ROADWORKS SUMMARY
WC1N 3NX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for WC1N 3NX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to WC1N 3NX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

Thames Tideway Tunnel logo

LONG TERM
Until
26 Jun 2024
Details
View Map
Share
Nine Elms Lane

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2019 at 07:00 and could run through until 26 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 12 Oct 2023 at 12:48.

Transport for London (TfL) logo

LONG TERM
Between
23 Mar 2020 and 14 Apr 2024
Details
View Map
Share
Old Street

Transport for London (TfL) are proposing to carry out roadworks on Old Street, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 March 2020 and could run through until 14 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Dec 2023 at 10:44.

Thames Tideway Tunnel logo

LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Chelsea Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2020 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 15 Feb 2024 at 15:50.

Thames Tideway Tunnel logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Chelsea Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2020 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 12 Oct 2023 at 09:39.

Thames Tideway Tunnel logo

LONG TERM
Until
30 May 2024
Details
View Map
Share
Deptford Church Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.

These works are categorised as Major.

The works started on 17 July 2020 at 08:00 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 09:28.

Thames Tideway Tunnel logo

LONG TERM
Until
30 Aug 2024
Details
View Map
Share
Yeoman Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Yeoman Street, London.

These works are categorised as Major.

The works started on 17 July 2020 at 08:00 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 4 Nov 2021 at 15:19.

Thames Tideway Tunnel logo

LONG TERM
Until
30 Aug 2024
Details
View Map
Share
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2020 at 07:00 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 8 Nov 2021 at 12:02.

Thames Tideway Tunnel logo

LONG TERM
Until
23 Dec 2024
Details
View Map
Share
West Lane

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on West Lane, London.

These works are categorised as Major.

The works started on 27 July 2020 at 07:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Nov 2021 at 10:01.

Thames Tideway Tunnel logo

LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Coffey Road

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Coffey Road, London.

These works are categorised as Major.

The works started on 4 August 2020 at 07:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 09:29.

Thames Water logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Vesta Road

Thames Water are carrying out Utility asset works on Vesta Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 June 2021 at 09:00 and could run through until 31 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Dec 2023 at 14:47.

Thames Water logo

LONG TERM
Until
22 Aug 2202
Details
View Map
Share
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 15:30.

City Of London Corporation logo

LONG TERM
Between
6 Dec 2021 and 25 Jul 2024
Details
View Map
Share
Blackfriars Bridge

City Of London Corporation are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2021 and could run through until 25 July 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 22 Nov 2021 at 16:21.

London Borough Of Southwark logo

LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Croft Street

London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2022 at 00:00 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 23:15.

Thames Tideway Tunnel logo

LONG TERM
Between
18 Sep 2022 and 12 Jul 2024
Details
View Map
Share
Albert Embankment

Thames Tideway Tunnel are proposing to carry out Utility repair and maintenance works on Albert Embankment, Prince's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2022 and could run through until 12 July 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Tideway Tunnel on 8 Mar 2021 at 13:32.

Network Rail logo

LONG TERM
Until
5 Sep 2024
Details
View Map
Share
Tanner Lane

Network Rail are carrying out Works for Rail Purposes on Tanner Lane, Westminster, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2022 at 06:30 and could run through until 5 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Oct 2022 at 07:08.

Network Rail logo

LONG TERM
Until
5 Sep 2024
Details
View Map
Share
South Wharf Road

Network Rail are carrying out Works for Rail Purposes on South Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 06:30 and could run through until 5 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2022 at 07:07.

Network Rail logo

LONG TERM
Until
5 Sep 2024
Details
View Map
Share
Junction Place

Network Rail are carrying out Works for Rail Purposes on Junction Place, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 06:30 and could run through until 5 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2022 at 07:09.

City Of London Corporation logo

LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Threadneedle Street

City Of London Corporation are carrying out Highway improvement works on Threadneedle Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 October 2022 at 07:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:21.

London Borough Of Wandsworth logo

LONG TERM
Between
31 Oct 2022 and 30 Apr 2024
Details
View Map
Share
Randall Close

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Randall Close, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2022 and could run through until 30 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Oct 2022 at 11:50.

Transport for London (TfL) logo

LONG TERM
Between
14 Nov 2022 and 5 Apr 2024
Details
View Map
Share
Farringdon Road

Transport for London (TfL) are proposing to carry out roadworks on Farringdon Road, Islington, London.

These works are categorised as Major.

The works will start on or after 14 November 2022 and could run through until 5 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Jan 2024 at 19:08.

Transport for London (TfL) logo

LONG TERM
Between
1 Dec 2022 and 19 Apr 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2022 and could run through until 19 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2023 at 10:10.

City Of London Corporation logo

LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Lombard Street

City Of London Corporation are carrying out Highway repair and maintenance works on Lombard Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2022 at 08:00 and could run through until 30 April 2024. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:02.

Network Rail logo

LONG TERM
Until
1 May 2024
Details
View Map
Share
Kingsbury Road

Network Rail are carrying out Works for Rail Purposes on Kingsbury Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 December 2022 at 17:30 and could run through until 1 May 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by Network Rail on 25 Jan 2024 at 12:42.

Transport for London (TfL) logo

LONG TERM
Between
19 Dec 2022 and 26 Aug 2024
Details
View Map
Share
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2022 and could run through until 26 August 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 11:17.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Sloane Street

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2023 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Jan 2023 at 09:41.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Sloane Terrace

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Ellis Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Ellis Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 15:53.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Pont Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pont Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Cadogan Place

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Harriet Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Harriet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

Transport for London (TfL) logo

LONG TERM
Until
2 May 2024
Details
View Map
Share
Stoke Newington High Street

Transport for London (TfL) are carrying out roadworks on Stoke Newington High Street, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2023 at 08:00 and could run through until 2 May 2024. The works will impact the footway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2024 at 11:37.

City Of London Corporation logo

LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Mansion House Street

City Of London Corporation are carrying out Highway repair and maintenance works on Mansion House Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 February 2023 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:04.

City Of London Corporation logo

LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Prince's Street

City Of London Corporation are carrying out Highway improvement works on Prince's Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 February 2023 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:19.

Transport for London (TfL) logo

LONG TERM
Between
4 Mar 2023 and 19 Apr 2024
Details
View Map
Share
Wood Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2023 and could run through until 19 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2024 at 10:34.

Transport for London (TfL) logo

LONG TERM
Between
27 Mar 2023 and 8 Sep 2025
Details
View Map
Share
Bishopsgate

Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.

London Borough Of Southwark logo

LONG TERM
Until
7 May 2024
Details
View Map
Share
Walworth Square

London Borough Of Southwark are carrying out Highway improvement works on Walworth Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2023 at 23:00 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 11:58.

Transport for London (TfL) logo

LONG TERM
Finishing
Tuesday
Details
View Map
Share
Holloway Road

Transport for London (TfL) are carrying out Highway improvement works on Holloway Road, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 May 2023 at 07:00 and could run through until 2 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2024 at 11:41.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Cadogan Gardens

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Cadogan Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2023 at 07:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 May 2023 at 08:01.

Thames Tideway Tunnel logo

LONG TERM
Until
24 May 2024
Details
View Map
Share
York Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 May 2023 at 07:00 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 15 Jun 2023 at 12:20.

Thames Water logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Kitto Road

Thames Water are carrying out Utility repair and maintenance works on Kitto Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2023 at 13:30 and could run through until 31 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2023 at 15:25.

London Borough Of Hackney logo

LONG TERM
Between
4 Jul 2023 and 12 May 2024
Details
View Map
Share
Lea Bridge Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2023 and could run through until 12 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 3 May 2023 at 10:19.

London Borough Of Southwark logo

LONG TERM
Until
24 Jul 2024
Details
View Map
Share
Warndon Street

London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 July 2023 at 23:00 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Nov 2023 at 10:50.

London Borough Of Southwark logo

LONG TERM
Between
12 Jul 2023 and 12 Aug 2024
Details
View Map
Share
Melior Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2023 and could run through until 12 August 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 27 Jul 2023 at 09:21.

Thames Tideway Tunnel logo

LONG TERM
Until
31 May 2024
Details
View Map
Share
Cringle Street

Thames Tideway Tunnel are carrying out Works for road purposes on Cringle Street, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2023 at 08:00 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 14 Mar 2024 at 15:48.

Thames Water logo

LONG TERM
Until
23 Apr 2025
Details
View Map
Share
Welsford Street

Thames Water are carrying out roadworks on Welsford Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 14:30 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Jul 2023 at 16:01.

Thames Water logo

LONG TERM
Until
16 May 2024
Details
View Map
Share
Finsbury Park Road

Thames Water are carrying out Utility repair and maintenance works on Finsbury Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 07:30 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2023 at 14:31.

Thames Water logo

LONG TERM
Until
16 May 2024
Details
View Map
Share
Myddleton Avenue

Thames Water are carrying out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 08:30 and could run through until 16 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Nov 2023 at 14:29.

London Borough Of Hackney logo

LONG TERM
Until
2 Jun 2024
Details
View Map
Share
Lea Bridge Road

London Borough Of Hackney are carrying out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 July 2023 at 08:05 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 24 Jul 2023 at 08:05.

Transport for London (TfL) logo

LONG TERM
Until
31 Aug 2024
Details
View Map
Share
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2023 at 23:00 and could run through until 31 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Nov 2023 at 16:30.

London Borough Of Southwark logo

LONG TERM
Until
20 May 2025
Details
View Map
Share
Ann Moss Way

London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.

These works are categorised as Major.

The works started on 21 August 2023 at 05:11 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Jan 2024 at 10:37.

London Borough Of Southwark logo

LONG TERM
Until
24 Apr 2024
Details
View Map
Share
Albion Street

London Borough Of Southwark are carrying out Highway improvement works on Albion Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2023 at 23:00 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 17 Jan 2024 at 12:32.

Transport for London (TfL) logo

LONG TERM
Between
29 Aug 2023 and 24 Oct 2024
Details
View Map
Share
Stamford Street

Transport for London (TfL) are proposing to carry out roadworks on Stamford Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 August 2023 and could run through until 24 October 2024. The works will impact the footway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2023 at 14:31.

Transport for London (TfL) logo

LONG TERM
Between
6 Sep 2023 and 3 Sep 2025
Details
View Map
Share
Walworth Road

Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 14:54.

City Of Westminster logo

LONG TERM
Between
9 Sep 2023 and 11 Sep 2024
Details
View Map
Share
Wigmore Street

City Of Westminster are proposing to carry out Highway improvement works on Wigmore Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2023 and could run through until 11 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 28 Jun 2023 at 05:54.

London Borough Of Southwark logo

LONG TERM
Until
22 Jun 2024
Details
View Map
Share
Lower Road

London Borough Of Southwark are carrying out Highway improvement works on Lower Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2023 at 23:00 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Oct 2023 at 05:52.

London Borough Of Camden logo

LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Tavistock Square

London Borough Of Camden are carrying out Highway improvement works on Tavistock Square, Bloomsbury, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2023 at 14:00 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 29 Sep 2023 at 15:00.

Thames Water logo

LONG TERM
Between
25 Sep 2023 and 31 Jan 2025
Details
View Map
Share
Jamaica Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Jamaica Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2023 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 May 2023 at 10:12.

London Borough Of Southwark logo

LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Bankside

London Borough Of Southwark are carrying out Highway improvement works on Bankside, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 30 September 2023 at 23:00 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2023 at 12:22.

Thames Water logo

LONG TERM
Until
14 Apr 2024
Details
View Map
Share
Crowndale Road

Thames Water are carrying out Utility asset works on Crowndale Road, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 09:21 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2023 at 11:20.

London Borough Of Camden logo

LONG TERM
Until
29 Jun 2024
Details
View Map
Share
York Way

London Borough Of Camden are carrying out Highway improvement works on York Way, St Pancras And Somers Town, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2023 at 09:00 and could run through until 29 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 26 Mar 2024 at 07:15.

Transport for London (TfL) logo

LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.

Transport for London (TfL) logo

LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 22:46.

City Of Westminster logo

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Embankment Place

City Of Westminster are carrying out Highway improvement works on Embankment Place, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2023 at 08:00 and could run through until 30 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 30 Jan 2024 at 06:26.

Thames Water logo

LONG TERM
Between
7 Nov 2023 and 10 May 2024
Details
View Map
Share
St Edmund's Terrace

Thames Water are proposing to carry out Utility asset works on St Edmund's Terrace, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2023 and could run through until 10 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Aug 2023 at 15:37.

Transport for London (TfL) logo

LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Pembroke Road

Transport for London (TfL) are carrying out Highway improvement works on Pembroke Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 08:00 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2023 at 08:59.

Transport for London (TfL) logo

LONG TERM
Until
12 Apr 2024
Details
View Map
Share
Pembroke Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Pembroke Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 08:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Feb 2024 at 14:18.

Transport for London (TfL) logo

LONG TERM
Until
5 Apr 2024
Details
View Map
Share
Holland Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Holland Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 08:00 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 10:47.

Thames Water logo

LONG TERM
Until
14 Apr 2024
Details
View Map
Share
Eversholt Street

Thames Water are carrying out Utility asset works on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 11:45 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2023 at 12:12.

Thames Water logo

LONG TERM
Between
13 Nov 2023 and 14 Apr 2024
Details
View Map
Share
Eversholt Street

Thames Water are proposing to carry out Utility asset works on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2023 and could run through until 14 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Aug 2023 at 12:43.

London Borough Of Southwark logo

LONG TERM
Until
7 May 2024
Details
View Map
Share
Walworth Square

London Borough Of Southwark are carrying out Highway improvement works on Walworth Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 November 2023 at 08:08 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 12:05.

London Borough Of Haringey logo

LONG TERM
Finishing
Today
Details
View Map
Share
The Bank

London Borough Of Haringey are carrying out Highway improvement works on The Bank, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2023 at 08:00 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 20 Nov 2023 at 09:20.

Network Rail logo

LONG TERM
Until
1 May 2024
Details
View Map
Share
St Jude Street

Network Rail are carrying out Works for Rail Purposes on St Jude Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Nov 2023 at 08:33.

Thames Water logo

LONG TERM
Until
8 Apr 2024
Details
View Map
Share
Reverdy Road

Thames Water are carrying out Disconnection or alteration of supply on Reverdy Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2023 at 09:30 and could run through until 8 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Nov 2023 at 09:49.

London Borough Of Southwark logo

LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Bankside

London Borough Of Southwark are carrying out Highway improvement works on Bankside, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 29 November 2023 at 06:11 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Nov 2023 at 06:14.

Thames Water logo

LONG TERM
Until
12 Apr 2024
Details
View Map
Share
Strand

Thames Water are carrying out Utility repair and maintenance works on Strand, St James's, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 November 2023 at 13:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Mar 2024 at 10:15.

Transport for London (TfL) logo

LONG TERM
Between
4 Dec 2023 and 3 May 2024
Details
View Map
Share
Borough High Street

Transport for London (TfL) are proposing to carry out roadworks on Borough High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2023 and could run through until 3 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2023 at 12:45.

Thames Water logo

LONG TERM
Between
9 Dec 2023 and 10 Dec 2024
Details
View Map
Share
Du Cane Road

Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.

Network Rail logo

LONG TERM
Until
5 Apr 2024
Details
View Map
Share
Leeke Street

Network Rail are carrying out Works for Rail Purposes on Leeke Street, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2023 at 08:00 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Dec 2023 at 09:16.

London Borough Of Southwark logo

LONG TERM
Until
16 Jul 2024
Details
View Map
Share
Albion Street

London Borough Of Southwark are carrying out Highway improvement works on Albion Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 December 2023 at 19:28 and could run through until 16 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 17 Dec 2023 at 19:31.

City Of Westminster logo

LONG TERM
Finishing
Today
Details
View Map
Share
Piccadilly

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 December 2023 at 08:00 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Dec 2023 at 08:47.

Thames Water logo

LONG TERM
Until
28 May 2024
Details
View Map
Share
Linden Grove

Thames Water are carrying out Utility repair and maintenance works on Linden Grove, London.

These works are categorised as Major.

The works started on 4 January 2024 at 08:00 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jan 2024 at 14:29.

Thames Water logo

LONG TERM
Until
12 Apr 2024
Details
View Map
Share
Monnow Road

Thames Water are carrying out Disconnection or alteration of supply on Monnow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 10:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2024 at 09:05.

London Borough Of Lambeth logo

LONG TERM
Between
2 Jan and 2 Jul 2024
Details
View Map
Share
Waterloo Bridge

London Borough Of Lambeth are proposing to carry out Remedial works on Waterloo Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 3 Oct 2023 at 07:51.

HS2 logo

LONG TERM
Between
2 Jan and 30 Apr 2024
Details
View Map
Share
Stanhope Street

HS2 are proposing to carry out Works for Rail Purposes on Stanhope Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 11 Dec 2023 at 13:50.

Thames Water logo

LONG TERM
Until
14 Apr 2024
Details
View Map
Share
New Cross Road

Thames Water are carrying out Utility repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 10:00 and could run through until 14 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 13:47.

Thames Water logo

LONG TERM
Until
21 Apr 2024
Details
View Map
Share
Warwick Way

Thames Water are carrying out Utility asset works on Warwick Way, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:45 and could run through until 21 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2024 at 08:59.

Thames Water logo

LONG TERM
Until
21 Apr 2024
Details
View Map
Share
Denbigh Street

Thames Water are carrying out Utility asset works on Denbigh Street, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:45 and could run through until 21 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2024 at 08:58.

Thames Water logo

LONG TERM
Until
18 Aug 2024
Details
View Map
Share
Wilton Road

Thames Water are carrying out Utility asset works on Wilton Road, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:45 and could run through until 18 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jan 2024 at 09:00.

Thames Water logo

LONG TERM
Until
15 Apr 2024
Details
View Map
Share
Grafton Crescent

Thames Water are carrying out Utility asset works on Grafton Crescent, Kentish Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 07:30 and could run through until 15 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jan 2024 at 08:56.

City Of London Corporation logo

LONG TERM
Until
5 Aug 2024
Details
View Map
Share
Leadenhall Street

City Of London Corporation are carrying out Highway improvement works on Leadenhall Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2024 at 08:00 and could run through until 5 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 5 Jan 2024 at 08:00.

City Of London Corporation logo

LONG TERM
Until
5 Aug 2024
Details
View Map
Share
Goring Street

City Of London Corporation are carrying out Highway improvement works on Goring Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2024 at 08:00 and could run through until 5 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 5 Jan 2024 at 08:00.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Between
8 Jan and 29 Apr 2024
Details
View Map
Share
Sloane Terrace

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 Dec 2023 at 10:45.

London Borough Of Camden logo

LONG TERM
Until
30 Oct 2024
Details
View Map
Share
Chalk Farm Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 12:30 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 16:23.

London Borough Of Haringey logo

LONG TERM
Between
8 Jan and 5 Apr 2024
Details
View Map
Share
Remington Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Remington Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 5 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 20 Dec 2023 at 12:44.

UK Power Networks Eastern & London logo

LONG TERM
Until
12 Apr 2024
Details
View Map
Share
Quebec Way

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Quebec Way, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 January 2024 at 08:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2024 at 08:34.

City Of Westminster logo

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
John Adam Street

City Of Westminster are carrying out Highway repair and maintenance works on John Adam Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 12:00 and could run through until 30 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 30 Jan 2024 at 06:24.

