57.
15 Apr and 11 May 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Clerkenwell Road, Holborn And Covent Garden, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 18:30.
15 Apr and 27 Jun 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Baynes Mews, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 27 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 21 Mar 2024 at 12:04.
16 and 20 Apr 2024
London Borough Of Lambeth are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 27 Mar 2024 at 12:29.
16 and 18 Apr 2024
BT are proposing to carry out Utility asset works on St James's Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Mar 2024 at 10:06.
16 and 22 Apr 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Conduit Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Jan 2024 at 15:29.
16 and 18 Apr 2024
BT are proposing to carry out Utility repair and maintenance works on Cursitor Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Mar 2024 at 14:29.
16 and 18 Apr 2024
Hyperoptic are proposing to carry out Utility asset works on Compton Avenue, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 27 Feb 2024 at 14:29.
16 and 18 Apr 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lea Bridge Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 14:24.
16 and 18 Apr 2024
Virgin Media are proposing to carry out Utility asset works on Vale Of Health, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 28 Mar 2024 at 09:13.
17 and 19 Apr 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Forthbridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2024 and could run through until 19 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 25 Jan 2024 at 07:45.
17 and 19 Apr 2024
BT are proposing to carry out Utility asset works on Yeoman's Row, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Mar 2024 at 09:26.
17 and 26 Apr 2024
City Of Westminster are proposing to carry out Highway improvement works on Dacre Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2024 and could run through until 26 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 19 Mar 2024 at 09:11.
17 and 30 Apr 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Nottingham Place, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Dec 2023 at 14:49.
18 and 20 Apr 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Owgan Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 8 Dec 2023 at 11:26.
18 and 20 Apr 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Benhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 28 Dec 2023 at 06:52.
18 Apr and 11 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Browning Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 11:39.
19 and 24 Apr 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Taybridge Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 26 Jan 2024 at 14:16.
19 and 22 Apr 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on St Philip Square, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 26 Jan 2024 at 14:19.
19 and 21 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Commercial Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 April 2024 and could run through until 21 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 12:53.
19 Apr and 31 May 2024
Transport for London (TfL) are proposing to carry out roadworks on Stanhope Mews West, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 April 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2024 at 15:01.
19 Apr and 30 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Sugar Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 April 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Jun 2023 at 13:49.
19 Apr and 14 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Greencroft Gardens, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 April 2024 and could run through until 14 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 14:06.
21 and 25 Apr 2024
Thames Water are proposing to carry out New service connection on Ebury Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 13:22.
21 and 23 Apr 2024
G. Network Communications are proposing to carry out Utility asset works on Palmer Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 23 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 14 Mar 2024 at 06:24.
21 and 25 Apr 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Fitzmaurice Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:17.
21 and 24 Apr 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Grafton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 24 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:38.
21 and 25 Apr 2024
Thames Water are proposing to carry out Utility asset works on Neal Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Feb 2024 at 17:06.
21 Apr and 2 May 2024
Vodafone are proposing to carry out Utility asset works on Adler Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 13 Mar 2024 at 14:10.
21 and 23 Apr 2024
Hyperoptic are proposing to carry out Utility asset works on Camden Street, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 23 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 22 Feb 2024 at 12:07.
22 and 27 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Ruby Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 1 Feb 2024 at 14:51.
22 Apr and 3 May 2024
Electricity Network Company are proposing to carry out Utility asset works on Carnation Way, London.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 23 Jan 2024 at 16:30.
22 Apr and 31 May 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2024 at 12:28.
22 Apr and 6 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Lower Addison Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 6 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 14:20.
22 Apr and 12 May 2024
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Queen Victoria Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 06:36.
22 and 26 Apr 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Green Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 9 Feb 2024 at 14:30.
22 Apr and 1 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Seymour Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:09.
22 Apr and 2 Aug 2024
City Of Westminster are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 2 August 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 08:34.
22 Apr and 13 May 2024
Thames Water are proposing to carry out Utility asset works on Droop Street, Queen's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Mar 2024 at 10:37.
22 Apr and 2 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Fifth Avenue, Queen's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Mar 2024 at 10:36.
22 and 24 Apr 2024
City Of London Telecomms are proposing to carry out Utility asset works on St Pancras Way, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 24 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 27 Mar 2024 at 22:01.
22 Apr and 13 May 2024
Thames Water are proposing to carry out Utility asset works on Westbere Road, Fortune Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 15:17.
22 Apr and 13 May 2024
Thames Water are proposing to carry out Utility asset works on Sarre Road, Fortune Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 15:27.
22 Apr and 3 May 2024
G. Network Communications are proposing to carry out Remedial works on Albion Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 26 Mar 2024 at 14:39.