Thames Water logo

LONG TERM
Until
14 Apr 2024
Details
View Map
Share
Warren Street

Thames Water are carrying out Utility asset works on Warren Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 14 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 14:43.

City Of Westminster logo

LONG TERM
Until
24 Sep 2024
Details
View Map
Share
Fernhead Road

City Of Westminster are carrying out Highway repair and maintenance works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 12:30 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 15 Jan 2024 at 14:17.

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Westfield Avenue

London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 16 Feb 2024 at 10:14.

London Borough Of Hackney logo

LONG TERM
Until
18 Apr 2024
Details
View Map
Share
Wayland Avenue

London Borough Of Hackney are carrying out Highway improvement works on Wayland Avenue, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:17 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:38.

London Borough Of Hackney logo

LONG TERM
Until
18 Apr 2024
Details
View Map
Share
Sigdon Road

London Borough Of Hackney are carrying out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:17 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:45.

London Borough Of Hackney logo

LONG TERM
Until
18 Apr 2024
Details
View Map
Share
Sandringham Road

London Borough Of Hackney are carrying out Highway improvement works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 14:44 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:27.

London Borough Of Haringey logo

LONG TERM
Between
15 Jan and 22 Apr 2024
Details
View Map
Share
Highgate High Street

London Borough Of Haringey are proposing to carry out Highway improvement works on Highgate High Street, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 21 Dec 2023 at 12:50.

London Borough Of Haringey logo

LONG TERM
Between
15 Jan and 22 Apr 2024
Details
View Map
Share
Southwood Lane

London Borough Of Haringey are proposing to carry out Highway improvement works on Southwood Lane, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 21 Dec 2023 at 12:50.

Thames Water logo

LONG TERM
Until
23 Sep 2024
Details
View Map
Share
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2024 at 10:27.

Thames Water logo

LONG TERM
Until
7 May 2024
Details
View Map
Share
Eccleston Street

Thames Water are carrying out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 7 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2024 at 10:14.

Thames Water logo

LONG TERM
Until
19 Jun 2024
Details
View Map
Share
Hobart Place

Thames Water are carrying out Utility asset works on Hobart Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 19 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2024 at 10:28.

Transport for London (TfL) logo

LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

Thames Water logo

LONG TERM
Until
14 Apr 2024
Details
View Map
Share
Thorparch Road

Thames Water are carrying out Utility asset works on Thorparch Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 January 2024 at 09:00 and could run through until 14 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:38.

UK Power Networks Eastern & London logo

LONG TERM
Between
22 Jan and 10 May 2024
Details
View Map
Share
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 14:19.

Transport for London (TfL) logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Bishopsgate

Transport for London (TfL) are carrying out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 January 2024 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2024 at 10:35.

Thames Water logo

LONG TERM
Until
13 May 2024
Details
View Map
Share
Mill Lane

Thames Water are carrying out Utility asset works on Mill Lane, Fortune Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 January 2024 at 10:00 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 07:19.

London Borough Of Southwark logo

LONG TERM
Between
24 Jan and 30 Oct 2024
Details
View Map
Share
Deal Porters Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porters Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 15 Dec 2023 at 16:25.

Transport for London (TfL) logo

LONG TERM
Finishing
Monday
Details
View Map
Share
Holland Gardens

Transport for London (TfL) are carrying out Highway improvement works on Holland Gardens, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 08:00 and could run through until 1 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Mar 2024 at 16:54.

Transport for London (TfL) logo

LONG TERM
Until
12 Apr 2024
Details
View Map
Share
Earl's Court Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Earl's Court Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 January 2024 at 08:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Feb 2024 at 14:17.

Transport for London (TfL) logo

LONG TERM
Until
5 Apr 2024
Details
View Map
Share
Camden Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Camden Road, Cantelowes, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 January 2024 at 08:00 and could run through until 5 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 10:05.

London Borough Of Southwark logo

LONG TERM
Until
3 Jul 2024
Details
View Map
Share
Thurlow Street

London Borough Of Southwark are carrying out Highway improvement works on Thurlow Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 January 2024 at 14:18 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Jan 2024 at 14:21.

Transport for London (TfL) logo

LONG TERM
Finishing
Today
Details
View Map
Share
Knightsbridge

Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2024 and could run through until 29 March 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2024 at 14:57.

Transport for London (TfL) logo

LONG TERM
Finishing
Today
Details
View Map
Share
Knightsbridge

Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2024 and could run through until 29 March 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 10:34.

Thames Water logo

LONG TERM
Between
5 Feb and 8 Apr 2024
Details
View Map
Share
Draycott Avenue

Thames Water are proposing to carry out Utility asset works on Draycott Avenue, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jan 2024 at 15:48.

Thames Water logo

LONG TERM
Between
5 Feb and 7 Apr 2024
Details
View Map
Share
Ixworth Place

Thames Water are proposing to carry out Utility asset works on Ixworth Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 7 April 2024. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Jan 2024 at 16:02.

Thames Water logo

LONG TERM
Between
5 Feb and 12 Jun 2024
Details
View Map
Share
Bevington Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Bevington Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 12 June 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Oct 2023 at 08:59.

LONG TERM
Until
5 Aug 2024
Details
View Map
Share
Clerkenwell Green

London Borough Of Islington are carrying out Highway improvement works on Clerkenwell Green, Islington, London.

These works are categorised as Major.

The works started on 5 February 2024 at 11:30 and could run through until 5 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 5 Feb 2024 at 11:40.

Thames Water logo

LONG TERM
Finishing
Today
Details
View Map
Share
Finborough Road

Thames Water are carrying out Utility repair and maintenance works on Finborough Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2024 at 08:40 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:04.

Thames Water logo

LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Linsey Street

Thames Water are carrying out Disconnection or alteration of supply on Linsey Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 10:00 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Feb 2024 at 10:56.

Thames Water logo

LONG TERM
Until
25 Apr 2024
Details
View Map
Share
Collett Road

Thames Water are carrying out Disconnection or alteration of supply on Collett Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 12:30 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 08:08.

Thames Water logo

LONG TERM
Finishing
Monday
Details
View Map
Share
Farncombe Street

Thames Water are carrying out Disconnection or alteration of supply on Farncombe Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 11:00 and could run through until 1 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 10:04.

Transport for London (TfL) logo

LONG TERM
Until
24 Apr 2024
Details
View Map
Share
Westminster Bridge

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 21:00 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2024 at 09:44.

Transport for London (TfL) logo

LONG TERM
Until
24 Apr 2024
Details
View Map
Share
Westminster Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge Road, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 21:00 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2024 at 09:43.

LONG TERM
Between
12 Feb and 8 Apr 2024
Details
View Map
Share
Wapping Dock Stairs

London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Wapping Dock Stairs, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2024 and could run through until 8 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 25 Jan 2024 at 13:35.

LONG TERM
Until
8 Apr 2024
Details
View Map
Share
Wapping Dock Stairs

London Borough Of Tower Hamlets are carrying out Highway repair and maintenance works on Wapping Dock Stairs, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 8 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 Feb 2024 at 12:51.

London Borough Of Hackney logo

LONG TERM
Until
31 Jul 2024
Details
View Map
Share
Queensbridge Road

London Borough Of Hackney are carrying out Highway improvement works on Queensbridge Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 08:14 and could run through until 31 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 08:14.

Thames Water logo

LONG TERM
Until
13 Apr 2024
Details
View Map
Share
Ixworth Place

Thames Water are carrying out Utility asset works on Ixworth Place, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 08:00 and could run through until 13 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 14:32.

Thames Water logo

LONG TERM
Until
14 Apr 2024
Details
View Map
Share
Draycott Avenue

Thames Water are carrying out Utility asset works on Draycott Avenue, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 08:00 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 14:35.

UK Power Networks Eastern & London logo

LONG TERM
Until
10 Jun 2024
Details
View Map
Share
Willesden Lane

UK Power Networks Eastern & London are carrying out New service connection on Willesden Lane, Kilburn, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 February 2024 at 09:35 and could run through until 10 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2024 at 09:40.

LONG TERM
Until
1 May 2024
Details
View Map
Share
Winnington Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Winnington Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:00 and could run through until 1 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Feb 2024 at 12:01.

London Borough Of Hackney logo

LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

Thames Water logo

LONG TERM
Between
17 Feb and 22 Apr 2024
Details
View Map
Share
Marine Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Marine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2024 and could run through until 22 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Nov 2023 at 10:02.

Transport for London (TfL) logo

LONG TERM
Finishing
Tuesday
Details
View Map
Share
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 09:30 and could run through until 2 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2024 at 15:34.

London Borough Of Southwark logo

LONG TERM
Between
19 Feb and 10 Jun 2024
Details
View Map
Share
Deal Porters Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porters Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 18:55.

London Borough Of Hackney logo

LONG TERM
Until
18 Apr 2024
Details
View Map
Share
Buckland Street

London Borough Of Hackney are carrying out Highway improvement works on Buckland Street, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 09:30 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 25 Mar 2024 at 12:48.

London Borough Of Hackney logo

LONG TERM
Until
18 Apr 2024
Details
View Map
Share
Pitfield Street

London Borough Of Hackney are carrying out Highway improvement works on Pitfield Street, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:00 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 25 Mar 2024 at 12:54.

Thames Water logo

LONG TERM
Until
11 Apr 2024
Details
View Map
Share
Colebrooke Row

Thames Water are carrying out Utility asset works on Colebrooke Row, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:00 and could run through until 11 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 14:40.

Transport for London (TfL) logo

LONG TERM
Between
19 Feb and 15 Apr 2024
Details
View Map
Share
Sandringham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 15 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2024 at 10:22.

LONG TERM
Until
16 Apr 2024
Details
View Map
Share
Caledonian Road

London Borough Of Islington are carrying out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:00 and could run through until 16 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Mar 2024 at 09:13.

UK Power Networks Eastern & London logo

LONG TERM
Until
17 Apr 2024
Details
View Map
Share
Rotherhithe New Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2024 at 17:00 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 18:00.

Transport for London (TfL) logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Knightsbridge

Transport for London (TfL) are carrying out Highway repair and maintenance works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2024 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2024 at 09:05.

Transport for London (TfL) logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Hyde Park Corner

Transport for London (TfL) are carrying out Highway repair and maintenance works on Hyde Park Corner, West End, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2024 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2024 at 09:13.

Transport for London (TfL) logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Park Lane

Transport for London (TfL) are carrying out Highway repair and maintenance works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2024 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2024 at 09:13.

Thames Tideway Tunnel logo

LONG TERM
Between
22 Feb and 30 Nov 2024
Details
View Map
Share
Chelsea Embankment

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Tideway Tunnel on 30 Jan 2024 at 09:17.

Transport for London (TfL) logo

LONG TERM
Until
5 Apr 2024
Details
View Map
Share
Rockingham Street

Transport for London (TfL) are carrying out Highway improvement works on Rockingham Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 07:01 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:43.

Transport for London (TfL) logo

LONG TERM
Between
26 Feb and 5 Apr 2024
Details
View Map
Share
Newington Causeway

Transport for London (TfL) are proposing to carry out Highway improvement works on Newington Causeway, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Dec 2023 at 20:32.

Transport for London (TfL) logo

LONG TERM
Until
5 Apr 2024
Details
View Map
Share
Newington Causeway

Transport for London (TfL) are carrying out Highway improvement works on Newington Causeway, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 07:01 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:42.

City Of London Corporation logo

LONG TERM
Finishing
Today
Details
View Map
Share
Blackfriars Bridge

City Of London Corporation are carrying out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 26 Feb 2024 at 08:00.

City Of London Corporation logo

LONG TERM
Finishing
Today
Details
View Map
Share
New Bridge Street

City Of London Corporation are carrying out Highway repair and maintenance works on New Bridge Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 26 Feb 2024 at 08:00.

City Of Westminster logo

LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Mortimer Street

City Of Westminster are carrying out Highway improvement works on Mortimer Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 February 2024 at 12:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 4 Mar 2024 at 12:01.

LONG TERM
Until
19 Apr 2024
Details
View Map
Share
Northchurch Road

London Borough Of Islington are carrying out Highway improvement works on Northchurch Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 26 Feb 2024 at 08:36.

London Borough Of Hackney logo

LONG TERM
Until
19 Apr 2024
Details
View Map
Share
Southgate Road

London Borough Of Hackney are carrying out Highway improvement works on Southgate Road, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:40 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 26 Feb 2024 at 08:40.

Transport for London (TfL) logo

LONG TERM
Finishing
Today
Details
View Map
Share
Camden Park Road

Transport for London (TfL) are carrying out Highway improvement works on Camden Park Road, Cantelowes, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:01 and could run through until 29 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:39.

Transport for London (TfL) logo

LONG TERM
Finishing
Today
Details
View Map
Share
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Cantelowes, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2024 and could run through until 29 March 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2023 at 13:32.

Transport for London (TfL) logo

LONG TERM
Finishing
Today
Details
View Map
Share
Torriano Avenue

Transport for London (TfL) are carrying out Highway improvement works on Torriano Avenue, Kentish Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:01 and could run through until 29 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:39.

UK Power Networks Eastern & London logo

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
St Pancras Way

UK Power Networks Eastern & London are carrying out Utility asset works on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 February 2024 at 08:29 and could run through until 30 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 11:59.

Cadent Gas logo

LONG TERM
Finishing
Thursday
Details
View Map
Share
Highgate West Hill

Cadent Gas are carrying out Utility repair and maintenance works on Highgate West Hill, Highgate, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 February 2024 at 11:09 and could run through until 4 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 15:55.

Transport for London (TfL) logo

LONG TERM
Between
1 Mar 2024 and 2 Jan 2026
Details
View Map
Share
Kennington Lane

Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 2 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2024 at 11:51.

UK Power Networks Eastern & London logo

LONG TERM
Until
5 Aug 2024
Details
View Map
Share
Southwark Park Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 13:00 and could run through until 5 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 13:43.

Transport for London (TfL) logo

LONG TERM
Between
1 Mar and 1 May 2024
Details
View Map
Share
Bow Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2023 at 11:05.

Transport for London (TfL) logo

LONG TERM
Until
1 May 2024
Details
View Map
Share
High Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 08:00 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2024 at 12:58.

Transport for London (TfL) logo

LONG TERM
Between
1 Mar and 1 May 2024
Details
View Map
Share
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2023 at 11:31.

Transport for London (TfL) logo

LONG TERM
Between
1 Mar and 1 May 2024
Details
View Map
Share
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2023 at 11:39.

Transport for London (TfL) logo

LONG TERM
Until
1 May 2024
Details
View Map
Share
High Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 08:00 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2024 at 12:57.

Network Rail logo

LONG TERM
Until
31 May 2024
Details
View Map
Share
Sheepcote Lane

Network Rail are carrying out Works for Rail Purposes on Sheepcote Lane, Battersea, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:33 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 08:24.

London Borough Of Southwark logo

Finishing
Tomorrow
Details
View Map
Share
Benhill Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Benhill Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 30 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Mar 2024 at 09:11.

London Borough Of Southwark logo

Finishing
Tomorrow
Details
View Map
Share
Elmington Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Elmington Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 30 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Mar 2024 at 09:10.

London Borough Of Southwark logo

Finishing
Tomorrow
Details
View Map
Share
Benhill Road

London Borough Of Southwark are carrying out Highway improvement works on Benhill Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 30 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Mar 2024 at 09:09.

London Borough Of Southwark logo

Finishing
Tuesday
Details
View Map
Share
Shorncliffe Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Shorncliffe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2024 and could run through until 2 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Dec 2023 at 15:59.

Transport for London (TfL) logo

LONG TERM
Between
4 Mar and 16 Apr 2024
Details
View Map
Share
Neathouse Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Neathouse Place, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2024 and could run through until 16 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Jan 2024 at 16:30.

Thames Water logo

LONG TERM
Until
14 Jun 2024
Details
View Map
Share
Wilson Grove

Thames Water are carrying out Disconnection or alteration of supply on Wilson Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2024 at 10:00 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 11:17.

LONG TERM
Between
4 Mar and 23 Apr 2024
Details
View Map
Share
Poplar High Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Poplar High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2024 and could run through until 23 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 Jan 2024 at 11:11.

UK Power Networks Eastern & London logo

LONG TERM
Until
6 Apr 2024
Details
View Map
Share
Hosier Lane

UK Power Networks Eastern & London are carrying out Utility asset works on Hosier Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 6 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 14:56.

Thames Water logo

LONG TERM
Until
4 May 2024
Details
View Map
Share
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 10:00 and could run through until 4 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 10:05.

London Borough Of Hackney logo

LONG TERM
Until
17 Apr 2024
Details
View Map
Share
Gore Road

London Borough Of Hackney are carrying out Highway improvement works on Gore Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 March 2024 at 14:17 and could run through until 17 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Mar 2024 at 13:03.

Network Rail logo

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Bodney Road

Network Rail are carrying out Works for Rail Purposes on Bodney Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 09:23.

Network Rail logo

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Downs Park Road

Network Rail are carrying out Works for Rail Purposes on Downs Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 10:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 10:47.

London Borough Of Camden logo

LONG TERM
Between
5 Mar and 26 Apr 2024
Details
View Map
Share
Georgiana Street

London Borough Of Camden are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2024 at 08:05.

London Borough Of Camden logo

LONG TERM
Until
12 Apr 2024
Details
View Map
Share
Goldhurst Terrace

London Borough Of Camden are carrying out Highway repair and maintenance works on Goldhurst Terrace, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2024 at 10:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 13:25.

Thames Water logo

LONG TERM
Until
11 Apr 2024
Details
View Map
Share
King Henry's Road

Thames Water are carrying out Utility repair and maintenance works on King Henry's Road, Swiss Cottage, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 March 2024 at 09:00 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 12:41.

Southern Gas Networks logo

Finishing
Tuesday
Details
View Map
Share
Camberwell New Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 March 2024 at 15:04 and could run through until 2 April 2024. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2024 at 12:38.

City Of Westminster logo

LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Sackville Street

City Of Westminster are carrying out Highway repair and maintenance works on Sackville Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 March 2024 at 09:30 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 7 Mar 2024 at 10:15.

Thames Water logo

Finishing
Monday
Details
View Map
Share
Glenarm Road

Thames Water are carrying out Utility repair and maintenance works on Glenarm Road, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 March 2024 at 09:40 and could run through until 1 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 14:02.

Thames Water logo

LONG TERM
Until
29 Sep 2024
Details
View Map
Share
Shakespeare Road

Thames Water are carrying out Utility asset works on Shakespeare Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2024 at 09:20 and could run through until 29 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2024 at 09:24.

London Borough Of Southwark logo

Until
6 Apr 2024
Details
View Map
Share
Marmont Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Marmont Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 08:00 and could run through until 6 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 11 Mar 2024 at 09:29.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Until
4 May 2024
Details
View Map
Share
Hollywood Road

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Hollywood Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 08:00 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 11 Mar 2024 at 08:32.

Thames Water logo

LONG TERM
Until
29 Aug 2024
Details
View Map
Share
Lynton Road

Thames Water are carrying out Disconnection or alteration of supply on Lynton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 14:00 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:02.

Thames Water logo

LONG TERM
Between
11 Mar and 27 May 2024
Details
View Map
Share
Wilton Road

Thames Water are proposing to carry out Utility asset works on Wilton Road, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Jul 2023 at 12:08.