22 Apr and 7 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Vale Road, Tottenham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2024 at 09:39.
23 Apr and 25 May 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2024 and could run through until 25 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 13:54.
23 and 27 Apr 2024
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 27 Feb 2024 at 16:33.
23 and 27 Apr 2024
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 9 Feb 2024 at 13:26.
23 and 27 Apr 2024
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 9 Feb 2024 at 13:25.
23 Apr and 18 Jun 2024
Thames Water are proposing to carry out Utility asset works on Prince Albert Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 09:18.
23 Apr and 18 Jun 2024
Thames Water are proposing to carry out Utility asset works on Culworth Street, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 17:43.
23 Apr and 18 Jun 2024
Thames Water are proposing to carry out Utility asset works on Eamont Street, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 17:30.
24 Apr and 3 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Drummond Crescent, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Feb 2024 at 16:03.
25 and 28 Apr 2024
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 16:19.
25 and 28 Apr 2024
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 17:08.
25 Apr and 11 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Rouel Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Jan 2024 at 16:08.
25 and 29 Apr 2024
City Of Westminster are proposing to carry out Highway improvement works on St Ermin's Hill, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 11:18.
25 and 29 Apr 2024
BT are proposing to carry out Utility asset works on Grove Road, Tottenham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 26 Mar 2024 at 13:07.
25 and 29 Apr 2024
BT are proposing to carry out Utility asset works on St Anns Road, Tottenham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 26 Mar 2024 at 13:07.
26 and 28 Apr 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Commercial Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 13:00.
26 Apr and 20 May 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Layard Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Mar 2024 at 11:15.
26 and 29 Apr 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 19 Feb 2024 at 14:09.
26 and 28 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 09:57.
26 and 28 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 09:54.
26 Apr and 13 May 2024
Virgin Media are proposing to carry out Utility asset works on Gower Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 28 Mar 2024 at 07:24.
27 and 29 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Marjorie Grove, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Jan 2024 at 15:23.
27 and 29 Apr 2024
Vodafone are proposing to carry out Utility repair and maintenance works on Abchurch Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 28 Mar 2024 at 08:25.
28 Apr and 10 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Hyndman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Feb 2024 at 13:20.
28 Apr and 3 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2024 at 10:56.
28 Apr and 25 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lambeth Bridge, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 25 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2024 at 10:55.
28 and 30 Apr 2024
Vodafone are proposing to carry out Utility asset works on Stratton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 22 Feb 2024 at 14:16.
28 Apr and 2 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Grafton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 16:00.
28 Apr and 2 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on New Bond Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 15:58.
28 Apr and 2 May 2024
Cadent Gas are proposing to carry out New service connection on St Anselm's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Feb 2024 at 07:01.
28 and 30 Apr 2024
City Of London Telecomms are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 22 Mar 2024 at 18:27.
28 Apr and 2 May 2024
Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Mar 2024 at 13:42.
28 Apr and 13 Jul 2024
Thames Water are proposing to carry out Utility asset works on College Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Mar 2024 at 06:55.
28 Apr and 2 May 2024
BT are proposing to carry out Utility repair and maintenance works on Terrace Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Mar 2024 at 12:19.
28 Apr and 3 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Shoot-up Hill, Fortune Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Mar 2024 at 16:30.
29 Apr and 20 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Quarrendon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Jan 2024 at 14:26.
29 Apr and 28 Jun 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Chapter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 19 Feb 2024 at 07:32.
29 Apr and 19 Jul 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Verney Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Feb 2024 at 10:29.
29 Apr and 16 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Bombay Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Feb 2024 at 08:22.
29 Apr and 3 May 2024
Thames Water are proposing to carry out New service connection on Cheval Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Feb 2024 at 10:21.
29 Apr and 15 May 2024
Thames Water are proposing to carry out New service connection on Kensington High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 15 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Mar 2024 at 08:38.
29 Apr and 10 May 2024
City Of Westminster are proposing to carry out Highway improvement works on Broadway, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 11:19.
29 Apr and 1 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Fielding Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Jan 2024 at 09:01.
29 Apr and 11 May 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manilla Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Mar 2024 at 09:33.
29 Apr and 11 May 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Cuba Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Mar 2024 at 09:36.
29 Apr and 8 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Katharines Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 8 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 17:37.
29 Apr and 8 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Saltwell Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Feb 2024 at 12:46.
29 Apr and 20 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:14.
29 Apr and 6 May 2024
Thames Water are proposing to carry out New service connection on Cleveland Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Feb 2024 at 12:57.