Royal Borough Of Kensington And Chelsea logo

LONG TERM
Between
11 Mar and 2 May 2024
Details
View Map
Share
Cadogan Place

Royal Borough Of Kensington And Chelsea are proposing to carry out Utility asset works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 8 Mar 2024 at 15:08.

Thames Water logo

LONG TERM
Between
11 Mar and 22 Jun 2024
Details
View Map
Share
Dockley Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Dockley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 09:37.

Thames Water logo

Between
11 Mar and 8 Apr 2024
Details
View Map
Share
Marigold Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Marigold Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 8 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Mar 2024 at 12:43.

UK Power Networks Eastern & London logo

Finishing
Wednesday
Details
View Map
Share
Cranleigh Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Cranleigh Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2024 at 20:42.

London Borough Of Barnet logo

Finishing
Today
Details
View Map
Share
West Heath Road

London Borough Of Barnet are carrying out Highway improvement works on West Heath Road, Hampstead, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 09:15 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Mar 2024 at 11:57.

Murphy Power Distribution logo

Finishing
Today
Details
View Map
Share
Magdala Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Magdala Avenue, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 29 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 11 Dec 2023 at 07:59.

Thames Water logo

LONG TERM
Until
10 May 2024
Details
View Map
Share
Macks Road

Thames Water are carrying out Disconnection or alteration of supply on Macks Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2024 at 09:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 08:57.

Thames Water logo

Until
9 Apr 2024
Details
View Map
Share
Holly Hill

Thames Water are carrying out Utility repair and maintenance works on Holly Hill, Hampstead Town, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2024 at 11:30 and could run through until 9 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 10:24.

UK Power Networks Eastern & London logo

Until
5 Apr 2024
Details
View Map
Share
Eversholt Street

UK Power Networks Eastern & London are carrying out New service connection on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 March 2024 at 08:00 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2024 at 09:29.

London Borough Of Camden logo

LONG TERM
Until
6 May 2024
Details
View Map
Share
Clarkson Row

London Borough Of Camden are carrying out Highway improvement works on Clarkson Row, Regent's Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 March 2024 at 08:00 and could run through until 6 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 17:40.

Cadent Gas logo

Today
Details
View Map
Share
Camden Street

Cadent Gas carried out Utility repair and maintenance works on Camden Street, Camden Town, London.

A lane was closed for some or all of the period.

The works were originally planned between 15 Mar 2024 and 29 Mar 2024 and were actually completed between 15 Mar 2024 (15:57) and 29 Mar 2024 (09:07). The works impacted the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Mar 2024 at 09:31.

London Borough Of Wandsworth logo

LONG TERM
Until
10 May 2024
Details
View Map
Share
Northcote Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Northcote Road, Battersea, London.

These works are categorised as Major.

The works started on 18 March 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 19 Mar 2024 at 10:31.

Transport for London (TfL) logo

LONG TERM
Until
7 May 2024
Details
View Map
Share
Vauxhall Bridge Road

Transport for London (TfL) are carrying out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2024 at 08:53.

Transport for London (TfL) logo

LONG TERM
Until
7 May 2024
Details
View Map
Share
Neathouse Place

Transport for London (TfL) are carrying out Highway improvement works on Neathouse Place, Warwick, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2024 at 08:54.

London Borough Of Camden logo

Until
14 Apr 2024
Details
View Map
Share
Theobald's Road

London Borough Of Camden are carrying out Highway improvement works on Theobald's Road, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 10:00 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2024 at 10:25.

London Borough Of Camden logo

Until
14 Apr 2024
Details
View Map
Share
Gray's Inn Road

London Borough Of Camden are carrying out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 10:00 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2024 at 10:26.

London Borough Of Camden logo

Until
14 Apr 2024
Details
View Map
Share
Theobald's Road

London Borough Of Camden are carrying out Highway improvement works on Theobald's Road, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 10:00 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2024 at 10:24.

London Borough Of Camden logo

Until
14 Apr 2024
Details
View Map
Share
Rosebery Avenue

London Borough Of Camden are carrying out Highway improvement works on Rosebery Avenue, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 10:00 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2024 at 10:26.

UK Power Networks Eastern & London logo

Until
12 Apr 2024
Details
View Map
Share
Old Nichol Street

UK Power Networks Eastern & London are carrying out Utility asset works on Old Nichol Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 15:00 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2024 at 15:20.

Thames Water logo

Finishing
Today
Details
View Map
Share
Frampton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Feb 2024 at 08:29.

Thames Water logo

Finishing
Today
Details
View Map
Share
Lisson Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Feb 2024 at 08:28.

City Of Westminster logo

Until
5 Apr 2024
Details
View Map
Share
St John's Terrace

City Of Westminster are carrying out Highway repair and maintenance works on St John's Terrace, Queen's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 10:00 and could run through until 5 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Mar 2024 at 10:43.

Finishing
Tomorrow
Details
View Map
Share
Geary Street

London Borough Of Islington are carrying out Highway improvement works on Geary Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 30 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 18 Mar 2024 at 08:36.

Until
12 Apr 2024
Details
View Map
Share
Biddestone Road

London Borough Of Islington are carrying out Highway improvement works on Biddestone Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 12 April 2024. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Islington on 18 Mar 2024 at 08:35.

London Borough Of Southwark logo

Until
15 Apr 2024
Details
View Map
Share
Rowcross Street

London Borough Of Southwark are carrying out Highway improvement works on Rowcross Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2024 at 09:00 and could run through until 15 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 14:25.

London Borough Of Southwark logo

Finishing
Monday
Details
View Map
Share
Rolls Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Rolls Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2024 at 09:00 and could run through until 1 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2024 at 10:07.

City Of London Corporation logo

Finishing
Wednesday
Details
View Map
Share
London Wall

City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2024 at 12:00 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 20 Mar 2024 at 15:42.

Cadent Gas logo

Finishing
Wednesday
Details
View Map
Share
Warwick Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Warwick Avenue, Little Venice, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 March 2024 at 18:00 and could run through until 3 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 12:08.

Cadent Gas logo

Finishing
Wednesday
Details
View Map
Share
Blomfield Road

Cadent Gas are carrying out Utility repair and maintenance works on Blomfield Road, Little Venice, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2024 at 15:00 and could run through until 3 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 12:08.

UK Power Networks Eastern & London logo

Until
12 Apr 2024
Details
View Map
Share
Stamford Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Stamford Street, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 March 2024 at 06:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 14:17.

UK Power Networks Eastern & London logo

Until
12 Apr 2024
Details
View Map
Share
Hatfields

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Hatfields, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2024 at 07:15 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 14:41.

Thames Water logo

LONG TERM
Between
21 Mar and 19 Jul 2024
Details
View Map
Share
Old Jamaica Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Old Jamaica Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2023 at 07:43.

Thames Water logo

Finishing
Today
Details
View Map
Share
Lisson Grove

Thames Water are carrying out Utility repair and maintenance works on Lisson Grove, Church Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 March 2024 at 23:55 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2024 at 16:04.

UK Power Networks Eastern & London logo

Until
10 Apr 2024
Details
View Map
Share
Eversholt Street

UK Power Networks Eastern & London are carrying out New service connection on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 March 2024 at 08:15 and could run through until 10 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Mar 2024 at 10:15.

City Of London Corporation logo

Until
5 Apr 2024
Details
View Map
Share
Minories

City Of London Corporation are carrying out Highway repair and maintenance works on Minories, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 March 2024 at 08:00 and could run through until 5 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 Mar 2024 at 08:53.

Thames Water logo

Finishing
Today
Details
View Map
Share
Garrick Street

Thames Water are carrying out Utility repair and maintenance works on Garrick Street, St James's, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2024 at 21:00 and could run through until 29 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2024 at 09:35.

Transport for London (TfL) logo

Today
Details
View Map
Share
Lower Clapton Road

Transport for London (TfL) carried out Highway improvement works on Lower Clapton Road, Hackney, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 24 Mar 2024 and 29 Mar 2024 and were actually completed between 24 Mar 2024 (21:00) and 29 Mar 2024 (05:00). The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Mar 2024 at 10:26.

London Borough Of Southwark logo

Until
20 Apr 2024
Details
View Map
Share
Dalwood Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Dalwood Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 08:00 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 09:12.

Cadent Gas logo

Finishing
Thursday
Details
View Map
Share
Battersea Park Road

Cadent Gas are carrying out Utility repair and maintenance works on Battersea Park Road, Battersea, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 12:12 and could run through until 4 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 10:26.

Thames Water logo

LONG TERM
Between
25 Mar and 29 Apr 2024
Details
View Map
Share
Surrey Canal Road

Thames Water are proposing to carry out Utility asset works on Surrey Canal Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Feb 2024 at 13:40.

Transport for London (TfL) logo

Until
12 Apr 2024
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are carrying out Highway improvement works on West Cromwell Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 08:00 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 08:03.

Thames Water logo

Finishing
Monday
Details
View Map
Share
Gray Street

Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2024 and could run through until 1 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Dec 2023 at 09:15.

Cadent Gas logo

Until
5 Apr 2024
Details
View Map
Share
Berkeley Square

Cadent Gas are carrying out Utility repair and maintenance works on Berkeley Square, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 13:00 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 16:00.

Thames Water logo

Finishing
Monday
Details
View Map
Share
Poland Street

Thames Water are carrying out Utility repair and maintenance works on Poland Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 09:31 and could run through until 1 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 16:30.

Thames Water logo

Until
15 Apr 2024
Details
View Map
Share
New Road

Thames Water are carrying out Utility repair and maintenance works on New Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 09:30 and could run through until 15 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:41.

Thames Water logo

Until
11 Apr 2024
Details
View Map
Share
Newark Street

Thames Water are carrying out Utility repair and maintenance works on Newark Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 09:00 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:46.

Thames Water logo

Finishing
Sunday
Details
View Map
Share
Norman Grove

Thames Water are carrying out New service connection on Norman Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 08:50 and could run through until 31 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2024 at 09:43.

Transport for London (TfL) logo

Between
25 Mar and 19 Apr 2024
Details
View Map
Share
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2024 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2024 at 15:48.

Thames Water logo

Finishing
Tuesday
Details
View Map
Share
Lavender Hill

Thames Water are carrying out Utility repair and maintenance works on Lavender Hill, Battersea, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 08:18 and could run through until 2 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 11:56.

Thames Water logo

Finishing
Tuesday
Details
View Map
Share
Shirley Grove

Thames Water are carrying out Utility repair and maintenance works on Shirley Grove, Battersea, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 08:18 and could run through until 2 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 15:12.

Thames Water logo

Finishing
Tuesday
Details
View Map
Share
Lillie Road

Thames Water are carrying out Utility repair and maintenance works on Lillie Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 11:54 and could run through until 2 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 14:03.

Thames Water logo

Finishing
Tuesday
Details
View Map
Share
Humbolt Road

Thames Water are carrying out roadworks on Humbolt Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 11:54 and could run through until 2 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 16:54.

Thames Water logo

LONG TERM
Between
26 Mar and 2 May 2024
Details
View Map
Share
Ambrose Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Ambrose Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2023 at 07:22.

Thames Water logo

Finishing
Tomorrow
Details
View Map
Share
Druid Street

Thames Water are carrying out Utility repair and maintenance works on Druid Street, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 11:05 and could run through until 30 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 14:39.

UK Power Networks Eastern & London logo

Finishing
Tuesday
Details
View Map
Share
Old Compton Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Old Compton Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 12:00 and could run through until 2 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2024 at 16:10.

Thames Water logo

Finishing
Tomorrow
Details
View Map
Share
Dean's Mews

Thames Water are carrying out New service connection on Dean's Mews, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 09:43 and could run through until 30 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 10:25.

Thames Water logo

Until
14 Apr 2024
Details
View Map
Share
Cleveland Street

Thames Water are carrying out Utility asset works on Cleveland Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 08:00 and could run through until 14 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 09:22.

Thames Water logo

Finishing
Tuesday
Details
View Map
Share
Samford Street

Thames Water are carrying out Utility repair and maintenance works on Samford Street, Church Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 06:54 and could run through until 2 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 08:02.

London Borough Of Camden logo

LONG TERM
Between
26 Mar and 30 Aug 2024
Details
View Map
Share
Tavistock Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Tavistock Place, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 16:26.

Thames Water logo

Finishing
Tuesday
Details
View Map
Share
Purves Road

Thames Water are carrying out Utility repair and maintenance works on Purves Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 08:38 and could run through until 2 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 22:21.

UK Power Networks Eastern & London logo

LONG TERM
Between
26 Mar and 5 Jun 2024
Details
View Map
Share
Acacia Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Mar 2024 at 10:20.

Thames Water logo

Wednesday
Details
View Map
Share
Lanesborough Place

Thames Water carried out Utility repair and maintenance works on Lanesborough Place, Knightsbridge & Belgravia, London.

The road was closed for some or all of the period.

The works were originally planned between 27 Mar 2024 and 3 Apr 2024 and were actually completed between 27 Mar 2024 (11:01) and 29 Mar 2024 (10:44). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 29 Mar 2024 at 11:43.

Thames Water logo

Finishing
Wednesday
Details
View Map
Share
Carlos Place

Thames Water are carrying out Utility repair and maintenance works on Carlos Place, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 08:14 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 15:34.

Transport for London (TfL) logo

Until
11 Apr 2024
Details
View Map
Share
Commercial Street

Transport for London (TfL) are carrying out Highway improvement works on Commercial Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 22:00 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:28.

Transport for London (TfL) logo

Until
8 Apr 2024
Details
View Map
Share
Hanbury Street

Transport for London (TfL) are carrying out Highway improvement works on Hanbury Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 22:00 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:37.

Transport for London (TfL) logo

Until
8 Apr 2024
Details
View Map
Share
Folgate Street

Transport for London (TfL) are carrying out Highway improvement works on Folgate Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 22:00 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:36.

Transport for London (TfL) logo

Until
8 Apr 2024
Details
View Map
Share
Jerome Street

Transport for London (TfL) are carrying out Highway improvement works on Jerome Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 22:00 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:37.

Transport for London (TfL) logo

Until
8 Apr 2024
Details
View Map
Share
Wheler Street

Transport for London (TfL) are carrying out Highway improvement works on Wheler Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 22:00 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:36.

Transport for London (TfL) logo

Finishing
Wednesday
Details
View Map
Share
Fleur De Lis Street

Transport for London (TfL) are carrying out Highway improvement works on Fleur De Lis Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 22:00 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:35.

Transport for London (TfL) logo

Finishing
Wednesday
Details
View Map
Share
Elder Street

Transport for London (TfL) are carrying out Highway improvement works on Elder Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 22:00 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:35.

Transport for London (TfL) logo

Finishing
Wednesday
Details
View Map
Share
Quaker Street

Transport for London (TfL) are carrying out Highway improvement works on Quaker Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 22:00 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:34.

UK Power Networks Eastern & London logo

LONG TERM
Between
27 Mar and 12 Nov 2024
Details
View Map
Share
Grove End Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2024 and could run through until 12 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 14:56.

BT logo

Finishing
Tomorrow
Details
View Map
Share
Cadogan Close

BT are proposing to carry out Utility repair and maintenance works on Cadogan Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2024 and could run through until 30 March 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Jan 2024 at 12:06.

Thames Water logo

Finishing
Thursday
Details
View Map
Share
Laud Street

Thames Water are carrying out Utility repair and maintenance works on Laud Street, Vauxhall, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 08:26 and could run through until 4 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 09:01.

Thames Water logo

Finishing
Thursday
Details
View Map
Share
Vincent Square

Thames Water are carrying out Utility repair and maintenance works on Vincent Square, Vincent Square, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 14:24 and could run through until 4 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 15:29.

Thames Water logo

Finishing
Thursday
Details
View Map
Share
Upper James Street

Thames Water are carrying out roadworks on Upper James Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 07:54 and could run through until 4 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 08:45.

Thames Water logo

Until
17 Apr 2024
Details
View Map
Share
Somerfield Road

Thames Water are carrying out Utility repair and maintenance works on Somerfield Road, Hackney, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 10:00 and could run through until 17 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 10:12.

London Borough Of Haringey logo

Until
19 Apr 2024
Details
View Map
Share
Wakefield Road

London Borough Of Haringey are carrying out Highway improvement works on Wakefield Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 09:41 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 28 Mar 2024 at 09:42.

Transport for London (TfL) logo

Finishing
Sunday
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2024 and could run through until 31 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2024 at 11:40.

Transport for London (TfL) logo

Finishing
Sunday
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2024 and could run through until 31 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 17:08.

Transport for London (TfL) logo

Finishing
Sunday
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2024 and could run through until 31 March 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Mar 2024 at 11:43.

Thames Water logo

Between
30 Mar and 13 Apr 2024
Details
View Map
Share
Cavendish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2024 and could run through until 13 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 11:16.

Thames Water logo

Between
30 Mar and 26 Apr 2024
Details
View Map
Share
Seven Sisters Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Seven Sisters Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2024 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Feb 2024 at 17:28.

Cadent Gas logo

Between
31 Mar and 14 Apr 2024
Details
View Map
Share
Elizabeth Street

Cadent Gas are proposing to carry out Remedial works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Jan 2024 at 10:23.

London Borough Of Hackney logo

LONG TERM
Between
31 Mar and 29 Aug 2024
Details
View Map
Share
Marvin Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Marvin Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 6 Dec 2023 at 10:05.

Transport for London (TfL) logo

Between
31 Mar and 28 Apr 2024
Details
View Map
Share
Seven Sisters Road

Transport for London (TfL) are proposing to carry out roadworks on Seven Sisters Road, Hackney, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 31 March 2024 and could run through until 28 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 11:12.

UK Power Networks Eastern & London logo

Between
1 and 14 Apr 2024
Details
View Map
Share
Albany Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Albany Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 14 April 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 11:59.

Thames Water logo

Between
1 and 15 Apr 2024
Details
View Map
Share
Buckingham Palace Road

Thames Water are proposing to carry out Utility asset works on Buckingham Palace Road, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 18:42.

Thames Water logo

LONG TERM
Between
1 Apr and 13 Jun 2024
Details
View Map
Share
Keetons Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Keetons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:13.

Thames Water logo

LONG TERM
Between
1 Apr and 1 Jul 2024
Details
View Map
Share
Netherwood Road

Thames Water are proposing to carry out Utility asset works on Netherwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2024 at 11:48.

London Borough Of Southwark logo

Finishing
Wednesday
Details
View Map
Share
Wardens Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Wardens Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 10:24.

London Borough Of Southwark logo

Finishing
Wednesday
Details
View Map
Share
Wardens Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Wardens Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Mar 2024 at 05:58.

London Borough Of Southwark logo

Finishing
Wednesday
Details
View Map
Share
Bank End

London Borough Of Southwark are proposing to carry out Highway improvement works on Bank End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Jan 2024 at 12:18.

Thames Water logo

Finishing
Wednesday
Details
View Map
Share
Kensington Place

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 12:35.

Between
1 and 20 Apr 2024
Details
View Map
Share
Commercial Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Commercial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Mar 2024 at 10:16.

Cadent Gas logo

Between
1 and 9 Apr 2024
Details
View Map
Share
Greek Street

Cadent Gas are proposing to carry out Utility asset works on Greek Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 13:47.

Thames Water logo

Between
1 and 21 Apr 2024
Details
View Map
Share
Westbourne Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Westbourne Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 21 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Mar 2024 at 09:48.

City Of Westminster logo

LONG TERM
Between
1 Apr and 14 May 2024
Details
View Map
Share
Praed Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Praed Street, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 14 May 2024. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 11:30.