29 Apr and 1 May 2024
BT are proposing to carry out Utility asset works on Porter Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Mar 2024 at 16:22.
29 Apr and 3 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Lower Terrace, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:40.
29 Apr and 10 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Feb 2024 at 12:11.
30 Apr and 2 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Sylvan Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Feb 2024 at 08:56.
30 Apr and 3 May 2024
BT are proposing to carry out Utility asset works on Granary Street, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Feb 2024 at 11:05.
30 Apr and 20 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Baynes Street, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 20 May 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Network Rail on 11 Mar 2024 at 07:42.
1 and 3 May 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Afghan Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 7 Feb 2024 at 12:24.
1 and 3 May 2024
London Borough Of Lewisham are proposing to carry out Highway improvement works on Pepys Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 27 Mar 2024 at 16:16.
1 and 3 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Barnham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 11:27.
1 and 3 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Shand Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 11:40.
1 and 30 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 13:34.
1 and 30 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on St Leonards Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 13:42.
1 May and 7 Jul 2024
City Of London Corporation are proposing to carry out Highway improvement works on Threadneedle Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 7 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 11 Mar 2024 at 10:11.
1 and 10 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Mar 2024 at 16:30.
1 and 14 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Formosa Street, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 Mar 2024 at 14:45.
1 May and 25 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 25 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 11:39.
1 and 20 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jan 2024 at 10:43.
1 and 20 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Varndell Street, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Mar 2024 at 10:10.
2 and 17 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Melon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Feb 2024 at 13:48.
2 and 26 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:10.
3 and 5 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Commercial Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 13:06.
3 and 31 May 2024
Electricity Network Company are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 17 Jan 2024 at 08:42.
3 and 17 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Mercer Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 6 Mar 2024 at 10:30.
5 and 10 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Barnham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 09:40.
5 and 8 May 2024
Vodafone are proposing to carry out Utility asset works on Berkeley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 22 Feb 2024 at 14:19.
6 May and 21 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jan 2024 at 19:31.
6 May and 3 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Mar 2024 at 10:47.
6 and 13 May 2024
Southern Gas Networks are proposing to carry out Permanent reinstatement on Avonmouth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 31 Jan 2024 at 09:58.
6 and 10 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Crucifix Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Mar 2024 at 12:10.
6 and 17 May 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Southwark Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Feb 2024 at 17:15.
6 and 9 May 2024
Thames Water are proposing to carry out New service connection on Palace Court, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2024 at 09:33.
6 and 10 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Little Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Mar 2024 at 13:33.
6 and 12 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Queen's Terrace, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Mar 2024 at 15:30.
6 and 27 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Royal College Street, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Feb 2024 at 16:25.
6 and 9 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Willow Road, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 15:16.
6 and 12 May 2024
Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:14.
7 May and 11 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Thorncombe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:17.
7 May and 11 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Glengarry Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:10.
7 May and 2 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Trossachs Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 2 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:10.
7 and 9 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Eddiscombe Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:17.
7 May and 13 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Road, Brixton North, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 13 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2024 at 14:46.
7 and 13 May 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2024 at 07:46.
7 May and 21 Aug 2024
Thames Water are proposing to carry out Utility asset works on Grosvenor Gardens, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jan 2024 at 14:18.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 13:44.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 13:46.
7 and 9 May 2024
Virgin Media are proposing to carry out Utility asset works on Cork Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 20 Feb 2024 at 06:50.
7 and 9 May 2024
Virgin Media are proposing to carry out Utility asset works on Cranbourn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 24 Jan 2024 at 09:34.
7 and 9 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Dunraven Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 Feb 2024 at 13:36.
7 and 9 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Green Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:10.
7 and 24 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Weighhouse Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2024 at 12:58.
7 and 22 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Eversholt Street, St Pancras And Somers Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2024 at 13:50.
7 May and 5 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crossfield Road, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:30.
8 and 10 May 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Ashbury Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 15 Feb 2024 at 10:53.
9 and 11 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Warner Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jan 2024 at 07:26.
9 and 12 May 2024
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 16:21.
9 and 12 May 2024
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 17:09.
9 and 22 May 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Market Mews, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Mar 2024 at 11:00.
10 and 12 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Jan 2024 at 09:13.
10 and 24 May 2024
Virgin Media are proposing to carry out Utility asset works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2024 and could run through until 24 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 1 Mar 2024 at 12:10.
11 and 19 May 2024
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Druid Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 13:51.
11 and 13 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 18:00.
11 and 13 May 2024
BT are proposing to carry out Utility repair and maintenance works on Chapman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 15 Feb 2024 at 10:44.
12 and 25 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Feb 2024 at 11:39.
12 and 25 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Stamford Street, London.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 25 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 09:43.
12 and 18 May 2024
Thames Water are proposing to carry out New service connection on Sackville Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Mar 2024 at 15:31.
12 and 20 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Marshall Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Mar 2024 at 20:44.
12 and 18 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Broadwick Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Mar 2024 at 20:44.
12 and 18 May 2024
Thames Water are proposing to carry out New service connection on Foubert's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Mar 2024 at 13:18.
12 May and 12 Jul 2024
HS2 are proposing to carry out Section 50 on Kilburn High Road, Kilburn, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 20 Mar 2024 at 22:47.
12 May and 30 Aug 2024
HS2 are proposing to carry out Section 50 on Greville Road, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Mar 2024 at 21:37.
12 May and 30 Aug 2024
HS2 are proposing to carry out Section 50 on Oxford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Mar 2024 at 21:23.
12 May and 30 Aug 2024
HS2 are proposing to carry out Section 50 on Oxford Road, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Mar 2024 at 16:34.
12 May and 12 Jul 2024
HS2 are proposing to carry out Section 50 on Kilburn High Road, Maida Vale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 18 Mar 2024 at 15:37.
12 May and 12 Jul 2024
HS2 are proposing to carry out Section 50 on Kilburn High Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 18 Mar 2024 at 16:12.
12 May and 17 Aug 2024
Thames Water are proposing to carry out Utility asset works on Holly Bush Hill, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 17 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Mar 2024 at 15:20.
13 and 15 May 2024
Thames Water are proposing to carry out Utility asset works on Nigel Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Mar 2024 at 09:05.
13 May and 22 Jun 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on De Laune Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 07:58.
13 May and 22 Jun 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Braganza Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 07:58.
13 May and 22 Jun 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Alberta Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 27 Feb 2024 at 13:47.
13 May and 15 Jun 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Berryfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 20 Feb 2024 at 07:40.
13 May and 15 Jun 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Penton Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 20 Feb 2024 at 07:40.
13 May and 15 Jun 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Amelia Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 20 Feb 2024 at 07:40.
13 May and 5 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on East Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:51.
13 and 15 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Fielding Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Feb 2024 at 10:51.
13 May and 21 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Mastmaker Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 12 Feb 2024 at 13:39.
13 and 18 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Aubrey Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Feb 2024 at 16:50.
13 and 21 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 11:49.
13 May and 3 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Vere Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2024 at 13:26.
13 May and 5 Jun 2024
Boldyn Networks are proposing to carry out Utility asset works on Norton Folgate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Boldyn Networks on 22 Mar 2024 at 13:22.
13 May and 1 Jul 2024
City Of Westminster are proposing to carry out Highway improvement works on Jerome Crescent, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 5 Feb 2024 at 09:27.
13 and 17 May 2024
Thames Water are proposing to carry out New service connection on Waterloo Terrace, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Feb 2024 at 13:51.
13 and 17 May 2024
BT are proposing to carry out Utility repair and maintenance works on Sutton Place, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Feb 2024 at 22:52.
13 and 30 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2024 at 14:56.
13 May and 3 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Chesterford Gardens, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:31.
14 and 16 May 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Grant Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 21 Feb 2024 at 10:26.
14 and 16 May 2024
Thames Water are proposing to carry out New service connection on Laurie Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Feb 2024 at 09:22.
14 May and 18 Aug 2024
Thames Water are proposing to carry out Utility asset works on Neathouse Place, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 18 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Jan 2024 at 11:18.
14 May and 23 Sep 2024
Thames Water are proposing to carry out Utility asset works on Wilton Road, Warwick, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 23 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Jan 2024 at 11:18.
14 and 17 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Mill Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:09.
14 and 16 May 2024
Hyperoptic are proposing to carry out Utility asset works on Dagmar Terrace, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 15 Mar 2024 at 09:01.
15 May and 30 Jun 2024
Thames Water are proposing to carry out Utility asset works on Goldsboro' Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:43.
15 May and 8 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Greycoat Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:31.
15 and 19 May 2024
Boldyn Networks are proposing to carry out Utility asset works on Worship Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Boldyn Networks on 28 Mar 2024 at 10:16.
16 and 19 May 2024
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 16:24.
16 and 19 May 2024
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 17:09.
16 May and 5 Jun 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Union Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Feb 2024 at 14:29.
16 May and 4 Jun 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Thorpedale Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 16 Feb 2024 at 09:55.
17 and 19 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Jan 2024 at 09:07.
17 and 20 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:43.
17 and 20 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:42.
17 and 20 May 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 13:09.