Thames Water logo

Finishing
Wednesday
Details
View Map
Share
Colville Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Colville Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 16:19.

Thames Water logo

Finishing
Thursday
Details
View Map
Share
Furnival Street

Thames Water are proposing to carry out New service connection on Furnival Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 4 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Mar 2024 at 14:27.

Eunetworks logo

Between
1 and 29 Apr 2024
Details
View Map
Share
Goodge Street

Eunetworks are proposing to carry out Utility asset works on Goodge Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 26 Mar 2024 at 07:29.

BT logo

Finishing
Wednesday
Details
View Map
Share
Cygnet Street

BT are proposing to carry out Utility asset works on Cygnet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Mar 2024 at 13:11.

BT logo

Finishing
Wednesday
Details
View Map
Share
Bacon Street

BT are proposing to carry out Utility asset works on Bacon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Mar 2024 at 13:13.

Thames Water logo

Between
1 and 14 Apr 2024
Details
View Map
Share
Bisson Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bisson Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Feb 2024 at 17:38.

Thames Water logo

Finishing
Thursday
Details
View Map
Share
Bayford Street

Thames Water are proposing to carry out New service connection on Bayford Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 4 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:59.

London Borough Of Camden logo

LONG TERM
Between
1 Apr and 2 Aug 2024
Details
View Map
Share
Camden Mews

London Borough Of Camden are proposing to carry out Highway improvement works on Camden Mews, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 11 Mar 2024 at 16:05.

Virgin Media logo

Finishing
Wednesday
Details
View Map
Share
Swan Yard

Virgin Media are proposing to carry out Utility asset works on Swan Yard, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 21 Dec 2023 at 08:10.

Between
1 and 17 Apr 2024
Details
View Map
Share
Hungerford Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hungerford Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 17 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 28 Mar 2024 at 13:50.

Thames Water logo

Between
1 and 7 Apr 2024
Details
View Map
Share
Carleton Road

Thames Water are proposing to carry out New service connection on Carleton Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 7 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 10:58.

Thames Water logo

Between
2 and 10 Apr 2024
Details
View Map
Share
Wakehurst Road

Thames Water are proposing to carry out New service connection on Wakehurst Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 10 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jan 2024 at 15:15.

London Borough Of Southwark logo

LONG TERM
Between
2 Apr and 18 May 2024
Details
View Map
Share
Windsor Walk

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Windsor Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 18:13.

London Borough Of Southwark logo

Between
2 and 27 Apr 2024
Details
View Map
Share
Southampton Way

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southampton Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 27 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 18 Dec 2023 at 14:49.

London Borough Of Southwark logo

Between
2 and 20 Apr 2024
Details
View Map
Share
Fenham Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Fenham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.

City Of Westminster logo

Between
2 and 5 Apr 2024
Details
View Map
Share
Lupus Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lupus Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 29 Feb 2024 at 09:38.

UK Power Networks Eastern & London logo

Between
2 and 20 Apr 2024
Details
View Map
Share
Brandon Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Brandon Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 18:13.

Transport for London (TfL) logo

LONG TERM
Between
2 Apr and 31 May 2024
Details
View Map
Share
Harrington Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrington Gardens, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Mar 2024 at 11:48.

Transport for London (TfL) logo

LONG TERM
Between
2 Apr and 31 May 2024
Details
View Map
Share
Stanhope Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Stanhope Gardens, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Mar 2024 at 11:48.

Transport for London (TfL) logo

LONG TERM
Between
2 Apr and 31 May 2024
Details
View Map
Share
Gloucester Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gloucester Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Mar 2024 at 11:48.

UK Power Networks Eastern & London logo

Between
2 and 12 Apr 2024
Details
View Map
Share
Pelham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Pelham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 15:47.

London Borough Of Southwark logo

Between
2 and 20 Apr 2024
Details
View Map
Share
Southwark Park Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 27 Mar 2024 at 09:07.

London Borough Of Hammersmith & Fulham logo

Between
2 and 9 Apr 2024
Details
View Map
Share
Blythe Road

London Borough Of Hammersmith & Fulham are proposing to carry out Remedial works on Blythe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Feb 2024 at 15:02.

Southern Gas Networks logo

Between
2 and 28 Apr 2024
Details
View Map
Share
Fair Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fair Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 28 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2024 at 11:14.

Between
2 and 5 Apr 2024
Details
View Map
Share
Chandler Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Chandler Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 14 Feb 2024 at 13:55.

Between
2 and 5 Apr 2024
Details
View Map
Share
Wapping Lane

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Wapping Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 14 Feb 2024 at 13:55.

Thames Water logo

Between
2 and 8 Apr 2024
Details
View Map
Share
St Katharines Way

Thames Water are proposing to carry out Utility repair and maintenance works on St Katharines Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 11:37.

City Of Westminster logo

Between
2 and 15 Apr 2024
Details
View Map
Share
Chilworth Mews

City Of Westminster are proposing to carry out Highway repair and maintenance works on Chilworth Mews, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 15 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 25 Mar 2024 at 15:19.

Boldyn Networks logo

Between
2 and 13 Apr 2024
Details
View Map
Share
Commercial Street

Boldyn Networks are proposing to carry out Utility asset works on Commercial Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 13 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Boldyn Networks on 20 Feb 2024 at 15:14.

UK Power Networks Eastern & London logo

Between
2 and 19 Apr 2024
Details
View Map
Share
Penfold Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Penfold Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jan 2024 at 09:18.

UK Power Networks Eastern & London logo

LONG TERM
Between
2 Apr and 14 Jun 2024
Details
View Map
Share
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Mar 2024 at 10:30.

Cadent Gas logo

LONG TERM
Between
2 Apr and 5 Jun 2024
Details
View Map
Share
Lever Street

Cadent Gas are proposing to carry out Utility asset works on Lever Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2024 at 12:18.

UK Power Networks Eastern & London logo

Between
2 and 13 Apr 2024
Details
View Map
Share
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 13 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2024 at 13:13.

Thames Water logo

Between
2 and 6 Apr 2024
Details
View Map
Share
Killick Street

Thames Water are proposing to carry out roadworks on Killick Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 6 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Jan 2024 at 08:07.

Murphy Power Distribution logo

Between
2 and 12 Apr 2024
Details
View Map
Share
Hargrave Park

Murphy Power Distribution are proposing to carry out Utility asset works on Hargrave Park, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Feb 2024 at 13:49.

Thames Water logo

Between
2 and 15 Apr 2024
Details
View Map
Share
Langdon Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2024 at 09:51.

Thames Water logo

Between
3 and 7 Apr 2024
Details
View Map
Share
The Cut

Thames Water are proposing to carry out New service connection on The Cut, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 7 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Feb 2024 at 09:08.

UK Power Networks Eastern & London logo

LONG TERM
Between
3 Apr and 29 May 2024
Details
View Map
Share
Blackwall Tunnel Northern Approach

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Feb 2024 at 13:42.

UK Power Networks Eastern & London logo

LONG TERM
Between
3 Apr and 29 May 2024
Details
View Map
Share
Lochnagar Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lochnagar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2024 at 09:04.

Transport for London (TfL) logo

Between
3 and 8 Apr 2024
Details
View Map
Share
Whites Row

Transport for London (TfL) are proposing to carry out Highway improvement works on Whites Row, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:30.

Transport for London (TfL) logo

Between
3 and 8 Apr 2024
Details
View Map
Share
Fashion Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Fashion Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:30.

Transport for London (TfL) logo

Between
3 and 8 Apr 2024
Details
View Map
Share
Brushfield Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Brushfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:29.

Transport for London (TfL) logo

Between
3 and 8 Apr 2024
Details
View Map
Share
Fournier Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Fournier Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:20.

Transport for London (TfL) logo

Between
3 and 8 Apr 2024
Details
View Map
Share
Lamb Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Lamb Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:18.

Cadent Gas logo

Between
4 and 6 Apr 2024
Details
View Map
Share
Cowcross Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2024 and could run through until 6 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2024 at 00:10.

Thames Water logo

Between
4 and 7 Apr 2024
Details
View Map
Share
Gray's Inn Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2024 and could run through until 7 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 10:20.

UK Power Networks Eastern & London logo

Between
4 and 11 Apr 2024
Details
View Map
Share
Paul Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Paul Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 11:52.

Thames Water logo

Between
5 and 7 Apr 2024
Details
View Map
Share
Brixton Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 7 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:29.

Thames Water logo

Between
5 and 7 Apr 2024
Details
View Map
Share
Old Kent Road

Thames Water are proposing to carry out Utility repair and maintenance works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 7 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 13:02.

UK Power Networks Eastern & London logo

Between
5 and 26 Apr 2024
Details
View Map
Share
Drummond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Drummond Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 07:57.

Transport for London (TfL) logo

Between
5 and 8 Apr 2024
Details
View Map
Share
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 13:13.

Transport for London (TfL) logo

Between
5 and 8 Apr 2024
Details
View Map
Share
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:34.

Transport for London (TfL) logo

Between
5 and 8 Apr 2024
Details
View Map
Share
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:35.

UK Power Networks Eastern & London logo

Between
5 and 17 Apr 2024
Details
View Map
Share
Newbury Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Newbury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 14:01.

Thames Water logo

Between
7 and 11 Apr 2024
Details
View Map
Share
Webbs Road

Thames Water are proposing to carry out Utility repair and maintenance works on Webbs Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2024 at 08:03.

Thames Water logo

Between
7 and 10 Apr 2024
Details
View Map
Share
Grandison Road

Thames Water are proposing to carry out New service connection on Grandison Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 10 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 13:00.

Thames Water logo

Between
7 and 9 Apr 2024
Details
View Map
Share
Moore Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Moore Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:19.

London Borough Of Hammersmith & Fulham logo

Between
7 and 12 Apr 2024
Details
View Map
Share
Normand Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Normand Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 26 Mar 2024 at 09:22.

London Borough Of Southwark logo

LONG TERM
Between
7 Apr and 24 May 2024
Details
View Map
Share
Canada Water Walkway

London Borough Of Southwark are proposing to carry out Highway improvement works on Canada Water Walkway, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 16:30.

Transport for London (TfL) logo

On
7 Apr 2024
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 7 April 2024 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 15:08.

Vodafone logo

Between
7 and 11 Apr 2024
Details
View Map
Share
Rivington Street

Vodafone are proposing to carry out Utility asset works on Rivington Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 26 Mar 2024 at 10:15.

Thames Water logo

Between
7 and 9 Apr 2024
Details
View Map
Share
Ladbroke Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Ladbroke Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 16:50.

Thames Water logo

Between
7 and 11 Apr 2024
Details
View Map
Share
Rosebank Gardens

Thames Water are proposing to carry out New service connection on Rosebank Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jan 2024 at 11:55.

BT logo

Between
7 and 9 Apr 2024
Details
View Map
Share
Halliford Street

BT are proposing to carry out Utility asset works on Halliford Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Mar 2024 at 08:27.

BT logo

Between
7 and 10 Apr 2024
Details
View Map
Share
Kenworthy Road

BT are proposing to carry out Utility repair and maintenance works on Kenworthy Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 10 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Jan 2024 at 10:21.

Between
7 and 15 Apr 2024
Details
View Map
Share
Penn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Penn Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 15 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 20 Mar 2024 at 11:03.

BT logo

Between
7 and 9 Apr 2024
Details
View Map
Share
Elwood Street

BT are proposing to carry out Utility asset works on Elwood Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Mar 2024 at 11:38.

Thames Water logo

Between
7 and 11 Apr 2024
Details
View Map
Share
Lancell Street

Thames Water are proposing to carry out New service connection on Lancell Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 09:37.

Thames Water logo

Between
7 and 11 Apr 2024
Details
View Map
Share
Tollington Way

Thames Water are proposing to carry out New service connection on Tollington Way, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jan 2024 at 08:25.

Thames Water logo

Between
7 and 11 Apr 2024
Details
View Map
Share
Cornwallis Road

Thames Water are proposing to carry out roadworks on Cornwallis Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jan 2024 at 15:23.

UK Power Networks Eastern & London logo

LONG TERM
Between
8 Apr and 31 May 2024
Details
View Map
Share
Portland Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Portland Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 11:46.

Cadent Gas logo

Between
8 and 12 Apr 2024
Details
View Map
Share
Smith Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Smith Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Feb 2024 at 16:26.

Thames Water logo

LONG TERM
Between
8 Apr and 18 Jun 2024
Details
View Map
Share
Alexis Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Alexis Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:22.

Thames Water logo

Between
8 and 10 Apr 2024
Details
View Map
Share
Earl's Court Road

Thames Water are proposing to carry out New service connection on Earl's Court Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 10 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Feb 2024 at 12:26.

Thames Water logo

LONG TERM
Between
8 Apr and 14 May 2024
Details
View Map
Share
Enid Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Enid Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:16.

UK Power Networks Eastern & London logo

Between
8 and 21 Apr 2024
Details
View Map
Share
Redcross Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2024 at 17:34.

City Of Westminster logo

Between
8 and 10 Apr 2024
Details
View Map
Share
Trebeck Street

City Of Westminster are proposing to carry out Highway improvement works on Trebeck Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 10 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 Mar 2024 at 15:14.

Cadent Gas logo

LONG TERM
Between
8 Apr and 31 Jul 2024
Details
View Map
Share
Tudor Street

Cadent Gas are proposing to carry out Utility asset works on Tudor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 31 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 08:23.

Thames Water logo

Between
8 and 29 Apr 2024
Details
View Map
Share
Westbourne Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Westbourne Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jan 2024 at 08:55.

Transport for London (TfL) logo

Between
8 and 11 Apr 2024
Details
View Map
Share
Pomell Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Pomell Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:38.

City Of Westminster logo

Between
8 Apr and 3 May 2024
Details
View Map
Share
Chilworth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Chilworth Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 20 Feb 2024 at 08:24.

Transport for London (TfL) logo

Between
8 and 11 Apr 2024
Details
View Map
Share
Wentworth Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Wentworth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:38.

Transport for London (TfL) logo

Between
8 and 11 Apr 2024
Details
View Map
Share
Thrawl Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Thrawl Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 17:26.

Transport for London (TfL) logo

Between
8 and 11 Apr 2024
Details
View Map
Share
Lolesworth Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Lolesworth Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 16:31.

UK Power Networks Eastern & London logo

Between
8 and 26 Apr 2024
Details
View Map
Share
Foscote Mews

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Foscote Mews, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2024 at 10:20.

Vodafone logo

Between
8 and 10 Apr 2024
Details
View Map
Share
Luke Street

Vodafone are proposing to carry out Utility asset works on Luke Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 10 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 26 Mar 2024 at 12:59.

UK Power Networks Eastern & London logo

Between
8 and 16 Apr 2024
Details
View Map
Share
Lorenzo Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lorenzo Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 16 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Jan 2024 at 07:30.

HS2 logo

LONG TERM
Between
8 Apr and 28 Jun 2024
Details
View Map
Share
Park Village East

HS2 are proposing to carry out Works for Rail Purposes on Park Village East, Regent's Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 28 Mar 2024 at 13:23.

London Borough Of Hackney logo

LONG TERM
Between
8 Apr and 24 Sep 2024
Details
View Map
Share
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Jan 2024 at 09:35.

Between
8 and 11 Apr 2024
Details
View Map
Share
Florence Street

G. Network Communications are proposing to carry out Remedial works on Florence Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 27 Feb 2024 at 13:58.

Thames Water logo

Between
8 and 12 Apr 2024
Details
View Map
Share
Canonbury Place

Thames Water are proposing to carry out New service connection on Canonbury Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Feb 2024 at 11:06.

Eunetworks logo

Between
9 and 11 Apr 2024
Details
View Map
Share
Cutler Street

Eunetworks are proposing to carry out Utility asset works on Cutler Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 13 Mar 2024 at 14:22.

London Borough Of Hackney logo

LONG TERM
Between
9 Apr and 25 Sep 2024
Details
View Map
Share
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 11:55.

London Borough Of Hackney logo

LONG TERM
Between
9 Apr and 25 Sep 2024
Details
View Map
Share
Laburnum Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Laburnum Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 14:09.

London Borough Of Hackney logo

LONG TERM
Between
9 Apr and 25 Sep 2024
Details
View Map
Share
Albion Drive

London Borough Of Hackney are proposing to carry out Highway improvement works on Albion Drive, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 10:55.

Network Rail logo

Between
9 and 30 Apr 2024
Details
View Map
Share
St Pancras Way

Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 30 April 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Network Rail on 26 Mar 2024 at 14:21.

City Of Westminster logo

Between
10 and 12 Apr 2024
Details
View Map
Share
Shepherd Market

City Of Westminster are proposing to carry out Highway improvement works on Shepherd Market, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 10:51.

City Of Westminster logo

Between
10 and 30 Apr 2024
Details
View Map
Share
St George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on St George Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 31 Jan 2024 at 14:19.

Between
10 and 12 Apr 2024
Details
View Map
Share
Charlotte Terrace

G. Network Communications are proposing to carry out Remedial works on Charlotte Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 25 Mar 2024 at 10:10.

Transport for London (TfL) logo

Between
11 Apr and 10 May 2024
Details
View Map
Share
Moat Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Moat Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Feb 2024 at 16:30.

Transport for London (TfL) logo

Between
11 Apr and 10 May 2024
Details
View Map
Share
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Jan 2024 at 14:57.

Transport for London (TfL) logo

Between
11 Apr and 10 May 2024
Details
View Map
Share
New Mill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Mill Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Feb 2024 at 16:30.

Transport for London (TfL) logo

Between
11 Apr and 10 May 2024
Details
View Map
Share
Ponton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Jan 2024 at 15:15.

UK Power Networks Eastern & London logo

LONG TERM
Between
12 Apr and 30 Aug 2024
Details
View Map
Share
Galleywall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Galleywall Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 16:30.

Transport for London (TfL) logo

Between
12 and 15 Apr 2024
Details
View Map
Share
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 12:10.

Transport for London (TfL) logo

Between
12 and 15 Apr 2024
Details
View Map
Share
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:39.

Transport for London (TfL) logo

Between
12 and 15 Apr 2024
Details
View Map
Share
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 12:12.

Thames Water logo

Between
12 Apr and 11 May 2024
Details
View Map
Share
Kentish Town Road

Thames Water are proposing to carry out New service connection on Kentish Town Road, Camden Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Feb 2024 at 16:30.

Thames Water logo

Between
13 and 15 Apr 2024
Details
View Map
Share
Vauxhall Bridge Road

Thames Water are proposing to carry out Utility repair and maintenance works on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 15:06.

Between
13 and 20 Apr 2024
Details
View Map
Share
Brushfield Street

London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Brushfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Mar 2024 at 16:26.

Thames Water logo

Between
13 Apr and 12 May 2024
Details
View Map
Share
Gaisford Street

Thames Water are proposing to carry out roadworks on Gaisford Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Feb 2024 at 13:16.

Thames Water logo

LONG TERM
Between
14 Apr and 17 May 2024
Details
View Map
Share
Crimsworth Road

Thames Water are proposing to carry out Utility asset works on Crimsworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:42.

Thames Water logo

Between
14 and 18 Apr 2024
Details
View Map
Share
Old Church Street

Thames Water are proposing to carry out New service connection on Old Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jan 2024 at 16:14.

Thames Water logo

Between
14 and 18 Apr 2024
Details
View Map
Share
Chichester Street

Thames Water are proposing to carry out New service connection on Chichester Street, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2024 at 09:04.