17 and 26 May 2024
ESP Electricity are proposing to carry out Utility asset works on Hayfield Passage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 26 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 27 Mar 2024 at 13:16.
17 May and 6 Sep 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 6 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2024 at 15:19.
18 May and 20 Jul 2024
Thames Water are proposing to carry out Utility asset works on Elderfield Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 May 2024 and could run through until 20 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:55.
18 and 20 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on St John's Grove, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 14 Mar 2024 at 07:41.
19 May and 23 Jun 2024
Thames Water are proposing to carry out Utility asset works on Ilderton Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 23 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 08:41.
19 and 26 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Crimscott Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 07:30.
19 and 24 May 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Risborough Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 07:44.
19 and 22 May 2024
Thames Water are proposing to carry out New service connection on Nicholson Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2024 at 10:30.
19 and 23 May 2024
Thames Water are proposing to carry out New service connection on Pollen Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Feb 2024 at 14:15.
19 and 21 May 2024
City Of London Telecomms are proposing to carry out Utility asset works on Foster Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 21 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 12 Mar 2024 at 14:17.
19 May and 2 Jun 2024
Thames Water are proposing to carry out New service connection on Fetter Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 14:09.
19 and 23 May 2024
Cadent Gas are proposing to carry out Utility asset works on Tidworth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Mar 2024 at 13:08.
19 and 23 May 2024
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Shacklewell Lane, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 28 Mar 2024 at 10:49.
19 and 23 May 2024
BT are proposing to carry out Utility repair and maintenance works on Cazenove Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Feb 2024 at 22:54.
20 May and 7 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 09:31.
20 May and 10 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Applegarth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Feb 2024 at 10:37.
20 May and 6 Aug 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Scott Lidgett Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 6 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:57.
20 and 23 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Albemarle Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:22.
20 and 23 May 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Stafford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:11.
20 and 24 May 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Notting Hill Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 13 Mar 2024 at 12:36.
20 May and 22 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2024 at 16:15.
20 May and 22 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Swan Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 Feb 2024 at 10:38.
20 May and 22 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Arthur Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 Feb 2024 at 10:34.
20 and 24 May 2024
Vodafone are proposing to carry out Utility repair and maintenance works on Oxford Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 20 Mar 2024 at 09:50.
20 May and 7 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Conduit Place, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 14:48.
20 May and 18 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Whiston Road, Hackney, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 18 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2024 at 17:35.
20 May and 10 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 10 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 15:13.
20 May and 3 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Leverton Street, Kentish Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:19.
21 and 23 May 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Simpson Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 29 Feb 2024 at 10:40.
21 and 28 May 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 29 Feb 2024 at 10:21.
21 and 23 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Feb 2024 at 14:46.
23 and 28 May 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Wroughton Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 1 Mar 2024 at 10:42.
23 and 28 May 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Queenstown Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 1 Mar 2024 at 13:40.
23 and 28 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Doric Way, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Feb 2024 at 16:03.
24 May and 1 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Dec 2023 at 15:46.
24 May and 15 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:42.
24 May and 17 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Bishopsgate, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Mar 2024 at 12:29.
24 May and 17 Jun 2024
Thames Water are proposing to carry out Utility asset works on Threadneedle Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 17 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Mar 2024 at 11:25.
24 May and 6 Aug 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ordnance Hill, Abbey Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 6 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 15:12.
24 May and 27 Aug 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Buckland Crescent, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 27 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:30.
24 May and 27 Aug 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 27 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:28.
26 May and 22 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Porchester Gardens, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 11:44.
26 May and 16 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Courtnell Street, Bayswater, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 16 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 10:31.
26 May and 31 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Charterhouse Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 31 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 09:56.
26 and 30 May 2024
Thames Water are proposing to carry out New service connection on Adpar Street, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:43.
26 and 30 May 2024
BT are proposing to carry out Utility repair and maintenance works on Northiam Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Mar 2024 at 13:21.
26 and 30 May 2024
BT are proposing to carry out Utility repair and maintenance works on Well Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Mar 2024 at 00:26.
27 May and 12 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Victoria Street, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 12 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 09:53.
27 and 31 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2024 at 10:45.
27 and 29 May 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on William Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 27 Mar 2024 at 12:03.
27 May and 9 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 9 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:08.
27 and 30 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Coptic Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Feb 2024 at 15:00.
27 May and 2 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on York Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 17:12.
27 May and 1 Jun 2024
Thames Water are proposing to carry out New service connection on Glasshouse Yard, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Mar 2024 at 08:31.
27 and 29 May 2024
Hyperoptic are proposing to carry out Utility asset works on Wakeham Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 4 Mar 2024 at 14:52.