London Borough Of Southwark logo

Between
14 and 22 Apr 2024
Details
View Map
Share
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 13:51.

London Borough Of Southwark logo

Between
14 and 22 Apr 2024
Details
View Map
Share
Redriff Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:04.

London Borough Of Southwark logo

Between
14 and 22 Apr 2024
Details
View Map
Share
Canada Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Canada Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:03.

London Borough Of Southwark logo

Between
14 and 22 Apr 2024
Details
View Map
Share
Lower Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Lower Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:10.

Thames Water logo

Between
14 Apr and 3 May 2024
Details
View Map
Share
Sulgrave Road

Thames Water are proposing to carry out Utility asset works on Sulgrave Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:04.

London Borough Of Southwark logo

Between
14 and 22 Apr 2024
Details
View Map
Share
Quebec Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Quebec Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 13:51.

London Borough Of Southwark logo

Between
14 and 22 Apr 2024
Details
View Map
Share
Rotherhithe Street

London Borough Of Southwark are proposing to carry out Remedial works on Rotherhithe Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:03.

London Borough Of Southwark logo

Between
14 and 22 Apr 2024
Details
View Map
Share
Salter Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Salter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 13:57.

London Borough Of Southwark logo

Between
14 and 22 Apr 2024
Details
View Map
Share
Brunel Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Brunel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:04.

Thames Water logo

Between
14 and 17 Apr 2024
Details
View Map
Share
The Cut

Thames Water are proposing to carry out New service connection on The Cut, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 17 April 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 19 Mar 2024 at 15:45.

London Borough Of Southwark logo

Between
14 and 16 Apr 2024
Details
View Map
Share
Great Suffolk Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Great Suffolk Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.

London Borough Of Southwark logo

LONG TERM
Between
14 Apr and 20 May 2024
Details
View Map
Share
Park Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 07:18.

Vodafone logo

Between
14 and 16 Apr 2024
Details
View Map
Share
Berkeley Street

Vodafone are proposing to carry out Utility asset works on Berkeley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 8 Mar 2024 at 12:56.

Thames Water logo

Between
14 and 18 Apr 2024
Details
View Map
Share
South Audley Street

Thames Water are proposing to carry out roadworks on South Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jan 2024 at 11:45.

Vodafone logo

Between
14 and 16 Apr 2024
Details
View Map
Share
Strand

Vodafone are proposing to carry out Utility asset works on Strand, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 Jan 2024 at 07:52.

Thames Water logo

Between
14 and 18 Apr 2024
Details
View Map
Share
Mincing Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Mincing Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 08:24.

Cadent Gas logo

Between
14 and 18 Apr 2024
Details
View Map
Share
Hessel Street

Cadent Gas are proposing to carry out New service connection on Hessel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 00:10.

Between
14 and 18 Apr 2024
Details
View Map
Share
Carr Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Carr Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 26 Feb 2024 at 10:06.

Cadent Gas logo

Between
14 and 18 Apr 2024
Details
View Map
Share
Chapel Street

Cadent Gas are proposing to carry out New service connection on Chapel Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 00:10.

Virgin Media logo

Between
14 and 16 Apr 2024
Details
View Map
Share
Hanley Road

Virgin Media are proposing to carry out Utility asset works on Hanley Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Jan 2024 at 11:03.

London Borough Of Barnet logo

Between
14 Apr and 10 May 2024
Details
View Map
Share
The Vale

London Borough Of Barnet are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

The works will start on or after 14 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 28 Mar 2024 at 10:35.

Thames Water logo

LONG TERM
Between
15 Apr 2024 and 2 May 2025
Details
View Map
Share
Wiltshire Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Wiltshire Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 12:24.

Thames Water logo

LONG TERM
Between
15 Apr 2024 and 7 Feb 2025
Details
View Map
Share
Western Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Western Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 12:27.

London Borough Of Southwark logo

Between
15 and 17 Apr 2024
Details
View Map
Share
Benhill Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Benhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 17 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 16:05.

Thames Water logo

LONG TERM
Between
15 Apr 2024 and 23 Jan 2025
Details
View Map
Share
Monnow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Monnow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2023 at 13:34.

Vodafone logo

Between
15 and 19 Apr 2024
Details
View Map
Share
Thermopylae Gate

Vodafone are proposing to carry out Utility asset works on Thermopylae Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 27 Mar 2024 at 14:03.

London Borough Of Southwark logo

Between
15 and 17 Apr 2024
Details
View Map
Share
Ewer Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Ewer Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:02.

UK Power Networks Eastern & London logo

Between
15 Apr and 11 May 2024
Details
View Map
Share
Fenchurch Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fenchurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 08:15.

City Of London Telecomms logo

Between
15 and 19 Apr 2024
Details
View Map
Share
Upper John Street

City Of London Telecomms are proposing to carry out Utility asset works on Upper John Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 6 Feb 2024 at 14:01.

Transport for London (TfL) logo

Between
15 Apr and 10 May 2024
Details
View Map
Share
Denmark Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Denmark Street, Holborn And Covent Garden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 14:17.

Transport for London (TfL) logo

Between
15 Apr and 10 May 2024
Details
View Map
Share
Charing Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Charing Cross Road, Holborn And Covent Garden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 14:18.

Thames Water logo

Between
15 and 21 Apr 2024
Details
View Map
Share
Blomfield Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Blomfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jan 2024 at 16:47.

UK Power Networks Eastern & London logo

Between
15 and 26 Apr 2024
Details
View Map
Share
Devonshire Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Devonshire Close, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 17:46.

Thames Water logo

Between
15 and 19 Apr 2024
Details
View Map
Share
Cosway Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Cosway Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jan 2024 at 10:57.

UK Power Networks Eastern & London logo

Between
15 Apr and 11 May 2024
Details
View Map
Share
Clerkenwell Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Clerkenwell Road, Holborn And Covent Garden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 18:30.

London Borough Of Camden logo

LONG TERM
Between
15 Apr and 27 Jun 2024
Details
View Map
Share
Baynes Mews

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Baynes Mews, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 21 Mar 2024 at 12:04.

London Borough Of Lambeth logo

Between
16 and 20 Apr 2024
Details
View Map
Share
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 27 Mar 2024 at 12:29.

BT logo

Between
16 and 18 Apr 2024
Details
View Map
Share
St James's Square

BT are proposing to carry out Utility asset works on St James's Square, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Mar 2024 at 10:06.

City Of Westminster logo

Between
16 and 22 Apr 2024
Details
View Map
Share
Conduit Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Conduit Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jan 2024 at 15:29.

BT logo

Between
16 and 18 Apr 2024
Details
View Map
Share
Cursitor Street

BT are proposing to carry out Utility repair and maintenance works on Cursitor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Mar 2024 at 14:29.

Hyperoptic logo

Between
16 and 18 Apr 2024
Details
View Map
Share
Compton Avenue

Hyperoptic are proposing to carry out Utility asset works on Compton Avenue, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 27 Feb 2024 at 14:29.

Transport for London (TfL) logo

Between
16 and 18 Apr 2024
Details
View Map
Share
Lea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 14:24.

Virgin Media logo

Between
16 and 18 Apr 2024
Details
View Map
Share
Vale Of Health

Virgin Media are proposing to carry out Utility asset works on Vale Of Health, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 Mar 2024 at 09:13.

London Borough Of Wandsworth logo

Between
17 and 19 Apr 2024
Details
View Map
Share
Forthbridge Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Forthbridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2024 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 25 Jan 2024 at 07:45.

BT logo

Between
17 and 19 Apr 2024
Details
View Map
Share
Yeoman's Row

BT are proposing to carry out Utility asset works on Yeoman's Row, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Mar 2024 at 09:26.

City Of Westminster logo

Between
17 and 26 Apr 2024
Details
View Map
Share
Dacre Street

City Of Westminster are proposing to carry out Highway improvement works on Dacre Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2024 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 19 Mar 2024 at 09:11.

City Of Westminster logo

Between
17 and 30 Apr 2024
Details
View Map
Share
Nottingham Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Nottingham Place, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Dec 2023 at 14:49.

London Borough Of Southwark logo

Between
18 and 20 Apr 2024
Details
View Map
Share
Owgan Close

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Owgan Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 8 Dec 2023 at 11:26.

London Borough Of Southwark logo

Between
18 and 20 Apr 2024
Details
View Map
Share
Benhill Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Benhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 28 Dec 2023 at 06:52.

UK Power Networks Eastern & London logo

Between
18 Apr and 11 May 2024
Details
View Map
Share
Browning Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Browning Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 11:39.

London Borough Of Wandsworth logo

Between
19 and 24 Apr 2024
Details
View Map
Share
Taybridge Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Taybridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Jan 2024 at 14:16.

London Borough Of Wandsworth logo

Between
19 and 22 Apr 2024
Details
View Map
Share
St Philip Square

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on St Philip Square, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Jan 2024 at 14:19.

London Borough Of Southwark logo

Between
19 and 21 Apr 2024
Details
View Map
Share
Commercial Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Commercial Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 21 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 12:53.

Transport for London (TfL) logo

LONG TERM
Between
19 Apr and 31 May 2024
Details
View Map
Share
Stanhope Mews West

Transport for London (TfL) are proposing to carry out roadworks on Stanhope Mews West, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2024 at 15:01.

Thames Water logo

LONG TERM
Between
19 Apr and 30 May 2024
Details
View Map
Share
Sugar Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Sugar Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2023 at 13:49.

UK Power Networks Eastern & London logo

LONG TERM
Between
19 Apr and 14 Nov 2024
Details
View Map
Share
Greencroft Gardens

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Greencroft Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 14:06.

Thames Water logo

Between
21 and 25 Apr 2024
Details
View Map
Share
Ebury Street

Thames Water are proposing to carry out New service connection on Ebury Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 13:22.

Between
21 and 23 Apr 2024
Details
View Map
Share
Palmer Street

G. Network Communications are proposing to carry out Utility asset works on Palmer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 23 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 14 Mar 2024 at 06:24.

Thames Water logo

Between
21 and 25 Apr 2024
Details
View Map
Share
Fitzmaurice Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Fitzmaurice Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:17.

Thames Water logo

Between
21 and 24 Apr 2024
Details
View Map
Share
Grafton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Grafton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:38.

Thames Water logo

Between
21 and 25 Apr 2024
Details
View Map
Share
Neal Street

Thames Water are proposing to carry out Utility asset works on Neal Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Feb 2024 at 17:06.

Vodafone logo

Between
21 Apr and 2 May 2024
Details
View Map
Share
Adler Street

Vodafone are proposing to carry out Utility asset works on Adler Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 13 Mar 2024 at 14:10.

Hyperoptic logo

Between
21 and 23 Apr 2024
Details
View Map
Share
Camden Street

Hyperoptic are proposing to carry out Utility asset works on Camden Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 23 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 22 Feb 2024 at 12:07.

London Borough Of Southwark logo

Between
22 and 27 Apr 2024
Details
View Map
Share
Ruby Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Ruby Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Feb 2024 at 14:51.

Electricity Network Company logo

Between
22 Apr and 3 May 2024
Details
View Map
Share
Carnation Way

Electricity Network Company are proposing to carry out Utility asset works on Carnation Way, London.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Jan 2024 at 16:30.

UK Power Networks Eastern & London logo

LONG TERM
Between
22 Apr and 31 May 2024
Details
View Map
Share
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2024 at 12:28.

Thames Water logo

Between
22 Apr and 6 May 2024
Details
View Map
Share
Lower Addison Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Lower Addison Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 6 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 14:20.

City Of London Corporation logo

Between
22 Apr and 12 May 2024
Details
View Map
Share
Queen Victoria Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Queen Victoria Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 06:36.

Cadent Gas logo

Between
22 and 26 Apr 2024
Details
View Map
Share
Green Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Green Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 9 Feb 2024 at 14:30.

UK Power Networks Eastern & London logo

Between
22 Apr and 1 May 2024
Details
View Map
Share
Seymour Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Seymour Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:09.

City Of Westminster logo

LONG TERM
Between
22 Apr and 2 Aug 2024
Details
View Map
Share
Great Portland Street

City Of Westminster are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 2 August 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 08:34.

Thames Water logo

Between
22 Apr and 13 May 2024
Details
View Map
Share
Droop Street

Thames Water are proposing to carry out Utility asset works on Droop Street, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 10:37.

Thames Water logo

LONG TERM
Between
22 Apr and 2 Jun 2024
Details
View Map
Share
Fifth Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Fifth Avenue, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 10:36.

City Of London Telecomms logo

Between
22 and 24 Apr 2024
Details
View Map
Share
St Pancras Way

City Of London Telecomms are proposing to carry out Utility asset works on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 27 Mar 2024 at 22:01.

Thames Water logo

Between
22 Apr and 13 May 2024
Details
View Map
Share
Westbere Road

Thames Water are proposing to carry out Utility asset works on Westbere Road, Fortune Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 15:17.

Thames Water logo

Between
22 Apr and 13 May 2024
Details
View Map
Share
Sarre Road

Thames Water are proposing to carry out Utility asset works on Sarre Road, Fortune Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 15:27.

Between
22 Apr and 3 May 2024
Details
View Map
Share
Albion Road

G. Network Communications are proposing to carry out Remedial works on Albion Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 26 Mar 2024 at 14:39.

UK Power Networks Eastern & London logo

Between
22 Apr and 7 May 2024
Details
View Map
Share
Vale Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Vale Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 7 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2024 at 09:39.

UK Power Networks Eastern & London logo

LONG TERM
Between
23 Apr and 25 May 2024
Details
View Map
Share
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 13:54.

City Of London Corporation logo

Between
23 and 27 Apr 2024
Details
View Map
Share
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 27 Feb 2024 at 16:33.

City Of London Corporation logo

Between
23 and 27 Apr 2024
Details
View Map
Share
Tower Bridge

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 9 Feb 2024 at 13:26.

City Of London Corporation logo

Between
23 and 27 Apr 2024
Details
View Map
Share
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 9 Feb 2024 at 13:25.

Thames Water logo

LONG TERM
Between
23 Apr and 18 Jun 2024
Details
View Map
Share
Prince Albert Road

Thames Water are proposing to carry out Utility asset works on Prince Albert Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 09:18.

Thames Water logo

LONG TERM
Between
23 Apr and 18 Jun 2024
Details
View Map
Share
Culworth Street

Thames Water are proposing to carry out Utility asset works on Culworth Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 17:43.

Thames Water logo

LONG TERM
Between
23 Apr and 18 Jun 2024
Details
View Map
Share
Eamont Street

Thames Water are proposing to carry out Utility asset works on Eamont Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 17:30.

UK Power Networks Eastern & London logo

Between
24 Apr and 3 May 2024
Details
View Map
Share
Drummond Crescent

UK Power Networks Eastern & London are proposing to carry out New service connection on Drummond Crescent, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Feb 2024 at 16:03.

Transport for London (TfL) logo

Between
25 and 28 Apr 2024
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 16:19.

Transport for London (TfL) logo

Between
25 and 28 Apr 2024
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 17:08.

Thames Water logo

Between
25 Apr and 11 May 2024
Details
View Map
Share
Rouel Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Rouel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jan 2024 at 16:08.

City Of Westminster logo

Between
25 and 29 Apr 2024
Details
View Map
Share
St Ermin's Hill

City Of Westminster are proposing to carry out Highway improvement works on St Ermin's Hill, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 11:18.

BT logo

Between
25 and 29 Apr 2024
Details
View Map
Share
Grove Road

BT are proposing to carry out Utility asset works on Grove Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Mar 2024 at 13:07.

BT logo

Between
25 and 29 Apr 2024
Details
View Map
Share
St Anns Road

BT are proposing to carry out Utility asset works on St Anns Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Mar 2024 at 13:07.

London Borough Of Southwark logo

Between
26 and 28 Apr 2024
Details
View Map
Share
Commercial Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Commercial Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 13:00.

UK Power Networks Eastern & London logo

Between
26 Apr and 20 May 2024
Details
View Map
Share
Layard Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Layard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Mar 2024 at 11:15.

City Of Westminster logo

Between
26 and 29 Apr 2024
Details
View Map
Share
Great Cumberland Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 Feb 2024 at 14:09.

Thames Water logo

Between
26 and 28 Apr 2024
Details
View Map
Share
New Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 09:57.

Thames Water logo

Between
26 and 28 Apr 2024
Details
View Map
Share
New Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 09:54.

Virgin Media logo

Between
26 Apr and 13 May 2024
Details
View Map
Share
Gower Street

Virgin Media are proposing to carry out Utility asset works on Gower Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 28 Mar 2024 at 07:24.

Thames Water logo

Between
27 and 29 Apr 2024
Details
View Map
Share
Marjorie Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Marjorie Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jan 2024 at 15:23.

Vodafone logo

Between
27 and 29 Apr 2024
Details
View Map
Share
Abchurch Lane

Vodafone are proposing to carry out Utility repair and maintenance works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 28 Mar 2024 at 08:25.

London Borough Of Southwark logo

Between
28 Apr and 10 May 2024
Details
View Map
Share
Hyndman Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Hyndman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Feb 2024 at 13:20.

Transport for London (TfL) logo

LONG TERM
Between
28 Apr and 3 Jun 2024
Details
View Map
Share
Millbank

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2024 at 10:56.

Transport for London (TfL) logo

LONG TERM
Between
28 Apr and 25 Jun 2024
Details
View Map
Share
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2024 at 10:55.

Vodafone logo

Between
28 and 30 Apr 2024
Details
View Map
Share
Stratton Street

Vodafone are proposing to carry out Utility asset works on Stratton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 22 Feb 2024 at 14:16.

Thames Water logo

Between
28 Apr and 2 May 2024
Details
View Map
Share
Grafton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Grafton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 16:00.

Thames Water logo

Between
28 Apr and 2 May 2024
Details
View Map
Share
New Bond Street

Thames Water are proposing to carry out Disconnection or alteration of supply on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 15:58.

Cadent Gas logo

Between
28 Apr and 2 May 2024
Details
View Map
Share
St Anselm's Place

Cadent Gas are proposing to carry out New service connection on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Feb 2024 at 07:01.

City Of London Telecomms logo

Between
28 and 30 Apr 2024
Details
View Map
Share
Dean Street

City Of London Telecomms are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 22 Mar 2024 at 18:27.

Thames Water logo

Between
28 Apr and 2 May 2024
Details
View Map
Share
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2024 at 13:42.

Thames Water logo

LONG TERM
Between
28 Apr and 13 Jul 2024
Details
View Map
Share
College Road

Thames Water are proposing to carry out Utility asset works on College Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Mar 2024 at 06:55.

BT logo

Between
28 Apr and 2 May 2024
Details
View Map
Share
Terrace Road

BT are proposing to carry out Utility repair and maintenance works on Terrace Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Mar 2024 at 12:19.

Thames Water logo

Between
28 Apr and 3 May 2024
Details
View Map
Share
Shoot-up Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Shoot-up Hill, Fortune Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 16:30.

Thames Water logo

Between
29 Apr and 20 May 2024
Details
View Map
Share
Quarrendon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Quarrendon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jan 2024 at 14:26.

London Borough Of Southwark logo

LONG TERM
Between
29 Apr and 28 Jun 2024
Details
View Map
Share
Chapter Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Feb 2024 at 07:32.

LONG TERM
Between
29 Apr and 19 Jul 2024
Details
View Map
Share
Verney Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Verney Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Feb 2024 at 10:29.

Thames Water logo

LONG TERM
Between
29 Apr and 16 Jul 2024
Details
View Map
Share
Bombay Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Bombay Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Feb 2024 at 08:22.

Thames Water logo

Between
29 Apr and 3 May 2024
Details
View Map
Share
Cheval Place

Thames Water are proposing to carry out New service connection on Cheval Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Feb 2024 at 10:21.

Thames Water logo

Between
29 Apr and 15 May 2024
Details
View Map
Share
Kensington High Street

Thames Water are proposing to carry out New service connection on Kensington High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 15 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 08:38.

City Of Westminster logo

Between
29 Apr and 10 May 2024
Details
View Map
Share
Broadway

City Of Westminster are proposing to carry out Highway improvement works on Broadway, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 11:19.

Thames Water logo

Between
29 Apr and 1 May 2024
Details
View Map
Share
Fielding Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fielding Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Jan 2024 at 09:01.

Between
29 Apr and 11 May 2024
Details
View Map
Share
Manilla Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manilla Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Mar 2024 at 09:33.

Between
29 Apr and 11 May 2024
Details
View Map
Share
Cuba Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Cuba Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Mar 2024 at 09:36.

UK Power Networks Eastern & London logo

LONG TERM
Between
29 Apr and 8 Jun 2024
Details
View Map
Share
St Katharines Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Katharines Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 8 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 17:37.

Thames Water logo

Between
29 Apr and 8 May 2024
Details
View Map
Share
Saltwell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Saltwell Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Feb 2024 at 12:46.

Thames Water logo

Between
29 Apr and 20 May 2024
Details
View Map
Share
Talbot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:14.

Thames Water logo

Between
29 Apr and 6 May 2024
Details
View Map
Share
Cleveland Street

Thames Water are proposing to carry out New service connection on Cleveland Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Feb 2024 at 12:57.

BT logo

Between
29 Apr and 1 May 2024
Details
View Map
Share
Porter Street

BT are proposing to carry out Utility asset works on Porter Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Mar 2024 at 16:22.

Thames Water logo

Between
29 Apr and 3 May 2024
Details
View Map
Share
Lower Terrace

Thames Water are proposing to carry out Disconnection or alteration of supply on Lower Terrace, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:40.

Thames Water logo

Between
29 Apr and 10 May 2024
Details
View Map
Share
Talbot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Feb 2024 at 12:11.

Thames Water logo

Between
30 Apr and 2 May 2024
Details
View Map
Share
Sylvan Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Sylvan Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Feb 2024 at 08:56.

BT logo

Between
30 Apr and 3 May 2024
Details
View Map
Share
Granary Street

BT are proposing to carry out Utility asset works on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Feb 2024 at 11:05.

Network Rail logo

Between
30 Apr and 20 May 2024
Details
View Map
Share
Baynes Street

Network Rail are proposing to carry out Works for Rail Purposes on Baynes Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 20 May 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Network Rail on 11 Mar 2024 at 07:42.

London Borough Of Wandsworth logo

Between
1 and 3 May 2024
Details
View Map
Share
Afghan Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Afghan Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Feb 2024 at 12:24.

London Borough Of Lewisham logo

Between
1 and 3 May 2024
Details
View Map
Share
Pepys Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 27 Mar 2024 at 16:16.

London Borough Of Southwark logo

Between
1 and 3 May 2024
Details
View Map
Share
Barnham Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Barnham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 11:27.

London Borough Of Southwark logo

Between
1 and 3 May 2024
Details
View Map
Share
Shand Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Shand Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 11:40.

Transport for London (TfL) logo

Between
1 and 30 May 2024
Details
View Map
Share
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 13:34.

Transport for London (TfL) logo

Between
1 and 30 May 2024
Details
View Map
Share
St Leonards Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on St Leonards Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 13:42.

City Of London Corporation logo

LONG TERM
Between
1 May and 7 Jul 2024
Details
View Map
Share
Threadneedle Street

City Of London Corporation are proposing to carry out Highway improvement works on Threadneedle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 7 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Mar 2024 at 10:11.

City Of Westminster logo

Between
1 and 10 May 2024
Details
View Map
Share
Oxford Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Mar 2024 at 16:30.

City Of Westminster logo

Between
1 and 14 May 2024
Details
View Map
Share
Formosa Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Formosa Street, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Mar 2024 at 14:45.

UK Power Networks Eastern & London logo

LONG TERM
Between
1 May and 25 Jun 2024
Details
View Map
Share
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 11:39.

UK Power Networks Eastern & London logo

Between
1 and 20 May 2024
Details
View Map
Share
Hampstead Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jan 2024 at 10:43.

UK Power Networks Eastern & London logo

Between
1 and 20 May 2024
Details
View Map
Share
Varndell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Varndell Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Mar 2024 at 10:10.

London Borough Of Southwark logo

Between
2 and 17 May 2024
Details
View Map
Share
Melon Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Melon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Feb 2024 at 13:48.

UK Power Networks Eastern & London logo

Between
2 and 26 May 2024
Details
View Map
Share
Upper Berkeley Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:10.

London Borough Of Southwark logo

Between
3 and 5 May 2024
Details
View Map
Share
Commercial Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Commercial Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2024 and could run through until 5 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 13:06.

Electricity Network Company logo

Between
3 and 31 May 2024
Details
View Map
Share
Wandsworth Road

Electricity Network Company are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Jan 2024 at 08:42.

City Of Westminster logo

Between
3 and 17 May 2024
Details
View Map
Share
Mercer Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Mercer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Mar 2024 at 10:30.

London Borough Of Southwark logo

Between
5 and 10 May 2024
Details
View Map
Share
Barnham Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Barnham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 09:40.

Vodafone logo

Between
5 and 8 May 2024
Details
View Map
Share
Berkeley Street

Vodafone are proposing to carry out Utility asset works on Berkeley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 Feb 2024 at 14:19.

UK Power Networks Eastern & London logo

LONG TERM
Between
6 May and 21 Jun 2024
Details
View Map
Share
Grove Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jan 2024 at 19:31.

Cadent Gas logo

Between
6 May and 3 Jun 2024
Details
View Map
Share
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Mar 2024 at 10:47.

Southern Gas Networks logo

Between
6 and 13 May 2024
Details
View Map
Share
Avonmouth Street

Southern Gas Networks are proposing to carry out Permanent reinstatement on Avonmouth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2024 at 09:58.

Network Rail logo

Between
6 and 10 May 2024
Details
View Map
Share
Crucifix Lane

Network Rail are proposing to carry out Works for Rail Purposes on Crucifix Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Mar 2024 at 12:10.

Between
6 and 17 May 2024
Details
View Map
Share
Southwark Bridge Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Southwark Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Feb 2024 at 17:15.

Thames Water logo

Between
6 and 9 May 2024
Details
View Map
Share
Palace Court

Thames Water are proposing to carry out New service connection on Palace Court, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2024 at 09:33.

Thames Water logo

Between
6 and 10 May 2024
Details
View Map
Share
Little Portland Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Little Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Mar 2024 at 13:33.

Thames Water logo

Between
6 and 12 May 2024
Details
View Map
Share
Queen's Terrace

Thames Water are proposing to carry out Disconnection or alteration of supply on Queen's Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Mar 2024 at 15:30.

Thames Water logo

Between
6 and 27 May 2024
Details
View Map
Share
Royal College Street

Thames Water are proposing to carry out Utility repair and maintenance works on Royal College Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Feb 2024 at 16:25.

Thames Water logo

Between
6 and 9 May 2024
Details
View Map
Share
Willow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Willow Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 15:16.

Thames Water logo

Between
6 and 12 May 2024
Details
View Map
Share
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:14.

Thames Water logo

LONG TERM
Between
7 May and 11 Dec 2024
Details
View Map
Share
Thorncombe Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:17.

Thames Water logo

LONG TERM
Between
7 May and 11 Dec 2024
Details
View Map
Share
Glengarry Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Glengarry Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:10.

Thames Water logo

LONG TERM
Between
7 May and 2 Jul 2024
Details
View Map
Share
Trossachs Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Trossachs Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 2 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:10.

Thames Water logo

Between
7 and 9 May 2024
Details
View Map
Share
Eddiscombe Road

Thames Water are proposing to carry out Utility repair and maintenance works on Eddiscombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:17.

Transport for London (TfL) logo

LONG TERM
Between
7 May and 13 Jun 2024
Details
View Map
Share
Brixton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2024 at 14:46.

UK Power Networks Eastern & London logo

Between
7 and 13 May 2024
Details
View Map
Share
Boundary Lane

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2024 at 07:46.

Thames Water logo

LONG TERM
Between
7 May and 21 Aug 2024
Details
View Map
Share
Grosvenor Gardens

Thames Water are proposing to carry out Utility asset works on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jan 2024 at 14:18.

London Borough Of Lambeth logo

LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 13:44.

London Borough Of Lambeth logo

LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 13:46.

Virgin Media logo

Between
7 and 9 May 2024
Details
View Map
Share
Cork Street

Virgin Media are proposing to carry out Utility asset works on Cork Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Feb 2024 at 06:50.

Virgin Media logo

Between
7 and 9 May 2024
Details
View Map
Share
Cranbourn Street

Virgin Media are proposing to carry out Utility asset works on Cranbourn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Jan 2024 at 09:34.

City Of Westminster logo

Between
7 and 9 May 2024
Details
View Map
Share
Dunraven Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Dunraven Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Feb 2024 at 13:36.

City Of Westminster logo

Between
7 and 9 May 2024
Details
View Map
Share
Green Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Green Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:10.

UK Power Networks Eastern & London logo

Between
7 and 24 May 2024
Details
View Map
Share
Weighhouse Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Weighhouse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2024 at 12:58.

UK Power Networks Eastern & London logo

Between
7 and 22 May 2024
Details
View Map
Share
Eversholt Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2024 at 13:50.

UK Power Networks Eastern & London logo

Between
7 May and 5 Jun 2024
Details
View Map
Share
Crossfield Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crossfield Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:30.

London Borough Of Wandsworth logo

Between
8 and 10 May 2024
Details
View Map
Share
Ashbury Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Ashbury Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 15 Feb 2024 at 10:53.

Thames Water logo

Between
9 and 11 May 2024
Details
View Map
Share
Warner Road

Thames Water are proposing to carry out Utility repair and maintenance works on Warner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 07:26.

Transport for London (TfL) logo

Between
9 and 12 May 2024
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 16:21.

Transport for London (TfL) logo

Between
9 and 12 May 2024
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 17:09.

Between
9 and 22 May 2024
Details
View Map
Share
Market Mews

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Mar 2024 at 11:00.

London Borough Of Southwark logo

Between
10 and 12 May 2024
Details
View Map
Share
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Jan 2024 at 09:13.

Virgin Media logo

Between
10 and 24 May 2024
Details
View Map
Share
Hendon Way

Virgin Media are proposing to carry out Utility asset works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2024 and could run through until 24 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 1 Mar 2024 at 12:10.

UK Power Networks Eastern & London logo

Between
11 and 19 May 2024
Details
View Map
Share
Druid Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Druid Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 13:51.

London Borough Of Southwark logo

Between
11 and 13 May 2024
Details
View Map
Share
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 18:00.

BT logo

Between
11 and 13 May 2024
Details
View Map
Share
Chapman Street

BT are proposing to carry out Utility repair and maintenance works on Chapman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 15 Feb 2024 at 10:44.

Thames Water logo

Between
12 and 25 May 2024
Details
View Map
Share
New Cross Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Feb 2024 at 11:39.

Thames Water logo

Between
12 and 25 May 2024
Details
View Map
Share
Stamford Street

Thames Water are proposing to carry out Utility repair and maintenance works on Stamford Street, London.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 25 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 09:43.

Thames Water logo

Between
12 and 18 May 2024
Details
View Map
Share
Sackville Street

Thames Water are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 15:31.

Thames Water logo

Between
12 and 20 May 2024
Details
View Map
Share
Marshall Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Marshall Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Mar 2024 at 20:44.

Thames Water logo

Between
12 and 18 May 2024
Details
View Map
Share
Broadwick Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Mar 2024 at 20:44.

Thames Water logo

Between
12 and 18 May 2024
Details
View Map
Share
Foubert's Place

Thames Water are proposing to carry out New service connection on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Mar 2024 at 13:18.

HS2 logo

LONG TERM
Between
12 May and 12 Jul 2024
Details
View Map
Share
Kilburn High Road

HS2 are proposing to carry out Section 50 on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 20 Mar 2024 at 22:47.

HS2 logo

LONG TERM
Between
12 May and 30 Aug 2024
Details
View Map
Share
Greville Road

HS2 are proposing to carry out Section 50 on Greville Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 18 Mar 2024 at 21:37.

HS2 logo

LONG TERM
Between
12 May and 30 Aug 2024
Details
View Map
Share
Oxford Road

HS2 are proposing to carry out Section 50 on Oxford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 18 Mar 2024 at 21:23.

HS2 logo

LONG TERM
Between
12 May and 30 Aug 2024
Details
View Map
Share
Oxford Road

HS2 are proposing to carry out Section 50 on Oxford Road, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 18 Mar 2024 at 16:34.

HS2 logo

LONG TERM
Between
12 May and 12 Jul 2024
Details
View Map
Share
Kilburn High Road

HS2 are proposing to carry out Section 50 on Kilburn High Road, Maida Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 18 Mar 2024 at 15:37.

HS2 logo

LONG TERM
Between
12 May and 12 Jul 2024
Details
View Map
Share
Kilburn High Road

HS2 are proposing to carry out Section 50 on Kilburn High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 18 Mar 2024 at 16:12.

Thames Water logo

LONG TERM
Between
12 May and 17 Aug 2024
Details
View Map
Share
Holly Bush Hill

Thames Water are proposing to carry out Utility asset works on Holly Bush Hill, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 17 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 15:20.

Thames Water logo

Between
13 and 15 May 2024
Details
View Map
Share
Nigel Road

Thames Water are proposing to carry out Utility asset works on Nigel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 09:05.

London Borough Of Southwark logo

LONG TERM
Between
13 May and 22 Jun 2024
Details
View Map
Share
De Laune Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on De Laune Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 07:58.

London Borough Of Southwark logo

LONG TERM
Between
13 May and 22 Jun 2024
Details
View Map
Share
Braganza Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Braganza Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 07:58.

London Borough Of Southwark logo

LONG TERM
Between
13 May and 22 Jun 2024
Details
View Map
Share
Alberta Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Alberta Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 27 Feb 2024 at 13:47.

London Borough Of Southwark logo

LONG TERM
Between
13 May and 15 Jun 2024
Details
View Map
Share
Berryfield Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Berryfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 20 Feb 2024 at 07:40.

London Borough Of Southwark logo

LONG TERM
Between
13 May and 15 Jun 2024
Details
View Map
Share
Penton Place

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Penton Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 20 Feb 2024 at 07:40.

London Borough Of Southwark logo

LONG TERM
Between
13 May and 15 Jun 2024
Details
View Map
Share
Amelia Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Amelia Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 20 Feb 2024 at 07:40.

Thames Water logo

LONG TERM
Between
13 May and 5 Jul 2024
Details
View Map
Share
East Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on East Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:51.

Thames Water logo

Between
13 and 15 May 2024
Details
View Map
Share
Fielding Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fielding Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Feb 2024 at 10:51.

Murphy Power Distribution logo

LONG TERM
Between
13 May and 21 Jun 2024
Details
View Map
Share
Mastmaker Road

Murphy Power Distribution are proposing to carry out Utility asset works on Mastmaker Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 12 Feb 2024 at 13:39.

Thames Water logo

Between
13 and 18 May 2024
Details
View Map
Share
Aubrey Walk

Thames Water are proposing to carry out Utility repair and maintenance works on Aubrey Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Feb 2024 at 16:50.

UK Power Networks Eastern & London logo

Between
13 and 21 May 2024
Details
View Map
Share
Chapel Side

UK Power Networks Eastern & London are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 11:49.

UK Power Networks Eastern & London logo

Between
13 May and 3 Jun 2024
Details
View Map
Share
Vere Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Vere Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2024 at 13:26.

Boldyn Networks logo

Between
13 May and 5 Jun 2024
Details
View Map
Share
Norton Folgate

Boldyn Networks are proposing to carry out Utility asset works on Norton Folgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Boldyn Networks on 22 Mar 2024 at 13:22.

City Of Westminster logo

LONG TERM
Between
13 May and 1 Jul 2024
Details
View Map
Share
Jerome Crescent

City Of Westminster are proposing to carry out Highway improvement works on Jerome Crescent, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Feb 2024 at 09:27.

Thames Water logo

Between
13 and 17 May 2024
Details
View Map
Share
Waterloo Terrace

Thames Water are proposing to carry out New service connection on Waterloo Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Feb 2024 at 13:51.

BT logo

Between
13 and 17 May 2024
Details
View Map
Share
Sutton Place

BT are proposing to carry out Utility repair and maintenance works on Sutton Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Feb 2024 at 22:52.

Transport for London (TfL) logo

Between
13 and 30 May 2024
Details
View Map
Share
Sandringham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2024 at 14:56.

Thames Water logo

Between
13 May and 3 Jun 2024
Details
View Map
Share
Chesterford Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Chesterford Gardens, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:31.

London Borough Of Wandsworth logo

Between
14 and 16 May 2024
Details
View Map
Share
Grant Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Grant Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 21 Feb 2024 at 10:26.

Thames Water logo

Between
14 and 16 May 2024
Details
View Map
Share
Laurie Grove

Thames Water are proposing to carry out New service connection on Laurie Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Feb 2024 at 09:22.

Thames Water logo

LONG TERM
Between
14 May and 18 Aug 2024
Details
View Map
Share
Neathouse Place

Thames Water are proposing to carry out Utility asset works on Neathouse Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 18 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jan 2024 at 11:18.

Thames Water logo

LONG TERM
Between
14 May and 23 Sep 2024
Details
View Map
Share
Wilton Road

Thames Water are proposing to carry out Utility asset works on Wilton Road, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jan 2024 at 11:18.

City Of Westminster logo

Between
14 and 17 May 2024
Details
View Map
Share
Mill Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Mill Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:09.

Hyperoptic logo

Between
14 and 16 May 2024
Details
View Map
Share
Dagmar Terrace

Hyperoptic are proposing to carry out Utility asset works on Dagmar Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 15 Mar 2024 at 09:01.

Thames Water logo

LONG TERM
Between
15 May and 30 Jun 2024
Details
View Map
Share
Goldsboro' Road

Thames Water are proposing to carry out Utility asset works on Goldsboro' Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:43.

City Of Westminster logo

Between
15 May and 8 Jun 2024
Details
View Map
Share
Greycoat Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Greycoat Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:31.

Boldyn Networks logo

Between
15 and 19 May 2024
Details
View Map
Share
Worship Street

Boldyn Networks are proposing to carry out Utility asset works on Worship Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Boldyn Networks on 28 Mar 2024 at 10:16.

Transport for London (TfL) logo

Between
16 and 19 May 2024
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 16:24.

Transport for London (TfL) logo

Between
16 and 19 May 2024
Details
View Map
Share
West Cromwell Road

Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on West Cromwell Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 17:09.

Between
16 May and 5 Jun 2024
Details
View Map
Share
Union Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Union Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Feb 2024 at 14:29.

Between
16 May and 4 Jun 2024
Details
View Map
Share
Thorpedale Road

London Borough Of Islington are proposing to carry out Highway improvement works on Thorpedale Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Feb 2024 at 09:55.

London Borough Of Southwark logo

Between
17 and 19 May 2024
Details
View Map
Share
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Jan 2024 at 09:07.