27 and 30 May 2024
Thames Water are proposing to carry out New service connection on Perrin's Lane, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Mar 2024 at 09:31.
28 May and 7 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 7 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 08:49.
28 May and 25 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 25 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2024 at 08:56.
28 May and 20 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 20 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2024 at 15:05.
28 and 30 May 2024
Virgin Media are proposing to carry out Utility asset works on Titmuss Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 14 Feb 2024 at 12:41.
28 and 30 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Snowsfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Mar 2024 at 13:59.
28 and 30 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on St Thomas Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 12:11.
28 May and 6 Jun 2024
ESP Electricity are proposing to carry out Utility asset works on Stepney Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by ESP Electricity on 27 Mar 2024 at 14:28.
28 and 31 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:42.
28 May and 28 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2024 at 09:32.
28 May and 2 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on St John's Grove, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 21 Mar 2024 at 09:29.
29 May and 18 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Aquila Street, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2024 and could run through until 18 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 23 Feb 2024 at 12:12.
29 and 31 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Royal College Street, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Feb 2024 at 16:02.
30 May and 1 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Ebor Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 14:28.
30 May and 1 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Ebor Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:47.
30 May and 1 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Chance Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 15:11.
31 May and 2 Jun 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2024 at 12:24.
31 May and 3 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 13:13.
31 May and 3 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:45.
31 May and 3 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:46.
31 May and 6 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Fetter Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Feb 2024 at 13:15.
31 May and 22 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lincoln Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Feb 2024 at 08:57.
31 May and 10 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2024 at 11:33.
1 and 30 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Trafalgar Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:38.
1 and 30 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:42.
1 and 30 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prestons Road Roundabout, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:27.
1 and 30 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prestons Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:45.
2 and 6 Jun 2024
Thames Water are proposing to carry out New service connection on Pimlico Road, Churchill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:45.
2 and 7 Jun 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Mill Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 07:30.
2 and 6 Jun 2024
Cadent Gas are proposing to carry out Remedial works on Mount Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 10:28.
2 and 6 Jun 2024
Thames Water are proposing to carry out New service connection on Artillery Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Mar 2024 at 08:40.
2 and 6 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:10.
2 and 6 Jun 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Plough Yard, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 00:22.
2 and 4 Jun 2024
Virgin Media are proposing to carry out Utility asset works on Vale Royal, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 20 Feb 2024 at 13:55.
2 and 6 Jun 2024
Thames Water are proposing to carry out New service connection on Collins Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Mar 2024 at 09:44.
2 and 4 Jun 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Winnington Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Dec 2023 at 13:46.
3 and 28 Jun 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ilderton Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Mar 2024 at 11:55.
3 Jun and 12 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 31 Jan 2024 at 03:27.
3 and 8 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Rochester Row, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:37.
3 and 8 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Greencoat Place, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:53.
3 and 8 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Spencer Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:56.
3 and 8 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Artillery Row, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:59.
3 Jun and 16 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Janeway Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 12:04.
3 Jun and 6 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Trafalgar Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Mar 2024 at 10:49.
3 Jun and 13 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Blackwall Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Mar 2024 at 10:17.
3 and 11 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Homer Row, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 15:14.
3 and 5 Jun 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Ladbroke Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 21 Mar 2024 at 14:39.
3 and 5 Jun 2024
Vodafone are proposing to carry out Utility asset works on Pentonville Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 6 Mar 2024 at 11:30.
3 and 23 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Feb 2024 at 11:18.
4 and 6 Jun 2024
Thames Water are proposing to carry out Utility asset works on Bolton Crescent, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Mar 2024 at 13:46.
4 and 17 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:46.
4 and 11 Jun 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Thayer Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Mar 2024 at 17:11.
4 and 10 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Luxborough Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 11:53.
5 Jun and 10 Oct 2024
Thames Water are proposing to carry out Utility asset works on Victoria Street, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Jul 2023 at 12:08.
5 Jun and 8 Sep 2024
Thames Water are proposing to carry out Utility asset works on Grosvenor Gardens, Warwick, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 8 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Jul 2023 at 12:08.
5 and 7 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Kingsway, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 Mar 2024 at 08:44.
5 and 7 Jun 2024
G. Network Communications are proposing to carry out Utility asset works on Gaisford Street, Cantelowes, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 28 Feb 2024 at 15:02.
5 Jun and 7 Jul 2024
London Borough Of Hackney are proposing to carry out Highway improvement works on Lower Clapton Road, Hackney, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 14 Mar 2024 at 10:58.
7 and 9 Jun 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2024 at 12:31.
7 and 9 Jun 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2024 at 12:37.