Transport for London (TfL) logo

Between
17 and 20 May 2024
Details
View Map
Share
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:43.

Transport for London (TfL) logo

Between
17 and 20 May 2024
Details
View Map
Share
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:42.

Transport for London (TfL) logo

Between
17 and 20 May 2024
Details
View Map
Share
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 13:09.

ESP Electricity logo

Between
17 and 26 May 2024
Details
View Map
Share
Hayfield Passage

ESP Electricity are proposing to carry out Utility asset works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 26 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 27 Mar 2024 at 13:16.

UK Power Networks Eastern & London logo

LONG TERM
Between
17 May and 6 Sep 2024
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 6 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2024 at 15:19.

Thames Water logo

LONG TERM
Between
18 May and 20 Jul 2024
Details
View Map
Share
Elderfield Road

Thames Water are proposing to carry out Utility asset works on Elderfield Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2024 and could run through until 20 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:55.

Murphy Power Distribution logo

Between
18 and 20 May 2024
Details
View Map
Share
St John's Grove

Murphy Power Distribution are proposing to carry out Utility asset works on St John's Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 14 Mar 2024 at 07:41.

Thames Water logo

LONG TERM
Between
19 May and 23 Jun 2024
Details
View Map
Share
Ilderton Road

Thames Water are proposing to carry out Utility asset works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 08:41.

London Borough Of Southwark logo

Between
19 and 26 May 2024
Details
View Map
Share
Crimscott Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Crimscott Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 07:30.

London Borough Of Southwark logo

Between
19 and 24 May 2024
Details
View Map
Share
Risborough Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Risborough Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 07:44.

Thames Water logo

Between
19 and 22 May 2024
Details
View Map
Share
Nicholson Street

Thames Water are proposing to carry out New service connection on Nicholson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2024 at 10:30.

Thames Water logo

Between
19 and 23 May 2024
Details
View Map
Share
Pollen Street

Thames Water are proposing to carry out New service connection on Pollen Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Feb 2024 at 14:15.

City Of London Telecomms logo

Between
19 and 21 May 2024
Details
View Map
Share
Foster Lane

City Of London Telecomms are proposing to carry out Utility asset works on Foster Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 21 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 12 Mar 2024 at 14:17.

Thames Water logo

Between
19 May and 2 Jun 2024
Details
View Map
Share
Fetter Lane

Thames Water are proposing to carry out New service connection on Fetter Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 14:09.

Cadent Gas logo

Between
19 and 23 May 2024
Details
View Map
Share
Tidworth Road

Cadent Gas are proposing to carry out Utility asset works on Tidworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Mar 2024 at 13:08.

London Borough Of Hackney logo

Between
19 and 23 May 2024
Details
View Map
Share
Shacklewell Lane

London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Shacklewell Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 28 Mar 2024 at 10:49.

BT logo

Between
19 and 23 May 2024
Details
View Map
Share
Cazenove Road

BT are proposing to carry out Utility repair and maintenance works on Cazenove Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Feb 2024 at 22:54.

Thames Water logo

Between
20 May and 7 Jun 2024
Details
View Map
Share
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 09:31.

Thames Water logo

Between
20 May and 10 Jun 2024
Details
View Map
Share
Applegarth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Applegarth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Feb 2024 at 10:37.

Thames Water logo

LONG TERM
Between
20 May and 6 Aug 2024
Details
View Map
Share
Scott Lidgett Crescent

Thames Water are proposing to carry out Disconnection or alteration of supply on Scott Lidgett Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 6 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:57.

City Of Westminster logo

Between
20 and 23 May 2024
Details
View Map
Share
Albemarle Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Albemarle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:22.

City Of Westminster logo

Between
20 and 23 May 2024
Details
View Map
Share
Stafford Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Stafford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:11.

Royal Borough Of Kensington And Chelsea logo

Between
20 and 24 May 2024
Details
View Map
Share
Notting Hill Gate

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Notting Hill Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 13 Mar 2024 at 12:36.

Transport for London (TfL) logo

LONG TERM
Between
20 May and 22 Jul 2024
Details
View Map
Share
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2024 at 16:15.

Transport for London (TfL) logo

LONG TERM
Between
20 May and 22 Jul 2024
Details
View Map
Share
Swan Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Swan Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Feb 2024 at 10:38.

Transport for London (TfL) logo

LONG TERM
Between
20 May and 22 Jul 2024
Details
View Map
Share
Arthur Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Arthur Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Feb 2024 at 10:34.

Vodafone logo

Between
20 and 24 May 2024
Details
View Map
Share
Oxford Street

Vodafone are proposing to carry out Utility repair and maintenance works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 20 Mar 2024 at 09:50.

UK Power Networks Eastern & London logo

Between
20 May and 7 Jun 2024
Details
View Map
Share
Conduit Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Conduit Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 14:48.

UK Power Networks Eastern & London logo

Between
20 May and 18 Jun 2024
Details
View Map
Share
Whiston Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Whiston Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2024 at 17:35.

UK Power Networks Eastern & London logo

LONG TERM
Between
20 May and 10 Jul 2024
Details
View Map
Share
Adamson Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 15:13.

Thames Water logo

Between
20 May and 3 Jun 2024
Details
View Map
Share
Leverton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Leverton Street, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:19.

London Borough Of Wandsworth logo

Between
21 and 23 May 2024
Details
View Map
Share
Simpson Street

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Simpson Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 29 Feb 2024 at 10:40.

London Borough Of Wandsworth logo

Between
21 and 28 May 2024
Details
View Map
Share
Prince Of Wales Drive

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 29 Feb 2024 at 10:21.

Transport for London (TfL) logo

Between
21 and 23 May 2024
Details
View Map
Share
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Feb 2024 at 14:46.

London Borough Of Wandsworth logo

Between
23 and 28 May 2024
Details
View Map
Share
Wroughton Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Wroughton Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 1 Mar 2024 at 10:42.

London Borough Of Wandsworth logo

Between
23 and 28 May 2024
Details
View Map
Share
Queenstown Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Queenstown Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 1 Mar 2024 at 13:40.

UK Power Networks Eastern & London logo

Between
23 and 28 May 2024
Details
View Map
Share
Doric Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Doric Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Feb 2024 at 16:03.

Thames Water logo

Between
24 May and 1 Jun 2024
Details
View Map
Share
Ilderton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Dec 2023 at 15:46.

UK Power Networks Eastern & London logo

LONG TERM
Between
24 May and 15 Jul 2024
Details
View Map
Share
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:42.

Thames Water logo

Between
24 May and 17 Jun 2024
Details
View Map
Share
Bishopsgate

Thames Water are proposing to carry out Utility repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 12:29.

Thames Water logo

Between
24 May and 17 Jun 2024
Details
View Map
Share
Threadneedle Street

Thames Water are proposing to carry out Utility asset works on Threadneedle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2024 at 11:25.

UK Power Networks Eastern & London logo

LONG TERM
Between
24 May and 6 Aug 2024
Details
View Map
Share
Ordnance Hill

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ordnance Hill, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 6 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 15:12.

UK Power Networks Eastern & London logo

LONG TERM
Between
24 May and 27 Aug 2024
Details
View Map
Share
Buckland Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Buckland Crescent, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 27 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:30.

UK Power Networks Eastern & London logo

LONG TERM
Between
24 May and 27 Aug 2024
Details
View Map
Share
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 27 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:28.

UK Power Networks Eastern & London logo

Between
26 May and 22 Jun 2024
Details
View Map
Share
Porchester Gardens

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 11:44.

Thames Water logo

Between
26 May and 16 Jun 2024
Details
View Map
Share
Courtnell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Courtnell Street, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 10:31.

Cadent Gas logo

LONG TERM
Between
26 May and 31 Aug 2024
Details
View Map
Share
Charterhouse Street

Cadent Gas are proposing to carry out Utility asset works on Charterhouse Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 31 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 09:56.

Thames Water logo

Between
26 and 30 May 2024
Details
View Map
Share
Adpar Street

Thames Water are proposing to carry out New service connection on Adpar Street, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:43.

BT logo

Between
26 and 30 May 2024
Details
View Map
Share
Northiam Street

BT are proposing to carry out Utility repair and maintenance works on Northiam Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Mar 2024 at 13:21.

BT logo

Between
26 and 30 May 2024
Details
View Map
Share
Well Street

BT are proposing to carry out Utility repair and maintenance works on Well Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Mar 2024 at 00:26.

UK Power Networks Eastern & London logo

Between
27 May and 12 Jun 2024
Details
View Map
Share
Victoria Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Victoria Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 09:53.

UK Power Networks Eastern & London logo

Between
27 and 31 May 2024
Details
View Map
Share
Palace Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2024 at 10:45.

Cornerstone Telecommunications Infrastructure logo

Between
27 and 29 May 2024
Details
View Map
Share
William Street

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on William Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 27 Mar 2024 at 12:03.

UK Power Networks Eastern & London logo

Between
27 May and 9 Jun 2024
Details
View Map
Share
Portman Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:08.

Thames Water logo

Between
27 and 30 May 2024
Details
View Map
Share
Coptic Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Coptic Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Feb 2024 at 15:00.

Thames Water logo

Between
27 May and 2 Jun 2024
Details
View Map
Share
York Street

Thames Water are proposing to carry out Disconnection or alteration of supply on York Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 17:12.

Thames Water logo

Between
27 May and 1 Jun 2024
Details
View Map
Share
Glasshouse Yard

Thames Water are proposing to carry out New service connection on Glasshouse Yard, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Mar 2024 at 08:31.

Hyperoptic logo

Between
27 and 29 May 2024
Details
View Map
Share
Wakeham Street

Hyperoptic are proposing to carry out Utility asset works on Wakeham Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 4 Mar 2024 at 14:52.

Thames Water logo

Between
27 and 30 May 2024
Details
View Map
Share
Perrin's Lane

Thames Water are proposing to carry out New service connection on Perrin's Lane, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 09:31.

Transport for London (TfL) logo

LONG TERM
Between
28 May and 7 Jul 2024
Details
View Map
Share
Millbank

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 7 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 08:49.

Transport for London (TfL) logo

LONG TERM
Between
28 May and 25 Jul 2024
Details
View Map
Share
Horseferry Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2024 at 08:56.

UK Power Networks Eastern & London logo

LONG TERM
Between
28 May and 20 Jul 2024
Details
View Map
Share
Gomm Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 20 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2024 at 15:05.

Virgin Media logo

Between
28 and 30 May 2024
Details
View Map
Share
Titmuss Street

Virgin Media are proposing to carry out Utility asset works on Titmuss Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 14 Feb 2024 at 12:41.

Thames Water logo

Between
28 and 30 May 2024
Details
View Map
Share
Snowsfields

Thames Water are proposing to carry out Utility repair and maintenance works on Snowsfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2024 at 13:59.

Thames Water logo

Between
28 and 30 May 2024
Details
View Map
Share
St Thomas Street

Thames Water are proposing to carry out Utility repair and maintenance works on St Thomas Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 12:11.

ESP Electricity logo

Between
28 May and 6 Jun 2024
Details
View Map
Share
Stepney Green

ESP Electricity are proposing to carry out Utility asset works on Stepney Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 27 Mar 2024 at 14:28.

Thames Water logo

Between
28 and 31 May 2024
Details
View Map
Share
Belsize Road

Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:42.

UK Power Networks Eastern & London logo

LONG TERM
Between
28 May and 28 Jun 2024
Details
View Map
Share
Lancaster Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2024 at 09:32.

Murphy Power Distribution logo

Between
28 May and 2 Jun 2024
Details
View Map
Share
St John's Grove

Murphy Power Distribution are proposing to carry out Utility asset works on St John's Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 21 Mar 2024 at 09:29.

City Of Westminster logo

Between
29 May and 18 Jun 2024
Details
View Map
Share
Aquila Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Aquila Street, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Feb 2024 at 12:12.

Network Rail logo

Between
29 and 31 May 2024
Details
View Map
Share
Royal College Street

Network Rail are proposing to carry out Works for Rail Purposes on Royal College Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Feb 2024 at 16:02.

Thames Water logo

Between
30 May and 1 Jun 2024
Details
View Map
Share
Ebor Street

Thames Water are proposing to carry out Utility repair and maintenance works on Ebor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 14:28.

Thames Water logo

Between
30 May and 1 Jun 2024
Details
View Map
Share
Ebor Street

Thames Water are proposing to carry out Utility repair and maintenance works on Ebor Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:47.

Thames Water logo

Between
30 May and 1 Jun 2024
Details
View Map
Share
Chance Street

Thames Water are proposing to carry out Utility repair and maintenance works on Chance Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 15:11.

London Borough Of Southwark logo

Between
31 May and 2 Jun 2024
Details
View Map
Share
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2024 at 12:24.

Transport for London (TfL) logo

Between
31 May and 3 Jun 2024
Details
View Map
Share
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 13:13.

Transport for London (TfL) logo

Between
31 May and 3 Jun 2024
Details
View Map
Share
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:45.

Transport for London (TfL) logo

Between
31 May and 3 Jun 2024
Details
View Map
Share
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:46.

UK Power Networks Eastern & London logo

Between
31 May and 6 Jun 2024
Details
View Map
Share
Fetter Lane

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Fetter Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Feb 2024 at 13:15.

UK Power Networks Eastern & London logo

Between
31 May and 22 Jun 2024
Details
View Map
Share
Lincoln Mews

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lincoln Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Feb 2024 at 08:57.

Transport for London (TfL) logo

Between
31 May and 10 Jun 2024
Details
View Map
Share
Sandringham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2024 at 11:33.

Transport for London (TfL) logo

Between
1 and 30 Jun 2024
Details
View Map
Share
Trafalgar Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Trafalgar Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:38.

Transport for London (TfL) logo

Between
1 and 30 Jun 2024
Details
View Map
Share
Aspen Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Aspen Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:42.

Transport for London (TfL) logo

Between
1 and 30 Jun 2024
Details
View Map
Share
Prestons Road Roundabout

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prestons Road Roundabout, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:27.

Transport for London (TfL) logo

Between
1 and 30 Jun 2024
Details
View Map
Share
Prestons Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prestons Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:45.

Thames Water logo

Between
2 and 6 Jun 2024
Details
View Map
Share
Pimlico Road

Thames Water are proposing to carry out New service connection on Pimlico Road, Churchill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:45.

London Borough Of Southwark logo

Between
2 and 7 Jun 2024
Details
View Map
Share
Mill Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Mill Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 07:30.

Cadent Gas logo

Between
2 and 6 Jun 2024
Details
View Map
Share
Mount Street

Cadent Gas are proposing to carry out Remedial works on Mount Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 10:28.

Thames Water logo

Between
2 and 6 Jun 2024
Details
View Map
Share
Artillery Lane

Thames Water are proposing to carry out New service connection on Artillery Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Mar 2024 at 08:40.

Thames Water logo

Between
2 and 6 Jun 2024
Details
View Map
Share
Broadley Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:10.

Cadent Gas logo

Between
2 and 6 Jun 2024
Details
View Map
Share
Plough Yard

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Plough Yard, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 00:22.

Virgin Media logo

Between
2 and 4 Jun 2024
Details
View Map
Share
Vale Royal

Virgin Media are proposing to carry out Utility asset works on Vale Royal, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Feb 2024 at 13:55.

Thames Water logo

Between
2 and 6 Jun 2024
Details
View Map
Share
Collins Road

Thames Water are proposing to carry out New service connection on Collins Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 09:44.

London Borough Of Barnet logo

Between
2 and 4 Jun 2024
Details
View Map
Share
Winnington Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Winnington Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Dec 2023 at 13:46.

Between
3 and 28 Jun 2024
Details
View Map
Share
Ilderton Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Mar 2024 at 11:55.

UK Power Networks Eastern & London logo

LONG TERM
Between
3 Jun and 12 Jul 2024
Details
View Map
Share
Grove Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Jan 2024 at 03:27.

City Of Westminster logo

Between
3 and 8 Jun 2024
Details
View Map
Share
Rochester Row

City Of Westminster are proposing to carry out Highway repair and maintenance works on Rochester Row, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:37.

City Of Westminster logo

Between
3 and 8 Jun 2024
Details
View Map
Share
Greencoat Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Greencoat Place, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:53.

City Of Westminster logo

Between
3 and 8 Jun 2024
Details
View Map
Share
Spencer Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Spencer Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:56.

City Of Westminster logo

Between
3 and 8 Jun 2024
Details
View Map
Share
Artillery Row

City Of Westminster are proposing to carry out Highway repair and maintenance works on Artillery Row, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jan 2024 at 12:59.

Thames Water logo

LONG TERM
Between
3 Jun and 16 Jul 2024
Details
View Map
Share
Janeway Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Janeway Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 12:04.

UK Power Networks Eastern & London logo

LONG TERM
Between
3 Jun and 6 Jul 2024
Details
View Map
Share
Trafalgar Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Trafalgar Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 6 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Mar 2024 at 10:49.

UK Power Networks Eastern & London logo

LONG TERM
Between
3 Jun and 13 Jul 2024
Details
View Map
Share
Blackwall Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Blackwall Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Mar 2024 at 10:17.

UK Power Networks Eastern & London logo

Between
3 and 11 Jun 2024
Details
View Map
Share
Homer Row

UK Power Networks Eastern & London are proposing to carry out New service connection on Homer Row, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 15:14.

Royal Borough Of Kensington And Chelsea logo

Between
3 and 5 Jun 2024
Details
View Map
Share
Ladbroke Grove

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Ladbroke Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 21 Mar 2024 at 14:39.

Vodafone logo

Between
3 and 5 Jun 2024
Details
View Map
Share
Pentonville Road

Vodafone are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 6 Mar 2024 at 11:30.

Thames Water logo

Between
3 and 23 Jun 2024
Details
View Map
Share
Talbot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 11:18.

Thames Water logo

Between
4 and 6 Jun 2024
Details
View Map
Share
Bolton Crescent

Thames Water are proposing to carry out Utility asset works on Bolton Crescent, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2024 at 13:46.

UK Power Networks Eastern & London logo

Between
4 and 17 Jun 2024
Details
View Map
Share
Wardour Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:46.

Between
4 and 11 Jun 2024
Details
View Map
Share
Thayer Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Thayer Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 11 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Mar 2024 at 17:11.

UK Power Networks Eastern & London logo

Between
4 and 10 Jun 2024
Details
View Map
Share
Luxborough Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Luxborough Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 11:53.

Thames Water logo

LONG TERM
Between
5 Jun and 10 Oct 2024
Details
View Map
Share
Victoria Street

Thames Water are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jul 2023 at 12:08.

Thames Water logo

LONG TERM
Between
5 Jun and 8 Sep 2024
Details
View Map
Share
Grosvenor Gardens

Thames Water are proposing to carry out Utility asset works on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 8 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jul 2023 at 12:08.

City Of Westminster logo

Between
5 and 7 Jun 2024
Details
View Map
Share
Kingsway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Kingsway, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Mar 2024 at 08:44.

Between
5 and 7 Jun 2024
Details
View Map
Share
Gaisford Street

G. Network Communications are proposing to carry out Utility asset works on Gaisford Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 28 Feb 2024 at 15:02.

London Borough Of Hackney logo

LONG TERM
Between
5 Jun and 7 Jul 2024
Details
View Map
Share
Lower Clapton Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lower Clapton Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 14 Mar 2024 at 10:58.

London Borough Of Southwark logo

Between
7 and 9 Jun 2024
Details
View Map
Share
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2024 at 12:31.