7 and 10 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:51.
7 and 10 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:51.
7 and 10 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 13:10.
7 and 24 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Bishopsgate, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Mar 2024 at 15:19.
9 and 11 Jun 2024
Virgin Media are proposing to carry out Utility asset works on Ashley Crescent, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 15 Mar 2024 at 08:44.
9 and 13 Jun 2024
Thames Water are proposing to carry out New service connection on Strutton Ground, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Mar 2024 at 09:32.
9 and 13 Jun 2024
Thames Water are proposing to carry out New service connection on Park Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Mar 2024 at 07:48.
9 Jun and 17 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Grosvenor Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 15:15.
9 Jun and 17 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Brook Gate, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2024 at 17:56.
9 Jun and 17 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Brook Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 15:19.
9 and 26 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Craven Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 10:30.
9 and 26 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Brook Mews North, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 10:30.
9 Jun and 17 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2024 at 17:55.
9 Jun and 17 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Cumberland Gate, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2024 at 17:55.
9 and 17 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Chance Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 15:11.
10 Jun and 9 Jul 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Fenham Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 9 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2024 at 13:54.
10 Jun and 9 Jul 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Friary Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 9 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2024 at 13:54.
10 Jun and 13 Jul 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Ambergate Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 08:04.
10 Jun and 1 Jul 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southwark Park Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2024 at 07:12.
10 and 23 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Great Suffolk Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Mar 2024 at 11:07.
10 and 14 Jun 2024
Squire Energy are proposing to carry out Remedial works on Spring Gardens, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 4 Mar 2024 at 09:13.
10 and 28 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Colville Terrace, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Mar 2024 at 12:10.
10 and 15 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Fitzhardinge Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 15 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:06.
10 and 19 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Grape Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 15:07.
10 and 21 Jun 2024
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Bartholomew Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:53.
10 and 14 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Rossmore Road, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Mar 2024 at 13:31.
10 and 14 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Rossmore Road, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Mar 2024 at 13:29.
11 and 13 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Holbein Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Mar 2024 at 11:09.
11 and 18 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Berwick Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 14:48.
12 and 26 Jun 2024
Electricity Network Company are proposing to carry out Utility asset works on Pascal Street, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 17 Jan 2024 at 08:19.
12 Jun and 2 Jul 2024
City Of Westminster are proposing to carry out Highway improvement works on New Cavendish Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 10:04.
13 and 17 Jun 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Credon Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Mar 2024 at 07:38.
14 and 17 Jun 2024
Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Mar 2024 at 15:57.
14 and 16 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Carlisle Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 16 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Mar 2024 at 15:27.
14 and 17 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on City Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Mar 2024 at 12:00.
14 Jun and 1 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Gascony Avenue, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 1 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2024 at 09:37.
16 and 21 Jun 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Sumner Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 06:41.
16 and 20 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Regeneration Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 09:34.
16 and 22 Jun 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Grange Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 15 Mar 2024 at 14:37.
16 and 18 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Emerson Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 08:30.
16 Jun and 1 Jul 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Manchester Square, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:12.
16 and 23 Jun 2024
Thames Water are proposing to carry out New service connection on Brady Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 17:39.
16 and 22 Jun 2024
Thames Water are proposing to carry out New service connection on Shrewsbury Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2024 at 08:27.
16 and 19 Jun 2024
Thames Water are proposing to carry out New service connection on Cheshire Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 08:06.
17 Jun and 26 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Queenstown Road, Wandsworth, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Feb 2024 at 09:22.
17 and 23 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Penton Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 13:10.
17 Jun and 8 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Frankland Close, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 8 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2024 at 08:12.
17 and 28 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Duke Street St James's, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2024 at 10:40.
17 Jun and 12 Jul 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 28 Mar 2024 at 08:52.
17 and 26 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 08:37.
17 and 19 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Brown Hart Gardens, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 19 Mar 2024 at 13:40.
17 and 20 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Gate Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 15:12.
17 Jun and 22 Nov 2024
City Of Westminster are proposing to carry out Highway improvement works on Great Titchfield Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by City Of Westminster on 23 Mar 2024 at 13:59.
17 Jun and 19 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on East Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 15 Mar 2024 at 14:38.
17 Jun and 19 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Silbury Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 15 Mar 2024 at 14:45.
17 and 21 Jun 2024
BT are proposing to carry out Utility asset works on Crogsland Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Mar 2024 at 15:10.
17 and 21 Jun 2024
Thames Water are proposing to carry out New service connection on Parolles Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Mar 2024 at 10:01.
17 and 19 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Mar 2024 at 08:38.
18 Jun and 1 Jul 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Seymour Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 19 Mar 2024 at 11:15.
18 and 20 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 18 Mar 2024 at 10:24.
18 Jun 2024 and 29 Sep 2025
Thames Water are proposing to carry out Utility asset works on Eade Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 07:27.
19 and 21 Jun 2024
BT are proposing to carry out Utility asset works on Record Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Mar 2024 at 07:56.
19 and 24 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 Mar 2024 at 13:26.
19 Jun and 3 Jul 2024
Virgin Media are proposing to carry out Utility asset works on Berners Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 18 Mar 2024 at 16:30.
19 Jun and 3 Jul 2024
Virgin Media are proposing to carry out Utility asset works on Mortimer Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 18 Mar 2024 at 16:35.
19 and 23 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Whiston Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2024 at 17:31.
20 and 22 Jun 2024
Sky UK are proposing to carry out Utility repair and maintenance works on London Wall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Sky UK on 25 Mar 2024 at 14:28.
22 and 25 Jun 2024
City Of London Corporation are proposing to carry out Highway improvement works on Eastcheap, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 25 Jan 2024 at 09:30.
23 Jun and 2 Jul 2024
Virgin Media are proposing to carry out Utility asset works on Fitzjames Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 13 Mar 2024 at 15:03.
23 and 25 Jun 2024
Virgin Media are proposing to carry out Utility asset works on Hamilton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 12 Mar 2024 at 10:50.
23 and 25 Jun 2024
Virgin Media are proposing to carry out Utility asset works on Borough High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Mar 2024 at 07:16.
23 Jun and 14 Jul 2024
City Of London Telecomms are proposing to carry out Utility asset works on Park Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 28 Mar 2024 at 15:07.
23 and 25 Jun 2024
Virgin Media are proposing to carry out Utility asset works on Johnson Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 15 Mar 2024 at 09:17.
23 and 27 Jun 2024
Thames Water are proposing to carry out New service connection on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Mar 2024 at 13:15.
23 and 27 Jun 2024
Thames Water are proposing to carry out New service connection on King's Mews, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 15:18.
23 Jun and 4 Jul 2024
Thames Water are proposing to carry out New service connection on Lisson Grove, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Mar 2024 at 11:39.
23 Jun and 8 Jul 2024
London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 25 Mar 2024 at 17:56.
23 and 27 Jun 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 28 Mar 2024 at 14:32.
24 Jun and 12 Oct 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Knatchbull Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.
24 Jun and 12 Oct 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Station Terrace, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.
24 Jun and 12 Oct 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.
24 Jun and 12 Oct 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell New Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 16:28.
24 Jun and 24 Jul 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southampton Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 11:39.
24 Jun and 30 Sep 2024
Thames Tideway Tunnel are proposing to carry out Highway improvement works on Deptford Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 13 Mar 2024 at 16:21.
24 Jun and 30 Sep 2024
Thames Tideway Tunnel are proposing to carry out roadworks on Creek Road, Deptford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 15 Mar 2024 at 06:58.
24 Jun and 22 Jul 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Mar 2024 at 14:29.
24 and 28 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 14:28.
24 Jun and 5 Jul 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 09:36.
24 and 26 Jun 2024
Virgin Media are proposing to carry out Utility asset works on Holly Hill, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Mar 2024 at 10:37.
24 Jun and 22 Jul 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on West Heath Road, Hampstead, London.
These works are categorised as Major.
The works will start on or after 24 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 16 Mar 2024 at 09:13.
25 and 28 Jun 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Prince Albert Road, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 18 Mar 2024 at 10:21.
26 Jun and 10 Jul 2024
Virgin Media are proposing to carry out Utility asset works on Hans Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 10 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 27 Mar 2024 at 16:41.
26 and 30 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Thackeray Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 09:37.
26 and 28 Jun 2024
BT are proposing to carry out New service connection on Mason's Arms Mews, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Mar 2024 at 12:15.
Roadworks Map near to WC1N 3NX
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
Roadworks Listing near to WC1N 3NX (137 Events)
(Scheduled Dates)
(miles)
(Scheduled: 28 Mar 2024 - 3 Apr 2024)
(Scheduled: 18 Mar 2024 - 14 Apr 2024)
(Scheduled: 27 Mar 2024 - 5 Apr 2024)
(Scheduled: 18 Mar 2024 - 14 Apr 2024)
(Scheduled: 18 Mar 2024 - 14 Apr 2024)
(Scheduled: 18 Mar 2024 - 14 Apr 2024)
(Scheduled: 11 Jan 2024 - 30 Mar 2024)
(Scheduled: 27 Mar 2024 - 5 Apr 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data