London Borough Of Southwark logo

Between
7 and 9 Jun 2024
Details
View Map
Share
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2024 at 12:37.

Transport for London (TfL) logo

Between
7 and 10 Jun 2024
Details
View Map
Share
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:51.

Transport for London (TfL) logo

Between
7 and 10 Jun 2024
Details
View Map
Share
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 11:51.

Transport for London (TfL) logo

Between
7 and 10 Jun 2024
Details
View Map
Share
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 13:10.

Thames Water logo

Between
7 and 24 Jun 2024
Details
View Map
Share
Bishopsgate

Thames Water are proposing to carry out Utility repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 15:19.

Virgin Media logo

Between
9 and 11 Jun 2024
Details
View Map
Share
Ashley Crescent

Virgin Media are proposing to carry out Utility asset works on Ashley Crescent, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 15 Mar 2024 at 08:44.

Thames Water logo

Between
9 and 13 Jun 2024
Details
View Map
Share
Strutton Ground

Thames Water are proposing to carry out New service connection on Strutton Ground, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2024 at 09:32.

Thames Water logo

Between
9 and 13 Jun 2024
Details
View Map
Share
Park Street

Thames Water are proposing to carry out New service connection on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Mar 2024 at 07:48.

Transport for London (TfL) logo

LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Upper Grosvenor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 15:15.

Transport for London (TfL) logo

LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Brook Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Brook Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2024 at 17:56.

Transport for London (TfL) logo

LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Upper Brook Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Brook Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 15:19.

Cadent Gas logo

Between
9 and 26 Jun 2024
Details
View Map
Share
Craven Terrace

Cadent Gas are proposing to carry out Utility asset works on Craven Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 10:30.

Cadent Gas logo

Between
9 and 26 Jun 2024
Details
View Map
Share
Brook Mews North

Cadent Gas are proposing to carry out Utility asset works on Brook Mews North, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 10:30.

Transport for London (TfL) logo

LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2024 at 17:55.

Transport for London (TfL) logo

LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Cumberland Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Cumberland Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2024 at 17:55.

Thames Water logo

Between
9 and 17 Jun 2024
Details
View Map
Share
Chance Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Chance Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 15:11.

London Borough Of Southwark logo

Between
10 Jun and 9 Jul 2024
Details
View Map
Share
Fenham Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Fenham Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 9 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2024 at 13:54.

London Borough Of Southwark logo

Between
10 Jun and 9 Jul 2024
Details
View Map
Share
Friary Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Friary Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2024 at 13:54.

London Borough Of Southwark logo

LONG TERM
Between
10 Jun and 13 Jul 2024
Details
View Map
Share
Ambergate Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Ambergate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 08:04.

London Borough Of Southwark logo

Between
10 Jun and 1 Jul 2024
Details
View Map
Share
Southwark Park Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southwark Park Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2024 at 07:12.

Thames Water logo

Between
10 and 23 Jun 2024
Details
View Map
Share
Great Suffolk Street

Thames Water are proposing to carry out Utility repair and maintenance works on Great Suffolk Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2024 at 11:07.

Between
10 and 14 Jun 2024
Details
View Map
Share
Spring Gardens

Squire Energy are proposing to carry out Remedial works on Spring Gardens, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 4 Mar 2024 at 09:13.

Thames Water logo

Between
10 and 28 Jun 2024
Details
View Map
Share
Colville Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Colville Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 12:10.

UK Power Networks Eastern & London logo

Between
10 and 15 Jun 2024
Details
View Map
Share
Fitzhardinge Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Fitzhardinge Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 15 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:06.

UK Power Networks Eastern & London logo

Between
10 and 19 Jun 2024
Details
View Map
Share
Grape Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Grape Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 15:07.

UK Power Networks Eastern & London logo

Between
10 and 21 Jun 2024
Details
View Map
Share
Bartholomew Close

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Bartholomew Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:53.

City Of Westminster logo

Between
10 and 14 Jun 2024
Details
View Map
Share
Rossmore Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Rossmore Road, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Mar 2024 at 13:31.

City Of Westminster logo

Between
10 and 14 Jun 2024
Details
View Map
Share
Rossmore Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Rossmore Road, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Mar 2024 at 13:29.

Thames Water logo

Between
11 and 13 Jun 2024
Details
View Map
Share
Holbein Mews

Thames Water are proposing to carry out Utility repair and maintenance works on Holbein Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Mar 2024 at 11:09.

UK Power Networks Eastern & London logo

Between
11 and 18 Jun 2024
Details
View Map
Share
Berwick Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 14:48.

Electricity Network Company logo

Between
12 and 26 Jun 2024
Details
View Map
Share
Pascal Street

Electricity Network Company are proposing to carry out Utility asset works on Pascal Street, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Jan 2024 at 08:19.

City Of Westminster logo

Between
12 Jun and 2 Jul 2024
Details
View Map
Share
New Cavendish Street

City Of Westminster are proposing to carry out Highway improvement works on New Cavendish Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 10:04.

Between
13 and 17 Jun 2024
Details
View Map
Share
Credon Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Credon Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Mar 2024 at 07:38.

Network Rail logo

Between
14 and 17 Jun 2024
Details
View Map
Share
Trundleys Road

Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Mar 2024 at 15:57.

Thames Water logo

Between
14 and 16 Jun 2024
Details
View Map
Share
Carlisle Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Carlisle Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Mar 2024 at 15:27.

Thames Water logo

Between
14 and 17 Jun 2024
Details
View Map
Share
City Road

Thames Water are proposing to carry out Utility repair and maintenance works on City Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 12:00.

UK Power Networks Eastern & London logo

LONG TERM
Between
14 Jun and 1 Oct 2024
Details
View Map
Share
Gascony Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Gascony Avenue, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 1 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2024 at 09:37.

London Borough Of Southwark logo

Between
16 and 21 Jun 2024
Details
View Map
Share
Sumner Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Sumner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 06:41.

Thames Water logo

Between
16 and 20 Jun 2024
Details
View Map
Share
Regeneration Road

Thames Water are proposing to carry out Utility repair and maintenance works on Regeneration Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 09:34.

London Borough Of Southwark logo

Between
16 and 22 Jun 2024
Details
View Map
Share
Grange Walk

London Borough Of Southwark are proposing to carry out Highway improvement works on Grange Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Mar 2024 at 14:37.

Thames Water logo

Between
16 and 18 Jun 2024
Details
View Map
Share
Emerson Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Emerson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 08:30.

UK Power Networks Eastern & London logo

Between
16 Jun and 1 Jul 2024
Details
View Map
Share
Manchester Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Manchester Square, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:12.

Thames Water logo

Between
16 and 23 Jun 2024
Details
View Map
Share
Brady Street

Thames Water are proposing to carry out New service connection on Brady Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 17:39.

Thames Water logo

Between
16 and 22 Jun 2024
Details
View Map
Share
Shrewsbury Street

Thames Water are proposing to carry out New service connection on Shrewsbury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2024 at 08:27.

Thames Water logo

Between
16 and 19 Jun 2024
Details
View Map
Share
Cheshire Street

Thames Water are proposing to carry out New service connection on Cheshire Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 08:06.

Transport for London (TfL) logo

LONG TERM
Between
17 Jun and 26 Jul 2024
Details
View Map
Share
Queenstown Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Queenstown Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Feb 2024 at 09:22.

Thames Water logo

Between
17 and 23 Jun 2024
Details
View Map
Share
Penton Place

Thames Water are proposing to carry out Utility repair and maintenance works on Penton Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 13:10.

UK Power Networks Eastern & London logo

Between
17 Jun and 8 Jul 2024
Details
View Map
Share
Frankland Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Frankland Close, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 8 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2024 at 08:12.

UK Power Networks Eastern & London logo

Between
17 and 28 Jun 2024
Details
View Map
Share
Duke Street St James's

UK Power Networks Eastern & London are proposing to carry out New service connection on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2024 at 10:40.

City Of Westminster logo

Between
17 Jun and 12 Jul 2024
Details
View Map
Share
Charing Cross Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 28 Mar 2024 at 08:52.

Thames Water logo

Between
17 and 26 Jun 2024
Details
View Map
Share
Cannon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 08:37.

City Of Westminster logo

Between
17 and 19 Jun 2024
Details
View Map
Share
Brown Hart Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Brown Hart Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 Mar 2024 at 13:40.

Thames Water logo

Between
17 and 20 Jun 2024
Details
View Map
Share
Gate Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Gate Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 15:12.

City Of Westminster logo

LONG TERM
Between
17 Jun and 22 Nov 2024
Details
View Map
Share
Great Titchfield Street

City Of Westminster are proposing to carry out Highway improvement works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by City Of Westminster on 23 Mar 2024 at 13:59.

Murphy Power Distribution logo

LONG TERM
Between
17 Jun and 19 Jul 2024
Details
View Map
Share
East Road

Murphy Power Distribution are proposing to carry out Utility asset works on East Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 15 Mar 2024 at 14:38.

Murphy Power Distribution logo

LONG TERM
Between
17 Jun and 19 Jul 2024
Details
View Map
Share
Silbury Street

Murphy Power Distribution are proposing to carry out Utility asset works on Silbury Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 15 Mar 2024 at 14:45.

BT logo

Between
17 and 21 Jun 2024
Details
View Map
Share
Crogsland Road

BT are proposing to carry out Utility asset works on Crogsland Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Mar 2024 at 15:10.

Thames Water logo

Between
17 and 21 Jun 2024
Details
View Map
Share
Parolles Road

Thames Water are proposing to carry out New service connection on Parolles Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 10:01.

Thames Water logo

Between
17 and 19 Jun 2024
Details
View Map
Share
Cranley Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 08:38.

City Of Westminster logo

Between
18 Jun and 1 Jul 2024
Details
View Map
Share
Seymour Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 Mar 2024 at 11:15.

City Of Westminster logo

Between
18 and 20 Jun 2024
Details
View Map
Share
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Mar 2024 at 10:24.

Thames Water logo

LONG TERM
Between
18 Jun 2024 and 29 Sep 2025
Details
View Map
Share
Eade Road

Thames Water are proposing to carry out Utility asset works on Eade Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 07:27.

BT logo

Between
19 and 21 Jun 2024
Details
View Map
Share
Record Street

BT are proposing to carry out Utility asset works on Record Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Mar 2024 at 07:56.

City Of Westminster logo

Between
19 and 24 Jun 2024
Details
View Map
Share
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Mar 2024 at 13:26.

Virgin Media logo

Between
19 Jun and 3 Jul 2024
Details
View Map
Share
Berners Street

Virgin Media are proposing to carry out Utility asset works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Mar 2024 at 16:30.

Virgin Media logo

Between
19 Jun and 3 Jul 2024
Details
View Map
Share
Mortimer Street

Virgin Media are proposing to carry out Utility asset works on Mortimer Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Mar 2024 at 16:35.

UK Power Networks Eastern & London logo

Between
19 and 23 Jun 2024
Details
View Map
Share
Whiston Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2024 at 17:31.

Sky UK logo

Between
20 and 22 Jun 2024
Details
View Map
Share
London Wall

Sky UK are proposing to carry out Utility repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sky UK on 25 Mar 2024 at 14:28.

City Of London Corporation logo

Between
22 and 25 Jun 2024
Details
View Map
Share
Eastcheap

City Of London Corporation are proposing to carry out Highway improvement works on Eastcheap, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 25 Jan 2024 at 09:30.

Virgin Media logo

Between
23 Jun and 2 Jul 2024
Details
View Map
Share
Fitzjames Avenue

Virgin Media are proposing to carry out Utility asset works on Fitzjames Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 13 Mar 2024 at 15:03.

Virgin Media logo

Between
23 and 25 Jun 2024
Details
View Map
Share
Hamilton Place

Virgin Media are proposing to carry out Utility asset works on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 12 Mar 2024 at 10:50.

Virgin Media logo

Between
23 and 25 Jun 2024
Details
View Map
Share
Borough High Street

Virgin Media are proposing to carry out Utility asset works on Borough High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 19 Mar 2024 at 07:16.

City Of London Telecomms logo

Between
23 Jun and 14 Jul 2024
Details
View Map
Share
Park Street

City Of London Telecomms are proposing to carry out Utility asset works on Park Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 28 Mar 2024 at 15:07.

Virgin Media logo

Between
23 and 25 Jun 2024
Details
View Map
Share
Johnson Street

Virgin Media are proposing to carry out Utility asset works on Johnson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 15 Mar 2024 at 09:17.

Thames Water logo

Between
23 and 27 Jun 2024
Details
View Map
Share
Dean Street

Thames Water are proposing to carry out New service connection on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Mar 2024 at 13:15.

Thames Water logo

Between
23 and 27 Jun 2024
Details
View Map
Share
King's Mews

Thames Water are proposing to carry out New service connection on King's Mews, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 15:18.

Thames Water logo

Between
23 Jun and 4 Jul 2024
Details
View Map
Share
Lisson Grove

Thames Water are proposing to carry out New service connection on Lisson Grove, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Mar 2024 at 11:39.

London Borough Of Hackney logo

Between
23 Jun and 8 Jul 2024
Details
View Map
Share
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 25 Mar 2024 at 17:56.

Between
23 and 27 Jun 2024
Details
View Map
Share
Caledonian Road

London Borough Of Islington are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 28 Mar 2024 at 14:32.

London Borough Of Southwark logo

LONG TERM
Between
24 Jun and 12 Oct 2024
Details
View Map
Share
Knatchbull Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Knatchbull Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.

London Borough Of Southwark logo

LONG TERM
Between
24 Jun and 12 Oct 2024
Details
View Map
Share
Station Terrace

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Station Terrace, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.

London Borough Of Southwark logo

LONG TERM
Between
24 Jun and 12 Oct 2024
Details
View Map
Share
Camberwell Station Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.

London Borough Of Southwark logo

LONG TERM
Between
24 Jun and 12 Oct 2024
Details
View Map
Share
Camberwell New Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 16:28.

London Borough Of Southwark logo

LONG TERM
Between
24 Jun and 24 Jul 2024
Details
View Map
Share
Southampton Way

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southampton Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 11:39.

Thames Tideway Tunnel logo

LONG TERM
Between
24 Jun and 30 Sep 2024
Details
View Map
Share
Deptford Church Street

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 13 Mar 2024 at 16:21.

Thames Tideway Tunnel logo

LONG TERM
Between
24 Jun and 30 Sep 2024
Details
View Map
Share
Creek Road

Thames Tideway Tunnel are proposing to carry out roadworks on Creek Road, Deptford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 15 Mar 2024 at 06:58.

Transport for London (TfL) logo

Between
24 Jun and 22 Jul 2024
Details
View Map
Share
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Mar 2024 at 14:29.

Thames Water logo

Between
24 and 28 Jun 2024
Details
View Map
Share
Cannon Street Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 14:28.

UK Power Networks Eastern & London logo

Between
24 Jun and 5 Jul 2024
Details
View Map
Share
Morwell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 09:36.

Virgin Media logo

Between
24 and 26 Jun 2024
Details
View Map
Share
Holly Hill

Virgin Media are proposing to carry out Utility asset works on Holly Hill, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 19 Mar 2024 at 10:37.

London Borough Of Barnet logo

Between
24 Jun and 22 Jul 2024
Details
View Map
Share
West Heath Road

London Borough Of Barnet are proposing to carry out Highway improvement works on West Heath Road, Hampstead, London.

These works are categorised as Major.

The works will start on or after 24 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 16 Mar 2024 at 09:13.

City Of Westminster logo

Between
25 and 28 Jun 2024
Details
View Map
Share
Prince Albert Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Prince Albert Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Mar 2024 at 10:21.

Virgin Media logo

Between
26 Jun and 10 Jul 2024
Details
View Map
Share
Hans Place

Virgin Media are proposing to carry out Utility asset works on Hans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 Mar 2024 at 16:41.

Thames Water logo

Between
26 and 30 Jun 2024
Details
View Map
Share
Thackeray Street

Thames Water are proposing to carry out Utility repair and maintenance works on Thackeray Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 09:37.

BT logo

Between
26 and 28 Jun 2024
Details
View Map
Share
Mason's Arms Mews

BT are proposing to carry out New service connection on Mason's Arms Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Mar 2024 at 12:15.


Roadworks Map near to WC1N 3NX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 29 Mar 2024 12:13
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.

Roadworks Listing near to WC1N 3NX (137 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
URGENT
  
THEOBALD'S ROAD (0.1 miles), HOLBORN AND COVENT GARDEN
Virgin Media
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 28 Mar 2024 09:00
(Scheduled: 28 Mar 2024 - 3 Apr 2024)
0.1
Share
2
London Borough Of Camden logo
MAJOR
  
THEOBALD'S ROAD (0.1 miles), HOLBORN AND COVENT GARDEN
London Borough Of Camden
Highway improvement works - Carriageway - Lane closure
In Progress
Since: 18 Mar 2024 10:00
(Scheduled: 18 Mar 2024 - 14 Apr 2024)
0.1
Share
3
UK Power Networks Eastern & London logo
URGENT
  
RED LION SQUARE (0.1 miles), HOLBORN AND COVENT GARDEN
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 24 Mar 2024 - 2 Apr 2024)
0.1
Share
4
UK Power Networks Eastern & London logo
JOCKEY'S FIELDS (0.1 miles), HOLBORN AND COVENT GARDEN
UK Power Networks Eastern & London
Disconnection or alteration of supply - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 27 Mar 2024 08:29
(Scheduled: 27 Mar 2024 - 5 Apr 2024)
0.1
Share
5
London Borough Of Camden logo
MAJOR
  
THEOBALD'S ROAD (0.2 miles), HOLBORN AND COVENT GARDEN
London Borough Of Camden
Highway improvement works - Carriageway - Lane closure
In Progress
Since: 18 Mar 2024 10:00
(Scheduled: 18 Mar 2024 - 14 Apr 2024)
0.2
Share
6
London Borough Of Camden logo
MAJOR
  
GRAY'S INN ROAD (0.2 miles), KING'S CROSS
London Borough Of Camden
Highway improvement works - Carriageway - Lane closure
In Progress
Since: 18 Mar 2024 10:00
(Scheduled: 18 Mar 2024 - 14 Apr 2024)
0.2
Share
7
London Borough Of Camden logo
MAJOR
  
GUILFORD STREET (0.2 miles), HOLBORN AND COVENT GARDEN
London Borough Of Camden
Highway improvement works - Carriageway - Two-way signals
Complete
20 Feb 2024 10:00 - 28 Mar 2024 17:00
0.2
Share
8
London Borough Of Camden logo
MAJOR
  
ROSEBERY AVENUE (0.3 miles), HOLBORN AND COVENT GARDEN
London Borough Of Camden
Highway improvement works - Carriageway - Lane closure
In Progress
Since: 18 Mar 2024 10:00
(Scheduled: 18 Mar 2024 - 14 Apr 2024)
0.3
Share
9
London Borough Of Camden logo
URGENT
  
PHOENIX PLACE (0.3 miles), KING'S CROSS
London Borough Of Camden
Highway improvement works - Footway - Priority working
In Progress
Since: 11 Jan 2024 08:00
(Scheduled: 11 Jan 2024 - 30 Mar 2024)
0.3
Share
10
Cadent Gas logo
URGENT
  
HATTON GARDEN (0.3 miles), HOLBORN AND COVENT GARDEN
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 27 Mar 2024 13:00
(Scheduled: 27 Mar 2024 - 5 Apr 2024)
0.3